Portishead Branch Line – MetroWest Phase 1 Examination Library … · 2021. 1. 26. · Portishead...
Transcript of Portishead Branch Line – MetroWest Phase 1 Examination Library … · 2021. 1. 26. · Portishead...
-
Portishead Branch Line – MetroWest Phase 1
Examination Library
Updated – 20 April 2021
This Examination Library relates to the Portishead Branch Line – MetroWest Phase 1 application. The library lists each document that has been submitted to the examination by any party and documents that have been issued by the Planning Inspectorate. All documents listed have been published to the National Infrastructure’s Planning website and a hyperlink is provided for each document. A unique reference is given to each document; these references will be used within the Report on the Implications for European Sites and will be used in the Examining Authority’s Recommendation Report. The documents within the library are categorised either by document type or by the deadline to which they are submitted.
Please note the following:
• This is a working document and will be updated periodically as the examination progresses.
• Advice under Section 51 of the Planning Act 2008 that has been issued by the Inspectorate, is published to the National Infrastructure Website but is not included within the Examination Library as such advice is not an examination document.
• This document contains references to documents from the point the application was submitted.
• The order of documents within each sub-section is either chronological, numerical, or alphabetical and confers no priority or higher status on those that have been listed first.
-
Document Index
TR040011 – Portishead Branch Line – MetroWest Phase 1 Examination Library - Index
Category Reference
Application Documents As submitted and amended version received before the PM. Any amended version received during the Examination stage to be saved under the Deadline received
APP-xxx
Adequacy of Consultation responses AoC-xxx
Relevant Representations RR-xxx
Procedural Decisions and Notifications from the Examining Authority
Includes Examining Authority’s questions, s55, and post acceptance s51
PD-xxx
Additional Submissions Includes anything accepted at the Preliminary Meeting and correspondence that is either relevant to a procedural decision or contains factual information pertaining to the examination including responses to Rule 6 and Rule 8 letters
AS-xxx
Events and Hearings Includes agendas for hearings and site inspections, audio recordings, responses to notifications and applicant’s hearing notices
EV-xxx
Representations – by Deadline
Procedural Deadline A PDA-xxx
Procedural Deadline B PDB-xxx
Documents requested in Rule 6 letter PDR6-xxx
Deadline 1: REP1-xxx
-
Document Index
Deadline 2: REP2-xxx
Deadline 3: REP3-xxx
Deadline 4: REP4-xxx
Deadline 5: REP5-xxx
Deadline 6: REP6-xxx
Deadline 7 REP7-xxx
Other Documents Includes s127/131/138 information, s56, s58 and s59 certificates, and transboundary documents
OD-xxx
-
Document Index
TR040011 – Portishead Branch Line – MetroWest Phase 1 Examination Library
Application Documents
APP-001 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 1.1 - Cover Letter to the Planning Inspectorate (including draft s55 Checklist)
APP-002 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 1.2 - Application Form
APP-003 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 1.3 - Copies of Newspaper Notices
APP-004 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 1.4 - Navigation Document This has now been superseded by document AS-011
APP-005 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 1.5 - Electronic Application Index
APP-006 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 1.6 - West of England Combined Authority support letter
APP-007 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.1 - Location Plan
APP-008 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.2 - Land Plans This has now been superseded by document AS-012
APP-009 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.3 - Works Plans This has now been superseded by document AS-013
APP-010 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.4 - General Arrangement Plans
APP-011 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.5 - Special Category Land Plan
APP-012 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.6 - Crown Land Plans
APP-013 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.7 - Disused railway engineering plans/ GRIP 4 Minor Civils - Part 1 of 2
https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000336-1.1%20Cover%20Letter%20to%20the%20Planning%20Inspectorate%20(including%20draft%20s55%20Checklist).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000336-1.1%20Cover%20Letter%20to%20the%20Planning%20Inspectorate%20(including%20draft%20s55%20Checklist).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000337-1.2%20Application%20form.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000337-1.2%20Application%20form.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000338-1.3%20Copies%20of%20Newspaper%20Notices.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000338-1.3%20Copies%20of%20Newspaper%20Notices.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000339-1.4%20Navigation%20Document.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000339-1.4%20Navigation%20Document.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000340-1.5%20Electronic%20Application%20Index.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000340-1.5%20Electronic%20Application%20Index.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000341-1.6%20WECA%20support%20letter.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000341-1.6%20WECA%20support%20letter.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000342-2.1%20Location%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000342-2.1%20Location%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000347-2.2%20Land%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000347-2.2%20Land%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000352-2.3%20Works%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000352-2.3%20Works%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000365-2.4%20General%20Arrangement%20plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000365-2.4%20General%20Arrangement%20plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000373-2.5%20Special%20Category%20Land%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000373-2.5%20Special%20Category%20Land%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000382-2.6%20Crown%20Land%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000382-2.6%20Crown%20Land%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000383-2.7%20Disused%20railway%20engineering%20plans%20GRIP%204%20Minor%20Civils%20%E2%80%93%20Part%201%20of%202.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000383-2.7%20Disused%20railway%20engineering%20plans%20GRIP%204%20Minor%20Civils%20%E2%80%93%20Part%201%20of%202.pdf
-
Document Index
APP-014 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.7 - Disused railway engineering plans/ GRIP 4 Minor Civils - Part 2 of 2
APP-015 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.8.1 - 2.8.10 - Engineering Sections
APP-016 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.9 - Longitudinal Profile of Railway Alignment (Section Plans)
APP-017 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.10 - Railway Landscape Plans (disused line)
APP-018 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.11 - 2.14 - Portishead Station Plans
APP-019 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.15 - 2.17 - Trinity Footbridge Plans
