POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

72
1 POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

description

POWER GRID CORPORATION OF INDIA LIMITED BANGALORE. NATIONAL GRID AND IMPROVEMENTS IN SOUTHERN GRID. By K.SATYAM EXECUTIVE DIRECTOR POWERGRID. POWERGRID – An Overview. STARTED COMMERCIAL OPERATION IN 92-93 WHEELS MORE THAN 40% OF THE POWER GENERATED IN THE COUNTRY OPERATES & MAINTAINS - PowerPoint PPT Presentation

Transcript of POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

Page 1: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

1

POWER GRID CORPORATION OF INDIA LIMITEDBANGALORE

Page 2: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

2

NATIONAL GRID NATIONAL GRID ANDAND

IMPROVEMENTS IN IMPROVEMENTS IN SOUTHERN GRID.SOUTHERN GRID.

ByByK.SATYAMK.SATYAM

EXECUTIVE DIRECTOREXECUTIVE DIRECTORPOWERGRIDPOWERGRID

Page 3: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

3

POWERGRID – An Overview

STARTED COMMERCIAL OPERATION IN 92-93STARTED COMMERCIAL OPERATION IN 92-93

WHEELS MORE THAN 40% OF THE POWER GENERATED IN THE WHEELS MORE THAN 40% OF THE POWER GENERATED IN THE COUNTRY COUNTRY

OPERATES & MAINTAINSOPERATES & MAINTAINS

50,000 CKMS. OF EHV TR. SYSTEM 50,000 CKMS. OF EHV TR. SYSTEM

82 SUB-STATIONS 82 SUB-STATIONS

OVER 99% SYSTEM AVAILABILITY.OVER 99% SYSTEM AVAILABILITY.

CONSISTENTLY PROFIT MAKING SINCE INCEPTIONCONSISTENTLY PROFIT MAKING SINCE INCEPTION

PROFIT LAST YEAR WAS RS. 748 CRS.PROFIT LAST YEAR WAS RS. 748 CRS.

Page 4: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

4

INDIAN POWER SYSTEMINDIAN POWER SYSTEM

GROWTH IN INSTALLED CAPACITYGROWTH IN INSTALLED CAPACITY PRE-INDEPENDENCEPRE-INDEPENDENCE 1362 MW1362 MW YEAR 2004YEAR 2004 1,12,000 1,12,000

MWMW THERMALTHERMAL 79,000 MW79,000 MW NUCLEARNUCLEAR 2720 MW2720 MW HYDROHYDRO 30,000 MW30,000 MW

YEAR 2012 (PROJECTED)YEAR 2012 (PROJECTED) 2,10,000 2,10,000 MWMW

Page 5: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

5

Indian Power System: Indian Power System: BY 2012

PROJECTED INSTALLED CAPACITY - 210,000 MW

• CAPACITY ADDITION ENVISAGED BY MoP•THERMAL

IN 10TH PLAN (2006-07) - 40,000 MWIN 11TH PLAN (2011-12) - 60,000 MW

HYDRO IN 10TH AND 11TH PLAN - 50,000 MW(APPROX. 10000 MW CAPACITY ADDITION PER YEAR)

• MAJOR RESOURCES FOR CAPACITY ADDITIONHYDRO POTENTIAL IN J&K, HP & NER COAL POTENTIAL IN BIHAR, ORISSA

Page 6: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

6

POWERGRIDPOWERGRID Perspective Perspective PlanPlan……

ADDITION OF 60,000 CKM OF TRANSMISSION NETWORK TO ADDITION OF 60,000 CKM OF TRANSMISSION NETWORK TO EVACUATE 1,50,000 MW BY 2011-12EVACUATE 1,50,000 MW BY 2011-12 INVESTMENT OF RS. 71,000 CRORE INVESTMENT OF RS. 71,000 CRORE

CREATION OF NATIONAL GRID CREATION OF NATIONAL GRID ENHANCING INTER-REGIONAL TRANSFER CAPACITY TO ENHANCING INTER-REGIONAL TRANSFER CAPACITY TO 30,000 MW BY 201230,000 MW BY 2012

CONVERGENCECONVERGENCE DIVERSIFICATION INTO TELECOM DIVERSIFICATION INTO TELECOM

APDRP PROGRAMMEAPDRP PROGRAMME RURAL ELECTRIFICATIONRURAL ELECTRIFICATION SUB-TRANSMISSION AUGMENTATIONSUB-TRANSMISSION AUGMENTATION

Page 7: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

7

TOWARDS A TOWARDS A NATIONAL GRIDNATIONAL GRID

Page 8: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

8

SOUTHERN REGION

WESTERNREGION

EASTERN REGION

NORTHERN REGION

NORTH-EASTERN REGION

Page 9: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

9

SOUTHERN REGION

WESTERNREGION

EASTERN REGION

NORTHERN REGION

NORTH-EASTERN REGION

‘ELECTRICAL’

REGIONS1

2

3

SAME FREQUENCY FROM GUJARAT TO ARUNACHAL PRADESH WITH EFFECT FROM MARCH 2003

ABOUT 2800 KMS! APART

WITH COMMISSIONING OF TALA PROJECT INDIA WOULD HAVE ONLY TWO GRIDS!!!

SOUTHERN GRID AND NORTHERN GRID

Page 10: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

10

TOWARDS A NATIONAL TOWARDS A NATIONAL GRIDGRID

INVESTMENTS IN CENTRAL INVESTMENTS IN CENTRAL SECTOR TRANSMISSION SECTOR TRANSMISSION PROJECTS ENVISAGED FOR 10PROJECTS ENVISAGED FOR 10thth AND 11AND 11tHtH PLAN: PLAN: 71,000 CRORES71,000 CRORES

INTER REGIONAL TRANSFER INTER REGIONAL TRANSFER CAPACITY ENVISAGED BY 2012 : CAPACITY ENVISAGED BY 2012 : 30,000 MW30,000 MWOVER 12,000 MU OF POWER WAS TRANSMITTED

