POWER GRID CORPORATION OF INDIA LIMITED BANGALORE
description
Transcript of POWER GRID CORPORATION OF INDIA LIMITED BANGALORE
1
POWER GRID CORPORATION OF INDIA LIMITEDBANGALORE
2
NATIONAL GRID NATIONAL GRID ANDAND
IMPROVEMENTS IN IMPROVEMENTS IN SOUTHERN GRID.SOUTHERN GRID.
ByByK.SATYAMK.SATYAM
EXECUTIVE DIRECTOREXECUTIVE DIRECTORPOWERGRIDPOWERGRID
3
POWERGRID – An Overview
STARTED COMMERCIAL OPERATION IN 92-93STARTED COMMERCIAL OPERATION IN 92-93
WHEELS MORE THAN 40% OF THE POWER GENERATED IN THE WHEELS MORE THAN 40% OF THE POWER GENERATED IN THE COUNTRY COUNTRY
OPERATES & MAINTAINSOPERATES & MAINTAINS
50,000 CKMS. OF EHV TR. SYSTEM 50,000 CKMS. OF EHV TR. SYSTEM
82 SUB-STATIONS 82 SUB-STATIONS
OVER 99% SYSTEM AVAILABILITY.OVER 99% SYSTEM AVAILABILITY.
CONSISTENTLY PROFIT MAKING SINCE INCEPTIONCONSISTENTLY PROFIT MAKING SINCE INCEPTION
PROFIT LAST YEAR WAS RS. 748 CRS.PROFIT LAST YEAR WAS RS. 748 CRS.
4
INDIAN POWER SYSTEMINDIAN POWER SYSTEM
GROWTH IN INSTALLED CAPACITYGROWTH IN INSTALLED CAPACITY PRE-INDEPENDENCEPRE-INDEPENDENCE 1362 MW1362 MW YEAR 2004YEAR 2004 1,12,000 1,12,000
MWMW THERMALTHERMAL 79,000 MW79,000 MW NUCLEARNUCLEAR 2720 MW2720 MW HYDROHYDRO 30,000 MW30,000 MW
YEAR 2012 (PROJECTED)YEAR 2012 (PROJECTED) 2,10,000 2,10,000 MWMW
5
Indian Power System: Indian Power System: BY 2012
PROJECTED INSTALLED CAPACITY - 210,000 MW
• CAPACITY ADDITION ENVISAGED BY MoP•THERMAL
IN 10TH PLAN (2006-07) - 40,000 MWIN 11TH PLAN (2011-12) - 60,000 MW
HYDRO IN 10TH AND 11TH PLAN - 50,000 MW(APPROX. 10000 MW CAPACITY ADDITION PER YEAR)
• MAJOR RESOURCES FOR CAPACITY ADDITIONHYDRO POTENTIAL IN J&K, HP & NER COAL POTENTIAL IN BIHAR, ORISSA
6
POWERGRIDPOWERGRID Perspective Perspective PlanPlan……
ADDITION OF 60,000 CKM OF TRANSMISSION NETWORK TO ADDITION OF 60,000 CKM OF TRANSMISSION NETWORK TO EVACUATE 1,50,000 MW BY 2011-12EVACUATE 1,50,000 MW BY 2011-12 INVESTMENT OF RS. 71,000 CRORE INVESTMENT OF RS. 71,000 CRORE
CREATION OF NATIONAL GRID CREATION OF NATIONAL GRID ENHANCING INTER-REGIONAL TRANSFER CAPACITY TO ENHANCING INTER-REGIONAL TRANSFER CAPACITY TO 30,000 MW BY 201230,000 MW BY 2012
CONVERGENCECONVERGENCE DIVERSIFICATION INTO TELECOM DIVERSIFICATION INTO TELECOM
APDRP PROGRAMMEAPDRP PROGRAMME RURAL ELECTRIFICATIONRURAL ELECTRIFICATION SUB-TRANSMISSION AUGMENTATIONSUB-TRANSMISSION AUGMENTATION
7
TOWARDS A TOWARDS A NATIONAL GRIDNATIONAL GRID
8
SOUTHERN REGION
WESTERNREGION
EASTERN REGION
NORTHERN REGION
NORTH-EASTERN REGION
9
SOUTHERN REGION
WESTERNREGION
EASTERN REGION
NORTHERN REGION
NORTH-EASTERN REGION
‘ELECTRICAL’
REGIONS1
2
3
SAME FREQUENCY FROM GUJARAT TO ARUNACHAL PRADESH WITH EFFECT FROM MARCH 2003
ABOUT 2800 KMS! APART
WITH COMMISSIONING OF TALA PROJECT INDIA WOULD HAVE ONLY TWO GRIDS!!!
