Power Cable Routing Guidelines · .x ±1,5 angular ± 1 º chg date: 12/18/09 rev by: f.byerly chg...

8
THE INFORMATION CONTAINED HEREIN IS CONFIDENTIAL AND PROPRIETARY TO THOMAS BUILT BUSES, INC. AND SHALL NOT BE COPIED, REPRODUCED, DISCLOSED, PUBLISHED, OR USED FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN PERMISSION OF THOMAS BUILT BUSES, INC. COPYRIGHT © THOMAS BUILT BUSES, INC. ALL RIGHTS RESERVED. CHECKED BY: UNIT OF MEASURE INCH SHEET 1 OF 8 WORD DRAWING 164942 THIRD ANGLE PROJECTION RELEASED TOLERANCE UNLESS OTHERWISE SPECIFIED REVISION DESCRIPTION REV A DECIMAL INCH .xxx ±.015 .xx ±.03 .x ±.06 CHECKED BY: S.JAVONOVICH DELIVERY MUST CONFORM EXACTLY WITH DRAWING SPECIFICATIONS AND, WHERE REQUIRED BY Q.A., WITH APPROVED Q.A. SAMPLES. ABSOLUTELY NO CHANGES ARE PERMITTED WITHOUT PRIOR APPROVAL BY THOMAS BUILT BUSES. THIS INCLUDES CHANGES TO: SOFTWARE, MATERIALS, INTERNAL COMPONENTS AND MANUFACTURING PROCESSES. METRIC [mm] .xxx ±0,5 .xx ±1,0 .x ±1,5 ANGULAR ± 1º CHG DATE: 12/18/09 REV BY: F.BYERLY CHG NO.: ECR_7174 SIZE A DRAWN BY: ENGR/DES: F.BYERLY 12/18/09 S.JAVONOVICH 12/18/09 F.BYERLY 12/18/09 THOMAS BUILT BUSES, INC. HIGH POINT, NC USA REFER TO ENGINEERING SPECIFICATION MASTER LIST DRAWING NUMBER 68152329 POWER CABLE ROUTING AND INSTALLATION, FORD MINOTOUR Power Cable Routing Guidelines: The main power cable which is attached to the starter and routed to the front firewall in the engine compartment is not to be routed through the small gap between the fender well stamping and the frame rail. The main power cable is to be routed below the frame rail and then straight upward toward the firewall mounted population stud. The power lift cable is to be routed in the same direction and paired with the main power cable under the frame rail. Additional cushion clamps, butterfly zip ties, and zip ties are to be used as shown in the following illustrations. Reference Routing Practice Guidelines - Battery Power And Ground Cable Routing And Installation for additional routing information.

Transcript of Power Cable Routing Guidelines · .x ±1,5 angular ± 1 º chg date: 12/18/09 rev by: f.byerly chg...

Page 1: Power Cable Routing Guidelines · .x ±1,5 angular ± 1 º chg date: 12/18/09 rev by: f.byerly chg no.: ecr_7174 size a drawn by: engr/des: f.byerly 12/18/09 s.javonovich 12/18/0

THE INFORMATION CONTAINED HEREIN IS CONFIDENTIAL AND PROPRIETARY TO THOMAS BUILT BUSES, INC. AND SHALL NOT BE COPIED, REPRODUCED, DISCLOSED, PUBLISHED, OR USED FOR ANY PURPOSE WITHOUT THE EXPRESS

WRITTEN PERMISSION OF THOMAS BUILT BUSES, INC. COPYRIGHT © THOMAS BUILT BUSES, INC. ALL RIGHTS RESERVED.

CHECKED BY:

UNIT OF MEASURE

INCH

SHEET 1 OF 8 WORD DRAWING 1 6 4 9 4 2

THIRD ANGLE PROJECTION

RELEASED

TOLERANCE UNLESS OTHERWISE SPECIFIED

REVISION DESCRIPTION

REV

A

DECIMAL INCH .xxx ±.015 .xx ±.03 .x ±.06

CHECKED BY: S.JAVONOVICH

DELIVERY MUST CONFORM EXACTLY WITH DRAWING SPECIFICATIONS AND, WHERE REQUIRED BY Q.A., WITH APPROVED Q.A.

