Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings...
Transcript of Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings...
![Page 1: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/1.jpg)
International Wood Symposium
23 January 2014 – Vancouver BC
Post-tensioned Multi-storey Post-tensioned Multi-storey
Timber Buildings
Professor Andy BuchananProfessor Andy BuchananUniversity of Canterbury, New Zealand
![Page 2: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/2.jpg)
Summary
Cost effectiveSustainableSustainable
High performanceTimber building systemsTimber building systems
![Page 3: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/3.jpg)
2010 & 2011 earthquakes
JapanJapanJapanJapan
TaiwanTaiwan
CaliforniaCalifornia
ChileChileNew ZealandNew Zealand
Movement of fault = 40mm per yearMovement of fault 40mm per year
![Page 4: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/4.jpg)
![Page 5: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/5.jpg)
![Page 6: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/6.jpg)
Christchurch earthquakes
Main quake:4 September 2010 4 September 2010, 4.30am. M 7.1No deathsNo deaths
Aftershock:22 February 2011 22 February 2011, 1 pm. M 6.3182 deaths182 deaths
![Page 7: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/7.jpg)
Christchurch earthquakes
Dust rising after the quake
![Page 8: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/8.jpg)
Masonry buildings
![Page 9: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/9.jpg)
Masonry buildings
![Page 10: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/10.jpg)
Building collapses. Loss of life
115 deaths in CTV. 18 deaths in PGC115 deaths in CTV. 18 deaths in PGC
42 deaths in other buildings (masonry)7 d th i kf ll t7 deaths in rockfall etc.
182 total deaths
![Page 11: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/11.jpg)
Liquefaction
![Page 12: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/12.jpg)
Liquefaction damage
![Page 13: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/13.jpg)
Vertical accelerations
Roof shaken off
Timber houset t ll structurally
safe
![Page 14: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/14.jpg)
Internal liningsGypsum plasterboard
Provided bracing for most housesProvided bracing for most houses
Ceiling damage
![Page 15: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/15.jpg)
Engineered timber buildings
Shear cracks Shear cracks in columnNo serious damage to any
non-residential timber buildings
![Page 16: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/16.jpg)
Solid wood houses
Good performance despite p pdifferential slab movement
![Page 17: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/17.jpg)
Wall bracing failures
![Page 18: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/18.jpg)
Soft storey collapses
BeforeBefore
After
![Page 19: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/19.jpg)
Steel buildings
![Page 20: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/20.jpg)
Reinforced concrete
Now demolished
![Page 21: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/21.jpg)
Why so many demolitions?
Earthquake engineering philosophy
Minor earthquake No damage
Moderate Repairable earthquake damageearthquake damage
Big earthquake No deaths. Damage is ok
![Page 22: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/22.jpg)
Christchurch after the quake
![Page 23: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/23.jpg)
What did we learn?
Good design can save lives
Life safety is not enough
W d “L D D i ” d We need “Low Damage Design” to reduce economic losses.
–Base isolation–Controlled repairable damageControlled repairable damage–Rocking systems
![Page 24: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/24.jpg)
Re-building Christchurch
What kind of city do we want?