SOUTHERN GRID AND NORTHERN GRID
10
TOWARDS A NATIONAL TOWARDS A NATIONAL GRIDGRID
INVESTMENTS IN CENTRAL INVESTMENTS IN CENTRAL SECTOR TRANSMISSION SECTOR TRANSMISSION PROJECTS ENVISAGED FOR 10PROJECTS ENVISAGED FOR 10thth AND 11AND 11tHtH PLAN: PLAN: 71,000 CRORES71,000 CRORES
INTER REGIONAL TRANSFER INTER REGIONAL TRANSFER CAPACITY ENVISAGED BY 2012 : CAPACITY ENVISAGED BY 2012 : 30,000 MW30,000 MWOVER 12,000 MU OF POWER WAS TRANSMITTED
THROUGH CENTRAL SECTOR LINES LAST YEAR
THIS POWER IS WORTH 2400 CRORE RUPEES
11
68 72 76 88 92 9680 84
S S
W W
NN
EE
NE
L
GEO POLITICAL
POWER REGIONS
B’DESH-
SRI
NEPALBHUTAN
INDIAINDIA
J&K
HP
PUNJAB
HARIANA
RAJASTHANUP
MP
BIHAR
ORISSA
WBGUJARAT
MAHARASHTRA
KARNATAKA
TAMIL
NADU
AP
ASSAM
MNP
MIZTRP
NG
ME
LAKSHADWEEP
A&N
MYANMAR
SKM
PONDICHERY
DELHI
GOA
DIU
DAMAN
NER NER
LANKA
JKND
CTGR
12
A NATIONAL GRIDA NATIONAL GRIDTHE ADVANTAGESTHE ADVANTAGES
STRONG BACKBONE STRONG BACKBONE ‘‘ANYWHERE TO ANYWHEREANYWHERE TO ANYWHERE’ ’ ’ ’ TRADINGTRADING
ECONOMIC OPERATIONECONOMIC OPERATION HARNESS DIVERSITYHARNESS DIVERSITY
SAVING OF 13,000 MW BY YEAR 2012SAVING OF 13,000 MW BY YEAR 2012 ADDED STABILITYADDED STABILITY BOUNDARY-LESS OPERATIONBOUNDARY-LESS OPERATION HUB AND SPOKE ARRANGEMENTHUB AND SPOKE ARRANGEMENT GENERATORS HAVE READY EVACUATION GENERATORS HAVE READY EVACUATION
PATHPATH
THE NATIONAL GRID ENVISAGED BY THE NATIONAL GRID ENVISAGED BY POWERGRIDPOWERGRID IS A HYBRID NETWORK IS A HYBRID NETWORK
COMPRISING A 765 Kv COMPRISING A 765 Kv HUBHUB WITH 400 KV AC WITH 400 KV AC AND 500KV HVDC AND 500KV HVDC SPOKESSPOKES
13
765 KV RING MAIN SYSTEM
THE POWER ‘HIGHWAY’
14
THE POWER ‘HIGHWAY’
•CHEAP HYDRO POWER ENTERS THE ‘HIGHWAY’ FROM THE NORTH-EAST AND EXITS TO POWER STARVED REGIONS
•CHEAP PIT HEAD POWER ENTERS THE ‘HIGHWAY’ FROM THE EAST AND EXITS TO POWER STARVED REGIONS
•AN IPP/CPP CAN USE THE HIGHWAY TO TRANSFER /TRADE POWER
THE POSSIBILITIES ARE IMMENSE
15
ENERGY RESOURCESENERGY RESOURCES COAL – RESERVES OF 202 BILLION TONNECOAL – RESERVES OF 202 BILLION TONNE
EASTERN REGION EASTERN REGION 69%69% WESTERN REGION WESTERN REGION 23%23% SOUTHERN REGION SOUTHERN REGION 6%6%
LIGNITE RESERVES - 24.4 BILLION TONNELIGNITE RESERVES - 24.4 BILLION TONNE SOUTHERN REGION SOUTHERN REGION 89%89% NORTHERN REGION NORTHERN REGION 6%6% WESTERN REGION WESTERN REGION 4%4%
HYDRO RESERVES – 84000 MW – HYDRO RESERVES – 84000 MW – 60% LOAD 60% LOAD FACTORFACTOR NORTHERN REGIONNORTHERN REGION 37.5%37.5% WESTERN REGIONWESTERN REGION 5.2%5.2% SOUTHERN REGIONSOUTHERN REGION 10.3%10.3% EASTERN REGIONEASTERN REGION 7.1%7.1% NORTH-EASTERN REGIONNORTH-EASTERN REGION 39.9% 39.9%
16
17
NATIONAL GRID PLANNATIONAL GRID PLAN
National Grid planned for execution in National Grid planned for execution in phases with an investment of Rs. 70,000 phases with an investment of Rs. 70,000 Crs by 2012.Crs by 2012.
8500 MW existing capacity8500 MW existing capacity 23000 MW planned by 200723000 MW planned by 2007 30,000 MW planned by 201230,000 MW planned by 2012
18
Plan for National Grid- Plan for National Grid- Phase-1Phase-1
INTERCONNECTION OF REGIONAL GRIDS INTERCONNECTION OF REGIONAL GRIDS THROUGH HVDC BACK-TO-BACK LINKS THROUGH HVDC BACK-TO-BACK LINKS NORTH – WEST: 500MW VINDHYACHAL B2B NORTH – WEST: 500MW VINDHYACHAL B2B
LINK LINK WEST – SOUTH: 1000MW CHANDRAPUR B2B WEST – SOUTH: 1000MW CHANDRAPUR B2B
LINK LINK EAST – SOUTH: 500MW GAZUWAKA B2B LINK EAST – SOUTH: 500MW GAZUWAKA B2B LINK EAST – NORTH: 500MW SASARAM B2B LINK EAST – NORTH: 500MW SASARAM B2B LINK
PHASE-I COMPLETEDPHASE-I COMPLETED
19
Plan for National Grid- Plan for National Grid- Phase-2Phase-2
PHASE-II (BY 2007):PHASE-II (BY 2007):• HIGH CAPACITY “HIGH CAPACITY “TRANSMISSION HIGHWAYSTRANSMISSION HIGHWAYS” ENVISAGED ” ENVISAGED
ALONG WITH MAJOR GENERATION PROJECTSALONG WITH MAJOR GENERATION PROJECTS• HYBRID HVAC AND HVDC INTERCONNECTIONHYBRID HVAC AND HVDC INTERCONNECTION
• INTER REGIONAL LINKS ALREADY CONSTRUCTEDINTER REGIONAL LINKS ALREADY CONSTRUCTED• KATHALGURI – MALDA 400KV D/C IN NERKATHALGURI – MALDA 400KV D/C IN NER• 2000 MW HVDC BIPOLE BETWEEN TALCHER-KOLAR BET. ER & SR2000 MW HVDC BIPOLE BETWEEN TALCHER-KOLAR BET. ER & SR• 400KV AC LINK BETWEEN ROURKELA AND RAIPUR BET. ER & WR400KV AC LINK BETWEEN ROURKELA AND RAIPUR BET. ER & WR
• IMPLEMENTATION ALREADY COMMENCEDIMPLEMENTATION ALREADY COMMENCED• HIGH CAPACITY 400 KV LINK FROM TALA TO DELHI BET. ER & NRHIGH CAPACITY 400 KV LINK FROM TALA TO DELHI BET. ER & NR 22NDND GAZUWAKA HVDC BACK-TO-BACK OF 500MW BET ER & SR GAZUWAKA HVDC BACK-TO-BACK OF 500MW BET ER & SR
• ABOUT 5000 CKT. KM OF 765 KV LINES PLANNED ALONGWITH ABOUT 5000 CKT. KM OF 765 KV LINES PLANNED ALONGWITH UPCOMING MEGA PROJECTS IN ERUPCOMING MEGA PROJECTS IN ER
• WITH THE COMPLETION OF PHASE-II, THE INTER-REGIONAL WITH THE COMPLETION OF PHASE-II, THE INTER-REGIONAL CAPACITY WOULD BE 23,000 MWCAPACITY WOULD BE 23,000 MW
20
SYNCHRONOUS AC TIES 17800 MW
HVDC CONNECTIONS 5000 MW
NR
NER
WR ER
1055 MW
1000 MW4050 MW
3000 MW
1700 MW
ACDC
ACDC
AC
AC
DC
AC DC
AC
500 MW500 MW
1000 MW300 MW200 MW
SR
INTER-REGIONAL TRANSFER BY END OF 10th PLAN (2007)
MAJOR SYSTEM
21
DEVELOPMENT OF NATIONAL GRID
NER
ER
NR
WR
SR
EXISTING
500MW
MW1000
MW500
GAZUWAKA
CHANDRAPUR
VINDHYACHAL
SASARAM
UNDERCONST.
