Portishead Branch Line – MetroWest Phase 1 Examination Library … · 2021. 1. 26. · Portishead...

75
Portishead Branch Line – MetroWest Phase 1 Examination Library Updated – 20 April 2021 This Examination Library relates to the Portishead Branch Line – MetroWest Phase 1 application. The library lists each document that has been submitted to the examination by any party and documents that have been issued by the Planning Inspectorate. All documents listed have been published to the National Infrastructure’s Planning website and a hyperlink is provided for each document. A unique reference is given to each document; these references will be used within the Report on the Implications for European Sites and will be used in the Examining Authority’s Recommendation Report. The documents within the library are categorised either by document type or by the deadline to which they are submitted. Please note the following: This is a working document and will be updated periodically as the examination progresses. Advice under Section 51 of the Planning Act 2008 that has been issued by the Inspectorate, is published to the National Infrastructure Website but is not included within the Examination Library as such advice is not an examination document. This document contains references to documents from the point the application was submitted. The order of documents within each sub-section is either chronological, numerical, or alphabetical and confers no priority or higher status on those that have been listed first.

Transcript of Portishead Branch Line – MetroWest Phase 1 Examination Library … · 2021. 1. 26. · Portishead...

  • Portishead Branch Line – MetroWest Phase 1

    Examination Library

    Updated – 20 April 2021

    This Examination Library relates to the Portishead Branch Line – MetroWest Phase 1 application. The library lists each document that has been submitted to the examination by any party and documents that have been issued by the Planning Inspectorate. All documents listed have been published to the National Infrastructure’s Planning website and a hyperlink is provided for each document. A unique reference is given to each document; these references will be used within the Report on the Implications for European Sites and will be used in the Examining Authority’s Recommendation Report. The documents within the library are categorised either by document type or by the deadline to which they are submitted.

    Please note the following:

    • This is a working document and will be updated periodically as the examination progresses.

    • Advice under Section 51 of the Planning Act 2008 that has been issued by the Inspectorate, is published to the National Infrastructure Website but is not included within the Examination Library as such advice is not an examination document.

    • This document contains references to documents from the point the application was submitted.

    • The order of documents within each sub-section is either chronological, numerical, or alphabetical and confers no priority or higher status on those that have been listed first.

  • Document Index

    TR040011 – Portishead Branch Line – MetroWest Phase 1 Examination Library - Index

    Category Reference

    Application Documents As submitted and amended version received before the PM. Any amended version received during the Examination stage to be saved under the Deadline received

    APP-xxx

    Adequacy of Consultation responses AoC-xxx

    Relevant Representations RR-xxx

    Procedural Decisions and Notifications from the Examining Authority

    Includes Examining Authority’s questions, s55, and post acceptance s51

    PD-xxx

    Additional Submissions Includes anything accepted at the Preliminary Meeting and correspondence that is either relevant to a procedural decision or contains factual information pertaining to the examination including responses to Rule 6 and Rule 8 letters

    AS-xxx

    Events and Hearings Includes agendas for hearings and site inspections, audio recordings, responses to notifications and applicant’s hearing notices

    EV-xxx

    Representations – by Deadline

    Procedural Deadline A PDA-xxx

    Procedural Deadline B PDB-xxx

    Documents requested in Rule 6 letter PDR6-xxx

    Deadline 1: REP1-xxx

  • Document Index

    Deadline 2: REP2-xxx

    Deadline 3: REP3-xxx

    Deadline 4: REP4-xxx

    Deadline 5: REP5-xxx

    Deadline 6: REP6-xxx

    Deadline 7 REP7-xxx

    Other Documents Includes s127/131/138 information, s56, s58 and s59 certificates, and transboundary documents

    OD-xxx

  • Document Index

    TR040011 – Portishead Branch Line – MetroWest Phase 1 Examination Library

    Application Documents

    APP-001 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 1.1 - Cover Letter to the Planning Inspectorate (including draft s55 Checklist)

    APP-002 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 1.2 - Application Form

    APP-003 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 1.3 - Copies of Newspaper Notices

    APP-004 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 1.4 - Navigation Document This has now been superseded by document AS-011

    APP-005 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 1.5 - Electronic Application Index

    APP-006 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 1.6 - West of England Combined Authority support letter

    APP-007 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.1 - Location Plan

    APP-008 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.2 - Land Plans This has now been superseded by document AS-012

    APP-009 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.3 - Works Plans This has now been superseded by document AS-013

    APP-010 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.4 - General Arrangement Plans

    APP-011 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.5 - Special Category Land Plan

    APP-012 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.6 - Crown Land Plans

    APP-013 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.7 - Disused railway engineering plans/ GRIP 4 Minor Civils - Part 1 of 2

    https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000336-1.1%20Cover%20Letter%20to%20the%20Planning%20Inspectorate%20(including%20draft%20s55%20Checklist).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000336-1.1%20Cover%20Letter%20to%20the%20Planning%20Inspectorate%20(including%20draft%20s55%20Checklist).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000337-1.2%20Application%20form.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000337-1.2%20Application%20form.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000338-1.3%20Copies%20of%20Newspaper%20Notices.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000338-1.3%20Copies%20of%20Newspaper%20Notices.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000339-1.4%20Navigation%20Document.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000339-1.4%20Navigation%20Document.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000340-1.5%20Electronic%20Application%20Index.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000340-1.5%20Electronic%20Application%20Index.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000341-1.6%20WECA%20support%20letter.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000341-1.6%20WECA%20support%20letter.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000342-2.1%20Location%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000342-2.1%20Location%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000347-2.2%20Land%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000347-2.2%20Land%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000352-2.3%20Works%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000352-2.3%20Works%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000365-2.4%20General%20Arrangement%20plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000365-2.4%20General%20Arrangement%20plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000373-2.5%20Special%20Category%20Land%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000373-2.5%20Special%20Category%20Land%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000382-2.6%20Crown%20Land%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000382-2.6%20Crown%20Land%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000383-2.7%20Disused%20railway%20engineering%20plans%20GRIP%204%20Minor%20Civils%20%E2%80%93%20Part%201%20of%202.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000383-2.7%20Disused%20railway%20engineering%20plans%20GRIP%204%20Minor%20Civils%20%E2%80%93%20Part%201%20of%202.pdf

