PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production:...

25
PosHYdon Pilot Offshore green hydrogen

Transcript of PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production:...

Page 1: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

PosHYdon PilotOffshore green hydrogen

Page 2: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

• Neptune Energy is a well-established operator in the Dutch part of the North Sea since 1964. We discover, develop and produce gas and oil fields.

• Largest offshore operator (infrastructure and production)

• 32 operated (platform) locations:

4 main production complexes

o 9 manned platforms

o 18 normally unmanned satellite platforms

o 1 stand alone jacket

o 5 subsea wells

o > 100 producing wells

• 32 production licenses

• 12 exploration licenses

• Operating the first fully electrified offshore platform in the Southern North Sea (Q13a-A)

• Noordgastransport B.V. : Partially owned (18.57%) by Neptune Energy, managed and operated by NGT; Neptune Energy provides services.

• NOGAT B.V. Partially owned by Neptune Energy (15.0%). Managed and operated by Neptune Energy; GBI operated by NAM on behalf of NOGAT.

FACTS & FIGURES – JULY 2019

2

Page 3: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

OUR INFRASTRUCTURE

3

Page 4: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NOORDGASTRANSPORT BV

• Partially owned (18.57%) by Neptune Energy Netherlands B.V., managed and operated by NGT; we provide

services.

• Other shareholders in NGT: XTO Netherlands Ltd 10.08%; Rosewood Exploration Ltd. 11.34%; PD Alternative

Investments NL ApS 40.00%; Viceroy Gas Transport II Lux S.à.r.l. 20.00%.

• NGT transports, treats and delivers gas for Neptune Energy and other gas producers such as NAM, Total,

Wintershall, ONE and Dana.

• NGT extension pipeline shareholders: Noordgastransport 70%; Viceroy Gas Transport Limited 18%; EBN 12%.

• Total length of pipeline: ± 470 km

• Total pipeline capacity: ± 42 million Nm3/day

• Annual gas throughput: ± 5 billion Nm3

• Uithuizen plant capacity: gas: ± 50 million Nm3 /day

- condensate: ± 800 m3 /day

• L10-AR platform / L10-AC platform

4

Noordgastransport B.V.

Office Zoetermeer

Einsteinlaan 10, 2719 EP Zoetermeer

T +31 - (0)79 368 67 66

Gas Treatment Station Uithuizen

Middenweg 2, 9981 VG Uithuizen

T +31 - (0)595 447 000

F +31 - (0)595 433 153

Page 5: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NOGAT BV

• Partially owned by Neptune Energy Global Gas Holding Nederland B.V. (15.0%).

• Managed and operated by Neptune Energy; GBI operated by NAM on behalf of NOGAT.

• Other shareholders NOGAT: EBN B.V. 45.0%, Stichting Depositary PGGM Infrastructure Funds 38.2%, Centrica

Production Nederland B.V. 1.8%.

• Transports, treats and delivers gas from Dutch, Danish and German gas producers.

• Total length of pipeline: ± 264 km

• Nominal pipeline capacity: ± 32 million Nm3/day

• Annual gas throughput: ± 3.6 billion Nm3

5

NOGAT B.V.

Office Zoetermeer

Einsteinlaan 10, 2719 EP Zoetermeer

T +31 - (0)79 368 68 68

Gas Treatment Installation Den Helder

Oostoeverweg 10, 1786 PT Den Helder

T +31 - (0)223 638302

F +31 - (0)223 638313

Page 6: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

6

CURRENTLY DRILLING

Page 7: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

L10 C/D/G Project Key Facts

• Production was ceased at beginning of 2016

• Heavy-lift removal by Boskalis; onshore demolition by Hoondert

Project Status Update

• No HSE incidents

• Pipeline and abandonment completed

• Offshore preparation activities completed

• Platforms in lighthouse mode, awaiting HLV arrival

• Heavy-lift removal scheduled to start in October 2019

• Onshore demolition & disposal will be completed within 9 months after onshore delivery