SAMPLES. ABSOLUTELY NO CHANGES ARE PERMITTED WITHOUT PRIOR APPROVAL BY

THOMAS BUILT BUSES. THIS INCLUDES CHANGES TO: SOFTWARE, MATERIALS,

INTERNAL COMPONENTS AND MANUFACTURING PROCESSES.

METRIC [mm] .xxx ±0,5 .xx ±1,0 .x ±1,5

ANGULAR

± 1º

CHG DATE: 12/18/09

REV BY: F.BYERLY

CHG NO.: ECR_7174

SIZE

A

DRAWN BY:

ENGR/DES:

F.BYERLY 12/18/09 S.JAVONOVICH 12/18/09 F.BYERLY 12/18/09

THOMAS BUILT BUSES, INC. HIGH POINT, NC USA

REFER TO ENGINEERING SPECIFICATION MASTER LIST DRAWING NUMBER 68152329

POWER CABLE ROUTING AND INSTALLATION, FORD MINOTOUR

Power Cable Routing Guidelines:

• The main power cable which is attached to the starter and routed to the front firewall in the engine compartment is not to be routed through the small gap between the fender well stamping and the frame rail.

• The main power cable is to be routed below the frame rail and then straight upward toward the firewall mounted population stud.

• The power lift cable is to be routed in the same direction and paired with the main power cable under the frame rail.

• Additional cushion clamps, butterfly zip ties, and zip ties are to be used as shown in the following illustrations.

• Reference Routing Practice Guidelines - Battery Power And Ground Cable Routing And Installation for additional routing information.

Page 2: Power Cable Routing Guidelines · .x ±1,5 angular ± 1 º chg date: 12/18/09 rev by: f.byerly chg no.: ecr_7174 size a drawn by: engr/des: f.byerly 12/18/09 s.javonovich 12/18/0

THE INFORMATION CONTAINED HEREIN IS CONFIDENTIAL AND PROPRIETARY TO THOMAS BUILT BUSES, INC. AND SHALL NOT BE COPIED, REPRODUCED, DISCLOSED, PUBLISHED, OR USED FOR ANY PURPOSE WITHOUT THE EXPRESS

WRITTEN PERMISSION OF THOMAS BUILT BUSES, INC. COPYRIGHT © THOMAS BUILT BUSES, INC. ALL RIGHTS RESERVED.

CHECKED BY:

UNIT OF MEASURE

INCH

SHEET 2 OF 8 WORD DRAWING 1 6 4 9 4 2

THIRD ANGLE PROJECTION

RELEASED

TOLERANCE UNLESS OTHERWISE SPECIFIED

REVISION DESCRIPTION

REV

A

DECIMAL INCH .xxx ±.015 .xx ±.03 .x ±.06

CHECKED BY: S.JAVONOVICH

DELIVERY MUST CONFORM EXACTLY WITH DRAWING SPECIFICATIONS AND, WHERE REQUIRED BY Q.A., WITH APPROVED Q.A.

SAMPLES. ABSOLUTELY NO CHANGES ARE PERMITTED WITHOUT PRIOR APPROVAL BY

THOMAS BUILT BUSES. THIS INCLUDES CHANGES TO: SOFTWARE, MATERIALS,

INTERNAL COMPONENTS AND MANUFACTURING PROCESSES.

METRIC [mm] .xxx ±0,5 .xx ±1,0 .x ±1,5

ANGULAR

± 1º

CHG DATE: 12/18/09

REV BY: F.BYERLY

CHG NO.: ECR_7174

SIZE

A

DRAWN BY:

ENGR/DES:

F.BYERLY 12/18/09 S.JAVONOVICH 12/18/09 F.BYERLY 12/18/09

THOMAS BUILT BUSES, INC. HIGH POINT, NC USA

REFER TO ENGINEERING SPECIFICATION MASTER LIST DRAWING NUMBER 68152329

POWER CABLE ROUTING AND INSTALLATION, FORD MINOTOUR

Main starter power and lift cables are to be routed under the frame rail and secured with

butterfly zip ties and cushion clamp as shown. Cushion clamp is to be secured by the

engine ground strap fastener.

