    POWER SITUATION

    April 2012

  • 8/2/2019 Power Summit 11 April 2012

    2/9

    Capacity MixLUZON VISAYAS MINDANA

    O

    BASELOAD

    POWERPLANTS:

    63.94%

    BASELOAD

    POWERPLANTS:

    71.88%

    BASELOAD

    POWERPLANTS:

    37.31%

    Note: Base-load Power Plants are the facilities used to meet some or all of a given continuous

    energy demand, and produce energy at a constant rate, usually at low cost relative toother facilities available to the system

    InstalledCapacity =

    11,869 MW

    InstalledCapacity =

    2,393 MW

    InstalledCapacity =

    1,971 MW

  • 8/2/2019 Power Summit 11 April 2012

    3/9

    Geothermal HydroCoal Oil-

    basedNatgasSource: DOR & DOH of NGCP

    Legend:2012 System PeakDemand

    2012 Max

    Peak =7,463 MW

    MinCapacity= 7,592

    MW

    MaxCapacity

    = 9,127MW

    2012 MinPeak =

    5847 MW

  • 8/2/2019 Power Summit 11 April 2012

    4/9

    Source: DOR & DOH of NGCP

    Legend:Geothermal

    Hydro

    Coal Oil-based

    2012 System PeakDemand

    2012 MaxPeak =

    1,423 MW

    2012 MinPeak =

    1,205 MW

    MinCapacity= 1,545

    MW

    MaxCapacity= 1,843

    MW

  • 8/2/2019 Power Summit 11 April 2012

    5/9

  • 8/2/2019 Power Summit 11 April 2012

    6/9

    Mindanao Power SituationStatus of Hydroelectric Power Plant

    Notes: Peak capacity refers to the capability of the power plant to operate continuously fo

    three hours. Off-peak capacity is the minimum stable plant loading.

    Peak Off-peak Agus 1 11 11 1

    Agus 1 111 11 1Agus 1 .1111 111 111

    Agus 1 11 11 1Agus 1 111 111 11

    Agus1 11 11 1

    Pulangi 111 111 1Total .1111 111 11

    Available Capacity (MW)Plant Name

    InstalledCapacity(MW)

  • 8/2/2019 Power Summit 11 April 2012

    7/9

    Mindanao Power SituationStatus of Thermal Power Plant

    Notes: Peak capacity refers to the capability of the power plant to operate continuously fo

    three hours. Off-peak capacity is the minimum stable plant loading.

    Peak Off-peak Mindanao Coal (STEAG) 111 111 111

    Mt. Apo Geo .111 1 11 1APTMI 1 .1111 11 1APTMI 1 .1111 11 1SPPC 11 11 1WMPC 111 11 1PB 111 11 11

    IDPP 111 1Total .1111 111 11

    Available Capacity (MW)Plant Name

    InstalledCapacity(MW)

  • 8/2/2019 Power Summit 11 April 2012

    8/9

    Power Supply-DemandSituationMarch 2012

    Notes: Source of data, NGCP Daily Operation Report * Actual System Peak Demand for the Month of March 2012 for Luzon-Visayas Grid * Projected System Peak Demand for the Month of March 2012 for Mindanao Grid

    Power Supply andDemand

    LUZON VISAYAS MINDANAO

    Available Capacity 9,127 1,843 1,280Peak Demand* 7,346 1,423 1,300

    Surplus/(Deficit) 1,781 420 (20)Required Reserve

    Margin

    1,588 257 150

    Peak Demand +Reserve Margin

    8,934 1,680 1,450

    Surplus/(Deficit) @Demand + ReserveMargin

    193 163 (170)

    Pulangi afterrepair

    100

    EmbeddedGeneration

    74

  • 8/2/2019 Power Summit 11 April 2012

    9/9

    POWER SITUATION

    April 2012

    END OF PRESENTATION