POTENTIAL OF ROADWATER HARVESTING IN...
Transcript of POTENTIAL OF ROADWATER HARVESTING IN...
![Page 1: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/1.jpg)
Assoc. Prof. Abdul Qayeum Karim, Ph.D.Civil Engineering Department, Faculty of Engineering
[email protected], 9 January 2017
POTENTIAL OF ROADWATER
HARVESTING IN AFGHANISTAN
1
![Page 2: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/2.jpg)
1. Water Harvesting History in Afghanistan
2. Whater Harvesting Techniques in Afghanistan
3. Why Road for Water?
4. Road for Water Techniques
5. Optimizing Road Design for Multiple Functions
6. Why Road for Water in Afghanistan
7. Suggested Roadwater Harvesting Techniques in the Urban Areas of Afghanistan
8. How to change the governance?
9. Learning Topics
References
Table of Contents
2
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 3: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/3.jpg)
Main purposes: Drinking water & Irrigation water
1. WH History in Afghanistan
- The actual history is not well documented.
- The oldest RWH structure is located in a Budist Stupa in
Northern province of Samangan (Thakht-e Rustam) built in
4th or 5th Centuries AD.
- Also ponds along the silk road shows that WH techniques
are used in the country for a long time.
3
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 4: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/4.jpg)
KANDA :
• Northern and Central parts - pastoral area (usually in the
mountains consisting of lime stone).
• Round or rectangular underground reservoir with more or less
than 10m3 volume
• Micro Catchments
• Rain and snow melt as source of water
• built by the herders and rain-fed farmers: excavating the
ponds/reservoirs in the mountain consisting of lime stones.
• Rainwater is harvested automatically
• In summer when there is no flow of water in close by streams
but still there is grass for grazing in the pastures
• Animals, herders and travelers, mainly for drinking purpose.
2. WH Techniques in Afghanistan
4
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 5: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/5.jpg)
KANDA :
2. WH Techniques in Afghanistan
5
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 6: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/6.jpg)
6
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 7: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/7.jpg)
RWH on the road between Saighan and Kahmard
7
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 8: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/8.jpg)
8
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 9: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/9.jpg)
NAWR, NAWOR or Hawz
• Northern, Western and Central parts of the country mainly in the villages and
pastoral areas (usually in low land area where the ground water is saline or
difficult to get)
• Mainly rectangular pond with different dimensions
• Macro catchment areas
• Rain water as source harvested through water channels during winter and spring
seasons
• Mainly built by the community/ farmers/herders.
• Used in summer when there is no flow of water in close by streams or canals, by
animals, herders and travelers
2. WH Techniques in Afghanistan ... .
9
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 10: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/10.jpg)
Nawr/Hawz after rehab
10
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 11: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/11.jpg)
Taile in Bawran village of Pashtoon Zarghoon
11
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 12: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/12.jpg)
YAKHDAN/BARFDAN:
• Northern, Western and Central part of the country mainly in hilly areas where it is easy to collect snow
• Shallow well with dia 5-10m and a depths of up to 10m build by the community and individual in Micro catchment areas
• Mainly fed from snow melt, which is collected from the close by area and compacted in layers in the well- snow is covered by rice straw and clay soils; during winter
• The water is used in summer when the weather is hot and there is no flow of water in close by streams or canals.
• Users are villagers for drinking purpose and local Ice Cream makers (old time) Snow Soil 6 – 8m 15m
2. WH Techniques in Afghanistan ... .
12
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 13: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/13.jpg)
2. WH Techniques in Afghanistan ... .
13POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 14: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/14.jpg)
WASTA:
• Southern part of the country where Monsoon can reach, mainly in low lands
• Pond surrounded by earthen bunds in an area of 1 or 2 ha with 1 to 2m depth
• In Macro Catchments, sourced by flood water
• Built by the farmers, harvested by flood water running in the wash is diverted to the Wasta; during early summer
• The water us used after a few days of harvest when the crops need water
• Used by villagers for agriculture purpose.
2. WH Techniques in Afghanistan ... .
14
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 15: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/15.jpg)
2. WH Techniques in Afghanistan ... .
15POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 16: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/16.jpg)
2. WH Techniques in Afghanistan ... .
16
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 17: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/17.jpg)
17
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 18: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/18.jpg)
TAILE /HAWZ/TALABS:
• Western, southern and northern parts of the country,
mainly in low lands with no ground water or saline
ground water/ along the silk road
• Covered or uncovered reservoir with different sizes,
found close to the mosques
• In Macro catchments, fed from canal water
• Built by the community, and canal water is diverted
to the taile during winter and spring.