138698 – Cushion Clamp

Page 3: Power Cable Routing Guidelines · .x ±1,5 angular ± 1 º chg date: 12/18/09 rev by: f.byerly chg no.: ecr_7174 size a drawn by: engr/des: f.byerly 12/18/09 s.javonovich 12/18/0

THE INFORMATION CONTAINED HEREIN IS CONFIDENTIAL AND PROPRIETARY TO THOMAS BUILT BUSES, INC. AND SHALL NOT BE COPIED, REPRODUCED, DISCLOSED, PUBLISHED, OR USED FOR ANY PURPOSE WITHOUT THE EXPRESS

WRITTEN PERMISSION OF THOMAS BUILT BUSES, INC. COPYRIGHT © THOMAS BUILT BUSES, INC. ALL RIGHTS RESERVED.

CHECKED BY:

UNIT OF MEASURE

INCH

SHEET 3 OF 8 WORD DRAWING 1 6 4 9 4 2

THIRD ANGLE PROJECTION

RELEASED

TOLERANCE UNLESS OTHERWISE SPECIFIED

REVISION DESCRIPTION

REV

A

DECIMAL INCH .xxx ±.015 .xx ±.03 .x ±.06

CHECKED BY: S.JAVONOVICH

DELIVERY MUST CONFORM EXACTLY WITH DRAWING SPECIFICATIONS AND, WHERE REQUIRED BY Q.A., WITH APPROVED Q.A.

SAMPLES. ABSOLUTELY NO CHANGES ARE PERMITTED WITHOUT PRIOR APPROVAL BY

THOMAS BUILT BUSES. THIS INCLUDES CHANGES TO: SOFTWARE, MATERIALS,

INTERNAL COMPONENTS AND MANUFACTURING PROCESSES.

METRIC [mm] .xxx ±0,5 .xx ±1,0 .x ±1,5

ANGULAR

± 1º

CHG DATE: 12/18/09

REV BY: F.BYERLY

CHG NO.: ECR_7174

SIZE

A

DRAWN BY:

ENGR/DES:

F.BYERLY 12/18/09 S.JAVONOVICH 12/18/09 F.BYERLY 12/18/09

THOMAS BUILT BUSES, INC. HIGH POINT, NC USA

REFER TO ENGINEERING SPECIFICATION MASTER LIST DRAWING NUMBER 68152329

POWER CABLE ROUTING AND INSTALLATION, FORD MINOTOUR

Main starter power and lift cables are to be

routed upward and over front passenger strut.

Secure with butterfly bands and cushion clamp

as shown. Cushion clamp is to be secured to

fender well stamping with a self tapping screw.

61371394 – DUAL TIE WRAP HEAVY DUTY W/ SPACER

61480923 – Cushion Clamp

Page 4: Power Cable Routing Guidelines · .x ±1,5 angular ± 1 º chg date: 12/18/09 rev by: f.byerly chg no.: ecr_7174 size a drawn by: engr/des: f.byerly 12/18/09 s.javonovich 12/18/0

THE INFORMATION CONTAINED HEREIN IS CONFIDENTIAL AND PROPRIETARY TO THOMAS BUILT BUSES, INC. AND SHALL NOT BE COPIED, REPRODUCED, DISCLOSED, PUBLISHED, OR USED FOR ANY PURPOSE WITHOUT THE EXPRESS

WRITTEN PERMISSION OF THOMAS BUILT BUSES, INC. COPYRIGHT © THOMAS BUILT BUSES, INC. ALL RIGHTS RESERVED.