THROUGH CENTRAL SECTOR LINES LAST YEAR

THIS POWER IS WORTH 2400 CRORE RUPEES

Page 11: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

11

68 72 76 88 92 9680 84

S S

W W

NN

EE

NE

L

GEO POLITICAL

POWER REGIONS

B’DESH-

SRI

NEPALBHUTAN

INDIAINDIA

J&K

HP

PUNJAB

HARIANA

RAJASTHANUP

MP

BIHAR

ORISSA

WBGUJARAT

MAHARASHTRA

KARNATAKA

TAMIL

NADU

AP

ASSAM

MNP

MIZTRP

NG

ME

LAKSHADWEEP

A&N

MYANMAR

SKM

PONDICHERY

DELHI

GOA

DIU

DAMAN

NER NER

LANKA

JKND

CTGR

Page 12: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

12

A NATIONAL GRIDA NATIONAL GRIDTHE ADVANTAGESTHE ADVANTAGES

STRONG BACKBONE STRONG BACKBONE ‘‘ANYWHERE TO ANYWHEREANYWHERE TO ANYWHERE’ ’ ’ ’ TRADINGTRADING

ECONOMIC OPERATIONECONOMIC OPERATION HARNESS DIVERSITYHARNESS DIVERSITY

SAVING OF 13,000 MW BY YEAR 2012SAVING OF 13,000 MW BY YEAR 2012 ADDED STABILITYADDED STABILITY BOUNDARY-LESS OPERATIONBOUNDARY-LESS OPERATION HUB AND SPOKE ARRANGEMENTHUB AND SPOKE ARRANGEMENT GENERATORS HAVE READY EVACUATION GENERATORS HAVE READY EVACUATION

PATHPATH

THE NATIONAL GRID ENVISAGED BY THE NATIONAL GRID ENVISAGED BY POWERGRIDPOWERGRID IS A HYBRID NETWORK IS A HYBRID NETWORK

COMPRISING A 765 Kv COMPRISING A 765 Kv HUBHUB WITH 400 KV AC WITH 400 KV AC AND 500KV HVDC AND 500KV HVDC SPOKESSPOKES

Page 13: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

13

765 KV RING MAIN SYSTEM

THE POWER ‘HIGHWAY’

Page 14: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

14

THE POWER ‘HIGHWAY’

•CHEAP HYDRO POWER ENTERS THE ‘HIGHWAY’ FROM THE NORTH-EAST AND EXITS TO POWER STARVED REGIONS

•CHEAP PIT HEAD POWER ENTERS THE ‘HIGHWAY’ FROM THE EAST AND EXITS TO POWER STARVED REGIONS

•AN IPP/CPP CAN USE THE HIGHWAY TO TRANSFER /TRADE POWER

THE POSSIBILITIES ARE IMMENSE

Page 15: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

15

ENERGY RESOURCESENERGY RESOURCES COAL – RESERVES OF 202 BILLION TONNECOAL – RESERVES OF 202 BILLION TONNE

EASTERN REGION EASTERN REGION 69%69% WESTERN REGION WESTERN REGION 23%23% SOUTHERN REGION SOUTHERN REGION 6%6%

LIGNITE RESERVES - 24.4 BILLION TONNELIGNITE RESERVES - 24.4 BILLION TONNE SOUTHERN REGION SOUTHERN REGION 89%89% NORTHERN REGION NORTHERN REGION 6%6% WESTERN REGION WESTERN REGION 4%4%

HYDRO RESERVES – 84000 MW – HYDRO RESERVES – 84000 MW – 60% LOAD 60% LOAD FACTORFACTOR NORTHERN REGIONNORTHERN REGION 37.5%37.5% WESTERN REGIONWESTERN REGION 5.2%5.2% SOUTHERN REGIONSOUTHERN REGION 10.3%10.3% EASTERN REGIONEASTERN REGION 7.1%7.1% NORTH-EASTERN REGIONNORTH-EASTERN REGION 39.9% 39.9%

Page 16: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

16

Page 17: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

17

NATIONAL GRID PLANNATIONAL GRID PLAN

National Grid planned for execution in National Grid planned for execution in phases with an investment of Rs. 70,000 phases with an investment of Rs. 70,000 Crs by 2012.Crs by 2012.

8500 MW existing capacity8500 MW existing capacity 23000 MW planned by 200723000 MW planned by 2007 30,000 MW planned by 201230,000 MW planned by 2012

Page 18: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

18

Plan for National Grid- Plan for National Grid- Phase-1Phase-1

INTERCONNECTION OF REGIONAL GRIDS INTERCONNECTION OF REGIONAL GRIDS THROUGH HVDC BACK-TO-BACK LINKS THROUGH HVDC BACK-TO-BACK LINKS NORTH – WEST: 500MW VINDHYACHAL B2B NORTH – WEST: 500MW VINDHYACHAL B2B

LINK LINK WEST – SOUTH: 1000MW CHANDRAPUR B2B WEST – SOUTH: 1000MW CHANDRAPUR B2B

LINK LINK EAST – SOUTH: 500MW GAZUWAKA B2B LINK EAST – SOUTH: 500MW GAZUWAKA B2B LINK EAST – NORTH: 500MW SASARAM B2B LINK EAST – NORTH: 500MW SASARAM B2B LINK

PHASE-I COMPLETEDPHASE-I COMPLETED

Page 19: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

19

Plan for National Grid- Plan for National Grid- Phase-2Phase-2

PHASE-II (BY 2007):PHASE-II (BY 2007):• HIGH CAPACITY “HIGH CAPACITY “TRANSMISSION HIGHWAYSTRANSMISSION HIGHWAYS” ENVISAGED ” ENVISAGED

ALONG WITH MAJOR GENERATION PROJECTSALONG WITH MAJOR GENERATION PROJECTS• HYBRID HVAC AND HVDC INTERCONNECTIONHYBRID HVAC AND HVDC INTERCONNECTION

• INTER REGIONAL LINKS ALREADY CONSTRUCTEDINTER REGIONAL LINKS ALREADY CONSTRUCTED• KATHALGURI – MALDA 400KV D/C IN NERKATHALGURI – MALDA 400KV D/C IN NER• 2000 MW HVDC BIPOLE BETWEEN TALCHER-KOLAR BET. ER & SR2000 MW HVDC BIPOLE BETWEEN TALCHER-KOLAR BET. ER & SR• 400KV AC LINK BETWEEN ROURKELA AND RAIPUR BET. ER & WR400KV AC LINK BETWEEN ROURKELA AND RAIPUR BET. ER & WR

• IMPLEMENTATION ALREADY COMMENCEDIMPLEMENTATION ALREADY COMMENCED• HIGH CAPACITY 400 KV LINK FROM TALA TO DELHI BET. ER & NRHIGH CAPACITY 400 KV LINK FROM TALA TO DELHI BET. ER & NR 22NDND GAZUWAKA HVDC BACK-TO-BACK OF 500MW BET ER & SR GAZUWAKA HVDC BACK-TO-BACK OF 500MW BET ER & SR

• ABOUT 5000 CKT. KM OF 765 KV LINES PLANNED ALONGWITH ABOUT 5000 CKT. KM OF 765 KV LINES PLANNED ALONGWITH UPCOMING MEGA PROJECTS IN ERUPCOMING MEGA PROJECTS IN ER