EXISTING
400 kV
220 kV
BONGAIGAONBIRPARA
MALDA
KORBA BUDHIPADAR
KOLHAPUR
BELGAUM
U.SILERU
BALIMELA
DEHRISAHUPURI
MALANPUR
AURAIYA
PHASE-I(By 2002)
TALCHER
KOLAR
NATIONAL GRID
REGION WISE INTERCONNECTS
AS ON DATE
RAIPUR
ROURKELA
22
Plan for National Grid- Plan for National Grid- Phase-3Phase-3
PHASE-III (BY 2012)PHASE-III (BY 2012) : :
RING OF 765KV LINES INTER-CONNECTING RING OF 765KV LINES INTER-CONNECTING
NORTHERN, WESTERN AND EASTERN REGIONSNORTHERN, WESTERN AND EASTERN REGIONS
ER INTER-CONNECTION WITH SR TO BE ER INTER-CONNECTION WITH SR TO BE
STRENGTHENED THROUGH HVDC LINES STRENGTHENED THROUGH HVDC LINES
(ASYNCHRONOUS LINK)(ASYNCHRONOUS LINK) COMPLETION OF PHASE-III WOULD LEAD TO COMPLETION OF PHASE-III WOULD LEAD TO
CUMULATIVE CAPACITY OF INTER-REGIONAL LINK CUMULATIVE CAPACITY OF INTER-REGIONAL LINK
TO 30,000 MWTO 30,000 MW
AGRA SIPAT
UNNAO SEONI
VARANASI BINA
BIHAR SHARIFF NAGDA
KARANPURA AGRA
23
INTER-REGIONAL TRANSFER BY END OF 11th PLAN (2012)
NR
NER
WR ER
13450 MW
1000 MW6450 MW
4600 MW
1300 MW3200 MW
SR
24
25
MERIT ORDER – IMPACT MERIT ORDER – IMPACT ON TRANSMISSION ON TRANSMISSION
PLANNINGPLANNING WITHIN THE REGIONWITHIN THE REGION
SKEWED DRAWAL PATTERNSKEWED DRAWAL PATTERN MERIT ORDER DISPATCHMERIT ORDER DISPATCH HYDRO CONSERVATIONHYDRO CONSERVATION
WITH OTHER REGIONSWITH OTHER REGIONS COSTLIEST GENERATORS ARE IN SRCOSTLIEST GENERATORS ARE IN SR ER HAS THE PITHEAD- CHEAP-ER HAS THE PITHEAD- CHEAP-
GENERATORSGENERATORSABOUT 3900 MU OF ER POWER WAS SENT TO SR ON TALCHER-KOLAR
LINE EVEN BEFORE TALCHER UNITS WERE SYNCHRONISED!!
26
PROJECTS IN THE PROJECTS IN THE PIPELINE IN PIPELINE IN SOUTHERN SOUTHERN
REGIONREGION
27
PROJECTS IN PROGRESS IN PROJECTS IN PROGRESS IN SOUTHERN REGIONSOUTHERN REGION
400 KV MADURAI-TRIVANDRUM LINE 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUMWITH 400 KV SS AT TRIVANDRUM
400 KV NELAMANGALA-MYSORE LINE 400 KV NELAMANGALA-MYSORE LINE WITH 400 KV SUBSTATION AT MYSOREWITH 400 KV SUBSTATION AT MYSORE
400 KV KAIGA-NARENDRA LINE ALONG 400 KV KAIGA-NARENDRA LINE ALONG WITH 400 KV SUB STATION AT NARENDRAWITH 400 KV SUB STATION AT NARENDRA
400 KV HYDERABAD-KURNOOL-GOOTY 400 KV HYDERABAD-KURNOOL-GOOTY LINELINE
400 KV 2400 KV 2ndnd GOOTY-BANGALORE LINE GOOTY-BANGALORE LINE 400 KV RAICHUR-GOOTY D/C QUAD LINE400 KV RAICHUR-GOOTY D/C QUAD LINE 400 KV RING MAIN AROUND BANGALORE400 KV RING MAIN AROUND BANGALORE 400 KV RING MAIN AROUND CHENNAI400 KV RING MAIN AROUND CHENNAI
28
PROJECTS IN SOUTHERN PROJECTS IN SOUTHERN REGIONREGION
400 KV RAMAGUNDAM – HYDERABAD-GOOTY-400 KV RAMAGUNDAM – HYDERABAD-GOOTY-NELAMANGALA LINE: RS 390 CRORESNELAMANGALA LINE: RS 390 CRORES
ADDITIONAL 500 MW HVDC POLE AT GAZUWAKA: ADDITIONAL 500 MW HVDC POLE AT GAZUWAKA: WORTH Rs 770 CRORESWORTH Rs 770 CRORES
ENHANCEMENT OF CAPACITY OF TALCHER POLES ENHANCEMENT OF CAPACITY OF TALCHER POLES BY 500MW (FROM 2000 MW TO 2500 MW FOR BY 500MW (FROM 2000 MW TO 2500 MW FOR UTILISATION DURING EMERGENCY ONLY): Rs 90 UTILISATION DURING EMERGENCY ONLY): Rs 90 CRORESCRORES
SYSTEM AUGMENTATION SCHEMES : Rs 415 SYSTEM AUGMENTATION SCHEMES : Rs 415 CRORESCRORES
KOODANKULAM NUCLEAR PLANT EVACUATION KOODANKULAM NUCLEAR PLANT EVACUATION SCHEME – 2000 MW CAPACITY- WORTH ABOUT Rs SCHEME – 2000 MW CAPACITY- WORTH ABOUT Rs 1700 CRORES1700 CRORES
ANOTHER HVDC LINK TO SR FROM ER/WRANOTHER HVDC LINK TO SR FROM ER/WR SYSTEM EXPANSION SCHEMES WORTH Rs 1233 SYSTEM EXPANSION SCHEMES WORTH Rs 1233
CRORESCRORES
29
NEW PROJECTS ON THE ANVILNEW PROJECTS ON THE ANVILKAIGA 3 & 4 TRANSMISSION SYSTEMKAIGA 3 & 4 TRANSMISSION SYSTEM
LINES : 413 KmsLINES : 413 Kms
MYSORE-KOZHIKODE D/C LINE MYSORE-KOZHIKODE D/C LINE
LILO OF KOLAR-SRIPERUMBADUR LILO OF KOLAR-SRIPERUMBADUR AT MELAKOTTAIYUR (40KM)AT MELAKOTTAIYUR (40KM)
NARENDRA-DAVANGERE D/C LINE NARENDRA-DAVANGERE D/C LINE
SUB-STATION : 2 Nos. NewSUB-STATION : 2 Nos. New
NEW 400/220KV SUBSTATION ATNEW 400/220KV SUBSTATION AT KOZHIKODE & MELAKOTTAIYURKOZHIKODE & MELAKOTTAIYUR
22NDND 315MVA TRANSFORMER 315MVA TRANSFORMER AT AT HIRIYUR S/S. HIRIYUR S/S. BAY EXTENSION AT NARENDRA, DAVANGERE (KPTCL) & BAY EXTENSION AT NARENDRA, DAVANGERE (KPTCL) &
HIRIYUR.HIRIYUR.
