Post – Rebuild Changes
at the SFGH Campus
Beginning of Part 2 of 2
![Page 2: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/2.jpg)
2
Campus Changes • Rebuild
• Potrero Ave. streetscape
• Campus changes after the Rebuild
• Move into new hospital
• Outpatient care centralized in existing hospital
• Retrofitting existing buildings
• New UC Research Building
San Francisco General Hospital and Trauma Center
![Page 3: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/3.jpg)
3
Potrero Ave. Streetscape
![Page 4: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/4.jpg)
4
New
Hospital
SFGH Campus Map
Proposed
UC
Research
Bldg Existing
Hospital
Bldg
9
Bldg.
40 Bldg
10
Bldg
20
Bldg
30
Bldg
1
Bldg
3
Bldg
80/90
Behavioral
Health
Center
Service
Bldg
Bldg
100
Parking
Garage
![Page 5: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/5.jpg)
1”
SFGH Campus Changes
Inpatient Services Move to
New Hospital
Retrofit Existing Hospital
Outpatient Services Move to
Existing Hospital
Retrofit Buildings 80/90
Construct New UCSF
Research Building
Building 40 Used for
Construction Offices
UCSF move from Red Brick
Buildings 1, 10/20, 30/40 to
New Research Building
Retrofit Red Brick Buildings
1, 10/20, 30/40
14
![Page 6: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/6.jpg)
SFGH Campus Changes
Inpatient Services Move to
New Hospital
Retrofit Existing Hospital
Outpatient Services Move to
Existing Hospital
Retrofit Buildings 80/90
Construct New UCSF
Research Building
Building 40 Used for
Construction Offices
UCSF move from Red Brick
Buildings 1, 10/20, 30/40 to
New Research Building
Retrofit Red Brick Buildings
1, 10/20, 30/40
15
![Page 7: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/7.jpg)
SFGH Campus Changes
Inpatient Services Move to
New Hospital
Retrofit Existing Hospital
Outpatient Services Move to
Existing Hospital
Retrofit Buildings 80/90
Construct New UCSF
Research Building
Building 40 Used for
Construction Offices
UCSF move from Red Brick
Buildings 1, 10/20, 30/40 to
New Research Building
Retrofit Red Brick Buildings
1, 10/20, 30/40
16
![Page 8: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/8.jpg)
SFGH Campus Changes
Inpatient Services Move to
New Hospital
Retrofit Existing Hospital
Outpatient Services Move to
Existing Hospital
Retrofit Buildings 80/90
Construct New UCSF
Research Building
Building 40 Used for
Construction Offices
UCSF move from Red Brick
Buildings 1, 10/20, 30/40 to
New Research Building
Retrofit Red Brick Buildings
1, 10/20, 30/40
17
![Page 9: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/9.jpg)
1/4”
1/8”
1”
SFGH Campus Changes
Inpatient Services Move to
New Hospital
Retrofit Existing Hospital
Outpatient Services Move to
Existing Hospital
Retrofit Buildings 80/90
Construct New UCSF
Research Building
Building 40 Used for
Construction Offices
UCSF move from Red Brick
Buildings 1, 10/20, 30/40 to
New Research Building
Retrofit Red Brick Buildings
1, 10/20, 30/40
18
![Page 10: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/10.jpg)
1/4”
1/8”
SFGH Campus Changes
Inpatient Services Move to
New Hospital
Retrofit Existing Hospital
Outpatient Services Move to
Existing Hospital
Retrofit Buildings 80/90
Construct New UCSF
Research Building
Building 40 Used for
Construction Offices
UCSF move from Red Brick
Buildings 1, 10/20, 30/40 to
New Research Building
Retrofit Red Brick Buildings
1, 10/20, 30/40
19
![Page 11: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/11.jpg)
1/4”
1/8”
SFGH Campus Changes
Inpatient Services Move to
New Hospital
Retrofit Existing Hospital
Outpatient Services Move to
Existing Hospital
Retrofit Buildings 80/90
Construct New UCSF
Research Building
Building 40 Used for
Construction Offices
UCSF move from Red Brick
Buildings 1, 10/20, 30/40 to
New Research Building
Retrofit Red Brick Buildings
1, 10/20, 30/40
20
![Page 12: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/12.jpg)
UCSF Interim Seismic Work
Proposals
12
![Page 13: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/13.jpg)
Background Seismic Information
• City owns space, which UCSF leases or occupies in exchange for services
• UC considers SFGH an adjunct campus, subject to UC seismic policy for owned space – requires that “Poor/Very Poor” buildings be retrofitted to policy-compliant or vacated
• Seismically “Poor/Very Poor” buildings (Levels V and VI per UC Seismic Policy) occupied by UCSF labs/offices/clinics (193K ASF) in Buildings 1, 5, 9, 10, 20, 30, 40, 80/90, 100. All buildings, except Building 5, are historically significant
• UCSF will continue to occupy space in Building 3, rated “Seismically Good” (Level III)
• Consulting seismic experts recommended retrofit or vacating Very Poor buildings by 2019 and interim measures to protect life safety.
13
![Page 14: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/14.jpg)
SFGH Campus Map and Seismic Ratings
14
![Page 15: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/15.jpg)
Proposed UCSF Interim Seismic Work
• Temporary measures to protect the safety of workers, patients and visitors in exiting Very Poor buildings (Buildings 10 – 40 & 100) during seismic event
• Canopies over building exits (not attached to buildings)
• Landscaping or low fences at 10’ perimeter of buildings where needed
• Re-anchor some roof tile on Building 30 above exit stairway
• Clear internal exit paths and anchor interior equipment as necessary
• Timeline: As soon as City’s environmental review is completed – work may take place by end of 2013
15
![Page 16: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/16.jpg)
16
![Page 17: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/17.jpg)
17
![Page 18: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/18.jpg)
Proposed UCSF Research Building at SFGH
18
![Page 19: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/19.jpg)
Proposed UCSF Research Building
• Build New Building on B/C parking lot
– “Wet” research labs and “Dry” research and administrative offices for UCSF employees now in SFGH brick buildings (Poor/Very Poor) + off-campus leases
– Building footprint to be determined.
– Lot contains 158 parking spaces – once building footprint is determined, number of displaced spaces will be determined. We are working on a solution.
• Relocate labs and offices from Buildings 1, 9, 10, 20, 30, 40, 80/90, 100 to new B/C lot bldg.
• Replace displaced parking from B/C lot – location to be determined.
19
![Page 20: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/20.jpg)
UCSF Research Building Site
20
![Page 21: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/21.jpg)
21
Parking Options Under
Study
![Page 22: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/22.jpg)
31
![Page 23: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/23.jpg)
Next Steps: Proposed Schedule & Review Process
23
![Page 24: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/24.jpg)
24
UC Actions
Negotiate site control with City 2013
Implement interim measures 2013
Amend LRDP & Complete EIR 2014
Approve budget, funding and design 2014
Build new B/C lot building 2016 – 2018
City Actions
Negotiate site control with UCSF 2013
Update 10-Year Capital Plan and
Institutional Master Plan 2013
SF Health Commission 2014
SF Planning Commission 2014
SF Board of Supervisors 2014
Proposed Schedule & Review Process
![Page 25: Post Rebuild Changes at the SFGH Campus · Negotiate site control with City 2013 Implement interim measures 2013 Amend LRDP & Complete EIR 2014 Approve budget, funding and design](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f56cd9ddeb0d30c4e06380a/html5/thumbnails/25.jpg)
UCSF SFGH Community Meeting
February 11, 2013