CHECKED BY:

UNIT OF MEASURE

INCH

SHEET 4 OF 8 WORD DRAWING 1 6 4 9 4 2

THIRD ANGLE PROJECTION

RELEASED

TOLERANCE UNLESS OTHERWISE SPECIFIED

REVISION DESCRIPTION

REV

A

DECIMAL INCH .xxx ±.015 .xx ±.03 .x ±.06

CHECKED BY: S.JAVONOVICH

DELIVERY MUST CONFORM EXACTLY WITH DRAWING SPECIFICATIONS AND, WHERE REQUIRED BY Q.A., WITH APPROVED Q.A.

SAMPLES. ABSOLUTELY NO CHANGES ARE PERMITTED WITHOUT PRIOR APPROVAL BY

THOMAS BUILT BUSES. THIS INCLUDES CHANGES TO: SOFTWARE, MATERIALS,

INTERNAL COMPONENTS AND MANUFACTURING PROCESSES.

METRIC [mm] .xxx ±0,5 .xx ±1,0 .x ±1,5

ANGULAR

± 1º

CHG DATE: 12/18/09

REV BY: F.BYERLY

CHG NO.: ECR_7174

SIZE

A

DRAWN BY:

ENGR/DES:

F.BYERLY 12/18/09 S.JAVONOVICH 12/18/09 F.BYERLY 12/18/09

THOMAS BUILT BUSES, INC. HIGH POINT, NC USA

REFER TO ENGINEERING SPECIFICATION MASTER LIST DRAWING NUMBER 68152329

POWER CABLE ROUTING AND INSTALLATION, FORD MINOTOUR

Starter cable

AC cable

Lift power

cable

138698 – Cushion Clamp

Tie Strap

Main starter power, lift cable and AC cable are to be routed along the fender well and secured

with cushion clamps as shown. Cushion clamps are secured to fender well stamping with a

self tapping screw.

Page 5: Power Cable Routing Guidelines · .x ±1,5 angular ± 1 º chg date: 12/18/09 rev by: f.byerly chg no.: ecr_7174 size a drawn by: engr/des: f.byerly 12/18/09 s.javonovich 12/18/0

THE INFORMATION CONTAINED HEREIN IS CONFIDENTIAL AND PROPRIETARY TO THOMAS BUILT BUSES, INC. AND SHALL NOT BE COPIED, REPRODUCED, DISCLOSED, PUBLISHED, OR USED FOR ANY PURPOSE WITHOUT THE EXPRESS

WRITTEN PERMISSION OF THOMAS BUILT BUSES, INC. COPYRIGHT © THOMAS BUILT BUSES, INC. ALL RIGHTS RESERVED.

CHECKED BY:

UNIT OF MEASURE

INCH

SHEET 5 OF 8 WORD DRAWING 1 6 4 9 4 2

THIRD ANGLE PROJECTION

RELEASED

TOLERANCE UNLESS OTHERWISE SPECIFIED

REVISION DESCRIPTION

REV

A

DECIMAL INCH .xxx ±.015 .xx ±.03 .x ±.06

CHECKED BY: S.JAVONOVICH

DELIVERY MUST CONFORM EXACTLY WITH DRAWING SPECIFICATIONS AND, WHERE REQUIRED BY Q.A., WITH APPROVED Q.A.

SAMPLES. ABSOLUTELY NO CHANGES ARE PERMITTED WITHOUT PRIOR APPROVAL BY

THOMAS BUILT BUSES. THIS INCLUDES CHANGES TO: SOFTWARE, MATERIALS,

INTERNAL COMPONENTS AND MANUFACTURING PROCESSES.

METRIC [mm] .xxx ±0,5 .xx ±1,0 .x ±1,5

ANGULAR

± 1º

CHG DATE: 12/18/09

REV BY: F.BYERLY

CHG NO.: ECR_7174

SIZE

A

DRAWN BY:

ENGR/DES:

F.BYERLY 12/18/09 S.JAVONOVICH 12/18/09 F.BYERLY 12/18/09

THOMAS BUILT BUSES, INC. HIGH POINT, NC USA

REFER TO ENGINEERING SPECIFICATION MASTER LIST DRAWING NUMBER 68152329

POWER CABLE ROUTING AND INSTALLATION, FORD MINOTOUR

Starter cable

AC cable

Lift power

cable

61371394 – DUAL TIE WRAP HEAVY DUTY W/ SPACER

Main starter power and lift cable routing come up from the frame rail and to the population

stud and circuit breaker. Cables are to be secured with butterfly bands and zip ties as shown.