APP-020 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.18 - 2.20 - Pill Station
APP-021 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.21 - Cattle Creep: Proposed General Arrangement (Sheets 1 and 2)
APP-022 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.22 - Avon Road Underbridge
APP-023 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.23 - 2.28 - Earthworks
APP-024 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.29 - Compounds, Haul Roads and Access to Works Plan
APP-025 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.30 - Permanent and Temporary Stopping up and Diversion Plan
APP-026 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.31 - Permanent Traffic Regulation Order Plans
APP-027 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.32 - Crossings to be Extinguished Plans
APP-028 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.33 - Public Rights of Way Plans
APP-029 Womble Bond Dickson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.34 - Diversion Routes for Pedestrians and Cyclists (Part 1 of 2)
https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000384-2.7%20Disused%20railway%20engineering%20plans%20GRIP%204%20Minor%20Civils%20%E2%80%93%20Part%202%20of%202.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000384-2.7%20Disused%20railway%20engineering%20plans%20GRIP%204%20Minor%20Civils%20%E2%80%93%20Part%202%20of%202.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000385-2.8.1%20to%202.8.10%20Engineering%20Sections.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000385-2.8.1%20to%202.8.10%20Engineering%20Sections.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000386-2.9%20Longitudinal%20Profile%20of%20Railway%20Alignment%20(Section%20Plans).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000386-2.9%20Longitudinal%20Profile%20of%20Railway%20Alignment%20(Section%20Plans).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000343-2.10%20Railway%20Landscape%20Plans%20(disused%20line).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000343-2.10%20Railway%20Landscape%20Plans%20(disused%20line).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000344-2.11%20-%202.14%20Portishead%20Station%20plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000344-2.11%20-%202.14%20Portishead%20Station%20plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000345-2.15%20to%202.17%20Trinity%20Footbridge%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000345-2.15%20to%202.17%20Trinity%20Footbridge%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000346-2.18%20to%202.20%20Pill%20Station.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000346-2.18%20to%202.20%20Pill%20Station.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000348-2.21%20Cattle%20Creep%20Proposed%20General%20Arrangement%20(Sheets%201%20and%202).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000348-2.21%20Cattle%20Creep%20Proposed%20General%20Arrangement%20(Sheets%201%20and%202).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000349-2.22%20Avon%20Road%20Underbridge.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000349-2.22%20Avon%20Road%20Underbridge.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000350-2.23%20to%202.28%20Earthworks.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000350-2.23%20to%202.28%20Earthworks.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000351-2.29%20Compound%2C%20Haul%20Road%20and%20Access%20to%20Works%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000351-2.29%20Compound%2C%20Haul%20Road%20and%20Access%20to%20Works%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000353-2.30%20Permanent%20and%20Temporary%20Stopping%20Up%20and%20Diversion%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000353-2.30%20Permanent%20and%20Temporary%20Stopping%20Up%20and%20Diversion%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000354-2.31%20Permanent%20Traffic%20Regulation%20Order%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000354-2.31%20Permanent%20Traffic%20Regulation%20Order%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000355-2.32%20Crossings%20to%20be%20Extinguished%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000355-2.32%20Crossings%20to%20be%20Extinguished%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000356-2.33%20Public%20Rights%20of%20Way%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000356-2.33%20Public%20Rights%20of%20Way%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000357-2.34%20Diversion%20Routes%20for%20Pedestrians%20and%20Cyclists%20(Part%201%20of%202).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000357-2.34%20Diversion%20Routes%20for%20Pedestrians%20and%20Cyclists%20(Part%201%20of%202).pdf
-
Document Index
APP-030 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.34 - Diversion Routes for Pedestrians and Cyclists (Part 2 of 2)
APP-031 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.35 - New Highways Plans
APP-032 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.36 - Cross Section Plans
APP-033 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.37 - National Cycle Network (NCN) Temporary and Permanent Work Plans
APP-034 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.37a - Bridleway Extension Under Elevated M5 Plan
APP-035 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.38 - Portishead Station Car Park Layout, Landscaping and New Boulevard and Access Plan (includes lighting for footpaths)
APP-036 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.39 - 2.40 - Wessex Water Compound and Portbury Hundred Construction Compound
APP-037 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.41 - Easton in Gordano Flood Mitigation Plan
APP-038 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.42 - Pill Station Car Park and PSP Layout, Landscaping, Lighting and Access Plan
APP-039 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.43 - 2.44 - Pill Memorial Club Bus Stops and Car Park Plan and Construction Compound
APP-040 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.45 - 2.46 - Ham Green Highway Works Plans and Pill Tunnel Eastern Portal Compound, Landscaping and Access Plan
APP-041 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.47 - Ashton Vale Road and Winterstoke Road Highway Works Plan
APP-042 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.48 - Ashton Vale Road Pedestrian Ramp Design Plan
APP-043 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.49 - 2.51 - Sheepway Bridge Maintenance Compound and Interim Access Arrangements