• WITH THE COMPLETION OF PHASE-II, THE INTER-REGIONAL WITH THE COMPLETION OF PHASE-II, THE INTER-REGIONAL CAPACITY WOULD BE 23,000 MWCAPACITY WOULD BE 23,000 MW

Page 20: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

20

SYNCHRONOUS AC TIES 17800 MW

HVDC CONNECTIONS 5000 MW

NR

NER

WR ER

1055 MW

1000 MW4050 MW

3000 MW

1700 MW

ACDC

ACDC

AC

AC

DC

AC DC

AC

500 MW500 MW

1000 MW300 MW200 MW

SR

INTER-REGIONAL TRANSFER BY END OF 10th PLAN (2007)

MAJOR SYSTEM

Page 21: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

21

DEVELOPMENT OF NATIONAL GRID

NER

ER

NR

WR

SR

EXISTING

500MW

MW1000

MW500

GAZUWAKA

CHANDRAPUR

VINDHYACHAL

SASARAM

UNDERCONST.

EXISTING

400 kV

220 kV

BONGAIGAONBIRPARA

MALDA

KORBA BUDHIPADAR

KOLHAPUR

BELGAUM

U.SILERU

BALIMELA

DEHRISAHUPURI

MALANPUR

AURAIYA

PHASE-I(By 2002)

TALCHER

KOLAR

NATIONAL GRID

REGION WISE INTERCONNECTS

AS ON DATE

RAIPUR

ROURKELA

Page 22: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

22

Plan for National Grid- Plan for National Grid- Phase-3Phase-3

PHASE-III (BY 2012)PHASE-III (BY 2012) : :

RING OF 765KV LINES INTER-CONNECTING RING OF 765KV LINES INTER-CONNECTING

NORTHERN, WESTERN AND EASTERN REGIONSNORTHERN, WESTERN AND EASTERN REGIONS

ER INTER-CONNECTION WITH SR TO BE ER INTER-CONNECTION WITH SR TO BE

STRENGTHENED THROUGH HVDC LINES STRENGTHENED THROUGH HVDC LINES

(ASYNCHRONOUS LINK)(ASYNCHRONOUS LINK) COMPLETION OF PHASE-III WOULD LEAD TO COMPLETION OF PHASE-III WOULD LEAD TO

CUMULATIVE CAPACITY OF INTER-REGIONAL LINK CUMULATIVE CAPACITY OF INTER-REGIONAL LINK

TO 30,000 MWTO 30,000 MW

AGRA SIPAT

UNNAO SEONI

VARANASI BINA

BIHAR SHARIFF NAGDA

KARANPURA  AGRA

Page 23: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

23

INTER-REGIONAL TRANSFER BY END OF 11th PLAN (2012)

NR

NER

WR ER

13450 MW

1000 MW6450 MW

4600 MW

1300 MW3200 MW

SR

Page 24: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

24

Page 25: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

25

MERIT ORDER – IMPACT MERIT ORDER – IMPACT ON TRANSMISSION ON TRANSMISSION

PLANNINGPLANNING WITHIN THE REGIONWITHIN THE REGION

SKEWED DRAWAL PATTERNSKEWED DRAWAL PATTERN MERIT ORDER DISPATCHMERIT ORDER DISPATCH HYDRO CONSERVATIONHYDRO CONSERVATION

WITH OTHER REGIONSWITH OTHER REGIONS COSTLIEST GENERATORS ARE IN SRCOSTLIEST GENERATORS ARE IN SR ER HAS THE PITHEAD- CHEAP-ER HAS THE PITHEAD- CHEAP-

GENERATORSGENERATORSABOUT 3900 MU OF ER POWER WAS SENT TO SR ON TALCHER-KOLAR

LINE EVEN BEFORE TALCHER UNITS WERE SYNCHRONISED!!

Page 26: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

26

PROJECTS IN THE PROJECTS IN THE PIPELINE IN PIPELINE IN SOUTHERN SOUTHERN

REGIONREGION

Page 27: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

27

PROJECTS IN PROGRESS IN PROJECTS IN PROGRESS IN SOUTHERN REGIONSOUTHERN REGION

400 KV MADURAI-TRIVANDRUM LINE 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUMWITH 400 KV SS AT TRIVANDRUM

400 KV NELAMANGALA-MYSORE LINE 400 KV NELAMANGALA-MYSORE LINE WITH 400 KV SUBSTATION AT MYSOREWITH 400 KV SUBSTATION AT MYSORE

400 KV KAIGA-NARENDRA LINE ALONG 400 KV KAIGA-NARENDRA LINE ALONG WITH 400 KV SUB STATION AT NARENDRAWITH 400 KV SUB STATION AT NARENDRA

400 KV HYDERABAD-KURNOOL-GOOTY 400 KV HYDERABAD-KURNOOL-GOOTY LINELINE

400 KV 2400 KV 2ndnd GOOTY-BANGALORE LINE GOOTY-BANGALORE LINE 400 KV RAICHUR-GOOTY D/C QUAD LINE400 KV RAICHUR-GOOTY D/C QUAD LINE 400 KV RING MAIN AROUND BANGALORE400 KV RING MAIN AROUND BANGALORE 400 KV RING MAIN AROUND CHENNAI400 KV RING MAIN AROUND CHENNAI

Page 28: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

28

PROJECTS IN SOUTHERN PROJECTS IN SOUTHERN REGIONREGION

400 KV RAMAGUNDAM – HYDERABAD-GOOTY-400 KV RAMAGUNDAM – HYDERABAD-GOOTY-NELAMANGALA LINE: RS 390 CRORESNELAMANGALA LINE: RS 390 CRORES

ADDITIONAL 500 MW HVDC POLE AT GAZUWAKA: ADDITIONAL 500 MW HVDC POLE AT GAZUWAKA: WORTH Rs 770 CRORESWORTH Rs 770 CRORES

ENHANCEMENT OF CAPACITY OF TALCHER POLES ENHANCEMENT OF CAPACITY OF TALCHER POLES BY 500MW (FROM 2000 MW TO 2500 MW FOR BY 500MW (FROM 2000 MW TO 2500 MW FOR UTILISATION DURING EMERGENCY ONLY): Rs 90 UTILISATION DURING EMERGENCY ONLY): Rs 90 CRORESCRORES