7

DECOMMISSIONING IN 2019

Page 8: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

• Installation: 2013• Location coordinates:

52º 11’ 30.84” N• 4º 08’ 14.66” E• Normally unmanned• Maximum POB: 14• Water depth: 20.0 m • Distance from Den Helder:

94.6 km (51.1 nm)• Distance from the Scheveningen shore:

13.4 km (7.2 nm)

8

Q13A ELECTRIFICATION

Page 9: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

Platform details:

• Zero emission to air and sea

Electrification details:

• Connected to Stedin’s 25 kV substation in the Constant Rebecquestraat (The Hague)

• 9 MW capacity of which only 25% used

• Dune crossing made by out-of service "Calvé" sewage pipe

• Preventing approx 16.000 ton/year of CO2 emissions

9

Q13A - A UNIQUE ELECTRIC POWERED PLATFORM

Page 10: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

10

Q13A & GREEN HYDROGEN PILOT: PROCESS DESCRIPTION

Green electricity supply from shore

Desalination/demineralization of sea water at Q13-platform

Electrolyze sweet water at Q13-platform

Hydrogen (H2) Oxygen (O2)

Evacuation with existing gas pipeline Vented from the platform

Page 11: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

Platform should have sufficient:

• Surface area and volume for pilot system

• Loadbearing capacity

• Hoisting capacity

• Electrical power for electrolyzer and auxiliaries

• Correct voltage for electrolyzer and auxiliaries

• Sea water

• Drinking water

• Hydrogen gas handling capacity (flow and pressure)

• Oxygen disposal

• Internet connection

• At least 2 year operational life time

• Crew to be trained in operation and HSE aspects of Hydrogen production

• HVAC

• election criteria by nexstep

11

SELECTION CRITERIA NEXSTEP

Page 12: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

• Main deck area: 400m²

• Deck load: 1680 kg/m²

• 40’ container: 40m²

• 25t: 625 kg/m²

12

SURFACE AREA, VOLUME AND LOADBEARING FOR PILOT SYSTEM

Page 13: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

• Type: PEM electrolyser

• Nr. of Cell stacks: 1

• Input power: 1 MW

• Water consumption: 300 l/h

• Hydrogen flow: 200Nm³/h

• Hydrogen purity: 99.998%

• Outlet pressure: 30 barg

• Footprint: 40ft container

• Weight: lifting weight of < 20 tonnes

• (perhaps requiring 40ft container to be broken down in smaller units)

13

Q13A-A HYDROGEN PILOT PLANT - ASSUMPTIONS

Page 14: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

Requirements

• Freshwater : 1.4 l/Nm³ x 400 Nm³/hr = 300l/hr

Available

• Seawater available: 19 m³/hr @ 6 barg

Additional

• Watermaker RO unit

- 1m³/hr, freshwater

- 1.9 m³/hr, seawater feed

- 6 kW

14

SEAWATER & FRESHWATER

Page 15: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

• Current production: 4000 b/d oil, 40,000 Nm³/d gas

• 400Nm³/hr @ 35 barg

• Line size required: 1”

• Pipeline operating pressure: approx. 32 barg

• Compressor probably not required

• TAQA could handle the hydrogen on P15

• Assess if hydrogen production can follow offshore wind profile

15

HYDROGEN HANDLING

Page 16: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

Neptune participates in Nexstep’s Reuse & Re-Purpose working group and since several years in TNO’s North Sea Energy Program. The H2 pilot was the result of staying tuned in these initiatives.

Neptune is still looking for partners in the pilot. Exploring meetings have been held with electrolysermanufacturers, Distributions System Operator Stedin and nearby windfarm operator Eneco.