• Used during summer time when the canal is not
flowing any more, by the villagers/livestock for
drinking purpose.
2. WH Techniques in Afghanistan ... .
18
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 19: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/19.jpg)
2. WH Techniques in Afghanistan ... .
19
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 20: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/20.jpg)
2. WH Techniques in Afghanistan ... .
20
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 21: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/21.jpg)
Malek Pool ملک حوض
2. WH Techniques in Afghanistan ... .
21
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 22: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/22.jpg)
2. WH Techniques in Afghanistan ... .
22
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 23: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/23.jpg)
2. WH Techniques in Afghanistan ... .
23
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 24: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/24.jpg)
Grapes in
Deep
Furrows
2. WH Techniques in Afghanistan ... .
24
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 25: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/25.jpg)
Roof rainwater harvesting
2. WH Techniques in Afghanistan ... .
25
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 26: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/26.jpg)
2. WH Techniques in Afghanistan ... .
Terraces
26
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 27: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/27.jpg)
- To have roads systematically used,
- To recharge/retention, storage water,
- To manage water all over the world,
(Sub Saharan Africa and Asia, such as Afghanistan), and
- To create win-wins
3. Why Road for Water? (Dream and Opportunity)
27
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 28: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/28.jpg)
Annual investment 1-2 Trillion USD on Roads
40% in developing countries,
1 Billion people totally unconnected
Increased water stress – most poor in water stressed areas (74%)
MDB’s invest USD 17.5 Billion/Yr up to 2022
United Nations Secretary-General’s High-Level Advisory Group on Sustainable Transport:
‘Transport plays an essential role in countries’ economic growth, competitevness, balanced and liveable spatial development, access to water and energy and food saving.
28
3. Why Road for Water? (Dream and Opportunity)
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 29: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/29.jpg)
Annual increase of roads: f.i. 70,000 km in SSA
Water is 35% of damage to paved roads, up to
80% to unpaved roads
Roads change the surface hydrology and have
major impacts on run-off
now often causing local flooding, water logging and
erosion
“This can be turned around in large potential for
water harvesting and water management”
29
3. Why Road for Water? (Dream and Opportunity)
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 30: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/30.jpg)
Some Results of Reconnaissance Studies
I. In 200 kilometers:
Erosion and sedimentation: 150 locations
Flooding of houses and land: 45 locations
Persistent waterlogging: 65 locations
II. Deficiencies in governance process
Missing from guidelines,
No coordination,
No interaction with road-side communities.
III. Social impacts
Damage to land and houses, dust
Poor – most vulnerable least access to potential
No compensation, indirect litigation
3. Why Road for Water? ... .
30
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 31: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/31.jpg)
- REDUCED WATER
DAMAGE
TO ROADS
(-35%)
+ HIGHER RELIABILITY
+ WATER HARVESTED FOR RODUCTIVE
USE 400,000 M3 PER KM
+ RISING GROUNDWATER LEVELS 1.9-
5.8 MTR
+ INCREASED SOIL MOISTURE
30-100%
- REDUCED DAMAGE FROM ROADS
THROUGH FLOODING, EROSION
AND SEDIMENT DEPOSITION (-30%)
NOW 1.3 PROBLEMSPOT
PER KILOMETRE
Triple Win
3. Why Road for Water? ... .
31
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 32: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/32.jpg)
Adapting to changed road run-off
1. Spreading water from road surface
2. Harvesting water from culverts, side drains and depressions
Converted borrow pits
Infiltration ponds
Infiltration trenches/ pits
Swallows
Diversions/cutoffs/trenches to farm
3. Gully plugging for recharge
4. Spring capture
4. Techniques of Road for Water
32
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 33: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/33.jpg)
The Netherlands: Swallow for Recharge
4. Techniques of Road for Water ... .
33
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 34: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/34.jpg)
4. Techniques of Road for Water ... .
Soaking pits along the
road for groundwater
recharge and
increased soil oisture
34
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 35: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/35.jpg)
4. Techniques of Road for Water ... .
Trenches/Soaking pits for groundwater
recharge and increased soil moisture
35
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 36: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/36.jpg)
4. Techniques of Road for Water ... .
36
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 37: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/37.jpg)
4. Techniques of Road for Water ... .
37
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 38: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/38.jpg)
4. Techniques of Road for Water ... .
38
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 39: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/39.jpg)
4. Techniques of Road for Water ... .
39
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 40: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/40.jpg)
4. Techniques of Road for Water ... .
40
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 41: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/41.jpg)
Deep trenches
Culverts
Borrow pit
4. Techniques of Road for Water ... .
Communities
which used to
have been
affected by
flooding are
saved from
dflooding.