https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000358-2.34%20Diversion%20Routes%20for%20Pedestrians%20and%20Cyclists%20(Part%202%20of%202).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000358-2.34%20Diversion%20Routes%20for%20Pedestrians%20and%20Cyclists%20(Part%202%20of%202).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000359-2.35%20New%20Highways%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000359-2.35%20New%20Highways%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000360-2.36%20Cross%20Section%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000360-2.36%20Cross%20Section%20Plans.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000361-2.37%20National%20Cycle%20Network%20(NCN)%20Temporary%20and%20Permanent%20Works%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000361-2.37%20National%20Cycle%20Network%20(NCN)%20Temporary%20and%20Permanent%20Works%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000362-2.37a%20Bridleway%20Extension%20Plan%20Under%20Elevated%20M5.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000362-2.37a%20Bridleway%20Extension%20Plan%20Under%20Elevated%20M5.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000363-2.38%20Portishead%20Station%20Car%20Park%20Layout%2C%20Landscaping%20and%20New%20Boulevard%20and%20Access%20Plan%20(includes%20lighting%20for%20footpaths).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000363-2.38%20Portishead%20Station%20Car%20Park%20Layout%2C%20Landscaping%20and%20New%20Boulevard%20and%20Access%20Plan%20(includes%20lighting%20for%20footpaths).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000364-2.39%20to%202.40%20Wessex%20Water%20Compound%20and%20Portbury%20Hundred%20Construction%20Compound.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000364-2.39%20to%202.40%20Wessex%20Water%20Compound%20and%20Portbury%20Hundred%20Construction%20Compound.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000366-2.41%20Easton%20in%20Gordano%20flood%20mitigation%20plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000366-2.41%20Easton%20in%20Gordano%20flood%20mitigation%20plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000367-2.42%20Pill%20Station%20Car%20Park%20and%20PSP%20Layout%2C%20Landscaping%2C%20Lighting%20and%20Access%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000367-2.42%20Pill%20Station%20Car%20Park%20and%20PSP%20Layout%2C%20Landscaping%2C%20Lighting%20and%20Access%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000368-2.43%20to%202.44%20Pill%20Memorial%20Club%20Bus%20Stops%2C%20Car%20Park%20Plan%20and%20Construction%20Compound.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000368-2.43%20to%202.44%20Pill%20Memorial%20Club%20Bus%20Stops%2C%20Car%20Park%20Plan%20and%20Construction%20Compound.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000369-2.45%20to%202.46%20Ham%20Green%20Highway%20Works%20and%20Pill%20Tunnel%20Eastern%20Portal%20Compound.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000369-2.45%20to%202.46%20Ham%20Green%20Highway%20Works%20and%20Pill%20Tunnel%20Eastern%20Portal%20Compound.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000370-2.47%20Ashton%20Vale%20Road%20and%20Winterstoke%20Road%20Highway%20Works%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000370-2.47%20Ashton%20Vale%20Road%20and%20Winterstoke%20Road%20Highway%20Works%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000371-2.48%20Ashton%20Vale%20Road%20Pedestrian%20Ramp%20Design%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000371-2.48%20Ashton%20Vale%20Road%20Pedestrian%20Ramp%20Design%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000372-2.49%20to%202.51%20Sheepway%20Bridge%20Maintenance%20Compound%20and%20Interim%20Access%20Arrangements.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000372-2.49%20to%202.51%20Sheepway%20Bridge%20Maintenance%20Compound%20and%20Interim%20Access%20Arrangements.pdf
-
Document Index
APP-044 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.52 - Clanage Road Compound, Landscaping and Access Plan
APP-045 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.53 - Environmental Masterplan
APP-046 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.54 - Plan(s) of Statutory and Non-Statutory Sites and Features of the Historic Environment
APP-047 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.55 - Plan of Statutory or Non-Statutory Sites and Features of Nature Conservation Designations
APP-048 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.56 - Important Hedgerow Plan
APP-049 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.57 - Portbury Hundred Location of Additional Tree Planting
APP-050 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.58 - Habitat impacted by construction works within the Avon Gorge Woodlands SAC
APP-051 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 2.59 - Great Crested Newt Indicative Pond Design
APP-052 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 3.1 - Draft Development Consent Order This has now been superseded by document AS - 014
APP-053 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 3.2 - Explanatory Memorandum
APP-054 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 3.3 - DCO Validation Report
APP-055 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 4.1 - Statement of Reasons This has now been superseded by document AS - 016
APP-056 Womble Bond Dickinson (UK) LLP on behalf on North Somerset District Council – The Applicant 4.2 - Funding Statement
APP-057 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 4.3 - Book of Reference
APP-058 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report
https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000374-2.52%20Clanage%20Road%20Compound%2C%20Landscaping%20and%20Access%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000374-2.52%20Clanage%20Road%20Compound%2C%20Landscaping%20and%20Access%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000375-2.53%20Environmental%20Masterplan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000375-2.53%20Environmental%20Masterplan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000376-2.54%20Plan(s)%20of%20Statutory%20and%20Non-Statutory%20Sites%20and%20Features%20of%20the%20Historic%20Environment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000376-2.54%20Plan(s)%20of%20Statutory%20and%20Non-Statutory%20Sites%20and%20Features%20of%20the%20Historic%20Environment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000377-2.55%20Plan%20of%20Statutory%20or%20Non-Statutory%20Sites%20and%20Features%20of%20Nature%20Conservation%20Designations.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000377-2.55%20Plan%20of%20Statutory%20or%20Non-Statutory%20Sites%20and%20Features%20of%20Nature%20Conservation%20Designations.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000378-2.56%20Important%20Hedgerow%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000378-2.56%20Important%20Hedgerow%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000379-2.57%20Portbury%20Hundred%20Location%20of%20Additional%20Tree%20Planting.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000379-2.57%20Portbury%20Hundred%20Location%20of%20Additional%20Tree%20Planting.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000380-2.58%20Habitat%20impacted%20by%20construction%20works%20within%20the%20Avon%20Gorge%20Woodlands%20SAC.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000380-2.58%20Habitat%20impacted%20by%20construction%20works%20within%20the%20Avon%20Gorge%20Woodlands%20SAC.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000381-2.59%20Great%20Crested%20Newt%20Indicative%20Pond%20Design.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000381-2.59%20Great%20Crested%20Newt%20Indicative%20Pond%20Design.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000387-3.1%20Draft%20proposed%20Development%20Consent%20Order.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000387-3.1%20Draft%20proposed%20Development%20Consent%20Order.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000389-3.2%20Explanatory%20Memorandum.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000389-3.2%20Explanatory%20Memorandum.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000390-3.3%20Validation%20Report.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000390-3.3%20Validation%20Report.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000391-4.1%20Statement%20of%20Reasons.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000391-4.1%20Statement%20of%20Reasons.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000392-4.2%20Funding%20Statement.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000392-4.2%20Funding%20Statement.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000394-4.3%20Book%20of%20Reference%20.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000394-4.3%20Book%20of%20Reference%20.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000395-5.1%20Consultation%20Report.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000395-5.1%20Consultation%20Report.pdf