SYSTEM AUGMENTATION SCHEMES : Rs 415 SYSTEM AUGMENTATION SCHEMES : Rs 415 CRORESCRORES

KOODANKULAM NUCLEAR PLANT EVACUATION KOODANKULAM NUCLEAR PLANT EVACUATION SCHEME – 2000 MW CAPACITY- WORTH ABOUT Rs SCHEME – 2000 MW CAPACITY- WORTH ABOUT Rs 1700 CRORES1700 CRORES

ANOTHER HVDC LINK TO SR FROM ER/WRANOTHER HVDC LINK TO SR FROM ER/WR SYSTEM EXPANSION SCHEMES WORTH Rs 1233 SYSTEM EXPANSION SCHEMES WORTH Rs 1233

CRORESCRORES

Page 29: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

29

NEW PROJECTS ON THE ANVILNEW PROJECTS ON THE ANVILKAIGA 3 & 4 TRANSMISSION SYSTEMKAIGA 3 & 4 TRANSMISSION SYSTEM

LINES : 413 KmsLINES : 413 Kms

MYSORE-KOZHIKODE D/C LINE MYSORE-KOZHIKODE D/C LINE

LILO OF KOLAR-SRIPERUMBADUR LILO OF KOLAR-SRIPERUMBADUR AT MELAKOTTAIYUR (40KM)AT MELAKOTTAIYUR (40KM)

NARENDRA-DAVANGERE D/C LINE NARENDRA-DAVANGERE D/C LINE

SUB-STATION : 2 Nos. NewSUB-STATION : 2 Nos. New

NEW 400/220KV SUBSTATION ATNEW 400/220KV SUBSTATION AT KOZHIKODE & MELAKOTTAIYURKOZHIKODE & MELAKOTTAIYUR

22NDND 315MVA TRANSFORMER 315MVA TRANSFORMER AT AT HIRIYUR S/S. HIRIYUR S/S. BAY EXTENSION AT NARENDRA, DAVANGERE (KPTCL) & BAY EXTENSION AT NARENDRA, DAVANGERE (KPTCL) &

HIRIYUR.HIRIYUR.

COST ESTIMATE : 512 CRORESCOST ESTIMATE : 512 CRORES

KERALA

Page 30: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

30

NEW PROJECTS ON THE ANVILNEW PROJECTS ON THE ANVIL

KUDANKULAM TRANSMISSION KUDANKULAM TRANSMISSION SYSTEM( 2000MW)SYSTEM( 2000MW)

LINES : 601+ 350 = 950 Km. ESTIMATED COST = 1710 CRORESLINES : 601+ 350 = 950 Km. ESTIMATED COST = 1710 CRORES

KUDANKULAM-TIRUNELVELI KUDANKULAM-TIRUNELVELI 2 X 400 KV D/C LINES WITH 2 X 400 KV D/C LINES WITH QUAD (108 & 83 Km.)QUAD (108 & 83 Km.)

TIRUNELVELI-UDUMALPET TIRUNELVELI-UDUMALPET D/C LINE WITH TWIN D/C LINE WITH TWIN MOOSE (300Km)MOOSE (300Km) LILO OF BOTH CIRCUITS OF LILO OF BOTH CIRCUITS OF MADURAI-TRIVANDRUM LINE MADURAI-TRIVANDRUM LINE AT TIRUNELVELI ( 2 X 55 Km)AT TIRUNELVELI ( 2 X 55 Km) EDAMON-EDAMON-MUVATTUPUZHA MUVATTUPUZHA D/C LINE QUAD (150Km)D/C LINE QUAD (150Km) TIRUNELVELI-EDAMON 400KV D/C LINE (110Km).TIRUNELVELI-EDAMON 400KV D/C LINE (110Km).

MUVATTUPUZHA-TRICHUR 400KV D/C LINE WITH MUVATTUPUZHA-TRICHUR 400KV D/C LINE WITH QUAD QUAD CONDUCTORS (90Km)CONDUCTORS (90Km)

T N

KARNATAKA

KERALA

Page 31: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

31

NEW PROJECTS ON THE ANVILNEW PROJECTS ON THE ANVIL

KUDANKULAM TRANSMISSION KUDANKULAM TRANSMISSION SYSTEM( 2000MW)SYSTEM( 2000MW)

SUB-STATIONSSUB-STATIONS

NEW 400/220KV SUBSTATIONS AT TIRUNELVELI, NEW 400/220KV SUBSTATIONS AT TIRUNELVELI, MUVATTUPUZHAMUVATTUPUZHA

AUGMENTATION OF TRANSFORMATION CAPACITY BY ONE AUGMENTATION OF TRANSFORMATION CAPACITY BY ONE TRANSFORMER EACH AT UDUMALPET & TRIVANDRUM S/STRANSFORMER EACH AT UDUMALPET & TRIVANDRUM S/S

SUPPLEMENTARY TRANSMISSION SYSTEMSUPPLEMENTARY TRANSMISSION SYSTEM LILO OF ONE CIRCUIT OF 400KV MADURAI-TRICHY LILO OF ONE CIRCUIT OF 400KV MADURAI-TRICHY AT KARAIKUDI ( 60 Km) ALONG WITH SUBSTATION ATAT KARAIKUDI ( 60 Km) ALONG WITH SUBSTATION AT KARAIKUDI (TAMILNADU)KARAIKUDI (TAMILNADU)

LILO OF ONE CIRCUIT OF TALAGUPPA-NELAMANGALA LILO OF ONE CIRCUIT OF TALAGUPPA-NELAMANGALA 400KV LINE AT HASSAN ( 80 KM) ALONG WITH SUBSTATION AT400KV LINE AT HASSAN ( 80 KM) ALONG WITH SUBSTATION AT HASSAN.(KARNATAKA)HASSAN.(KARNATAKA)

Page 32: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

32

NEW PROJECTS ON THE ANVILNEW PROJECTS ON THE ANVILNLC-TS-II EXPANSION TRANSMISSION SYSTEMNLC-TS-II EXPANSION TRANSMISSION SYSTEM

LINES : 467 Km.LINES : 467 Km.

2 NOS. 400KV S/C LINES FROM 2 NOS. 400KV S/C LINES FROM NEYVELI-TS-II (EXISTING) NEYVELI-TS-II (EXISTING) TO NLC TS-II (EXPAN) (8 KM).TO NLC TS-II (EXPAN) (8 KM). NEYVELI-PUGALUR D/C LINENEYVELI-PUGALUR D/C LINE

PUGALUR-MADURAI D/C LINEPUGALUR-MADURAI D/C LINE

UDUMALPET-ARASUR D/C LINEUDUMALPET-ARASUR D/C LINE

LILO OF NEYVELI-SRIPERUMBU-LILO OF NEYVELI-SRIPERUMBU- DUR LINE AT PONDY.DUR LINE AT PONDY.