COST ESTIMATE : 512 CRORESCOST ESTIMATE : 512 CRORES
KERALA
30
NEW PROJECTS ON THE ANVILNEW PROJECTS ON THE ANVIL
KUDANKULAM TRANSMISSION KUDANKULAM TRANSMISSION SYSTEM( 2000MW)SYSTEM( 2000MW)
LINES : 601+ 350 = 950 Km. ESTIMATED COST = 1710 CRORESLINES : 601+ 350 = 950 Km. ESTIMATED COST = 1710 CRORES
KUDANKULAM-TIRUNELVELI KUDANKULAM-TIRUNELVELI 2 X 400 KV D/C LINES WITH 2 X 400 KV D/C LINES WITH QUAD (108 & 83 Km.)QUAD (108 & 83 Km.)
TIRUNELVELI-UDUMALPET TIRUNELVELI-UDUMALPET D/C LINE WITH TWIN D/C LINE WITH TWIN MOOSE (300Km)MOOSE (300Km) LILO OF BOTH CIRCUITS OF LILO OF BOTH CIRCUITS OF MADURAI-TRIVANDRUM LINE MADURAI-TRIVANDRUM LINE AT TIRUNELVELI ( 2 X 55 Km)AT TIRUNELVELI ( 2 X 55 Km) EDAMON-EDAMON-MUVATTUPUZHA MUVATTUPUZHA D/C LINE QUAD (150Km)D/C LINE QUAD (150Km) TIRUNELVELI-EDAMON 400KV D/C LINE (110Km).TIRUNELVELI-EDAMON 400KV D/C LINE (110Km).
MUVATTUPUZHA-TRICHUR 400KV D/C LINE WITH MUVATTUPUZHA-TRICHUR 400KV D/C LINE WITH QUAD QUAD CONDUCTORS (90Km)CONDUCTORS (90Km)
T N
KARNATAKA
KERALA
31
NEW PROJECTS ON THE ANVILNEW PROJECTS ON THE ANVIL
KUDANKULAM TRANSMISSION KUDANKULAM TRANSMISSION SYSTEM( 2000MW)SYSTEM( 2000MW)
SUB-STATIONSSUB-STATIONS
NEW 400/220KV SUBSTATIONS AT TIRUNELVELI, NEW 400/220KV SUBSTATIONS AT TIRUNELVELI, MUVATTUPUZHAMUVATTUPUZHA
AUGMENTATION OF TRANSFORMATION CAPACITY BY ONE AUGMENTATION OF TRANSFORMATION CAPACITY BY ONE TRANSFORMER EACH AT UDUMALPET & TRIVANDRUM S/STRANSFORMER EACH AT UDUMALPET & TRIVANDRUM S/S
SUPPLEMENTARY TRANSMISSION SYSTEMSUPPLEMENTARY TRANSMISSION SYSTEM LILO OF ONE CIRCUIT OF 400KV MADURAI-TRICHY LILO OF ONE CIRCUIT OF 400KV MADURAI-TRICHY AT KARAIKUDI ( 60 Km) ALONG WITH SUBSTATION ATAT KARAIKUDI ( 60 Km) ALONG WITH SUBSTATION AT KARAIKUDI (TAMILNADU)KARAIKUDI (TAMILNADU)
LILO OF ONE CIRCUIT OF TALAGUPPA-NELAMANGALA LILO OF ONE CIRCUIT OF TALAGUPPA-NELAMANGALA 400KV LINE AT HASSAN ( 80 KM) ALONG WITH SUBSTATION AT400KV LINE AT HASSAN ( 80 KM) ALONG WITH SUBSTATION AT HASSAN.(KARNATAKA)HASSAN.(KARNATAKA)
32
NEW PROJECTS ON THE ANVILNEW PROJECTS ON THE ANVILNLC-TS-II EXPANSION TRANSMISSION SYSTEMNLC-TS-II EXPANSION TRANSMISSION SYSTEM
LINES : 467 Km.LINES : 467 Km.
2 NOS. 400KV S/C LINES FROM 2 NOS. 400KV S/C LINES FROM NEYVELI-TS-II (EXISTING) NEYVELI-TS-II (EXISTING) TO NLC TS-II (EXPAN) (8 KM).TO NLC TS-II (EXPAN) (8 KM). NEYVELI-PUGALUR D/C LINENEYVELI-PUGALUR D/C LINE
PUGALUR-MADURAI D/C LINEPUGALUR-MADURAI D/C LINE
UDUMALPET-ARASUR D/C LINEUDUMALPET-ARASUR D/C LINE
LILO OF NEYVELI-SRIPERUMBU-LILO OF NEYVELI-SRIPERUMBU- DUR LINE AT PONDY.DUR LINE AT PONDY.