-
Document Index
APP-059 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - A1 to A2
APP-060 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - B1 to B2
APP-061 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendix - B3
APP-062 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - C1 to D3
APP-063 Womble Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - E1 to E4
APP-064 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - F1 to F3
APP-065 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - G1 to G3
APP-066 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - H1 to H2
APP-067 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - I1 to I6
APP-068 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant Consultation Report Appendix - I7
APP-069 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendix - I8
APP-070 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - J1 to J2
APP-071 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.1 - Consultation Report Appendices - K1 to K2
APP-072 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.2 - Environmental Protection Statement of Engagement
APP-073 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.3 - Consents and Licences required under Other Legislation
APP-074 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.4 - Construction Strategy
APP-075 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.5 - Report to Inform Habitat Regulations Assessment
https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000396-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20A1%20to%20A2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000396-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20A1%20to%20A2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000397-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20B1%20to%20B2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000397-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20B1%20to%20B2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000398-5.1%20Consultation%20Report%20Appendix%20B3%20(redacted%20version).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000398-5.1%20Consultation%20Report%20Appendix%20B3%20(redacted%20version).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000400-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20C1%20to%20D3.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000400-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20C1%20to%20D3.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000401-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20E1%20to%20E4.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000401-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20E1%20to%20E4.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000402-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20F1%20to%20F3.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000402-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20F1%20to%20F3.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000403-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20G1%20to%20G3.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000403-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20G1%20to%20G3.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000404-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20H1%20to%20H2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000404-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20H1%20to%20H2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000405-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20I1%20to%20I6.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000405-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20I1%20to%20I6.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000406-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20I7.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000406-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20I7.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000407-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20I8.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000407-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20I8.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000408-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20J1%20to%20J2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000408-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20J1%20to%20J2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000409-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20K1%20to%20K2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000409-5.1%20Consultation%20Report%20Appendices%20-%20Appendices%20K1%20to%20K2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000410-5.2%20Environmental%20Protection%20Statement%20of%20Engagement.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000410-5.2%20Environmental%20Protection%20Statement%20of%20Engagement.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000411-5.3%20Consents%20and%20Licences%20required%20under%20Other%20Legislation.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000411-5.3%20Consents%20and%20Licences%20required%20under%20Other%20Legislation.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000412-5.4%20Construction%20strategy.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000412-5.4%20Construction%20strategy.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000413-5.5%20Report%20to%20Inform%20Habitats%20Regulations%20Assessment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000413-5.5%20Report%20to%20Inform%20Habitats%20Regulations%20Assessment.pdf
-
Document Index
APP-076 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 1 of 17)
APP-077 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 2 of 17) - Appendix B (Part 1 of 2)
APP-078 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 3 of 17) - Appendix B (Part 2 of 2)
APP-079 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 4 of 17) - Appendix C to J
APP-080 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 5 of 17) - Appendix K to M
APP-081 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 6 of 17) - Appendix N (Part 1)
APP-082 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 7 of 17) - Appendix N (Part 2) - Tidal flood maps 2015
APP-083 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 8 of 17) - Appendix N (Part 3) - Tidal flood maps 2075
APP-084 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 9 of 17) - Appendix N (Part 4) - Tidal flood maps 2115
APP-085 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 10 of 17) - Appendix N (Part 5) - Fluvial flood maps 2015
APP-086 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 11 of 17) - Appendix N (Part 6) - Fluvial flood maps 2075
APP-087 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 12 of 17) - Appendix N (Part 7) - Fluvial flood maps 2115
APP-088 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 13 of 17) - Appendix N (Part 8) - Flood difference maps
APP-089 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 14 of 17) - Appendix O (Part 1)