Warren and Mahoney
![Page 25: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/25.jpg)
Re-building Christchurch
Wood is part of the solution
Old Government Buildings, Wellington, 1876
Wood is green
![Page 26: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/26.jpg)
Design objectives Resilient low damage buildings
E i l i ft th k Economical repair after an earthquake
Post-tensioning with replaceable dissipaters b th b t l timay be the best solution
Not only earthquakes
Fire safety – EU Guide, Arup Guide
A ti ib ti Acoustics, vibration
Durability, sustainability
Cost and time of construction
![Page 27: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/27.jpg)
New technology
New materialsLVL LSL–LVL, LSL
–CLT Hi-Tech manufacturing New fastenersNew fasteners
–Screws, rivetsNew structural concepts New structural concepts
–Post-tensioning
![Page 28: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/28.jpg)
New materials
Glulam
LVLLaminated Laminated Veneer Lumber
CLTCrossCrossLaminated Timber
![Page 29: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/29.jpg)
New materials
Glulam: Straight or curved: Beams, panels
LVL:Laminated
Long straight and strongBeams Laminated
Veneer Lumber
Beams ColumnsTrusses
CLT:Cross
Big flat panelsSolid timber floorsCross
Laminated Timber
Solid timber floorsSolid timber walls
There is a place for all of these, with other materials
![Page 30: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/30.jpg)
Hi-tech manufacturing
![Page 31: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/31.jpg)
New fasteners
Rivets Screws
![Page 32: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/32.jpg)
Post-tensioned timberRocking Concrete Systems: University of California, San Diego
![Page 33: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/33.jpg)
Post-tensioned timber frames
P t t i i id t tiPost-tensioning provides moment connections
![Page 34: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/34.jpg)
Post-tensioned timber walls
U
U
U
T ll b ildi ill h t b l t tTaller buildings will have tubular structure
![Page 35: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/35.jpg)
STIC Research Consortium
Structural Timber Innovation Company
Partners• Timber industry
(NZ and Australia)(NZ and Australia)• NZ Government
• University of Canterbury• University of Auckland• UTS SydneyUTS Sydney
$10 million (2008-2013)
![Page 36: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/36.jpg)
Hybrid specimen 3 – HY320
Testing at Canterbury University Hybrid specimen 3 HY3
5
10
15
20
orce
[kN
]
-15
-10
-5
0
Top
-late
ral F
f f-20
-0,05 -0,04 -0,03 -0,02 -0,01 0 0,01 0,02 0,03 0,04 0,05Drift
fp0 = 0.6fpy
![Page 37: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/37.jpg)
Flag-shaped hysteresis loops
Energy dissipationSelf-centering Hybrid system
F F F
D D D++ =+
Unbonded Post-Tensioned (PT) tendons
Mild Steel or Energy Dissipation Devices PT tendons and Energy
Dissipation Devices
Energy absorption, but no residual deformations
![Page 38: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/38.jpg)
Flag-shaped hysteresis loops
Effect of Dissipation on Seismic Performance
A trade-off between energy dissipation and re-centering
Dissipation also adds moment resistanceDissipation also adds moment resistance
![Page 39: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/39.jpg)
UC Test Building
FramesPost-tensioning Frames WallsPost-tensioningtendons
![Page 40: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/40.jpg)
Expan Head Office
No damage in earthquakes
![Page 41: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/41.jpg)
NMIT Building, Nelson
ISJ Architects, Aurecon
![Page 42: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/42.jpg)
NMIT Building, Nelson
ISJ Architects, Aurecon
![Page 43: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/43.jpg)
Massey University, Wellington
Massey University, Wellington.Athfield Architects, Dunning Thornton
![Page 44: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/44.jpg)
Massey University, Wellington
Massey University, Wellington.Athfield Architects, Dunning Thornton
![Page 45: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/45.jpg)
Precast TCC floors
![Page 46: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/46.jpg)
Massey University, Wellington
Massey University, Wellington.Athfield Architects, Dunning Thornton
![Page 47: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/47.jpg)
Massey University, Wellington
Massey University, Wellington.Athfield Architects, Dunning Thornton
![Page 48: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/48.jpg)
Big box construction
![Page 49: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/49.jpg)
Big box construction
Epoxied rod connections
![Page 50: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/50.jpg)
Big box construction
Steel plates with nailed connections
![Page 51: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/51.jpg)
Big box construction
Screwed wood and steel connections
![Page 52: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/52.jpg)
Big box construction
Post-tensioned timber walls, LVL roof trusses with rivets
![Page 53: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/53.jpg)
Post-tensioned beams
Long spans (draped tendons)
F lFewer columns
![Page 54: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/54.jpg)
Post-tensioned beams
Hollow beams. LVL chords, plywood webs, draped tendons
![Page 55: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/55.jpg)
Kaikoura
Museum, library, council offices, Kaikoura DC
All timber. No concrete. Post-tensioned CLT walls.