  • Document Index

    APP-014 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.7 - Disused railway engineering plans/ GRIP 4 Minor Civils - Part 2 of 2

    APP-015 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.8.1 - 2.8.10 - Engineering Sections

    APP-016 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.9 - Longitudinal Profile of Railway Alignment (Section Plans)

    APP-017 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.10 - Railway Landscape Plans (disused line)

    APP-018 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.11 - 2.14 - Portishead Station Plans

    APP-019 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.15 - 2.17 - Trinity Footbridge Plans

    APP-020 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.18 - 2.20 - Pill Station

    APP-021 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.21 - Cattle Creep: Proposed General Arrangement (Sheets 1 and 2)

    APP-022 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.22 - Avon Road Underbridge

    APP-023 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.23 - 2.28 - Earthworks

    APP-024 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.29 - Compounds, Haul Roads and Access to Works Plan

    APP-025 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.30 - Permanent and Temporary Stopping up and Diversion Plan

    APP-026 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.31 - Permanent Traffic Regulation Order Plans

    APP-027 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.32 - Crossings to be Extinguished Plans

    APP-028 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.33 - Public Rights of Way Plans

    APP-029 Womble Bond Dickson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.34 - Diversion Routes for Pedestrians and Cyclists (Part 1 of 2)

    https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000384-2.7%20Disused%20railway%20engineering%20plans%20GRIP%204%20Minor%20Civils%20%E2%80%93%20Part%202%20of%202.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000384-2.7%20Disused%20railway%20engineering%20plans%20GRIP%204%20Minor%20Civils%20%E2%80%93%20Part%202%20of%202.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000385-2.8.1%20to%202.8.10%20Engineering%20Sections.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000385-2.8.1%20to%202.8.10%20Engineering%20Sections.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000386-2.9%20Longitudinal%20Profile%20of%20Railway%20Alignment%20(Section%20Plans).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000386-2.9%20Longitudinal%20Profile%20of%20Railway%20Alignment%20(Section%20Plans).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000343-2.10%20Railway%20Landscape%20Plans%20(disused%20line).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000343-2.10%20Railway%20Landscape%20Plans%20(disused%20line).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000344-2.11%20-%202.14%20Portishead%20Station%20plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000344-2.11%20-%202.14%20Portishead%20Station%20plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000345-2.15%20to%202.17%20Trinity%20Footbridge%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000345-2.15%20to%202.17%20Trinity%20Footbridge%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000346-2.18%20to%202.20%20Pill%20Station.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000346-2.18%20to%202.20%20Pill%20Station.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000348-2.21%20Cattle%20Creep%20Proposed%20General%20Arrangement%20(Sheets%201%20and%202).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000348-2.21%20Cattle%20Creep%20Proposed%20General%20Arrangement%20(Sheets%201%20and%202).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000349-2.22%20Avon%20Road%20Underbridge.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000349-2.22%20Avon%20Road%20Underbridge.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000350-2.23%20to%202.28%20Earthworks.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000350-2.23%20to%202.28%20Earthworks.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000351-2.29%20Compound%2C%20Haul%20Road%20and%20Access%20to%20Works%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000351-2.29%20Compound%2C%20Haul%20Road%20and%20Access%20to%20Works%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000353-2.30%20Permanent%20and%20Temporary%20Stopping%20Up%20and%20Diversion%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000353-2.30%20Permanent%20and%20Temporary%20Stopping%20Up%20and%20Diversion%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000354-2.31%20Permanent%20Traffic%20Regulation%20Order%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000354-2.31%20Permanent%20Traffic%20Regulation%20Order%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000355-2.32%20Crossings%20to%20be%20Extinguished%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000355-2.32%20Crossings%20to%20be%20Extinguished%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000356-2.33%20Public%20Rights%20of%20Way%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000356-2.33%20Public%20Rights%20of%20Way%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000357-2.34%20Diversion%20Routes%20for%20Pedestrians%20and%20Cyclists%20(Part%201%20of%202).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000357-2.34%20Diversion%20Routes%20for%20Pedestrians%20and%20Cyclists%20(Part%201%20of%202).pdf

  • Document Index

    APP-030 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.34 - Diversion Routes for Pedestrians and Cyclists (Part 2 of 2)

    APP-031 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.35 - New Highways Plans

    APP-032 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.36 - Cross Section Plans

    APP-033 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.37 - National Cycle Network (NCN) Temporary and Permanent Work Plans

    APP-034 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.37a - Bridleway Extension Under Elevated M5 Plan

    APP-035 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.38 - Portishead Station Car Park Layout, Landscaping and New Boulevard and Access Plan (includes lighting for footpaths)

    APP-036 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.39 - 2.40 - Wessex Water Compound and Portbury Hundred Construction Compound

    APP-037 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.41 - Easton in Gordano Flood Mitigation Plan

    APP-038 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.42 - Pill Station Car Park and PSP Layout, Landscaping, Lighting and Access Plan

    APP-039 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.43 - 2.44 - Pill Memorial Club Bus Stops and Car Park Plan and Construction Compound