Main starter cable must be secured 6 inches or less from stud to reduce the downward loading

on the population stud.

Page 6: Power Cable Routing Guidelines · .x ±1,5 angular ± 1 º chg date: 12/18/09 rev by: f.byerly chg no.: ecr_7174 size a drawn by: engr/des: f.byerly 12/18/09 s.javonovich 12/18/0

THE INFORMATION CONTAINED HEREIN IS CONFIDENTIAL AND PROPRIETARY TO THOMAS BUILT BUSES, INC. AND SHALL NOT BE COPIED, REPRODUCED, DISCLOSED, PUBLISHED, OR USED FOR ANY PURPOSE WITHOUT THE EXPRESS

WRITTEN PERMISSION OF THOMAS BUILT BUSES, INC. COPYRIGHT © THOMAS BUILT BUSES, INC. ALL RIGHTS RESERVED.

CHECKED BY:

UNIT OF MEASURE

INCH

SHEET 6 OF 8 WORD DRAWING 1 6 4 9 4 2

THIRD ANGLE PROJECTION

RELEASED

TOLERANCE UNLESS OTHERWISE SPECIFIED

REVISION DESCRIPTION

REV

A

DECIMAL INCH .xxx ±.015 .xx ±.03 .x ±.06

CHECKED BY: S.JAVONOVICH

DELIVERY MUST CONFORM EXACTLY WITH DRAWING SPECIFICATIONS AND, WHERE REQUIRED BY Q.A., WITH APPROVED Q.A.

SAMPLES. ABSOLUTELY NO CHANGES ARE PERMITTED WITHOUT PRIOR APPROVAL BY

THOMAS BUILT BUSES. THIS INCLUDES CHANGES TO: SOFTWARE, MATERIALS,

INTERNAL COMPONENTS AND MANUFACTURING PROCESSES.

METRIC [mm] .xxx ±0,5 .xx ±1,0 .x ±1,5

ANGULAR

± 1º

CHG DATE: 12/18/09

REV BY: F.BYERLY

CHG NO.: ECR_7174

SIZE

A

DRAWN BY:

ENGR/DES:

F.BYERLY 12/18/09 S.JAVONOVICH 12/18/09 F.BYERLY 12/18/09

THOMAS BUILT BUSES, INC. HIGH POINT, NC USA

REFER TO ENGINEERING SPECIFICATION MASTER LIST DRAWING NUMBER 68152329

POWER CABLE ROUTING AND INSTALLATION, FORD MINOTOUR

View of the main starter cable and

AC power cable. The AC power

cable is to be secured using a

swivel clamp 61480908 as shown.

Page 7: Power Cable Routing Guidelines · .x ±1,5 angular ± 1 º chg date: 12/18/09 rev by: f.byerly chg no.: ecr_7174 size a drawn by: engr/des: f.byerly 12/18/09 s.javonovich 12/18/0

THE INFORMATION CONTAINED HEREIN IS CONFIDENTIAL AND PROPRIETARY TO THOMAS BUILT BUSES, INC. AND SHALL NOT BE COPIED, REPRODUCED, DISCLOSED, PUBLISHED, OR USED FOR ANY PURPOSE WITHOUT THE EXPRESS

WRITTEN PERMISSION OF THOMAS BUILT BUSES, INC. COPYRIGHT © THOMAS BUILT BUSES, INC. ALL RIGHTS RESERVED.

