Post Mortem VDC Cross Project Learning: Feedback KM Unit Technical Design

12
Post Mortem VDC Cross Project Learning: Feedback KM Unit Technical Design

description

Post Mortem VDC Cross Project Learning: Feedback KM Unit Technical Design. Event-Knowledge Sharing Session. Event : VDC CROSS LEARNING SESSION Purpose : To Continuously learn and and   share knowledge with the ongoing VDC projects team - PowerPoint PPT Presentation

Transcript of Post Mortem VDC Cross Project Learning: Feedback KM Unit Technical Design

Page 1: Post Mortem VDC Cross Project Learning: Feedback KM Unit Technical Design

Post MortemVDC Cross Project Learning: Feedback

KM UnitTechnical Design

Page 2: Post Mortem VDC Cross Project Learning: Feedback KM Unit Technical Design

The proposal and recommendations contained herewith remain the sole property of Sunway Group. Any unauthorized duplication or content use without consent of authority from Sunway Group, is deemed as breach of copyright.

Event-Knowledge Sharing SessionEvent : VDC CROSS LEARNING SESSIONPurpose : To Continuously learn and and share

knowledge with the ongoing VDC projects teamSpeakers : Khoo Chee Seong & Yap Wei LenMain Coordinator : KM Team-Raja Nadia & GunalanVDC Team : Liew Ee Lin & Goo Sze (Audrey)Date : 4th March 2014 (Tuesday) Venue : Menara Sunway, Level 20 Time : 9:15am-1:00pm

Page 3: Post Mortem VDC Cross Project Learning: Feedback KM Unit Technical Design

The proposal and recommendations contained herewith remain the sole property of Sunway Group. Any unauthorized duplication or content use without consent of authority from Sunway Group, is deemed as breach of copyright.

ContentThe Objective of Post Mortem DiscussionThe Summary listing of feedbackKey Problem AreasKey Lessons Learned/Recommendation

Page 4: Post Mortem VDC Cross Project Learning: Feedback KM Unit Technical Design

The proposal and recommendations contained herewith remain the sole property of Sunway Group. Any unauthorized duplication or content use without consent of authority from Sunway Group, is deemed as breach of copyright.

Post Mortem-VDC Cross Learning Session Goal/Objective: (Post Mortem is a valuable tool for continuous Improvement).

The purpose of this discussion is to record, in detail, the specific activities that were most effective and those that require adjustments for future events. (i.e. obstacles, challenges, successes, what could be done differently next time, etc.).

To identify the weakness of handling & organizing the ‘VDC Cross Learning Session’ on the 4th March 2014 and how to improve the event by giving a listing of recommendations (what we could do better next time).

To avoid repeating the same mistake (important Lessons Learned during the project).

Page 5: Post Mortem VDC Cross Project Learning: Feedback KM Unit Technical Design

The proposal and recommendations contained herewith remain the sole property of Sunway Group. Any unauthorized duplication or content use without consent of authority from Sunway Group, is deemed as breach of copyright.

Summary Feedback

TRAINING EVALUATION FORM PARTICIPANT'S ANSWERS A. Program Objective: Overal how would you rate this programme

5-Excellent 7 4-Good 37 3-Satisfactory 15 2-Fair 3 1-Poor 1

B. Participant's Benefit 1.Increased your work knowledge

5-Excellent 10 4-Good 35 3-Satisfactory 12 2-Fair 4 1-Poor 1

2. Improved your work compentencies 5-Excellent 1 4-Good 18 3-Satisfactory 10 2-Fair 7 1-Poor 2

3. Helped you in your current work? 5-Excellent 8 4-Good 26 3-Satisfactory 20 2-Fair 9 1-Poor n/a

4. How would you rate the speaker? 5-Excellent 10 4-Good 36

Page 6: Post Mortem VDC Cross Project Learning: Feedback KM Unit Technical Design

The proposal and recommendations contained herewith remain the sole property of Sunway Group. Any unauthorized duplication or content use without consent of authority from Sunway Group, is deemed as breach of copyright.

Summary of Training Evaluation

5.Name two key learning points you can apply at work Related to "Coordination": To have proper coordination, Interface coordination, remind to coordinate work ahead of schedule. 6

Related to Pinnacle: Pinnacle share, Pinnacle methodology 2 Related to 3D: 3D modelling to full utilized at site, To explore 3D into further scope to work at site, We need 4D team involved to share more info on how 4D incorporate into the 3D model.

3

Steel structure modelling process 1 Related to BIM:BIM knowledge, Future plan ofBIM, BIM implementation based on in-hse modeler independent. 3

Related to VDC: VDC implememntation project, Problems arrised with VDC & the ways to overcome them, VDC adalah program yang boleh menjimatkan masa & kos projek, VDC challenges, More training to implement VDC in site project.

5

Related to work & cost: Sharing from other sites, Sequence of work is important, More room to improve, Time & cost saving, mengetahui prodedur untuk memulakan pekerjaan.