    APP-040 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.45 - 2.46 - Ham Green Highway Works Plans and Pill Tunnel Eastern Portal Compound, Landscaping and Access Plan

    APP-041 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.47 - Ashton Vale Road and Winterstoke Road Highway Works Plan

    APP-042 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.48 - Ashton Vale Road Pedestrian Ramp Design Plan

    APP-043 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.49 - 2.51 - Sheepway Bridge Maintenance Compound and Interim Access Arrangements

    https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000358-2.34%20Diversion%20Routes%20for%20Pedestrians%20and%20Cyclists%20(Part%202%20of%202).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000358-2.34%20Diversion%20Routes%20for%20Pedestrians%20and%20Cyclists%20(Part%202%20of%202).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000359-2.35%20New%20Highways%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000359-2.35%20New%20Highways%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000360-2.36%20Cross%20Section%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000360-2.36%20Cross%20Section%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000361-2.37%20National%20Cycle%20Network%20(NCN)%20Temporary%20and%20Permanent%20Works%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000361-2.37%20National%20Cycle%20Network%20(NCN)%20Temporary%20and%20Permanent%20Works%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000362-2.37a%20Bridleway%20Extension%20Plan%20Under%20Elevated%20M5.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000362-2.37a%20Bridleway%20Extension%20Plan%20Under%20Elevated%20M5.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000363-2.38%20Portishead%20Station%20Car%20Park%20Layout%2C%20Landscaping%20and%20New%20Boulevard%20and%20Access%20Plan%20(includes%20lighting%20for%20footpaths).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000363-2.38%20Portishead%20Station%20Car%20Park%20Layout%2C%20Landscaping%20and%20New%20Boulevard%20and%20Access%20Plan%20(includes%20lighting%20for%20footpaths).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000364-2.39%20to%202.40%20Wessex%20Water%20Compound%20and%20Portbury%20Hundred%20Construction%20Compound.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000364-2.39%20to%202.40%20Wessex%20Water%20Compound%20and%20Portbury%20Hundred%20Construction%20Compound.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000366-2.41%20Easton%20in%20Gordano%20flood%20mitigation%20plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000366-2.41%20Easton%20in%20Gordano%20flood%20mitigation%20plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000367-2.42%20Pill%20Station%20Car%20Park%20and%20PSP%20Layout%2C%20Landscaping%2C%20Lighting%20and%20Access%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000367-2.42%20Pill%20Station%20Car%20Park%20and%20PSP%20Layout%2C%20Landscaping%2C%20Lighting%20and%20Access%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000368-2.43%20to%202.44%20Pill%20Memorial%20Club%20Bus%20Stops%2C%20Car%20Park%20Plan%20and%20Construction%20Compound.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000368-2.43%20to%202.44%20Pill%20Memorial%20Club%20Bus%20Stops%2C%20Car%20Park%20Plan%20and%20Construction%20Compound.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000369-2.45%20to%202.46%20Ham%20Green%20Highway%20Works%20and%20Pill%20Tunnel%20Eastern%20Portal%20Compound.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000369-2.45%20to%202.46%20Ham%20Green%20Highway%20Works%20and%20Pill%20Tunnel%20Eastern%20Portal%20Compound.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000370-2.47%20Ashton%20Vale%20Road%20and%20Winterstoke%20Road%20Highway%20Works%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000370-2.47%20Ashton%20Vale%20Road%20and%20Winterstoke%20Road%20Highway%20Works%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000371-2.48%20Ashton%20Vale%20Road%20Pedestrian%20Ramp%20Design%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000371-2.48%20Ashton%20Vale%20Road%20Pedestrian%20Ramp%20Design%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000372-2.49%20to%202.51%20Sheepway%20Bridge%20Maintenance%20Compound%20and%20Interim%20Access%20Arrangements.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000372-2.49%20to%202.51%20Sheepway%20Bridge%20Maintenance%20Compound%20and%20Interim%20Access%20Arrangements.pdf

  • Document Index

    APP-044 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.52 - Clanage Road Compound, Landscaping and Access Plan

    APP-045 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.53 - Environmental Masterplan

    APP-046 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.54 - Plan(s) of Statutory and Non-Statutory Sites and Features of the Historic Environment

    APP-047 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.55 - Plan of Statutory or Non-Statutory Sites and Features of Nature Conservation Designations

    APP-048 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.56 - Important Hedgerow Plan

    APP-049 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.57 - Portbury Hundred Location of Additional Tree Planting

    APP-050 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.58 - Habitat impacted by construction works within the Avon Gorge Woodlands SAC

    APP-051 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.59 - Great Crested Newt Indicative Pond Design

    APP-052 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 3.1 - Draft Development Consent Order This has now been superseded by document AS - 014

    APP-053 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 3.2 - Explanatory Memorandum

    APP-054 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 3.3 - DCO Validation Report

    APP-055 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 4.1 - Statement of Reasons This has now been superseded by document AS - 016

    APP-056 Womble Bond Dickinson (UK) LLP on behalf on North Somerset District Council – The Applicant 4.2 - Funding Statement

    APP-057 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 4.3 - Book of Reference