![Page 56: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/56.jpg)
Kaikoura
Post-tensioned CLT walls for all lateral loads
![Page 57: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/57.jpg)
Re-building Christchurch
Sheppard and Rout Architects, Kirk Roberts Engineers
![Page 58: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/58.jpg)
Re-building Christchurch
University of Canterbury laboratory testing
![Page 59: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/59.jpg)
Re-building Christchurch
Sheppard and Rout Architects, Kirk Roberts Engineers
![Page 60: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/60.jpg)
Re-building Christchurch
Sheppard and Rout Architects, Kirk Roberts Engineers
![Page 61: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/61.jpg)
Re-building Christchurch
Sheppard and Rout Architects, Kirk Roberts Engineers
![Page 62: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/62.jpg)
Re-building Christchurch
Sheppard and Rout Architects, Kirk Roberts Engineers
![Page 63: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/63.jpg)
Re-building Christchurch
Sheppard and Rout Architects, Kirk Roberts Engineers
![Page 64: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/64.jpg)
Re-building Christchurch
Opus Architects and Engineers
![Page 65: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/65.jpg)
Re-building Christchurch
Opus Architects and Engineers
![Page 66: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/66.jpg)
Re-building Christchurch
Opus Architects and Engineers
![Page 67: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/67.jpg)
Post-tensioned timber frames
Opus Architects and Engineers
![Page 68: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/68.jpg)
Re-building Christchurch
Opus Architects and Engineers
![Page 69: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/69.jpg)
Re-building Christchurch
Opus Architects and Engineers
![Page 70: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/70.jpg)
Re-building Christchurch
Exterior view
Opus Architects and Engineers
![Page 71: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/71.jpg)
Re-building Christchurch
Rick Proko Architects, Ruamoko Engineers
![Page 72: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/72.jpg)
Re-building Christchurch
B i l t d b ildi Base-isolated building. Frames both directions with concrete columns and post-tensioned LVL beams.
Rick Proko Architects, Ruamoko Engineers
![Page 73: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/73.jpg)
Re-building Christchurch
Rick Proko Architects, Ruamoko Engineers
![Page 74: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/74.jpg)
NZ -> Other countries
The Pres-Lam structural concept is patented p pin New Zealand
Free use for registered users in NZ Free use for registered users in NZ
Patent applied for in USA, Canada, Europe Patent applied for in USA, Canada, Europe
Investment enquiries are welcome
See me if you are interested
![Page 75: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/75.jpg)
Why use wood ?
Constructability
Sustainability
R bilitCost effectiveS t i bl Renewability
Availability
SustainableHigh performancey
WeightTimber building systems
Cost
Fire safety durability acoustics energy
Why is it not happening?
Fire safety, durability, acoustics, energy
![Page 76: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/76.jpg)
The Supply Chain
Logs Forest owner
Logs
Wood products Processor
Structural elements Fabricator
ErectorStructural skeleton
Erector
ContractorWhole building
Building owner
They may have to take some risks
![Page 77: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/77.jpg)
The Design TeamStructural, seismic Structural engineer, architect
Fire Fire engineer, architectg ,
Acoustic Acoustic engineer
Thermal Building services engineer, architectThermal Building services engineer, architect
Durability Façade engineer, architect
Environmental Architect environmental consultantEnvironmental Architect, environmental consultant
Cost control Quantity surveyor
Construction Project managerConstruction Project manager
1. They must all know something about wood2. They may have to take some risks
![Page 78: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/78.jpg)
Who carries the risk?
Client: building owner
Design team: Structural engineer
Construction team:
Main contractor
Architect
Etc
Sub-contractors
Project manager
OthersMaterial suppliers• Regulators
• BankersManufacturers• Insurers etc
![Page 79: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/79.jpg)
How to reduce the risk ?
PROVIDE CONFIDENCE– Continue research
– Support design professionalspp g p
– Educate new players
– Share the knowledgeShare the knowledge
– Codes and Design Guides
– Celebrate successful projectsCelebrate successful projects
– Workshops like today
![Page 80: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/80.jpg)
Conclusions We have the technology, more coming
We have the materials, hybrids coming
We have the structural systemsy
We have the enthusiasm
The hard part is putting it all together
d h i k f ll k h ldReduce the risk for all stakeholders
Work togetherg
For a sustainable resilient future
![Page 81: Post-tensioned Multi-storey Timber Buildings · Design objectives Resilient low damage buildings Eil i ft thkEconomical repair after an earthquake Post-tensioning with replaceable](https://reader033.fdocuments.us/reader033/viewer/2022042015/5e74055316b4b7499d19aef8/html5/thumbnails/81.jpg)
Thank you