41
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 42: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/42.jpg)
42
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
4. Techniques of Road for Water ... .
![Page 43: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/43.jpg)
Cascading
of soak
pits/harves
ting ponds
along the
road
4. Techniques of Road for Water ...
.
43
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 44: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/44.jpg)
1. Irish bridges/drifts/low causeways
Flood water spreading
River bed stabilization
Acting as sand dams
2. Changing road alignment to recharge
areas
3. Optimize culvert location
5. Optimizing Road Design for Mutlipel Functions
44
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 45: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/45.jpg)
Drift acting as sand dam – hold water
for supplementary irrigation
Road crossing acting as sand dam
5. Optimizing Road Design for Mutlipel Functions ... .
45
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 46: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/46.jpg)
Pakistan:
Road =
Spate
Irrigation
Bed
Stabili
zer
5. Optimizing Road Design for Mutlipel Functions ... .
46
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 47: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/47.jpg)
Road
Crossing
acting as
Sand Dam
+ Brick
Making
5. Optimizing Road Design for Mutlipel Functions ... .
47
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 48: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/48.jpg)
1. Reuse excavated bed material from roads for soil improvement
2. Controlled sand mining along roads
3. Evacuation in times of floods
4. Road side tree planting
5. Brick making
>> We can turn roads into development reservoirs
Many a
dditio
nal o
pportu
nitie
s
to b
ette
r use
roads fo
r wate
r
5. Optimizing Road Design for Mutlipel Functions ... .
48
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 49: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/49.jpg)
Brick
making
along
the oad
crossing
a sandy
river
bed.
5. Optimizing Road Design for Mutlipel Functions ... .
49
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 50: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/50.jpg)
Road side
tree
plantation
5. Optimizing Road Design for Mutlipel Functions ... .
50
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 51: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/51.jpg)
6. Why Road for Water in Afghanistan? ... .
51
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 52: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/52.jpg)
Land Use Area (ha) Share (%)
Roads and Street 2,878 8.90%
Public Structures 679 2.10%
Parks and Open Space 3,557 11.00%
Individual Houses 4,222 13.06%
Commercial and Residential
Buildings4,574 14.14%
Mountains & Rivers 16,428 50.80%
Total 32,338 100.00%
Table – 6 Proposed Land Use of Kabul City by the Third Kabul Master Plan (1978) Source: Japan
International Cooperation Agency 2011)
Therefore, covering of ground by impermeable paving arise the following problems:52
6. Why Road for Water in Afghanistan?
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 53: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/53.jpg)
6. Why Road for Water in Afghanistan? ... .
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 54: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/54.jpg)
Sim
ple
calc
ula
tion f
rom
Kabul (A
fghanis
tan)
Kabul Average rainfall 300 mm,
1mm rainfall = 10 m3 of water in 1 ha
300 mm rainfall = 3,000 m3 of water in 1 ha
Width of Darul-Aman Road say 40 m
Total length of Road is 5.5 km or 5500m
Total surface is equal to 5,500 X 40 = 220,000m2 or 22ha
Total amount of rainfall 3,000 X 22 = 66,000m3
Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha.
For each ha of the green area available water is 66,000/5.5=
12,000 m3.
Say 60% of rainwater harvesting, 7,000 m3 water for each ha or
700 mm of rain fall; this amount of water will be enough for
around 1500 trees (300 trees/ha) or 2 trees/7m; 20 cm
irrigation in each 5 days for 5.5 ha green area.54
6. Why Road for Water in Afghanistan?
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 55: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/55.jpg)
6. WH Techniques in Afghanistan ... .
55
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 56: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/56.jpg)