SUB-STATIONSUB-STATION
NEW 400/220KV SUBSTATIONS AT PUGALUR, ARASUR & NEW 400/220KV SUBSTATIONS AT PUGALUR, ARASUR & PONDICHERRY.PONDICHERRY.
COST ESTIMATE : 721 CRORESCOST ESTIMATE : 721 CRORES
T N
KERALA
KARNATAKA
33
GRID OPERATION GRID OPERATION IN THE IN THE
SOUTHERN SOUTHERN REGIONREGION
34
THE SOUTHERN THE SOUTHERN REGION IN REGION IN
BRIEFBRIEF
35
14886 (46%)
10579 (33%)830 (3%)
3975 (12%)
828 (2.6%)
1018 (3%)
HYDRO THERMAL GAS WIND IPP NUCLEAR
INSTALLED CAPACITY OF SOUTHERN REGION IN MW
31,316 MW
HYDRO
THERMAL
WIND
IPPNUCLEAR
GAS
MICRO AND CAPTIVE CAPACITIES ARE NOT INCLUDED IN THE INSTALLED CAPACITY
36
SOUTHERN REGION:QUICK SOUTHERN REGION:QUICK FACTSFACTSINSTALLED CAPACITY:31,316 MW MAX
DEMAND MET:21,928 MW MAX CONSUMPTION: 457 MUKARNATAKA
MAX DEMAND MET
5445 MWINSTALLED CAPACITY
5802 MWDAILY CONSUMPTION AVG
84 MU
ANDHRAPRADESH
MAX DEMAND MET
7441 MW
9515 MWINSTALLED CAPACITY
DAILY CONSUMPTION AVG
130 MU
TAMILNADUMAX DEMAND MET
7228 MW
7037 MW
INSTALLED CAPACITY
DAILY CONSUMPTION AVG
126 MU
KERALAMAX DEMAND MET
2426 MW
2610 MWINSTALLED CAPACITY
DAILY CONSUMPTION AVG
34 MU
DAILY CONSUMPTION MAX
107 MU
DAILY CONSUMPTION MAX
166 MU
DAILY CONSUMPTION MAX
39 MUDAILY CONSUMPTION MAX
147 MU
37
GENERATING UNITS AND GENERATING UNITS AND CAPACITYCAPACITY
UNIT CAPACITY AP KAR KER TN CGS TOTAL
THERMAL(500 MW) 2 6 8
THERMAL (200-250 MW)
10 7 13 15 45
GAS/THER(100-150 MW)
9 2 3 10 24
HYDRO(>50 MW) 27 27 16 15 85
TOTAL 48 36 19 38 162
38
KHAMMAM
VIJAYAWADANAGARJUNASAGAR
VISAKHAPATNAM
(POWERGRID)HYDERABAD
RAICHUR
GOOTY
HOODY
SALEM
UDUMALPET
TRICHUR
MADURAI
TRICHY
MADRAS
NEYVELI
CUDDAPAHDAVANAGERE
KAIGA
115
317
RSTPP
BHADRAVATI
130x216
4x2
182
151
181
173
302
308172
277
279
155
178x
2
PONDICHERY
BANGALORE
SIRSI
MUNIRABAD
PP
P
P
P
P
P
P
P
P
P
PP
P
P
N
KOLAR
PALLOM
KAYANKULAM EDAMON
TALCHER
JEYPORE
63
187
2x78
2x221
54
HOSUR
KADRA
KODASAALY
Nagjhari
1
120
60
MAPS
P
SSLMM
MMDP
THIRUVANATHAPURAM
ALMATHI
NELLORE
400 KV LINE PRESENTLY
OPERATED AT 220 KV
NELAMANGALA
KURNOOL
GAZUWAKA(AP)
SIMHADRI NTPC
HIRIYUR
189
195
267x
2
258
242
175
179
127
130x
2
221x2
146x252x2
197x2
301x2
8x4
15x2
300
28
330
ABOUT 12000 CKM
400KV TRANSMISSION
TALGUPPA
3500 MW TRANSFER CAPABILITY ON HVDC.ANOTHER 500 MW POLE TO BE ADDED AT GZK. TALCHER POLE CAPABILITY TO BE ENHANCED TO 2500 MW
GRID MAPGRID MAP
TYPICAL FLOWS ARE FROM NORTH TO SOUTH
GRID FOCAL POINT SHIFTED TO KOLAR AFTER COMMISSIONING OF HVDC
QUANTUM CHANGES IN FLOW PATTERN LIKELY AFTER COMMISSIONING OF KOODANKULAM 2000 MW
39
TRANSMISSION IN SOUTHERN TRANSMISSION IN SOUTHERN INDIAINDIA
VOLTAGE LEVEL AP KAR KER TN CGS TOTAL
400 KV 2042 1614 8462 12118
220/230 KV 10050 7590 2650 6270 366 26926
132/110 KV 12360 6060 3720 10220 32360
TOTAL 23710 15110 6370 16490 71404
ABOUT 2800 CKM OF 400 KV LINES ADDED IN THE PAST 2 YEARS
40
LINK TO FOLDER
3D DEMAND, LOAD CURVES
HOURLY AVERAGE DEMAND ETC
41
GRID OPERATION GRID OPERATION IN THE IN THE
SOUTHERN SOUTHERN REGIONREGION
42
THE GRIDTHE GRID
INTERCONNECTED SYSTEMS WITH INTERCONNECTED SYSTEMS WITH THOUSANDS OF KILOMETERS OF THOUSANDS OF KILOMETERS OF LINES AND HUNDREDS OF LINES AND HUNDREDS OF GENERATORS OPERATING WITH SPLIT GENERATORS OPERATING WITH SPLIT SECOND SYNCHRONISM IS THE SECOND SYNCHRONISM IS THE GREATEST SCIENTIFIC ACHIEVEMENT GREATEST SCIENTIFIC ACHIEVEMENT OF THE MILLENIUMOF THE MILLENIUM
THE LARGEST SINGLE MACHINE EVER THE LARGEST SINGLE MACHINE EVER CREATEDCREATED
43
INTERCONNECTED INTERCONNECTED SYSTEMSYSTEM
A quarter century ago, Dr. R. Buckminister A quarter century ago, Dr. R. Buckminister Fuller proposed interconnecting regional Power Fuller proposed interconnecting regional Power System into a single, continuous worldwide System into a single, continuous worldwide Electric Energy Grid as a number one solution Electric Energy Grid as a number one solution to solve many of the world's pressing problems. to solve many of the world's pressing problems. While he envisioned creating economical Power While he envisioned creating economical Power Systems, Fuller also saw power grid as the way Systems, Fuller also saw power grid as the way to reduce human suffering, preserve the to reduce human suffering, preserve the environment and make war obsolete. Expanding environment and make war obsolete. Expanding power grid has proved to be both economically power grid has proved to be both economically and environmentally desirable since the time and environmentally desirable since the time zone and seasonal diversity that exist between zone and seasonal diversity that exist between adjacent Power Systems can postpone or adjacent Power Systems can postpone or eliminate the necessity of building redundant eliminate the necessity of building redundant generation.generation.