https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000414-5.6%20Flood%20Risk%20Assessment%20(Part%201%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000414-5.6%20Flood%20Risk%20Assessment%20(Part%201%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000415-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20B%20EA%20data%20part%201%20(Part%202%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000415-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20B%20EA%20data%20part%201%20(Part%202%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000416-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20B%20EA%20data%20part%202%20(Part%203%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000416-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20B%20EA%20data%20part%202%20(Part%203%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000417-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20C%20to%20J%20(Part%204%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000417-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20C%20to%20J%20(Part%204%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000418-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20K%20to%20M%20(Part%205%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000418-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20K%20to%20M%20(Part%205%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000419-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%201%20(Part%206%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000419-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%201%20(Part%206%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000420-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%202%20-%20Tidal%20flood%20maps%202015%20(Part%207%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000420-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%202%20-%20Tidal%20flood%20maps%202015%20(Part%207%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000421-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%203%20-%20Tidal%20flood%20maps%202075%20(Part%208%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000421-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%203%20-%20Tidal%20flood%20maps%202075%20(Part%208%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000422-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%204%20-%20Tidal%20flood%20maps%202115%20(Part%209%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000422-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%204%20-%20Tidal%20flood%20maps%202115%20(Part%209%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000423-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%205%20-%20Fluvial%20flood%20maps%202015%20(Part%2010%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000423-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%205%20-%20Fluvial%20flood%20maps%202015%20(Part%2010%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000424-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%206%20-%20Fluvial%20flood%20maps%202075%20(Part%2011%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000424-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%206%20-%20Fluvial%20flood%20maps%202075%20(Part%2011%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000425-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%207%20-%20Fluvial%20flood%20maps%202115%20(Part%2012%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000425-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%207%20-%20Fluvial%20flood%20maps%202115%20(Part%2012%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000426-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%208%20-%20Flood%20difference%20maps%20(Part%2013%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000426-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20N%20part%208%20-%20Flood%20difference%20maps%20(Part%2013%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000427-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20O%20part%201%20(Part%2014%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000427-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20O%20part%201%20(Part%2014%20of%2017).pdf
-
Document Index
APP-090 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 15 of 17) - Appendix O (Part 2)
APP-091 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 16 of 17) - Appendix O (Part 3)
APP-092 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 5.6 - Flood Risk Assessment (Part 17 of 17) - Appendix P to T
APP-093 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.1 - Scoping Opinion
APP-094 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.2 - ES Volume 1 – Non-Technical Summary
APP-095 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.3 – ES Table of Contents
APP-096 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.4 - ES Chapter 1 – Introduction
APP-097 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.5 - ES Chapter 2 - Description of the Study Area
APP-098 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.6 - ES Chapter 3 - Scheme Development and Alternatives Considered
APP-099 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.7 - ES Chapter 4 - Description of the Proposed Works
APP-100 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.8 - ES Chapter 5 - Approach to the Environmental Statement
APP-101 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.9 - ES Chapter 6 – Planning Framework
APP-102 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.10 - ES Chapter 7 – Air Quality and Greenhouse Gases
APP-103 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.11 - ES Chapter 8 - Cultural Heritage
APP-104 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.12 - ES Chapter 9 – Ecology and Biodiversity
APP-105 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.13 - ES Chapter 10 – Geology, Hydrogeology, Ground Conditions and Contaminated Land
https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000428-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20O%20part%202%20(Part%2015%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000428-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20O%20part%202%20(Part%2015%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000429-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20O%20part%203%20(Part%2016%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000429-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20O%20part%203%20(Part%2016%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000430-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20P%20to%20T%20(Part%2017%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000430-5.6%20Flood%20Risk%20Assessment%20Appendix%20App%20P%20to%20T%20(Part%2017%20of%2017).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000431-6.1%20Scoping%20Opinion.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000431-6.1%20Scoping%20Opinion.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000442-6.2%20ES%20Volume%201%20Non%20Technical%20Summary.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000442-6.2%20ES%20Volume%201%20Non%20Technical%20Summary.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000524-6.3%20Table%20of%20Contents.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000524-6.3%20Table%20of%20Contents.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000526-6.4%20ES%20Chapter%201%20Introduction.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000526-6.4%20ES%20Chapter%201%20Introduction.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000527-6.5%20ES%20Chapter%202%20Description%20of%20the%20Study%20Area.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000527-6.5%20ES%20Chapter%202%20Description%20of%20the%20Study%20Area.