    APP-058 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report

    https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000374-2.52%20Clanage%20Road%20Compound%2C%20Landscaping%20and%20Access%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000374-2.52%20Clanage%20Road%20Compound%2C%20Landscaping%20and%20Access%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000375-2.53%20Environmental%20Masterplan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000375-2.53%20Environmental%20Masterplan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000376-2.54%20Plan(s)%20of%20Statutory%20and%20Non-Statutory%20Sites%20and%20Features%20of%20the%20Historic%20Environment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000376-2.54%20Plan(s)%20of%20Statutory%20and%20Non-Statutory%20Sites%20and%20Features%20of%20the%20Historic%20Environment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000377-2.55%20Plan%20of%20Statutory%20or%20Non-Statutory%20Sites%20and%20Features%20of%20Nature%20Conservation%20Designations.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000377-2.55%20Plan%20of%20Statutory%20or%20Non-Statutory%20Sites%20and%20Features%20of%20Nature%20Conservation%20Designations.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000378-2.56%20Important%20Hedgerow%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000378-2.56%20Important%20Hedgerow%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000379-2.57%20Portbury%20Hundred%20Location%20of%20Additional%20Tree%20Planting.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000379-2.57%20Portbury%20Hundred%20Location%20of%20Additional%20Tree%20Planting.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000380-2.58%20Habitat%20impacted%20by%20construction%20works%20within%20the%20Avon%20Gorge%20Woodlands%20SAC.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000380-2.58%20Habitat%20impacted%20by%20construction%20works%20within%20the%20Avon%20Gorge%20Woodlands%20SAC.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000381-2.59%20Great%20Crested%20Newt%20Indicative%20Pond%20Design.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000381-2.59%20Great%20Crested%20Newt%20Indicative%20Pond%20Design.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000387-3.1%20Draft%20proposed%20Development%20Consent%20Order.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000387-3.1%20Draft%20proposed%20Development%20Consent%20Order.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000389-3.2%20Explanatory%20Memorandum.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000389-3.2%20Explanatory%20Memorandum.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000390-3.3%20Validation%20Report.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000390-3.3%20Validation%20Report.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000391-4.1%20Statement%20of%20Reasons.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000391-4.1%20Statement%20of%20Reasons.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000392-4.2%20Funding%20Statement.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000392-4.2%20Funding%20Statement.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000394-4.3%20Book%20of%20Reference%20.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000394-4.3%20Book%20of%20Reference%20.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000395-5.1%20Consultation%20Report.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000395-5.1%20Consultation%20Report.pdf

  • Document Index

    APP-059 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - A1 to A2

    APP-060 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - B1 to B2

    APP-061 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendix - B3

    APP-062 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - C1 to D3

    APP-063 Womble Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - E1 to E4

    APP-064 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - F1 to F3

    APP-065 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - G1 to G3

    APP-066 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - H1 to H2

    APP-067 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - I1 to I6

    APP-068 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant Consultation Report Appendix - I7

    APP-069 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendix - I8

    APP-070 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - J1 to J2

    APP-071 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - K1 to K2

    APP-072 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.2 - Environmental Protection Statement of Engagement

    APP-073 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.3 - Consents and Licences required under Other Legislation

    APP-074 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.4 - Construction Strategy

    APP-075 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.5 - Report to Inform Habitat Regulations Assessment

    https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000396-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20A1%20to%20A2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000396-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20A1%20to%20A2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000397-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20B1%20to%20B2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000397-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20B1%20to%20B2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000398-5.1%20Consultation%20Report%20Appendix%20B3%20(redacted%20version).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000398-5.1%20Consultation%20Report%20Appendix%20B3%20(redacted%20version).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000400-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20C1%20to%20D3.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000400-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20C1%20to%20D3.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000401-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20E1%20to%20E4.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000401-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20E1%20to%20E4.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000402-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20F1%20to%20F3.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000402-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20F1%20to%20F3.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000403-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20G1%20to%20G3.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000403-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20G1%20to%20G3.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000404-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20H1%20to%20H2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000404-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20H1%20to%20H2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000405-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20I1%20to%20I6.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000405-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20I1%20to%20I6.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000406-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20I7.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000406-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20I7.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000407-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20I8.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000407-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20I8.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000408-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20J1%20to%20J2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000408-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20J1%20to%20J2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000409-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20K1%20to%20K2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000409-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20K1%20to%20K2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000410-5.2%20Environmental%20Protection%20Statement%20of%20Engagement.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000410-5.2%20Environmental%20Protection%20Statement%20of%20Engagement.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000411-5.3%20Consents%20and%20Licences%20required%20under%20Other%20Legislation.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000411-5.3%20Consents%20and%20Licences%20required%20under%20Other%20Legislation.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000412-5.4%20Construction%20strategy.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000412-5.4%20Construction%20strategy.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000413-5.5%20Report%20to%20Inform%20Habitats%20Regulations%20Assessment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000413-5.5%20Report%20to%20Inform%20Habitats%20Regulations%20Assessment.pdf

  • Document Index

    APP-076 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 1 of 17)

    APP-077 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 2 of 17) - Appendix B (Part 1 of 2)

    APP-078 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 3 of 17) - Appendix B (Part 2 of 2)

    APP-079 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 4 of 17) - Appendix C to J

    APP-080 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 5 of 17) - Appendix K to M

    APP-081 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 6 of 17) - Appendix N (Part 1)

    APP-082 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 7 of 17) - Appendix N (Part 2) - Tidal flood maps 2015

    APP-083 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 8 of 17) - Appendix N (Part 3) - Tidal flood maps 2075

    APP-084 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 9 of 17) - Appendix N (Part 4) - Tidal flood maps 2115

    APP-085 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 10 of 17) - Appendix N (Part 5) - Fluvial flood maps 2015

    APP-086 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 11 of 17) - Appendix N (Part 6) - Fluvial flood maps 2075

    APP-087 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 12 of 17) - Appendix N (Part 7) - Fluvial flood maps 2115

    APP-088 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 13 of 17) - Appendix N (Part 8) - Flood difference maps