SUB-STATIONSUB-STATION

NEW 400/220KV SUBSTATIONS AT PUGALUR, ARASUR & NEW 400/220KV SUBSTATIONS AT PUGALUR, ARASUR & PONDICHERRY.PONDICHERRY.

COST ESTIMATE : 721 CRORESCOST ESTIMATE : 721 CRORES

T N

KERALA

KARNATAKA

Page 33: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

33

GRID OPERATION GRID OPERATION IN THE IN THE

SOUTHERN SOUTHERN REGIONREGION

Page 34: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

34

THE SOUTHERN THE SOUTHERN REGION IN REGION IN

BRIEFBRIEF

Page 35: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

35

14886 (46%)

10579 (33%)830 (3%)

3975 (12%)

828 (2.6%)

1018 (3%)

HYDRO THERMAL GAS WIND IPP NUCLEAR

INSTALLED CAPACITY OF SOUTHERN REGION IN MW

31,316 MW

HYDRO

THERMAL

WIND

IPPNUCLEAR

GAS

MICRO AND CAPTIVE CAPACITIES ARE NOT INCLUDED IN THE INSTALLED CAPACITY

Page 36: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

36

SOUTHERN REGION:QUICK SOUTHERN REGION:QUICK FACTSFACTSINSTALLED CAPACITY:31,316 MW MAX

DEMAND MET:21,928 MW MAX CONSUMPTION: 457 MUKARNATAKA

MAX DEMAND MET

5445 MWINSTALLED CAPACITY

5802 MWDAILY CONSUMPTION AVG

84 MU

ANDHRAPRADESH

MAX DEMAND MET

7441 MW

9515 MWINSTALLED CAPACITY

DAILY CONSUMPTION AVG

130 MU

TAMILNADUMAX DEMAND MET

7228 MW

7037 MW

INSTALLED CAPACITY

DAILY CONSUMPTION AVG

126 MU

KERALAMAX DEMAND MET

2426 MW

2610 MWINSTALLED CAPACITY

DAILY CONSUMPTION AVG

34 MU

DAILY CONSUMPTION MAX

107 MU

DAILY CONSUMPTION MAX

166 MU

DAILY CONSUMPTION MAX

39 MUDAILY CONSUMPTION MAX

147 MU

Page 37: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

37

GENERATING UNITS AND GENERATING UNITS AND CAPACITYCAPACITY

UNIT CAPACITY AP KAR KER TN CGS TOTAL

THERMAL(500 MW) 2 6 8

THERMAL (200-250 MW)

10 7 13 15 45

GAS/THER(100-150 MW)

9 2 3 10 24

HYDRO(>50 MW) 27 27 16 15 85

TOTAL 48 36 19 38 162

Page 38: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

38

KHAMMAM

VIJAYAWADANAGARJUNASAGAR

VISAKHAPATNAM

(POWERGRID)HYDERABAD

RAICHUR

GOOTY

HOODY

SALEM

UDUMALPET

TRICHUR

MADURAI

TRICHY

MADRAS

NEYVELI

CUDDAPAHDAVANAGERE

KAIGA

115

317

RSTPP

BHADRAVATI

130x216

4x2

182

151

181

173

302

308172

277

279

155

178x

2

PONDICHERY

BANGALORE

SIRSI

MUNIRABAD

PP

P

P

P

P

P

P

P

P

P

PP

P

P

N

KOLAR

PALLOM

KAYANKULAM EDAMON

TALCHER

JEYPORE

63

187

2x78

2x221

54

HOSUR

KADRA

KODASAALY

Nagjhari

1

120

60

MAPS

P

SSLMM

MMDP

THIRUVANATHAPURAM

ALMATHI

NELLORE

400 KV LINE PRESENTLY

OPERATED AT 220 KV

NELAMANGALA

KURNOOL

GAZUWAKA(AP)

SIMHADRI NTPC

HIRIYUR

189

195

267x

2

258

242

175

179

127

130x

2

221x2

146x252x2

197x2

301x2

8x4

15x2

300

28

330

ABOUT 12000 CKM

400KV TRANSMISSION

TALGUPPA

3500 MW TRANSFER CAPABILITY ON HVDC.ANOTHER 500 MW POLE TO BE ADDED AT GZK. TALCHER POLE CAPABILITY TO BE ENHANCED TO 2500 MW

GRID MAPGRID MAP

TYPICAL FLOWS ARE FROM NORTH TO SOUTH

GRID FOCAL POINT SHIFTED TO KOLAR AFTER COMMISSIONING OF HVDC

QUANTUM CHANGES IN FLOW PATTERN LIKELY AFTER COMMISSIONING OF KOODANKULAM 2000 MW

Page 39: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

39

TRANSMISSION IN SOUTHERN TRANSMISSION IN SOUTHERN INDIAINDIA

VOLTAGE LEVEL AP KAR KER TN CGS TOTAL

400 KV 2042 1614     8462 12118

220/230 KV 10050 7590 2650 6270 366 26926

132/110 KV 12360 6060 3720 10220   32360

TOTAL 23710 15110 6370 16490 71404

ABOUT 2800 CKM OF 400 KV LINES ADDED IN THE PAST 2 YEARS

Page 40: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

40

LINK TO FOLDER

3D DEMAND, LOAD CURVES

HOURLY AVERAGE DEMAND ETC

Page 41: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

41

GRID OPERATION GRID OPERATION IN THE IN THE

SOUTHERN SOUTHERN REGIONREGION

Page 42: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

42

THE GRIDTHE GRID

INTERCONNECTED SYSTEMS WITH INTERCONNECTED SYSTEMS WITH THOUSANDS OF KILOMETERS OF THOUSANDS OF KILOMETERS OF LINES AND HUNDREDS OF LINES AND HUNDREDS OF GENERATORS OPERATING WITH SPLIT GENERATORS OPERATING WITH SPLIT SECOND SYNCHRONISM IS THE SECOND SYNCHRONISM IS THE GREATEST SCIENTIFIC ACHIEVEMENT GREATEST SCIENTIFIC ACHIEVEMENT OF THE MILLENIUMOF THE MILLENIUM

THE LARGEST SINGLE MACHINE EVER THE LARGEST SINGLE MACHINE EVER CREATEDCREATED

Page 43: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

43

INTERCONNECTED INTERCONNECTED SYSTEMSYSTEM

A quarter century ago, Dr. R. Buckminister A quarter century ago, Dr. R. Buckminister Fuller proposed interconnecting regional Power Fuller proposed interconnecting regional Power System into a single, continuous worldwide System into a single, continuous worldwide Electric Energy Grid as a number one solution Electric Energy Grid as a number one solution to solve many of the world's pressing problems. to solve many of the world's pressing problems. While he envisioned creating economical Power While he envisioned creating economical Power Systems, Fuller also saw power grid as the way Systems, Fuller also saw power grid as the way to reduce human suffering, preserve the to reduce human suffering, preserve the environment and make war obsolete. Expanding environment and make war obsolete. Expanding power grid has proved to be both economically power grid has proved to be both economically and environmentally desirable since the time and environmentally desirable since the time zone and seasonal diversity that exist between zone and seasonal diversity that exist between adjacent Power Systems can postpone or adjacent Power Systems can postpone or eliminate the necessity of building redundant eliminate the necessity of building redundant generation.generation.