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000528-6.6%20ES%20Chapter%203%20Scheme%20Development.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000528-6.6%20ES%20Chapter%203%20Scheme%20Development.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000529-6.7%20ES%20Chapter%204%20Description%20of%20the%20Proposed%20Works.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000529-6.7%20ES%20Chapter%204%20Description%20of%20the%20Proposed%20Works.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000530-6.8%20ES%20Chapter%205%20Approach%20to%20the%20Environmental%20Statement.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000530-6.8%20ES%20Chapter%205%20Approach%20to%20the%20Environmental%20Statement.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000531-6.9%20ES%20Chapter%206%20Planning%20Framework.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000531-6.9%20ES%20Chapter%206%20Planning%20Framework.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000432-6.10%20ES%20Chapter%207%20Air%20Quality%20and%20Greenhouse%20Gases.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000432-6.10%20ES%20Chapter%207%20Air%20Quality%20and%20Greenhouse%20Gases.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000433-6.11%20ES%20Chapter%208%20Cultural%20Heritage.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000433-6.11%20ES%20Chapter%208%20Cultural%20Heritage.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000434-6.12%20ES%20Chapter%209%20Ecology%20and%20Biodiversity.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000434-6.12%20ES%20Chapter%209%20Ecology%20and%20Biodiversity.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000435-6.13%20ES%20Chapter%2010%20Geology%2C%20Hydrogeology%2C%20Ground%20Conditions%20and%20Contaminated%20Land.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000435-6.13%20ES%20Chapter%2010%20Geology%2C%20Hydrogeology%2C%20Ground%20Conditions%20and%20Contaminated%20Land.pdf
-
Document Index
APP-106 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.14 - ES Chapter 11 – Landscape and Visual Impacts Assessment
APP-107 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.15 - ES Chapter 12 – Materials and Waste
APP-108 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.16 - ES Chapter 13 – Noise and Vibration
APP-109 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.17 - ES Chapter 14 – Socio-economics and Economic Regeneration
APP-110 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.18 - ES Chapter 15 – Soils, Agriculture, Land Use and Assets
APP-111 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.19 - ES Chapter 16 – Transport, Access and Non-Motorised Users
APP-112 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.20 - ES Chapter 17 – Water Resources, Drainage and Flood Risk
APP-113 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.21 - ES Chapter 18 – In-combination and Cumulative Effects Assessment
APP-114 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.23 - ES Chapter 19 – Glossary
APP-115 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figure 1.3 Location Plan
APP-116 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figure 6.1 - Planning Constraints
APP-117 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figures 7.1 to 7.4 - Air Quality
APP-118 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figures 8.1 and 8.2 - Cultural Heritage
APP-119 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figures 9.1 to 9.4 – Ecology
APP-120 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figure 10.1 - Ground Conditions
https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000436-6.14%20ES%20Chapter%2011%20Landscape%20and%20Visual%20Impacts%20Assessment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000436-6.14%20ES%20Chapter%2011%20Landscape%20and%20Visual%20Impacts%20Assessment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000437-6.15%20ES%20Chapter%2012%20Materials%20and%20Waste.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000437-6.15%20ES%20Chapter%2012%20Materials%20and%20Waste.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000438-6.16%20ES%20Chapter%2013%20Noise%20and%20Vibration.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000438-6.16%20ES%20Chapter%2013%20Noise%20and%20Vibration.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000439-6.17%20ES%20Chapter%2014%20Socio-economics%20and%20Economic%20Regeneration.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000439-6.17%20ES%20Chapter%2014%20Socio-economics%20and%20Economic%20Regeneration.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000440-6.18%20ES%20Chapter%2015%20Soils%2C%20Agriculture%2C%20Land%20Use%20and%20Assets.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000440-6.18%20ES%20Chapter%2015%20Soils%2C%20Agriculture%2C%20Land%20Use%20and%20Assets.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000441-6.19%20ES%20Chapter%2016%20Transport%2C%20Access%20and%20Non-Motorised%20Users.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000441-6.19%20ES%20Chapter%2016%20Transport%2C%20Access%20and%20Non-Motorised%20Users.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000443-6.20%20ES%20Chapter%2017%20Water%20Resources%2C%20Drainage%20and%20Flood%20Risk.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000443-6.20%20ES%20Chapter%2017%20Water%20Resources%2C%20Drainage%20and%20Flood%20Risk.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000444-6.21%20ES%20Chapter%2018%20In-combination%20and%20Cumulative%20Effects%20Assessment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000444-6.21%20ES%20Chapter%2018%20In-combination%20and%20Cumulative%20Effects%20Assessment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000445-6.23%20ES%20Chapter%2019%20Glossary.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000445-6.23%20ES%20Chapter%2019%20Glossary.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000446-6.24%20ES%20Volume%203%20Figure%201.3%20Location%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000446-6.24%20ES%20Volume%203%20Figure%201.3%20Location%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000447-6.24%20ES%20Volume%203%20Figure%206.1%20Planning%20Constraints.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000447-6.24%20ES%20Volume%203%20Figure%206.1%20Planning%20Constraints.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000448-6.24%20ES%20Volume%203%20Figures%207.1%20to%207.4%20Air%20Quality.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000448-6.24%20ES%20Volume%203%20Figures%207.1%20to%207.4%20Air%20Quality.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000462-6.25%20ES%20Volume%204%20Appendix%208%20Series%20Cultural%20Heritage.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000462-6.25%20ES%20Volume%204%20Appendix%208%20Series%20Cultural%20Heritage.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000450-6.24%20ES%20Volume%203%20Figures%209.1%20to%209.4%20Ecology.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000450-6.24%20ES%20Volume%203%20Figures%209.1%20to%209.4%20Ecology.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000451-6.24%20ES%20Volume%203%20Figure%2010.1%20Ground%20Conditions.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000451-6.24%20ES%20Volume%203%20Figure%2010.1%20Ground%20Conditions.pdf
-
Document Index
APP-121 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figures 11.1 to 11.3 - Landscape and Visual Impacts Assessment
APP-122 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figures 13.1 and 13.2 - Noise Vibration
APP-123 Womble Bond Dickenson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figure 17.1 - Water Features