    APP-089 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 14 of 17) - Appendix O (Part 1)

    https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000414-5.6%20Flood%20Risk%20Assessment%20(Part%201%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000414-5.6%20Flood%20Risk%20Assessment%20(Part%201%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000415-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20B%20EA%20data%20part%201%20(Part%202%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000415-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20B%20EA%20data%20part%201%20(Part%202%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000416-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20B%20EA%20data%20part%202%20(Part%203%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000416-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20B%20EA%20data%20part%202%20(Part%203%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000417-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20C%20to%20J%20(Part%204%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000417-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20C%20to%20J%20(Part%204%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000418-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20K%20to%20M%20(Part%205%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000418-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20K%20to%20M%20(Part%205%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000419-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%201%20(Part%206%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000419-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%201%20(Part%206%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000420-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%202%20-%20Tidal%20flood%20maps%202015%20(Part%207%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000420-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%202%20-%20Tidal%20flood%20maps%202015%20(Part%207%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000421-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%203%20-%20Tidal%20flood%20maps%202075%20(Part%208%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000421-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%203%20-%20Tidal%20flood%20maps%202075%20(Part%208%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000422-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%204%20-%20Tidal%20flood%20maps%202115%20(Part%209%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000422-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%204%20-%20Tidal%20flood%20maps%202115%20(Part%209%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000423-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%205%20-%20Fluvial%20flood%20maps%202015%20(Part%2010%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000423-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%205%20-%20Fluvial%20flood%20maps%202015%20(Part%2010%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000424-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%206%20-%20Fluvial%20flood%20maps%202075%20(Part%2011%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000424-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%206%20-%20Fluvial%20flood%20maps%202075%20(Part%2011%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000425-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%207%20-%20Fluvial%20flood%20maps%202115%20(Part%2012%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000425-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%207%20-%20Fluvial%20flood%20maps%202115%20(Part%2012%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000426-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%208%20-%20Flood%20difference%20maps%20(Part%2013%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000426-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%208%20-%20Flood%20difference%20maps%20(Part%2013%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000427-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20O%20part%201%20(Part%2014%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000427-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20O%20part%201%20(Part%2014%20of%2017).pdf

  • Document Index

    APP-090 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 15 of 17) - Appendix O (Part 2)

    APP-091 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 16 of 17) - Appendix O (Part 3)

    APP-092 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 17 of 17) - Appendix P to T

    APP-093 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.1 - Scoping Opinion

    APP-094 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.2 - ES Volume 1 – Non-Technical Summary

    APP-095 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.3 – ES Table of Contents

    APP-096 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.4 - ES Chapter 1 – Introduction

    APP-097 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.5 - ES Chapter 2 - Description of the Study Area

    APP-098 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.6 - ES Chapter 3 - Scheme Development and Alternatives Considered

    APP-099 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.7 - ES Chapter 4 - Description of the Proposed Works

    APP-100 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.8 - ES Chapter 5 - Approach to the Environmental Statement

    APP-101 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.9 - ES Chapter 6 – Planning Framework

    APP-102 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.10 - ES Chapter 7 – Air Quality and Greenhouse Gases

    APP-103 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.11 - ES Chapter 8 - Cultural Heritage

    APP-104 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.12 - ES Chapter 9 – Ecology and Biodiversity

    APP-105 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.13 - ES Chapter 10 – Geology, Hydrogeology, Ground Conditions and Contaminated Land

    https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000428-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20O%20part%202%20(Part%2015%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000428-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20O%20part%202%20(Part%2015%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000429-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20O%20part%203%20(Part%2016%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000429-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20O%20part%203%20(Part%2016%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000430-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20P%20to%20T%20(Part%2017%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000430-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20P%20to%20T%20(Part%2017%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000431-6.1%20Scoping%20Opinion.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000431-6.1%20Scoping%20Opinion.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000442-6.2%20ES%20Volume%201%20Non%20Technical%20Summary.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000442-6.2%20ES%20Volume%201%20Non%20Technical%20Summary.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000524-6.3%20Table%20of%20Contents.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000524-6.3%20Table%20of%20Contents.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000526-6.4%20ES%20Chapter%201%20Introduction.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000526-6.4%20ES%20Chapter%201%20Introduction.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000527-6.5%20ES%20Chapter%202%20Description%20of%20the%20Study%20Area.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000527-6.5%20ES%20Chapter%202%20Description%20of%20the%20Study%20Area.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000528-6.6%20ES%20Chapter%203%20Scheme%20Development.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000528-6.6%20ES%20Chapter%203%20Scheme%20Development.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000529-6.7%20ES%20Chapter%204%20Description%20of%20the%20Proposed%20Works.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000529-6.7%20ES%20Chapter%204%20Description%20of%20the%20Proposed%20Works.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000530-6.8%20ES%20Chapter%205%20Approach%20to%20the%20Environmental%20Statement.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000530-6.8%20ES%20Chapter%205%20Approach%20to%20the%20Environmental%20Statement.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000531-6.9%20ES%20Chapter%206%20Planning%20Framework.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000531-6.9%20ES%20Chapter%206%20Planning%20Framework.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000432-6.10%20ES%20Chapter%207%20Air%20Quality%20and%20Greenhouse%20Gases.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000432-6.10%20ES%20Chapter%207%20Air%20Quality%20and%20Greenhouse%20Gases.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000433-6.11%20ES%20Chapter%208%20Cultural%20Heritage.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000433-6.11%20ES%20Chapter%208%20Cultural%20Heritage.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000434-6.12%20ES%20Chapter%209%20Ecology%20and%20Biodiversity.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000434-6.12%20ES%20Chapter%209%20Ecology%20and%20Biodiversity.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000435-6.13%20ES%20Chapter%2010%20Geology%2C%20Hydrogeology%2C%20Ground%20Conditions%20and%20Contaminated%20Land.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000435-6.13%20ES%20Chapter%2010%20Geology%2C%20Hydrogeology%2C%20Ground%20Conditions%20and%20Contaminated%20Land.pdf