44
45
GRID OPERATION:GRID OPERATION: A TIGHT ROPE WALK A TIGHT ROPE WALK
BLACK-OUTVOLTAGE
COLLAPSE IN-ECONOMIC
OPERATION
INSTABILITYPOWER
SWINGSINCREASED
LOSSES
46
GRID OPERATION IN THE GRID OPERATION IN THE PAST PAST
LOW FREQUENCY PROBLEMSLOW FREQUENCY PROBLEMS FREQUENCY REMAINED AT 48 HZ AND BELOW FOR FREQUENCY REMAINED AT 48 HZ AND BELOW FOR
MOST PARTMOST PART LOW VOLTAGE OPERATIONLOW VOLTAGE OPERATION
VOLTAGE AT BANGALORE DIPPED TO AS LOW AS 300 VOLTAGE AT BANGALORE DIPPED TO AS LOW AS 300 Kv!!!!Kv!!!!
FREQUENT GRID DISTURBANCESFREQUENT GRID DISTURBANCES A DISTURBANCE ALMOST EVERY MONTHA DISTURBANCE ALMOST EVERY MONTH IMMENSE FINANCIAL LOSSES FOR INDUSTRYIMMENSE FINANCIAL LOSSES FOR INDUSTRY LOADS FREQUENTLY CUT OFF DUE TO RELAY LOADS FREQUENTLY CUT OFF DUE TO RELAY
OPERATIONOPERATION INCREASED ELECTRICAL LOSSESINCREASED ELECTRICAL LOSSES
INEFFICIENT OPERATION OF ELECTRIC EQUIPMENTSINEFFICIENT OPERATION OF ELECTRIC EQUIPMENTS GRID OPERATION FOCUSSED ON FIRE-GRID OPERATION FOCUSSED ON FIRE-
FIGHTING RATHER THAN OPTIMISATION AND FIGHTING RATHER THAN OPTIMISATION AND ECONOMYECONOMY
47
LANDMARK EVENTSLANDMARK EVENTS
ADDITION OF GENERATING CAPACITYADDITION OF GENERATING CAPACITY TALCHER-KOLAR AND ASSOCIATED TALCHER-KOLAR AND ASSOCIATED
SYSTEMSYSTEM UNIFIED LOAD DESPATCH SCHEMEUNIFIED LOAD DESPATCH SCHEME TRANSMISSION SYSTEM TRANSMISSION SYSTEM
AUGMENTATIONAUGMENTATION AVAILABILITY BASED TARIFFAVAILABILITY BASED TARIFF
48
IMPROVEMENTS IN GRID IMPROVEMENTS IN GRID OPERATIONOPERATION
POWER SYSTEM PARAMETERSPOWER SYSTEM PARAMETERS FREQUENCY IMPROVEDFREQUENCY IMPROVED VOLTAGES STABLE ACROSS THE GRIDVOLTAGES STABLE ACROSS THE GRID
OPTIMAL OPERATIONOPTIMAL OPERATION LOSSES REDUCED BY 1-1.5 % THROUGHOUT THE GRIDLOSSES REDUCED BY 1-1.5 % THROUGHOUT THE GRID SAVINGS OF ABOUT Rs 450 CRORES EVERY YEARSAVINGS OF ABOUT Rs 450 CRORES EVERY YEAR!! MERIT ORDER OPERATION :- OPTIMISATIONMERIT ORDER OPERATION :- OPTIMISATION
HYDRO CONSERVATIONHYDRO CONSERVATION HEALTHY RESERVOIR LEVELS HEALTHY RESERVOIR LEVELS USE HYDRO GENERATION FOR PEAKING AND RESERVEUSE HYDRO GENERATION FOR PEAKING AND RESERVE PUMP MODE OPERATION AT KADAMPARAIPUMP MODE OPERATION AT KADAMPARAI
TALCHER – KOLAR LINK TALCHER – KOLAR LINK INTER REGIONAL POWER :- INTER REGIONAL POWER :- 10530MUs/1600MW MAX10530MUs/1600MW MAX
UTILISATION OF COMMERCIAL MECHANISMUTILISATION OF COMMERCIAL MECHANISM TURNOVER OF 5143 MU ON UI WORTH MORE THAN 900 TURNOVER OF 5143 MU ON UI WORTH MORE THAN 900
CRORESCRORES COSTLY GENERATION REDUCED.COSTLY GENERATION REDUCED.
49
WHAT THE GRID EXPECTS WHAT THE GRID EXPECTS FROM THE GENERATORFROM THE GENERATOR
PROVIDE PRIMARY RESPONSEPROVIDE PRIMARY RESPONSE PARTICIPATE IN REACTIVE POWERPARTICIPATE IN REACTIVE POWER MATCH RAMPS WITH GRID DEMANDMATCH RAMPS WITH GRID DEMAND FLEXIBILITYFLEXIBILITY BLACK START CAPABILITYBLACK START CAPABILITY GOOD CO-ORDINATIONGOOD CO-ORDINATION FLOW OF INFORMATIONFLOW OF INFORMATION ALL WHAT A SOCIETY EXPECTS FROM A ALL WHAT A SOCIETY EXPECTS FROM A
CIVILISED CITIZENCIVILISED CITIZEN
50
WHAT THE GENERATOR WHAT THE GENERATOR EXPECTS FROM THE GRID EXPECTS FROM THE GRID STABLE FREQUENCYSTABLE FREQUENCY GOOD VOLTAGE PROFILEGOOD VOLTAGE PROFILE STRONG CONNECTIVITYSTRONG CONNECTIVITY ROBUST MARKETROBUST MARKET FLOW OF INFORMATIONFLOW OF INFORMATION ALL WHAT A CIVILISED CITIZEN ALL WHAT A CIVILISED CITIZEN
EXPECTS FROM A SOCIETYEXPECTS FROM A SOCIETY
51
52
47.50
48.00
48.50
49.00
49.50
50.00
50.50
51.00
25 26 27 28 29 30 31
DAYS ----->
FR
EQ
UE
NC
Y IN
HZ
---
->FREQUENCY PROFILEFREQUENCY PROFILE
2002, 2003 & 2004
53
320
330
340
350
360
370
380
390
400
410
42000
:05
01:0
5
02:0
5
03:0
5
04:0
5
05:0
5
06:0
5
07:0
5
08:0
5
09:0
5
10:0
5
11:0
5
12:0
5
13:0
5
14:0
5
15:0
5
16:0
5
17:0
5
18:0
5
19:0
5
20:0
5
21:0
5
22:0
5
23:0
5
TIME IN HRS --->
VO
LT
AG
E IN
KV
---
>
REALITY BITE:
FARMERS IN KARNATAKA ARE HAPPY WITH FEWER HOURS OF QUALITY POWER!!.