56
6. WH Techniques in Afghanistan ... .?
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 57: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/57.jpg)
7. Suggested Roadwater Harvesting Techniques in
the Urban Areas of Afghanistan
French
Drain:
(a) without
pipe
(b) with pipe,
57
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 58: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/58.jpg)
Kerbs and Gully
(inset in to verge)
Side entry gully
58
7. Suggested Roadwater Harvesting Techniques in
the Urban Areas of Afghanistan
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 59: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/59.jpg)
Combined Kerb
and Drainage
Block
Linear Drainage
Channel
59
7. Suggested Roadwater Harvesting Techniques in
the Urban Areas of Afghanistan
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 60: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/60.jpg)
Surface Water Channel French Drain
60
7. Suggested Roadwater Harvesting Techniques in
the Urban Areas of Afghanistan
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 61: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/61.jpg)
61
7. Suggested Roadwater Harvesting Techniques in
the Urban Areas of Afghanistan
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 62: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/62.jpg)
62
7. Suggested Roadwater Harvesting Techniques in
the Urban Areas of Afghanistan
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 63: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/63.jpg)
63
7. Suggested Roadwater Harvesting Techniques in
the Urban Areas of Afghanistan
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 64: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/64.jpg)
Comparison of Natural and
Man Made Plantation
64
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 65: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/65.jpg)
65
7. Suggested Roadwater Harvesting Techniques in
the Urban Areas of Afghanistan
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 66: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/66.jpg)
66
7. Suggested Roadwater Harvesting Techniques in
the Urban Areas of Afghanistan
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 67: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/67.jpg)
Proposed Section for Darulaman Road
67
7. Suggested Roadwater Harvesting Techniques in
the Urban Areas of Afghanistan
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 68: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/68.jpg)
Current section of
Khairkhana pass road
68
7. Suggested Roadwater Harvesting Techniques in
the Urban Areas of Afghanistan
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 69: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/69.jpg)
Proposed section for Khair
Khana Pass Main Road
69
7. Suggested Roadwater Harvesting Techniques in
the Urban Areas of Afghanistan
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 70: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/70.jpg)
1. Integratation of RFW in road and watershed programs
2. Community engagement in the business
3. Change procedures in roads development
• Manuals
• Investment budgets
• Maintenance budgets
• Cooperation
4. Capacity building
• Short courses
• Tools (run-off models)
8. How to Change Governance?
70
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 71: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/71.jpg)
Introduction- Roads for Water,
creating resilience
Culvert and cross drainage design
Drainage from unpaved roads
Estimating drainage flows
Gully assessment and prevention
Landslide related road failures in
Ethiopia
Rainwater run-off from roads
Road for water planing and
governance
Roads crossing river beds
Roads for inclusiveness
Roads in flood plains
9. Learning Topics
Roadside planting
Social engagement processes
Social impact of roads for water harvesting
Spate irrigation from road run-off
Water harvesting from roads: experiences from Tigray
Water harvesting from seasonal river crossings
Weather proofing and water harvesting
Road crossings as sand dams –Kenyan Experience
GIS and Remote Sensing application in watershed management
Environmental mitigation of impact from road water harvesting
71
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 72: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/72.jpg)
World Bank (2006) Social Analysis in Transport Projects: Guidelines for Incorporating Social Dimensions into Bank-Supported Projects. 63
World Business Council for Sustainable Development (2009) Mobility for Development. 64
World Health Organization (WHO) (2004) World Report on Road Traffic Injury Prevention.
International Road Safety Assessment programme (iRAP): http://www.irap.org/
Global Road Safety Partnership: http://www.grsproadsafety.org/
World Road Association (PIARC): http://www.piarc.org/en/
The UK Transport Research Laboratory (TRL) produced the Overseas Roadnotes series: http://www.trl.co.uk/
global Transport Knowledge Partnership (gTKP): http://www.gtkp.com/
World Health Organization: http://www.who.int/roadsafety/
The International Forum for Rural Transport and Development (IFRTD): http://www.ifrtd.org/new/index.htm
Commission for Global Road Safety: http://www.fiafoundation.org/commissionforglobalroadsafety/ United States Transportation Research Board: http://www.trb.org/Main/Home.aspx
Access Exchange International (an NGO promoting accessible public transport for persons with disabilities): http://www.globalride-sf.org
Luwieke Bosma
S.Sharif Shobair
References
72
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN
![Page 73: POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTANspate-irrigation.org/wp-content/uploads/2017/11/03... · Say 10m green area, total area 10 X 5,500=55,000 m2 or 5.5 ha. For each ha](https://reader033.fdocuments.us/reader033/viewer/2022042410/5f28a879b0dc6049da783fc8/html5/thumbnails/73.jpg)
Roads for Water Security
Water for Roads Safety!
Let’s travel together
73
POTENTIAL OF ROADWATER HARVESTING IN AFGHANISTAN