  • Document Index

    APP-106 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.14 - ES Chapter 11 – Landscape and Visual Impacts Assessment

    APP-107 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.15 - ES Chapter 12 – Materials and Waste

    APP-108 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.16 - ES Chapter 13 – Noise and Vibration

    APP-109 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.17 - ES Chapter 14 – Socio-economics and Economic Regeneration

    APP-110 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.18 - ES Chapter 15 – Soils, Agriculture, Land Use and Assets

    APP-111 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.19 - ES Chapter 16 – Transport, Access and Non-Motorised Users

    APP-112 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.20 - ES Chapter 17 – Water Resources, Drainage and Flood Risk

    APP-113 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.21 - ES Chapter 18 – In-combination and Cumulative Effects Assessment

    APP-114 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.23 - ES Chapter 19 – Glossary

    APP-115 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figure 1.3 Location Plan

    APP-116 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figure 6.1 - Planning Constraints

    APP-117 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figures 7.1 to 7.4 - Air Quality

    APP-118 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figures 8.1 and 8.2 - Cultural Heritage

    APP-119 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figures 9.1 to 9.4 – Ecology

    APP-120 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figure 10.1 - Ground Conditions

    https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000436-6.14%20ES%20Chapter%2011%20Landscape%20and%20Visual%20Impacts%20Assessment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000436-6.14%20ES%20Chapter%2011%20Landscape%20and%20Visual%20Impacts%20Assessment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000437-6.15%20ES%20Chapter%2012%20Materials%20and%20Waste.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000437-6.15%20ES%20Chapter%2012%20Materials%20and%20Waste.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000438-6.16%20ES%20Chapter%2013%20Noise%20and%20Vibration.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000438-6.16%20ES%20Chapter%2013%20Noise%20and%20Vibration.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000439-6.17%20ES%20Chapter%2014%20Socio-economics%20and%20Economic%20Regeneration.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000439-6.17%20ES%20Chapter%2014%20Socio-economics%20and%20Economic%20Regeneration.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000440-6.18%20ES%20Chapter%2015%20Soils%2C%20Agriculture%2C%20Land%20Use%20and%20Assets.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000440-6.18%20ES%20Chapter%2015%20Soils%2C%20Agriculture%2C%20Land%20Use%20and%20Assets.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000441-6.19%20ES%20Chapter%2016%20Transport%2C%20Access%20and%20Non-Motorised%20Users.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000441-6.19%20ES%20Chapter%2016%20Transport%2C%20Access%20and%20Non-Motorised%20Users.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000443-6.20%20ES%20Chapter%2017%20Water%20Resources%2C%20Drainage%20and%20Flood%20Risk.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000443-6.20%20ES%20Chapter%2017%20Water%20Resources%2C%20Drainage%20and%20Flood%20Risk.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000444-6.21%20ES%20Chapter%2018%20In-combination%20and%20Cumulative%20Effects%20Assessment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000444-6.21%20ES%20Chapter%2018%20In-combination%20and%20Cumulative%20Effects%20Assessment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000445-6.23%20ES%20Chapter%2019%20Glossary.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000445-6.23%20ES%20Chapter%2019%20Glossary.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000446-6.24%20ES%20Volume%203%20Figure%201.3%20Location%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000446-6.24%20ES%20Volume%203%20Figure%201.3%20Location%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000447-6.24%20ES%20Volume%203%20Figure%206.1%20Planning%20Constraints.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000447-6.24%20ES%20Volume%203%20Figure%206.1%20Planning%20Constraints.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000448-6.24%20ES%20Volume%203%20Figures%207.1%20to%207.4%20Air%20Quality.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000448-6.24%20ES%20Volume%203%20Figures%207.1%20to%207.4%20Air%20Quality.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000462-6.25%20ES%20Volume%204%20Appendix%208%20Series%20Cultural%20Heritage.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000462-6.25%20ES%20Volume%204%20Appendix%208%20Series%20Cultural%20Heritage.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000450-6.24%20ES%20Volume%203%20Figures%209.1%20to%209.4%20Ecology.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000450-6.24%20ES%20Volume%203%20Figures%209.1%20to%209.4%20Ecology.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000451-6.24%20ES%20Volume%203%20Figure%2010.1%20Ground%20Conditions.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000451-6.24%20ES%20Volume%203%20Figure%2010.1%20Ground%20Conditions.pdf

  • Document Index

    APP-121 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figures 11.1 to 11.3 - Landscape and Visual Impacts Assessment

    APP-122 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figures 13.1 and 13.2 - Noise Vibration

    APP-123 Womble Bond Dickenson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figure 17.1 - Water Features

    APP-124 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figure 18.1 - Proposed Development

    APP-125 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 1.1 to 1.3 - Series Introduction

    APP-126 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 4.1 - Code of Construction Practice

    APP-127 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 4.2 - Master Construction Environmental Management Plan

    APP-128 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 4.3 - Schedule of Mitigation

    APP-129 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 4.4 to 4.8 - Description of the Proposed Works

    APP-130 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 5 - Series Approach to the Environmental Statement

    APP-131 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 7 Series - Air Quality and Greenhouse Gases

    APP-132 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 8 - Series Cultural Heritage

    APP-133 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.1 - Extended Phase 1 Habitat Survey – Please see REP4-005 for figures