EFFICIENCY OF PUMPS AT TG HALLI WATER WORKS IMPROVED!
COMPARISION OF BANGALORE VOLTAGE-TYPICAL DAY
BETTER VOLTAGE PROFILE MEANS LESS ELECTRICAL LOSSES
54
WATER SUPPLY TO WATER SUPPLY TO BANGALOREBANGALORE
LOW VOLTAGE PROBLEMS AROUND BANGALORE HAMPERED WATER SUPPLY EARLIER
WITH BETTER VOLTAGE NOW, PUMPING EFFICIENCY HAS IMPROVED
400 KV STATION AT MYSORE BEING COMMISSIONED ON WAR FOOTING TO FURTHER FORTIFY THIS PART OF THE GRID
PUMPING LOSSES REDUCED
ENORMOUS SAVINGS TO THE STATE
MOTOR BURNING AND MAINTENANCE COSTS ALSO CAME DOWN DRASTICALLY
55
600
300
150
56
12000
13000
14000
15000
16000
17000
18000
19000
00:0
1
01:0
1
02:0
1
03:0
1
04:0
1
05:0
1
06:0
1
07:0
1
08:0
1
09:0
1
10:0
1
11:0
1
12:0
1
13:0
1
14:0
1
15:0
1
16:0
1
17:0
1
18:0
1
19:0
1
20:0
1
21:0
1
22:0
1
23:0
1
TIME --->
DE
MA
ND
IN M
W -
-->
49.00
49.20
49.40
49.60
49.80
50.00
50.20
50.40
FR
EQ
UE
NC
Y IN
HZ
---
>
DEMAND Vs FREQUENCY FOR 30-JULY-04DEMAND Vs FREQUENCY FOR 30-JULY-04
FREQ
DEMAND
57
SR DEMAND Vs FREQUENCY FOR JULY-04
6000
8500
11000
13500
16000
18500
2100001
-Jul
-04
02-J
ul-0
4
03-J
ul-0
4
04-J
ul-0
4
05-J
ul-0
4
06-J
ul-0
4
07-J
ul-0
4
08-J
ul-0
4
09-J
ul-0
4
10-J
ul-0
4
11-J
ul-0
4
12-J
ul-0
4
13-J
ul-0
4
14-J
ul-0
4
15-J
ul-0
4
16-J
ul-0
4
17-J
ul-0
4
18-J
ul-0
4
19-J
ul-0
4
20-J
ul-0
4
21-J
ul-0
4
22-J
ul-0
4
23-J
ul-0
4
24-J
ul-0
4
25-J
ul-0
4
26-J
ul-0
4
27-J
ul-0
4
28-J
ul-0
4
29-J
ul-0
4
30-J
ul-0
4
31-J
ul-0
4
DAYS ---->
DE
MA
ND
IN M
W -
--->
49.20
49.60
50.00
50.40
50.80
51.20
51.60
FRE
QU
EN
CY
IN H
Z --
-->
SR DEMAND FREQUENCY
58
SR DEMAND Vs FREQUENCY FOR OCT-03
1000
3000
5000
7000
9000
11000
13000
15000
17000
19000
2100001
-Oct
-03
02-O
ct-0
3
03-O
ct-0
3
04-O
ct-0
3
05-O
ct-0
3
06-O
ct-0
3
07-O
ct-0
3
08-O
ct-0
3
09-O
ct-0
3
10-O
ct-0
3
11-O
ct-0
3
12-O
ct-0
3
13-O
ct-0
3
14-O
ct-0
3
15-O
ct-0
3
16-O
ct-0
3
17-O
ct-0
3
18-O
ct-0
3
19-O
ct-0
3
20-O
ct-0
3
21-O
ct-0
3
22-O
ct-0
3
23-O
ct-0
3
24-O
ct-0
3
25-O
ct-0
3
26-O
ct-0
3
27-O
ct-0
3
28-O
ct-0
3
29-O
ct-0
3
30-O
ct-0
3
31-O
ct-0
3
DAYS ---->
DE
MA
ND
IN M
W -
--->
48.50
48.90
49.30
49.70
50.10
50.50
50.90
51.30
51.70
52.10
52.50
FRE
QU
EN
CY
IN H
Z --
-->
SR DEMAND FREQUENCY
59
MERIT ORDER : UNITS BOXED UPMERIT ORDER : UNITS BOXED UPPOWER STATION STATE CAPACITY(MW) FUEL
VARIABLE COST
TATA DIESELKARNATAK
A 79 DIESEL 308
RAYALSEEMA DGPP
KARNATAKA 27 DIESEL 360
YELEHANKA DIESEL
KARNATAKA 128 DIESEL 314
THANRBHAVIKARNATAK
A 220 NAPTHA 325
SUB-TOTAL 454
BRAHAMPURAM DPP KERALA 107 DIESEL 275
BSES KERALA 157 NAPTHA 308
KASARGODE PCL KERALA 22 NAPTHA 298
KAYAMKULAM KERALA 360 NAPTHA 322
SUB-TOTAL 646
BASIN BRIDGETAMIL NADU 120 NAPTHA 584
P.P.NALLURTAMIL NADU 330 NAPTHA 415
SUB-TOTAL 450
TOTAL 1550
60
OPTIMAL RESERVOIR OPTIMAL RESERVOIR UTILISATIONUTILISATION
LINGANAMAKKI IN KARNATAKALINGANAMAKKI IN KARNATAKA
ENERGY STORAGE IN MU (THIS YEAR) :- 2473MILLION UNITS
ENERGY STORAGE IN MU (LAST YEAR) :- 1689MILLION UNITS
MORE THAN 400 MILLION UNITS OF ENERGY SAVED DUE TO IMPROVED OPERATIONAL EFFICIENCY AND OPTIMISATION
THIS IS WORTH Rs 80 CRORES
61
-250-200-150-100-50
050
100150200
00:0
001
:00
02:0
003
:00
04:0
005
:00
06:0
007
:00
08:0
009
:00
10:0
011
:00
12:0
013
:00
14:0