Page 44: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

44

Page 45: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

45

GRID OPERATION:GRID OPERATION: A TIGHT ROPE WALK A TIGHT ROPE WALK

BLACK-OUTVOLTAGE

COLLAPSE IN-ECONOMIC

OPERATION

INSTABILITYPOWER

SWINGSINCREASED

LOSSES

Page 46: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

46

GRID OPERATION IN THE GRID OPERATION IN THE PAST PAST

LOW FREQUENCY PROBLEMSLOW FREQUENCY PROBLEMS FREQUENCY REMAINED AT 48 HZ AND BELOW FOR FREQUENCY REMAINED AT 48 HZ AND BELOW FOR

MOST PARTMOST PART LOW VOLTAGE OPERATIONLOW VOLTAGE OPERATION

VOLTAGE AT BANGALORE DIPPED TO AS LOW AS 300 VOLTAGE AT BANGALORE DIPPED TO AS LOW AS 300 Kv!!!!Kv!!!!

FREQUENT GRID DISTURBANCESFREQUENT GRID DISTURBANCES A DISTURBANCE ALMOST EVERY MONTHA DISTURBANCE ALMOST EVERY MONTH IMMENSE FINANCIAL LOSSES FOR INDUSTRYIMMENSE FINANCIAL LOSSES FOR INDUSTRY LOADS FREQUENTLY CUT OFF DUE TO RELAY LOADS FREQUENTLY CUT OFF DUE TO RELAY

OPERATIONOPERATION INCREASED ELECTRICAL LOSSESINCREASED ELECTRICAL LOSSES

INEFFICIENT OPERATION OF ELECTRIC EQUIPMENTSINEFFICIENT OPERATION OF ELECTRIC EQUIPMENTS GRID OPERATION FOCUSSED ON FIRE-GRID OPERATION FOCUSSED ON FIRE-

FIGHTING RATHER THAN OPTIMISATION AND FIGHTING RATHER THAN OPTIMISATION AND ECONOMYECONOMY

Page 47: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

47

LANDMARK EVENTSLANDMARK EVENTS

ADDITION OF GENERATING CAPACITYADDITION OF GENERATING CAPACITY TALCHER-KOLAR AND ASSOCIATED TALCHER-KOLAR AND ASSOCIATED

SYSTEMSYSTEM UNIFIED LOAD DESPATCH SCHEMEUNIFIED LOAD DESPATCH SCHEME TRANSMISSION SYSTEM TRANSMISSION SYSTEM

AUGMENTATIONAUGMENTATION AVAILABILITY BASED TARIFFAVAILABILITY BASED TARIFF

Page 48: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

48

IMPROVEMENTS IN GRID IMPROVEMENTS IN GRID OPERATIONOPERATION

POWER SYSTEM PARAMETERSPOWER SYSTEM PARAMETERS FREQUENCY IMPROVEDFREQUENCY IMPROVED VOLTAGES STABLE ACROSS THE GRIDVOLTAGES STABLE ACROSS THE GRID

OPTIMAL OPERATIONOPTIMAL OPERATION LOSSES REDUCED BY 1-1.5 % THROUGHOUT THE GRIDLOSSES REDUCED BY 1-1.5 % THROUGHOUT THE GRID SAVINGS OF ABOUT Rs 450 CRORES EVERY YEARSAVINGS OF ABOUT Rs 450 CRORES EVERY YEAR!! MERIT ORDER OPERATION :- OPTIMISATIONMERIT ORDER OPERATION :- OPTIMISATION

HYDRO CONSERVATIONHYDRO CONSERVATION HEALTHY RESERVOIR LEVELS HEALTHY RESERVOIR LEVELS USE HYDRO GENERATION FOR PEAKING AND RESERVEUSE HYDRO GENERATION FOR PEAKING AND RESERVE PUMP MODE OPERATION AT KADAMPARAIPUMP MODE OPERATION AT KADAMPARAI

TALCHER – KOLAR LINK TALCHER – KOLAR LINK INTER REGIONAL POWER :- INTER REGIONAL POWER :- 10530MUs/1600MW MAX10530MUs/1600MW MAX

UTILISATION OF COMMERCIAL MECHANISMUTILISATION OF COMMERCIAL MECHANISM TURNOVER OF 5143 MU ON UI WORTH MORE THAN 900 TURNOVER OF 5143 MU ON UI WORTH MORE THAN 900

CRORESCRORES COSTLY GENERATION REDUCED.COSTLY GENERATION REDUCED.

Page 49: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

49

WHAT THE GRID EXPECTS WHAT THE GRID EXPECTS FROM THE GENERATORFROM THE GENERATOR

PROVIDE PRIMARY RESPONSEPROVIDE PRIMARY RESPONSE PARTICIPATE IN REACTIVE POWERPARTICIPATE IN REACTIVE POWER MATCH RAMPS WITH GRID DEMANDMATCH RAMPS WITH GRID DEMAND FLEXIBILITYFLEXIBILITY BLACK START CAPABILITYBLACK START CAPABILITY GOOD CO-ORDINATIONGOOD CO-ORDINATION FLOW OF INFORMATIONFLOW OF INFORMATION ALL WHAT A SOCIETY EXPECTS FROM A ALL WHAT A SOCIETY EXPECTS FROM A

CIVILISED CITIZENCIVILISED CITIZEN

Page 50: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

50

WHAT THE GENERATOR WHAT THE GENERATOR EXPECTS FROM THE GRID EXPECTS FROM THE GRID STABLE FREQUENCYSTABLE FREQUENCY GOOD VOLTAGE PROFILEGOOD VOLTAGE PROFILE STRONG CONNECTIVITYSTRONG CONNECTIVITY ROBUST MARKETROBUST MARKET FLOW OF INFORMATIONFLOW OF INFORMATION ALL WHAT A CIVILISED CITIZEN ALL WHAT A CIVILISED CITIZEN