    APP-134 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.2 - Bat Technical Appendix

    https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000452-6.24%20ES%20Volume%203%20Figures%2011.1%2C%2011.2%20and%2011.3%20LVIA.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000452-6.24%20ES%20Volume%203%20Figures%2011.1%2C%2011.2%20and%2011.3%20LVIA.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000453-6.24%20ES%20Volume%203%20Figures%2013.1%2C%2013.2%20Noise%20Vibration.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000453-6.24%20ES%20Volume%203%20Figures%2013.1%2C%2013.2%20Noise%20Vibration.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000454-6.24%20ES%20Volume%203%20Figure%2017.1%20Water%20Features.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000454-6.24%20ES%20Volume%203%20Figure%2017.1%20Water%20Features.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000455-6.24%20ES%20Volume%203%20Figure%2018.1%20Proposed%20Development.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000455-6.24%20ES%20Volume%203%20Figure%2018.1%20Proposed%20Development.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000456-6.25%20ES%20Volume%204%20Appendix%201%20Series%20Introduction.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000456-6.25%20ES%20Volume%204%20Appendix%201%20Series%20Introduction.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000457-6.25%20ES%20Volume%204%20Appendix%204.1%20Code%20of%20Construction%20Practice.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000457-6.25%20ES%20Volume%204%20Appendix%204.1%20Code%20of%20Construction%20Practice.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000458-6.25%20ES%20Volume%204%20Appendix%204.2%20Master%20Construction%20Environmental%20Management%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000458-6.25%20ES%20Volume%204%20Appendix%204.2%20Master%20Construction%20Environmental%20Management%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000459-6.25%20ES%20Volume%204%20Appendix%204.3%20Schedule%20of%20Mitigation.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000459-6.25%20ES%20Volume%204%20Appendix%204.3%20Schedule%20of%20Mitigation.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000522-6.25%20ES%20Volume%204%20Appendix%204.4%20to%204.8%20Description%20of%20the%20Proposed%20Works.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000522-6.25%20ES%20Volume%204%20Appendix%204.4%20to%204.8%20Description%20of%20the%20Proposed%20Works.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000460-6.25%20ES%20Volume%204%20Appendix%205%20Series%20Approach%20to%20the%20Environmental%20Statement.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000460-6.25%20ES%20Volume%204%20Appendix%205%20Series%20Approach%20to%20the%20Environmental%20Statement.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000461-6.25%20ES%20Volume%204%20Appendix%207%20Series%20Air%20Quality%20and%20Greenhouse%20Gases.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000461-6.25%20ES%20Volume%204%20Appendix%207%20Series%20Air%20Quality%20and%20Greenhouse%20Gases.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000462-6.25%20ES%20Volume%204%20Appendix%208%20Series%20Cultural%20Heritage.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000462-6.25%20ES%20Volume%204%20Appendix%208%20Series%20Cultural%20Heritage.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000463-6.25%20ES%20Volume%204%20Appendix%209.1%20Phase%201%20Survey%20Part%201.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000463-6.25%20ES%20Volume%204%20Appendix%209.1%20Phase%201%20Survey%20Part%201.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000464-6.25%20ES%20Volume%204%20Appendix%209.2%20Bat%20Technical%20Appendix.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000464-6.25%20ES%20Volume%204%20Appendix%209.2%20Bat%20Technical%20Appendix.pdf

  • Document Index

    APP-135 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.3A and 9.3B - Bird Surveys

    APP-136 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.3c - Schedule 1 Bird Survey CONFIDENTIAL

    APP-137 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.4 and 9.5 - Great Crested Newt Survey Report and Reptiles

    APP-138 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.6 - Badger Survey CONFIDENTIAL

    APP-139 Womble Bond Dickenson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.7 Dormice, 9.8 Otters and 9.9 Water Voles

    APP-140 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.10 - Flora Survey: Avon Gorge Woodlands SAC/Avon Gorge SSSI

    APP-141 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.11 - Avon Gorge Vegetation Management Plan

    APP-142 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.12 - Report to inform Habitats Regulations Assessment

    APP-143 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.13 to 9.18 - Various ecology appendices

    APP-144 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 10.1 - Risk Classification

    APP-145 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 10.2 - Land Contamination Summary Report Annex A1 (Part 1 of 5) Portishead Station Envirocheck

    APP-146 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 10.2 - Land Contamination Summary Report Annex A2 (Part 2 of 5) Portishead to Portbury Envirocheck