APP-124 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.24 - ES Volume 3 - Figure 18.1 - Proposed Development
APP-125 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 1.1 to 1.3 - Series Introduction
APP-126 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 4.1 - Code of Construction Practice
APP-127 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 4.2 - Master Construction Environmental Management Plan
APP-128 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 4.3 - Schedule of Mitigation
APP-129 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 4.4 to 4.8 - Description of the Proposed Works
APP-130 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 5 - Series Approach to the Environmental Statement
APP-131 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 7 Series - Air Quality and Greenhouse Gases
APP-132 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 8 - Series Cultural Heritage
APP-133 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.1 - Extended Phase 1 Habitat Survey – Please see REP4-005 for figures
APP-134 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.2 - Bat Technical Appendix
https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000452-6.24%20ES%20Volume%203%20Figures%2011.1%2C%2011.2%20and%2011.3%20LVIA.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000452-6.24%20ES%20Volume%203%20Figures%2011.1%2C%2011.2%20and%2011.3%20LVIA.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000453-6.24%20ES%20Volume%203%20Figures%2013.1%2C%2013.2%20Noise%20Vibration.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000453-6.24%20ES%20Volume%203%20Figures%2013.1%2C%2013.2%20Noise%20Vibration.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000454-6.24%20ES%20Volume%203%20Figure%2017.1%20Water%20Features.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000454-6.24%20ES%20Volume%203%20Figure%2017.1%20Water%20Features.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000455-6.24%20ES%20Volume%203%20Figure%2018.1%20Proposed%20Development.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000455-6.24%20ES%20Volume%203%20Figure%2018.1%20Proposed%20Development.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000456-6.25%20ES%20Volume%204%20Appendix%201%20Series%20Introduction.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000456-6.25%20ES%20Volume%204%20Appendix%201%20Series%20Introduction.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000457-6.25%20ES%20Volume%204%20Appendix%204.1%20Code%20of%20Construction%20Practice.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000457-6.25%20ES%20Volume%204%20Appendix%204.1%20Code%20of%20Construction%20Practice.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000458-6.25%20ES%20Volume%204%20Appendix%204.2%20Master%20Construction%20Environmental%20Management%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000458-6.25%20ES%20Volume%204%20Appendix%204.2%20Master%20Construction%20Environmental%20Management%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000459-6.25%20ES%20Volume%204%20Appendix%204.3%20Schedule%20of%20Mitigation.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000459-6.25%20ES%20Volume%204%20Appendix%204.3%20Schedule%20of%20Mitigation.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000522-6.25%20ES%20Volume%204%20Appendix%204.4%20to%204.8%20Description%20of%20the%20Proposed%20Works.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000522-6.25%20ES%20Volume%204%20Appendix%204.4%20to%204.8%20Description%20of%20the%20Proposed%20Works.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000460-6.25%20ES%20Volume%204%20Appendix%205%20Series%20Approach%20to%20the%20Environmental%20Statement.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000460-6.25%20ES%20Volume%204%20Appendix%205%20Series%20Approach%20to%20the%20Environmental%20Statement.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000461-6.25%20ES%20Volume%204%20Appendix%207%20Series%20Air%20Quality%20and%20Greenhouse%20Gases.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000461-6.25%20ES%20Volume%204%20Appendix%207%20Series%20Air%20Quality%20and%20Greenhouse%20Gases.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000462-6.25%20ES%20Volume%204%20Appendix%208%20Series%20Cultural%20Heritage.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000462-6.25%20ES%20Volume%204%20Appendix%208%20Series%20Cultural%20Heritage.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000463-6.25%20ES%20Volume%204%20Appendix%209.1%20Phase%201%20Survey%20Part%201.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000463-6.25%20ES%20Volume%204%20Appendix%209.1%20Phase%201%20Survey%20Part%201.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000464-6.25%20ES%20Volume%204%20Appendix%209.2%20Bat%20Technical%20Appendix.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000464-6.25%20ES%20Volume%204%20Appendix%209.2%20Bat%20Technical%20Appendix.pdf
-
Document Index
APP-135 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.3A and 9.3B - Bird Surveys
APP-136 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.3c - Schedule 1 Bird Survey CONFIDENTIAL
APP-137 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.4 and 9.5 - Great Crested Newt Survey Report and Reptiles
APP-138 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.6 - Badger Survey CONFIDENTIAL
APP-139 Womble Bond Dickenson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.7 Dormice, 9.8 Otters and 9.9 Water Voles
APP-140 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.10 - Flora Survey: Avon Gorge Woodlands SAC/Avon Gorge SSSI
APP-141 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.11 - Avon Gorge Vegetation Management Plan
APP-142 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.12 - Report to inform Habitats Regulations Assessment
APP-143 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 9.13 to 9.18 - Various ecology appendices
APP-144 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 10.1 - Risk Classification
APP-145 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 10.2 - Land Contamination Summary Report Annex A1 (Part 1 of 5) Portishead Station Envirocheck
APP-146 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 10.2 - Land Contamination Summary Report Annex A2 (Part 2 of 5) Portishead to Portbury Envirocheck
https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000465-6.25%20ES%20Volume%204%20Appendix%209.3A%20and%209.3B%20Bird%20Surveys.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000465-6.25%20ES%20Volume%204%20Appendix%209.3A%20and%209.3B%20Bird%20Surveys.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000466-6.25%20ES%20Volume%204%20Appendix%209.3c%20Schedule%201%20Bird%20Survey%20CONFIDENTIAL.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000466-6.25%20ES%20Volume%204%20Appendix%209.3c%20Schedule%201%20Bird%20Survey%20CONFIDENTIAL.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000467-6.25%20ES%20Volume%204%20Appendix%209.4%20and%209.5%20GCNs%20and%20Reptiles.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000467-6.25%20ES%20Volume%204%20Appendix%209.4%20and%209.5%20GCNs%20and%20Reptiles.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000468-6.25%20ES%20Volume%204%20Appendix%209.6%20Badger%20Survey%20CONFIDENTIAL.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000468-6.25%20ES%20Volume%204%20Appendix%209.6%20Badger%20Survey%20CONFIDENTIAL.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000469-6.25%20ES%20Volume%204%20Appendix%209.7%20Dormouse%2C%209.8%20Otter%20and%209.9%20Water%20Vole.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000469-6.25%20ES%20Volume%204%20Appendix%209.7%20Dormouse%2C%209.8%20Otter%20and%209.9%20Water%20Vole.