015
:00
16:0
017
:00
18:0
019
:00
20:0
021
:00
22:0
023
:00
00:0
0
TIME ---->
IN M
W --
-->
49.00
49.50
50.00
50.50
FREQ
UENC
Y IN
HZ
---->
62
UI DETAILSUI DETAILS
63
APAP KARKAR KERKER TNTN PONDYPONDY
Total UI Total UI exported(-) / exported(-) / Imported(+) Imported(+)
in MUsin MUs
-2889-2889 24352435 976976 958958 -25-25
Total amount Total amount paid in paid in
Crores Rs.Crores Rs.-533-533 428428 167167 227227 1.61.6
Average rate Average rate of UI in of UI in
paise/unitpaise/unit191191 176176 171171 237237 6666
SUMMARY OF UISUMMARY OF UI(FROM 01/JAN/03 TO 29/AUG/04)(FROM 01/JAN/03 TO 29/AUG/04)
64
INTER REGIONAL UI IN SRINTER REGIONAL UI IN SR (FROM 01/01/03 TO 29/08/04) (FROM 01/01/03 TO 29/08/04)
TOTAL UI TURNOVER :- 5143 MUTOTAL UI TURNOVER :- 5143 MU TOTAL UI AMOUNT DISBURSED:- 980 CRTOTAL UI AMOUNT DISBURSED:- 980 CR INTER REGIONAL UI:- +1014 MU (-)191 INTER REGIONAL UI:- +1014 MU (-)191
MUMU AVG WEEKLY TRANSACTION:- 59 MUAVG WEEKLY TRANSACTION:- 59 MU AVG WEEKLY UI AMT DISBURSED:- 11 CRAVG WEEKLY UI AMT DISBURSED:- 11 CR AVG RATE OF UI WITH WR IN PS/UAVG RATE OF UI WITH WR IN PS/U
155 PS/U155 PS/U @SR @SR 250 PS/U250 PS/U @WR @WR
AVG RATE OF UI IMPORT FROM ER IN AVG RATE OF UI IMPORT FROM ER IN PS/UPS/U 144 PS/U 144 PS/U @ ER @ ER
65
INTER-REGIONAL EXCHANGES A/C DETAILS TILL 29/08/04INTER-REGIONAL EXCHANGES A/C DETAILS TILL 29/08/04
1. SR IMPORTED 334 MU AND EXPORTED 181 MU TO WR.
2. AMOUNT ACCRUED IN SREB – IRE DUE TO DIFF. IN WR A/C = 38.2Crs
3. AMOUNT ACCRUED IN WREB – IRE DUE TO DIFF. IN SR A/C = 23.3Crs
4. AMOUNT DUE TO SR CONSTITUENTS ON 50:50 BASIS = 30.75Crs
5. 100 % DISBURSEMENT
66
BANGALORE 400 KV RING BANGALORE 400 KV RING MAIN(INTERIM)MAIN(INTERIM)
400 KV RING MAIN
SOMANAHALLI
NELAMANGALA
KOLAR
HOODY
FROM GOOTY
67
BANGALORE 400 KV RING BANGALORE 400 KV RING MAIN(FINAL)MAIN(FINAL)
400 KV RING MAIN
SOMANAHALLI
NELAMANGALA
KOLAR
HOODY
FROM GOOTY
68MELKOTTAIYUR
SRIPERUMBUDUR
ALMATHI
TO KOLAR
TO NELLORE
CHENNAI RING MAINCHENNAI RING MAIN
TO CHITOOR
69
SKEWED DRAWALAUG-04
STATE AVG DRAWAL
MAX DRAWALAUG 04 TILL NOW
ENTITLEMENT
WITH TAL WITH TAL
1500MW 2000MW
MIN DRAWALAUG 04 TILL NOW
AP 510 1460 1890 1284 1389 - 1070 - 1070
KAR 1100 1900 2130 1329 1432 -140 - 140
KER 500 830 1040 860 934 220 20
TN 1650 2380 2730 2164 2297 980 - 100
PONDY 185 225 235 240 257 140 10
APR-04
APR-04
APR-04 APR-04
MAR-04
FEB-04
AUG-04
OCT-03
DEC-03
AUG-04
70
600
300
150
71
MERIT ORDER : UNITS BOXED UP
POWER STATION STATE CAPACITY(MW) FUELVARIABLE
COST
TATA DIESELKARNATAK
A 79 DIESEL 308
RAYALSEEMA DGPP
KARNATAKA 27 DIESEL 360
YELEHANKA DIESEL
KARNATAKA 128 DIESEL 314
THANRBHAVIKARNATAK
A 220 NAPTHA 325
SUB-TOTAL 454
BRAHAMPURAM DPP KERALA 107 DIESEL 275
BSES KERALA 157 NAPTHA 308
KASARGODE PCL KERALA 22 NAPTHA 298
KAYAMKULAM KERALA 360 NAPTHA 322
SUB-TOTAL 646
BASIN BRIDGETAMIL NADU 120 NAPTHA 584
P.P.NALLURTAMIL NADU 330 NAPTHA 415
SUB-TOTAL 450
TOTAL 1550
72
ER TO WR FLOW: TYPICAL DAYHARNESSING DIVERSITY
500
600
700
800
900
1000
1100
1200
1300
1400
1500
0:00
1:00
2:00
3:00
4:00
5:00
6:00
7:00
8:00
9:00
10:0
0
11:0
0
12:0
0
13:0
0
14:0
0
15:0
0
16:0
0
17:0
0
18:0
0
19:0
0
20:0
0
21:0
0
22:0
0
23:0
0
HOUR
MW