CHECKED BY:

UNIT OF MEASURE

INCH

SHEET 7 OF 8 WORD DRAWING 1 6 4 9 4 2

THIRD ANGLE PROJECTION

RELEASED

TOLERANCE UNLESS OTHERWISE SPECIFIED

REVISION DESCRIPTION

REV

A

DECIMAL INCH .xxx ±.015 .xx ±.03 .x ±.06

CHECKED BY: S.JAVONOVICH

DELIVERY MUST CONFORM EXACTLY WITH DRAWING SPECIFICATIONS AND, WHERE REQUIRED BY Q.A., WITH APPROVED Q.A.

SAMPLES. ABSOLUTELY NO CHANGES ARE PERMITTED WITHOUT PRIOR APPROVAL BY

THOMAS BUILT BUSES. THIS INCLUDES CHANGES TO: SOFTWARE, MATERIALS,

INTERNAL COMPONENTS AND MANUFACTURING PROCESSES.

METRIC [mm] .xxx ±0,5 .xx ±1,0 .x ±1,5

ANGULAR

± 1º

CHG DATE: 12/18/09

REV BY: F.BYERLY

CHG NO.: ECR_7174

SIZE

A

DRAWN BY:

ENGR/DES:

F.BYERLY 12/18/09 S.JAVONOVICH 12/18/09 F.BYERLY 12/18/09

THOMAS BUILT BUSES, INC. HIGH POINT, NC USA

REFER TO ENGINEERING SPECIFICATION MASTER LIST DRAWING NUMBER 68152329

POWER CABLE ROUTING AND INSTALLATION, FORD MINOTOUR

AC power, Lift power and main body cables are to be secured with butterfly bands as shown.

61371394 – DUAL TIE WRAP HEAVY DUTY W/ SPACER

Page 8: Power Cable Routing Guidelines · .x ±1,5 angular ± 1 º chg date: 12/18/09 rev by: f.byerly chg no.: ecr_7174 size a drawn by: engr/des: f.byerly 12/18/09 s.javonovich 12/18/0

THE INFORMATION CONTAINED HEREIN IS CONFIDENTIAL AND PROPRIETARY TO THOMAS BUILT BUSES, INC. AND SHALL NOT BE COPIED, REPRODUCED, DISCLOSED, PUBLISHED, OR USED FOR ANY PURPOSE WITHOUT THE EXPRESS

WRITTEN PERMISSION OF THOMAS BUILT BUSES, INC. COPYRIGHT © THOMAS BUILT BUSES, INC. ALL RIGHTS RESERVED.

CHECKED BY:

UNIT OF MEASURE

INCH

SHEET 8 OF 8 WORD DRAWING 1 6 4 9 4 2

THIRD ANGLE PROJECTION

RELEASED

TOLERANCE UNLESS OTHERWISE SPECIFIED

REVISION DESCRIPTION

REV

A

DECIMAL INCH .xxx ±.015 .xx ±.03 .x ±.06

CHECKED BY: S.JAVONOVICH

DELIVERY MUST CONFORM EXACTLY WITH DRAWING SPECIFICATIONS AND, WHERE REQUIRED BY Q.A., WITH APPROVED Q.A.

SAMPLES. ABSOLUTELY NO CHANGES ARE PERMITTED WITHOUT PRIOR APPROVAL BY

THOMAS BUILT BUSES. THIS INCLUDES CHANGES TO: SOFTWARE, MATERIALS,

INTERNAL COMPONENTS AND MANUFACTURING PROCESSES.

METRIC [mm] .xxx ±0,5 .xx ±1,0 .x ±1,5

ANGULAR

± 1º

CHG DATE: 12/18/09

REV BY: F.BYERLY

CHG NO.: ECR_7174

SIZE

A

DRAWN BY:

ENGR/DES:

F.BYERLY 12/18/09 S.JAVONOVICH 12/18/09 F.BYERLY 12/18/09

THOMAS BUILT BUSES, INC. HIGH POINT, NC USA

REFER TO ENGINEERING SPECIFICATION MASTER LIST DRAWING NUMBER 68152329

POWER CABLE ROUTING AND INSTALLATION, FORD MINOTOUR

Overall view of power cable routing in engine compartment.