Way forward:

• Budget approval from Q13-A partners (TAQA; EBN; Neptune)

• P15-C/D operator to join (TAQA)

• Request for subsidy; being done by TNO and Nexstep

• Get pilot partners on board to supply electricity and PEM electrolyser

16

STATUS AND WAY FORWARD

Page 17: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

Neptune Costs (+/- 30% accuracy):

2 mln eur for pre-study (Legal, Safety, Permitting, Operational, HR etc etc)

2.5 mln eur for platform modifications

Neptune receives 25% subsidy for the above amount

Not included:

PEM electrolyser and sea water treatment system ( to be purchased by TNO, who recieves80% subsidy) 2-2.5 mln eur

Electricy supply and transport 0.5 – 1 mln eur (trying to get Stedin and Eneco on board)

Modifications needed on host platform P15-C/D (TAQA to estimate and get subsidy andpartner approval)

17

COSTS

Page 18: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

Subsidy request finalised and all partners on board: Q1 2020

Budget approval for pre study work appr 2 mln Q1 2020

FEED and scope definition finalised Summer 2020

FID and start purchasing Long lead items (electrolyser) Q3 2020

Delivery electrolyser and Q13-A platform modifications ready: Summer 2021

Onshore electrolyzer tests ready (3 months) Q3 2021

Offshore installation and commissioning ready Q4 2021

Start up Q4 2021

Duration pilot (2 years)+ removal containerised units End 2023

18

TIMELINE

Page 19: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

Short term

• H2 will be used as fuelgas on TAQA’s P15

• H2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent

• H2 content in fuel gas is less than 10%; which is OK according to Solar Turbines

• 1,000 t/y abated CO2

Longer term

• Windpower far from shore can be evacuated via existing gas infrastructure to shore, and beyond

• H2 can carry part of the cost operational cost and enable tail end offshore domestic gas production

19

THE BENEFITS

Page 20: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

• Windpower to be routed further inland:

• “IJmuiden Ver” with 2 x 2 GW DC cables potentially to Geertruidenberg

• “Ten Noorden van de Waddeneilanden” potentially crossing the Waddenzee to Friesland

• High cost and long term permitting

20

WINDFARMS BEYOND 2023; ROADMAP TENNET

Page 21: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

• Hydrogen commingled with Natural gas to shore

• Can the conventional steam reforming process maintain the economic value of H2?

21

WINDFARMS BEYOND 2023: HYDROGEN ROUTE

Page 22: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

• Vattenvall and Equinor: Magnum powerplant run on “Blue Hydrogen”

• Gasunie started up HyStock in summer 2019

• NAM intends to convert their “Gaszuiveringsinstallatie” in Emmen

22

WINDFARMS BEYOND 2030: HYDROGEN ROUTE

Page 23: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

• Hydrogen form the Doggersbank to NL and UK via existing infrastructure

• 36” NGT pipeline has 8-12 GW H2 capacity.

• Pipeline technical capable of handling 100% H2

23

WINDFARMS BEYOND 2030: HYDROGEN ROUTE

Page 24: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

• Constrains in the electric grid can be solved by the gas infrastructure.

- Windfarms are being built further from shore

- Fluctuating renewable power can be handled by the gas infrastructure.

- Capacity of the 36” pipelines are about 10x higher than the biggest HV DC cables

- Comingled stream of H2 and natural gas is possible

- H2 extraction might be possible by conventional Steam reforming (Under investigation)

24

OFFSHORE HYDROGEN LONG TERM – THE BENEFITS

Page 25: PosHYdon Pilot - ogauthority.co.uk · will be used as fuelgas on TAQA’sP15 • H 2 Production: 200 Nm³/hr => 0,5 mln Nm³/y Natural gas equivalent • H 2 content in fuel gas is

NEPTUNE ENERGY THE NETHERLANDS

Sharing infrastructure and costs

- Accelerate the energy transition

- No renewable energy goes to waste

- Enables long term North Sea offshore gas production

- Fossil fuel with the lowest carbon footprint

- Domestic offshore gas has a lower footprint than imported gas

- Domestic gas/energy supply has socio/economic benefits

- Safest conditions / stict permiting and supervision

25

OFFSHORE HYDROGEN – THE BENEFITS