EXPECTS FROM A SOCIETYEXPECTS FROM A SOCIETY

Page 51: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

51

Page 52: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

52

47.50

48.00

48.50

49.00

49.50

50.00

50.50

51.00

25 26 27 28 29 30 31

DAYS ----->

FR

EQ

UE

NC

Y IN

HZ

---

->FREQUENCY PROFILEFREQUENCY PROFILE

2002, 2003 & 2004

Page 53: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

53

320

330

340

350

360

370

380

390

400

410

42000

:05

01:0

5

02:0

5

03:0

5

04:0

5

05:0

5

06:0

5

07:0

5

08:0

5

09:0

5

10:0

5

11:0

5

12:0

5

13:0

5

14:0

5

15:0

5

16:0

5

17:0

5

18:0

5

19:0

5

20:0

5

21:0

5

22:0

5

23:0

5

TIME IN HRS --->

VO

LT

AG

E IN

KV

---

>

REALITY BITE:

FARMERS IN KARNATAKA ARE HAPPY WITH FEWER HOURS OF QUALITY POWER!!.

EFFICIENCY OF PUMPS AT TG HALLI WATER WORKS IMPROVED!

COMPARISION OF BANGALORE VOLTAGE-TYPICAL DAY

BETTER VOLTAGE PROFILE MEANS LESS ELECTRICAL LOSSES

Page 54: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

54

WATER SUPPLY TO WATER SUPPLY TO BANGALOREBANGALORE

LOW VOLTAGE PROBLEMS AROUND BANGALORE HAMPERED WATER SUPPLY EARLIER

WITH BETTER VOLTAGE NOW, PUMPING EFFICIENCY HAS IMPROVED

400 KV STATION AT MYSORE BEING COMMISSIONED ON WAR FOOTING TO FURTHER FORTIFY THIS PART OF THE GRID

PUMPING LOSSES REDUCED

ENORMOUS SAVINGS TO THE STATE

MOTOR BURNING AND MAINTENANCE COSTS ALSO CAME DOWN DRASTICALLY

Page 55: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

55

600

300

150

Page 56: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

56

12000

13000

14000

15000

16000

17000

18000

19000

00:0

1

01:0

1

02:0

1

03:0

1

04:0

1

05:0

1

06:0

1

07:0

1

08:0

1

09:0

1

10:0

1

11:0

1

12:0

1

13:0

1

14:0

1

15:0

1

16:0

1

17:0

1

18:0

1

19:0

1

20:0

1

21:0

1

22:0

1

23:0

1

TIME --->

DE

MA

ND

IN M

W -

-->

49.00

49.20

49.40

49.60

49.80

50.00

50.20

50.40

FR

EQ

UE

NC

Y IN

HZ

---

>

DEMAND Vs FREQUENCY FOR 30-JULY-04DEMAND Vs FREQUENCY FOR 30-JULY-04

FREQ

DEMAND

Page 57: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

57

SR DEMAND Vs FREQUENCY FOR JULY-04

6000

8500

11000

13500

16000

18500

2100001

-Jul

-04

02-J

ul-0

4

03-J

ul-0

4

04-J

ul-0

4

05-J

ul-0

4

06-J

ul-0

4

07-J

ul-0

4

08-J

ul-0

4

09-J

ul-0

4

10-J

ul-0

4

11-J

ul-0

4

12-J

ul-0

4

13-J

ul-0

4

14-J

ul-0

4

15-J

ul-0

4

16-J

ul-0

4

17-J

ul-0

4

18-J

ul-0

4

19-J

ul-0

4

20-J

ul-0

4

21-J

ul-0

4

22-J

ul-0

4

23-J

ul-0

4

24-J

ul-0

4

25-J

ul-0

4

26-J

ul-0

4

27-J

ul-0

4

28-J

ul-0

4

29-J

ul-0

4

30-J

ul-0

4

31-J

ul-0

4

DAYS ---->

DE

MA

ND

IN M

W -

--->

49.20

49.60

50.00

50.40

50.80

51.20

51.60

FRE

QU

EN

CY

IN H

Z --

-->

SR DEMAND FREQUENCY

Page 58: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

58

SR DEMAND Vs FREQUENCY FOR OCT-03

1000

3000

5000

7000

9000

11000

13000

15000

17000

19000

2100001

-Oct

-03

02-O

ct-0

3

03-O

ct-0

3

04-O

ct-0

3

05-O

ct-0

3

06-O

ct-0

3

07-O

ct-0

3

08-O

ct-0

3

09-O

ct-0

3

10-O

ct-0

3

11-O

ct-0

3

12-O

ct-0

3

13-O

ct-0

3

14-O

ct-0

3

15-O

ct-0

3

16-O

ct-0

3

17-O

ct-0

3

18-O

ct-0

3

19-O

ct-0

3

20-O

ct-0

3

21-O

ct-0

3

22-O

ct-0

3

23-O

ct-0

3

24-O

ct-0

3

25-O

ct-0

3

26-O

ct-0

3

27-O

ct-0

3

28-O

ct-0

3

29-O

ct-0

3

30-O

ct-0

3

31-O

ct-0

3

DAYS ---->

DE

MA

ND

IN M

W -

--->

48.50

48.90

49.30

49.70

50.10

50.50

50.90

51.30

51.70

52.10

52.50

FRE

QU

EN

CY

IN H

Z --

-->

SR DEMAND FREQUENCY

Page 59: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

59

MERIT ORDER : UNITS BOXED UPMERIT ORDER : UNITS BOXED UPPOWER STATION STATE CAPACITY(MW) FUEL

VARIABLE COST

TATA DIESELKARNATAK

A 79 DIESEL 308

RAYALSEEMA DGPP

KARNATAKA 27 DIESEL 360

YELEHANKA DIESEL

KARNATAKA 128 DIESEL 314

THANRBHAVIKARNATAK

A 220 NAPTHA 325

SUB-TOTAL 454    

BRAHAMPURAM DPP KERALA 107 DIESEL 275

BSES KERALA 157 NAPTHA 308

KASARGODE PCL KERALA 22 NAPTHA 298

KAYAMKULAM KERALA 360 NAPTHA 322

SUB-TOTAL 646    

BASIN BRIDGETAMIL NADU 120 NAPTHA 584

P.P.NALLURTAMIL NADU 330 NAPTHA 415

SUB-TOTAL 450    

TOTAL 1550    

Page 60: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

60

OPTIMAL RESERVOIR OPTIMAL RESERVOIR UTILISATIONUTILISATION

LINGANAMAKKI IN KARNATAKALINGANAMAKKI IN KARNATAKA