    https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000465-6.25%20ES%20Volume%204%20Appendix%209.3A%20and%209.3B%20Bird%20Surveys.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000465-6.25%20ES%20Volume%204%20Appendix%209.3A%20and%209.3B%20Bird%20Surveys.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000466-6.25%20ES%20Volume%204%20Appendix%209.3c%20Schedule%201%20Bird%20Survey%20CONFIDENTIAL.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000466-6.25%20ES%20Volume%204%20Appendix%209.3c%20Schedule%201%20Bird%20Survey%20CONFIDENTIAL.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000467-6.25%20ES%20Volume%204%20Appendix%209.4%20and%209.5%20GCNs%20and%20Reptiles.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000467-6.25%20ES%20Volume%204%20Appendix%209.4%20and%209.5%20GCNs%20and%20Reptiles.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000468-6.25%20ES%20Volume%204%20Appendix%209.6%20Badger%20Survey%20CONFIDENTIAL.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000468-6.25%20ES%20Volume%204%20Appendix%209.6%20Badger%20Survey%20CONFIDENTIAL.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000469-6.25%20ES%20Volume%204%20Appendix%209.7%20Dormouse%2C%209.8%20Otter%20and%209.9%20Water%20Vole.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000469-6.25%20ES%20Volume%204%20Appendix%209.7%20Dormouse%2C%209.8%20Otter%20and%209.9%20Water%20Vole.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000470-6.25%20ES%20Volume%204%20Appendix%209.10%20Flora%20Report.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000470-6.25%20ES%20Volume%204%20Appendix%209.10%20Flora%20Report.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000471-6.25%20ES%20Volume%204%20Appendix%209.11%20Avon%20Gorge%20Vegetation%20Management%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000471-6.25%20ES%20Volume%204%20Appendix%209.11%20Avon%20Gorge%20Vegetation%20Management%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000472-6.25%20ES%20Volume%204%20Appendix%209.12%20Report%20to%20inform%20Habitats%20Regulations%20Assessment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000472-6.25%20ES%20Volume%204%20Appendix%209.12%20Report%20to%20inform%20Habitats%20Regulations%20Assessment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000473-6.25%20ES%20Volume%204%20Appendix%209.13%20to%209.18%20Various%20ecology%20appendices.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000473-6.25%20ES%20Volume%204%20Appendix%209.13%20to%209.18%20Various%20ecology%20appendices.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000474-6.25%20ES%20Volume%204%20Appendix%2010.1%20Risk%20Classification.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000474-6.25%20ES%20Volume%204%20Appendix%2010.1%20Risk%20Classification.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000475-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A1.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000475-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A1.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000482-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000482-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A2.pdf

  • Document Index

    APP-147 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 10.2 - Land Contamination Summary Report Annex A3 (Part 3 of 5) Portishead to Easton-in- Gordano Envirocheck

    APP-148 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 10.2 - Land Contamination Summary Report Annex A4 (Part 4 of 5) Pill Envirocheck

    APP-149 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 10.2 - Land Contamination Summary Report Annex A5 (Part 5 of 5) Ashton Vale Envirocheck

    APP-150 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 10.2 - Land Contamination Annexes B to J

    APP-151 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 11.1 and 11.2 - Landscape and Visual Impact Assessment

    APP-152 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 11.3 and 11.4 - Landscape and Visual Impact Assessment

    APP-153 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 13 Series - Noise and Vibration

    APP-154 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 14 Series - Socio-economics and Economic Regeneration

    APP-155 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 1 of 18)

    APP-156 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 2 of 18) - Figures Vol 1

    APP-157 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 3 of 18) - Figures Vol 2

    APP-158 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 4 of 18) - Figures Vol 3

    https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000483-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A3.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000483-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A3.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000484-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A4.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000484-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A4.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000485-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A5.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000485-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A5.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000486-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annexes%20B%20to%20J.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000486-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annexes%20B%20to%20J.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000476-6.25%20ES%20Volume%204%20Appendix%2011%20Series%20LVIA%2011.1%20and%2011.2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000476-6.25%20ES%20Volume%204%20Appendix%2011%20Series%20LVIA%2011.1%20and%2011.2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000477-6.25%20ES%20Volume%204%20Appendix%2011%20Series%20LVIA%2011.3%20and%2011.4.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000477-6.25%20ES%20Volume%204%20Appendix%2011%20Series%20LVIA%2011.3%20and%2011.4.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000478-6.25%20ES%20Volume%204%20Appendix%2013%20Series%20Noise%20and%20Vibration.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000478-6.25%20ES%20Volume%204%20Appendix%2013%20Series%20Noise%20and%20Vibration.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000479-6.25%20ES%20Volume%204%20Appendix%20Series%2014%20Socio-economics.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000479-6.25%20ES%20Volume%204%20Appendix%20Series%2014%20Socio-economics.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000504-6.25%20ES%20Volume%204%20Appendix%2016.1%20Transport%20Assessment_Pt%201%20Main%20Report%20(Part%201%20of%2018).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000504-6.25%20ES%20Volume%204%20Appendix%2016.1%20Transport%20Assessment_Pt%201%20Main%20Report%20(Part%201%20of%2018).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000505-6.25%20ES%20Volume%204%20Appendix%2016.1%20Transport%20Assessment_Pt%202%20FIGURES%201%20(Part%202%20of%2018).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000505-6.25%20ES%20Volume%204%20Appendix%2016.1%20Transport%20Assessment_Pt%202%20FIGURES%201%20(Part%202%20of%2018).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000506-6.25%20ES%20Volume%204%20Appendix%2016.1%20Transport%20Assessment_Pt%203%20FIGURES%202%20(Part%203%20of%2018).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000506-6.25%20ES%20Volume%204%20Appendix%2016.1%20Transport%20Assessment_Pt%203%20FIGURES%202%20(Part%203%20of%2018).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000507-6.25%20ES%20Volume%204%20Appendix%2016.1%20Transport%20Assessment_Pt%204%20FIGURES%203%20(Part%204%20of%2018).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000507-6.25%20ES%20Volume%204%20Appendix%2016.1%20Transport%20Assessment_Pt%204%20FIGURES%203%20(Part%204%20of%2018).pdf

  • Document Index

    APP-159 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 5 of 18) - Appendix A TA Scoping Report

    APP-160 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 6 of 18) - Appendix B Committed Developments

    APP-161 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 7 of 18) - Appendix C Report of Surveys

    APP-162 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 8 of 18) - Appendix D Accidents Data

    APP-163 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 9 of 18) - Appendix E Network Plots

    APP-164 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 10 of 18) - Appendix F Junction Assessments

    APP-165 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 11 of 18) - Appendix G Distribution and Assignments

    APP-166 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 12 of 18) - Appendix H Avonmouth/Severnside

    APP-167 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 13 of 18) - Appendix I Parking Surveys

    APP-168 Womble Bond Dicki