9

Related to Shop Drawing: Work site implemetation requirement capture in shop drawing. 1

6. Share two suggestions to improve the quality of this programme Time: to have better time planning 1

MEP: To elaborate more on MEP services, Coordination between architecture, structure & MEP Interfacing

2

Visual Aids: Video Conference to be improved, Separate session for Southern Region, Improve the technology areas & training team must have quality visual aids (especially the microphones), Better audio & video system, Please improve the IT teachnical , visual aids (Speaker, Live coonection, Micropohone & etc).

13

Page 7: Post Mortem VDC Cross Project Learning: Feedback KM Unit Technical Design

The proposal and recommendations contained herewith remain the sole property of Sunway Group. Any unauthorized duplication or content use without consent of authority from Sunway Group, is deemed as breach of copyright.

Summary Feedback

Page 8: Post Mortem VDC Cross Project Learning: Feedback KM Unit Technical Design

The proposal and recommendations contained herewith remain the sole property of Sunway Group. Any unauthorized duplication or content use without consent of authority from Sunway Group, is deemed as breach of copyright.

Key Problem Areas

Key Problem Areas:

What went wrong?

What work process didn’t work well?

Technical Challenges

What need to be improved?

Page 9: Post Mortem VDC Cross Project Learning: Feedback KM Unit Technical Design

The proposal and recommendations contained herewith remain the sole property of Sunway Group. Any unauthorized duplication or content use without consent of authority from Sunway Group, is deemed as breach of copyright.

Key Lessons Learned & Recommendation

No. Areas/Challenges Do’s Don’t

1. Objective/goals (achieved/not)

1. To inform all the staff the main objective of the event & what they can gain from the event

N/A

2. Planning/Schedule

1.Probably the best time for next cross project learning is after 4pm(a) IT Support Standby (b)Internet Bandwidth2. To Book Pent house One (1) month earlier.3. Look ahead schedule-to come out with an annual list of session for pre-arrangement.4. It is best to make the event time shorter based on speakers content (propose by the speaker) based on specific topics shared by relevant attendees in a smaller group discussion5. Facilitator to prepare the event checklist, proper arrangement & agenda6. Must have rehearsal/run through before the event.

N/A

3. Invitee/Name-list 1.Do a proper composition on staff which needs to attend the Cross Learning Project.2.Senior & Top management staff no need to invite/attend in the event of smaller group discussion with specific topics.

N/A

4. Speakers/Topics 1. Standardize the topics with all projects which they can learn from each other. N/A

5. Presentation slides/content

Use larger font size (min size 18) for slide presentation (ad more slides if necessary to fit the contents).

Do not use smaller font for presentation slide in large group.

6. Seating Arrangement

1. In Penthouse, to arrange classroom seating arrangement.2. Smaller group, prefer at conference meeting room

Seating Arrangement - Do not make seating arrangement far from screen ( if Penthouse, just use the first partition).

7 Presentation Topic

Proposed topics by PIC’s N/A

Page 10: Post Mortem VDC Cross Project Learning: Feedback KM Unit Technical Design

The proposal and recommendations contained herewith remain the sole property of Sunway Group. Any unauthorized duplication or content use without consent of authority from Sunway Group, is deemed as breach of copyright.

Key Lessons Learned No. Areas/Challenges Do’s Don’t

7. Venue 1. Large Group-Pent House2. Smaller Group-Conference meeting Room

1. Do not arrange the seating far from the screen.

8. Visual aids 1. Microphones & Speakers: Do testing & trial one day before the event (proposed for new visual aids from the maintenance department).

N/A

9. Manpower's /staff Come out with structured Man Power for during the event - Roles such as – Attendance PIC, IT PIC, Technical PIC (audio/video), Runner PIC

N/A

10. Registration Appoint staff to in-charge the registration during the whole event (Participants might come late for registration-even after the event has started).

N/A

11. Video Conferencing (Technical)

1.Inform Site staff to not download heavy material during the teleconferencing.2.Prefer to use LAN Connection compare to WIFI.3.A special VDC workshop for southern region (if needed) for BIM Implementation (Separate Session). 4. Prefer to us webcam compare to poligon.

1.Do not use WIFI connection for teleconferencing2.Avoid using ‘Poligon’ tool.

12. Training Department 1. Liaise with training team for attendance invitation, Send out Online Training evaluation, Venue Booking, Projectors, Screens, microphones,

2. Do Trial/test on technical part I day before the event

N/A

13. Training Evaluation (distribute form/online)

Do online survey rather than hard copy after the Cross Project Learning.

Do not distribute the hardcopy.

Page 11: Post Mortem VDC Cross Project Learning: Feedback KM Unit Technical Design

The proposal and recommendations contained herewith remain the sole property of Sunway Group. Any unauthorized duplication or content use without consent of authority from Sunway Group, is deemed as breach of copyright.

Recommendation

Log in base system, for audience to join the event from their workspace. (Request from IT team).