ENERGY STORAGE IN MU (THIS YEAR) :- 2473MILLION UNITS

ENERGY STORAGE IN MU (LAST YEAR) :- 1689MILLION UNITS

MORE THAN 400 MILLION UNITS OF ENERGY SAVED DUE TO IMPROVED OPERATIONAL EFFICIENCY AND OPTIMISATION

THIS IS WORTH Rs 80 CRORES

Page 61: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

61

-250-200-150-100-50

050

100150200

00:0

001

:00

02:0

003

:00

04:0

005

:00

06:0

007

:00

08:0

009

:00

10:0

011

:00

12:0

013

:00

14:0

015

:00

16:0

017

:00

18:0

019

:00

20:0

021

:00

22:0

023

:00

00:0

0

TIME ---->

IN M

W --

-->

49.00

49.50

50.00

50.50

FREQ

UENC

Y IN

HZ

---->

Page 62: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

62

UI DETAILSUI DETAILS

Page 63: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

63

APAP KARKAR KERKER TNTN PONDYPONDY

Total UI Total UI exported(-) / exported(-) / Imported(+) Imported(+)

in MUsin MUs

-2889-2889 24352435 976976 958958 -25-25

Total amount Total amount paid in paid in

Crores Rs.Crores Rs.-533-533 428428 167167 227227 1.61.6

Average rate Average rate of UI in of UI in

paise/unitpaise/unit191191 176176 171171 237237 6666

SUMMARY OF UISUMMARY OF UI(FROM 01/JAN/03 TO 29/AUG/04)(FROM 01/JAN/03 TO 29/AUG/04)

Page 64: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

64

INTER REGIONAL UI IN SRINTER REGIONAL UI IN SR (FROM 01/01/03 TO 29/08/04) (FROM 01/01/03 TO 29/08/04)

TOTAL UI TURNOVER :- 5143 MUTOTAL UI TURNOVER :- 5143 MU TOTAL UI AMOUNT DISBURSED:- 980 CRTOTAL UI AMOUNT DISBURSED:- 980 CR INTER REGIONAL UI:- +1014 MU (-)191 INTER REGIONAL UI:- +1014 MU (-)191

MUMU AVG WEEKLY TRANSACTION:- 59 MUAVG WEEKLY TRANSACTION:- 59 MU AVG WEEKLY UI AMT DISBURSED:- 11 CRAVG WEEKLY UI AMT DISBURSED:- 11 CR AVG RATE OF UI WITH WR IN PS/UAVG RATE OF UI WITH WR IN PS/U

155 PS/U155 PS/U @SR @SR 250 PS/U250 PS/U @WR @WR

AVG RATE OF UI IMPORT FROM ER IN AVG RATE OF UI IMPORT FROM ER IN PS/UPS/U 144 PS/U 144 PS/U @ ER @ ER

Page 65: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

65

INTER-REGIONAL EXCHANGES A/C DETAILS TILL 29/08/04INTER-REGIONAL EXCHANGES A/C DETAILS TILL 29/08/04

1. SR IMPORTED 334 MU AND EXPORTED 181 MU TO WR.

2. AMOUNT ACCRUED IN SREB – IRE DUE TO DIFF. IN WR A/C = 38.2Crs

3. AMOUNT ACCRUED IN WREB – IRE DUE TO DIFF. IN SR A/C = 23.3Crs

4. AMOUNT DUE TO SR CONSTITUENTS ON 50:50 BASIS = 30.75Crs

5. 100 % DISBURSEMENT

Page 66: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

66

BANGALORE 400 KV RING BANGALORE 400 KV RING MAIN(INTERIM)MAIN(INTERIM)

400 KV RING MAIN

SOMANAHALLI

NELAMANGALA

KOLAR

HOODY

FROM GOOTY

Page 67: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

67

BANGALORE 400 KV RING BANGALORE 400 KV RING MAIN(FINAL)MAIN(FINAL)

400 KV RING MAIN

SOMANAHALLI

NELAMANGALA

KOLAR

HOODY

FROM GOOTY

Page 68: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

68MELKOTTAIYUR

SRIPERUMBUDUR

ALMATHI

TO KOLAR

TO NELLORE

CHENNAI RING MAINCHENNAI RING MAIN

TO CHITOOR

Page 69: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

69

SKEWED DRAWALAUG-04

STATE AVG DRAWAL

MAX DRAWALAUG 04 TILL NOW

ENTITLEMENT

WITH TAL WITH TAL

1500MW 2000MW

MIN DRAWALAUG 04 TILL NOW

AP 510 1460 1890 1284 1389 - 1070 - 1070

KAR 1100 1900 2130 1329 1432 -140 - 140

KER 500 830 1040 860 934 220 20

TN 1650 2380 2730 2164 2297 980 - 100

PONDY 185 225 235 240 257 140 10

APR-04

APR-04

APR-04 APR-04

MAR-04

FEB-04

AUG-04

OCT-03

DEC-03

AUG-04

Page 70: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

70

600

300

150

Page 71: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

71

MERIT ORDER : UNITS BOXED UP

POWER STATION STATE CAPACITY(MW) FUELVARIABLE

COST

TATA DIESELKARNATAK

A 79 DIESEL 308

RAYALSEEMA DGPP

KARNATAKA 27 DIESEL 360

YELEHANKA DIESEL

KARNATAKA 128 DIESEL 314

THANRBHAVIKARNATAK

A 220 NAPTHA 325

SUB-TOTAL 454    

BRAHAMPURAM DPP KERALA 107 DIESEL 275

BSES KERALA 157 NAPTHA 308

KASARGODE PCL KERALA 22 NAPTHA 298

KAYAMKULAM KERALA 360 NAPTHA 322

SUB-TOTAL 646    

BASIN BRIDGETAMIL NADU 120 NAPTHA 584

P.P.NALLURTAMIL NADU 330 NAPTHA 415

SUB-TOTAL 450    

TOTAL 1550    

Page 72: POWER GRID CORPORATION OF INDIA LIMITED BANGALORE

72

ER TO WR FLOW: TYPICAL DAYHARNESSING DIVERSITY

500

600

700

800

900

1000

1100

1200

1300

1400

1500

0:00

1:00

2:00

3:00

4:00

5:00

6:00

7:00

8:00

9:00

10:0

0

11:0

0

12:0

0

13:0

0

14:0

0

15:0

0

16:0

0

17:0

0

18:0

0

19:0

0

20:0

0

21:0

0

22:0

0

23:0

0

HOUR

MW