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000470-6.25%20ES%20Volume%204%20Appendix%209.10%20Flora%20Report.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000470-6.25%20ES%20Volume%204%20Appendix%209.10%20Flora%20Report.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000471-6.25%20ES%20Volume%204%20Appendix%209.11%20Avon%20Gorge%20Vegetation%20Management%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000471-6.25%20ES%20Volume%204%20Appendix%209.11%20Avon%20Gorge%20Vegetation%20Management%20Plan.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000472-6.25%20ES%20Volume%204%20Appendix%209.12%20Report%20to%20inform%20Habitats%20Regulations%20Assessment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000472-6.25%20ES%20Volume%204%20Appendix%209.12%20Report%20to%20inform%20Habitats%20Regulations%20Assessment.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000473-6.25%20ES%20Volume%204%20Appendix%209.13%20to%209.18%20Various%20ecology%20appendices.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000473-6.25%20ES%20Volume%204%20Appendix%209.13%20to%209.18%20Various%20ecology%20appendices.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000474-6.25%20ES%20Volume%204%20Appendix%2010.1%20Risk%20Classification.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000474-6.25%20ES%20Volume%204%20Appendix%2010.1%20Risk%20Classification.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000475-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A1.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000475-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A1.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000482-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000482-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A2.pdf
-
Document Index
APP-147 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 10.2 - Land Contamination Summary Report Annex A3 (Part 3 of 5) Portishead to Easton-in- Gordano Envirocheck
APP-148 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 10.2 - Land Contamination Summary Report Annex A4 (Part 4 of 5) Pill Envirocheck
APP-149 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 10.2 - Land Contamination Summary Report Annex A5 (Part 5 of 5) Ashton Vale Envirocheck
APP-150 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 10.2 - Land Contamination Annexes B to J
APP-151 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 11.1 and 11.2 - Landscape and Visual Impact Assessment
APP-152 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 11.3 and 11.4 - Landscape and Visual Impact Assessment
APP-153 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 13 Series - Noise and Vibration
APP-154 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 14 Series - Socio-economics and Economic Regeneration
APP-155 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 1 of 18)
APP-156 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 2 of 18) - Figures Vol 1
APP-157 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 3 of 18) - Figures Vol 2
APP-158 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 4 of 18) - Figures Vol 3
https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000483-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A3.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000483-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A3.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000484-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A4.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000484-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A4.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000485-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A5.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000485-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annex%20A5.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000486-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annexes%20B%20to%20J.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000486-6.25%20ES%20Volume%204%20Appendix%2010.2%20Land%20Contamination%20Annexes%20B%20to%20J.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000476-6.25%20ES%20Volume%204%20Appendix%2011%20Series%20LVIA%2011.1%20and%2011.2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000476-6.25%20ES%20Volume%204%20Appendix%2011%20Series%20LVIA%2011.1%20and%2011.2.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000477-6.25%20ES%20Volume%204%20Appendix%2011%20Series%20LVIA%2011.3%20and%2011.4.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000477-6.25%20ES%20Volume%204%20Appendix%2011%20Series%20LVIA%2011.3%20and%2011.4.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000478-6.25%20ES%20Volume%204%20Appendix%2013%20Series%20Noise%20and%20Vibration.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000478-6.25%20ES%20Volume%204%20Appendix%2013%20Series%20Noise%20and%20Vibration.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000479-6.25%20ES%20Volume%204%20Appendix%20Series%2014%20Socio-economics.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000479-6.25%20ES%20Volume%204%20Appendix%20Series%2014%20Socio-economics.pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000504-6.25%20ES%20Volume%204%20Appendix%2016.1%20Transport%20Assessment_Pt%201%20Main%20Report%20(Part%201%20of%2018).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000504-6.25%20ES%20Volume%204%20Appendix%2016.1%20Transport%20Assessment_Pt%201%20Main%20Report%20(Part%201%20of%2018).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000505-6.25%20ES%20Volume%204%20Appendix%2016.1%20Transport%20Assessment_Pt%202%20FIGURES%201%20(Part%202%20of%2018).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000505-6.25%20ES%20Volume%204%20Appendix%2016.1%20Transport%20Assessment_Pt%202%20FIGURES%201%20(Part%202%20of%2018).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000506-6.25%20ES%20Volume%204%20Appendix%2016.1%20Transport%20Assessment_Pt%203%20FIGURES%202%20(Part%203%20of%2018).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000506-6.25%20ES%20Volume%204%20Appendix%2016.1%20Transport%20Assessment_Pt%203%20FIGURES%202%20(Part%203%20of%2018).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000507-6.25%20ES%20Volume%204%20Appendix%2016.1%20Transport%20Assessment_Pt%204%20FIGURES%203%20(Part%204%20of%2018).pdfhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR040011/TR040011-000507-6.25%20ES%20Volume%204%20Appendix%2016.1%20Transport%20Assessment_Pt%204%20FIGURES%203%20(Part%204%20of%2018).pdf
-
Document Index
APP-159 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 5 of 18) - Appendix A TA Scoping Report
APP-160 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 6 of 18) - Appendix B Committed Developments
APP-161 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 7 of 18) - Appendix C Report of Surveys
APP-162 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 8 of 18) - Appendix D Accidents Data
APP-163 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 9 of 18) - Appendix E Network Plots
APP-164 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 10 of 18) - Appendix F Junction Assessments
APP-165 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 11 of 18) - Appendix G Distribution and Assignments
APP-166 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 12 of 18) - Appendix H Avonmouth/Severnside
APP-167 Womble Bond Dickinson (UK) LLP on behalf of North Somerset District Council – The Applicant 6.25 - ES Volume 4 - Appendix 16.1 - Transport Assessment (Part 13 of 18) - Appendix I Parking Surveys
APP-168 Womble Bond Dicki