Potted History of BIM from an MEP Perspective
-
Upload
be2camp-admin -
Category
Business
-
view
1.123 -
download
1
description
Transcript of Potted History of BIM from an MEP Perspective
![Page 1: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/1.jpg)
Potted History of BIM from an
MEP Perspective
Eddie Murphy Technical Director
14 December 2011
![Page 2: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/2.jpg)
Virtual or Real?
2006 Vulcan House Bid Image in StudioMax
![Page 3: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/3.jpg)
Calculation Model
2006 Designbuilder/Energy Plus Thermal Modelling
![Page 4: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/4.jpg)
Lighting Models
Relux Radiance
![Page 5: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/5.jpg)
2008: IES Model Arts Tower, University of Sheffield
CFD
•Grade II* listed building •Office made to fit an academic use •Hot in Summer •Draughty in Winter •Over occupation
![Page 6: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/6.jpg)
3D CAD
2008: Arts Tower Existing Riser in Autodesk MEP
![Page 7: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/7.jpg)
Organic Improvement
2008 - 2010
![Page 8: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/8.jpg)
Level1+
2010 Halton School Revit MEP
![Page 9: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/9.jpg)
Implications of Step Change
Client Engagement
Virtual Construction
Actual Construction
Post Handover
Programme
Supply Chain
Skills base
Co- ordination
Cost Final Detailing
Logistics
Design
![Page 10: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/10.jpg)
Skills Transfer
Spatial Skills
Component Knowledge
Technical Understanding
![Page 11: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/11.jpg)
Example
Wide Sweep Screwed
Mapress Stainless
Butt Equal Tee Galv. Painted Equal Tee
![Page 12: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/12.jpg)
New Language/New Methodology
![Page 13: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/13.jpg)
Common View on Risks and Rewards
![Page 14: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/14.jpg)
Incentive needs to be…
“committed leadership, a focus on the customer, integrated processes and teams, a quality driven agenda and commitment to people”
![Page 15: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/15.jpg)
Founded upon…
Partnering
![Page 16: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/16.jpg)
So we can Catch Up…
Boeing 777; Paperless design and construct to less than 0.6mm tolerance
![Page 17: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/17.jpg)
Our Approach
![Page 18: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/18.jpg)
Collaborating Offline
![Page 19: Potted History of BIM from an MEP Perspective](https://reader033.fdocuments.us/reader033/viewer/2022052523/5566770ad8b42ad5798b4b8b/html5/thumbnails/19.jpg)
Summary
• Yes BIM is here… but… – Is it a marketing tool or the beginnings of a
new epoc for the Industry?
– Are the Rewards and Reduced Risk enough for the whole industry to completely revolutionise how we do things?
– Will historic lack of investment in our industry frustrate progress to Level 2 and beyond?
– Can this industry step up to the plate to us BIM as the vehicle to deliver real value for its customers?