Portfolio Pezzini Roberto
-
Upload
roberto-pezzini -
Category
Documents
-
view
220 -
download
4
description
Transcript of Portfolio Pezzini Roberto
f a c a d e d e s i g n e r
p o r t f o l i op e z z i n i r o b e r t oa r c h i t e c t u r a l e n g i n e e r
Roberto PezziniFaçade designerArchitectural Engineer
PROFESSIONAL EXPERIENCE
London | United KingdomMasonry and Bricks Specialist | Façade Designer 12.2014 - On going
• Facade design (Stone Cladding, Brickwork, Membranes, Insulation, Bespoke Secondary Steel Support System, 2D Thermal Analysis)
Projects involvement: • ST GILES CIRCUS_on site• LINCOLN'S SQUARE | 48 CAREY STREET_on site• THE SPICE BUILDING - DEVONSHIRE SQUARE BLD 8_on site• 30 BROADWICK STREET DEVELOPMENT_Completed• RIVERWALK APARTMENTS_Completed
PGS PARTNERS srl | Mantua | Italy Architectural and Engineering Consultant | Architectural assistant 04.2014 - 08.2014
• Participated in the development of the executive project for the hospital polispecialistico Armonia, coordinating structural, electrical and mechanical drawings to complete interior design finishes
• Supported the office with ideas for healthcare competitions
UN-HABITAT | Housing and Slum Upgrading branch | Nairobi | Kenya Non Profit Organisation | Internship 07.2013 - 12.2013
• Implemented the Participatory Slum Upgrading Programme (PSUP), increasing awareness of the programme and explaning its different phases
• Organised the GHS International ‘Mass Housing’ Competition supporting the team in the definition of the competition guidelines and the design its website
• Assisted the organisation of the 2nd Tripartite Conference in Kigali, Rwanda: Sustainable urbanisation for poverty eradication in ACP countries
• Contributed to a project in Mathare (Nairobi) under the "Delivering as One initiative" (UN Volunteers programme)
LAND srl | Milan | Italy Landscape Architecture | Internship | Architectural assistant 03.2013 - 06.2013
• Supported the design team in the development of several projects on landscape and public spaces from conception to construction details
• Assisted with the implementation of the preliminary stage of the revitalisation public square in Solbiate (Milan)
• Assisted with the refurbishment of the UNESCO archaeological area The Capitolium (Brescia)
ZINTEK srl | Venice | Italy Zinc Titanium Roofing and Cladding Specialist | Facade and Roof Designer06.2011 - 04.2012
C V
AREAS OF EXPERTISEFacade DesignStone Cladding Metal RoofingSustainable ArchitectureRevitalisation of public realmLandscape ArchitectureSlum upgrading
London, SE17
+44(0)[email protected]
PERSONAL INTERESTSPassion for travelingStreet photography
LANGUAGESItalian mother tongueEnglish proficient Portuguese proficient
KEY SKILLS Sustainable design approachCapacity to work under pressureExcellent attention to detailsMulti-taskingTeam playerHigh sense of adabtabilityProactive and positive personality
ACADEMIC & PROFESSIONAL QUALIFICATIONS
AUTODESK REVIT | Template and Family Creation Training Cadline Ltd | London | UK03.2015
AUTODESK REVIT | Essential & Advanced course + One month work experienceSprunt media Ltd| London | UK09.2014
PROFESSIONAL MASTER'S DEGREE IN SUSTAINABLE ARCHITECTURE | 98/100European Institute of Design (IED) | Turin | Italy 05.2012 - 03.2013
• Thesis: Urban revitalisation and share housing of Mirafiori neighborhood in Turin
CLIMATE HOUSE BASIC TRAINING Climate House Agency | Bolzano | Italy 12.2012
MASTER'S DEGREE IN ARCHITECTURAL ENGINEERING | 105/110Università degli studi di Padova | Faculty of Architectural Engineering | Padua | Italy 10.2004 - 04.2011
• Thesis: Urban revitalisation of the central area of Favela Vila Fatìma, Porto Alegre, Brazil
EXCHANCE PROGRAM BRAZIL PUCRSPontificia Universidade do Rio Grande do Sul | Porto Alegre | Brazil 08.2010 - 01.2011
• Slum upgrading of Favela Vila Fatìma• Attended the 54° IFHP World Congress 2010
IT SKILLS
Revit advancedAutocad 2D-3D advancedPhotoshop advancedIllustrator advancedInDesign advancedWindows Office advancedLightroom advanced3DStudioMax intermediateSketch-Up basicEcotect basic Design Builder basicInventor basic
IDEAS COMPETITIONS
10.2015 | Borgo Ruga revitalisationPonzano Veneto | Treviso |Italy3rd prize
04.2014 | Piazza Castello revitalisation Isorella | Brescia | Italy2nd prize
09.2012 | Remembrance Park revitalisation Rapino | Chieti | Italy1st prize
12.2011 | Piazza Garibaldi revitalisation Robecco sul Naviglio | Milan | Italy1st prize
LINCOLN'S SQUAREResidential | London | UK | On site
DEVONSHIRE SQUARE - BLD 8Commercial | London | UK | On Site
ST.GILES CIRCUS Mix Used | London | UK | On Site
P R O J E C T SI N V O L V E M E N T
30 BROADWICK STREETCommercial | London | UK | Completed
RIVERWALK APARTMENTSResidential | London | UK | Completed
ARMONIA HOSPITALHealthcare | Mantova | IT | Completed
LE ALBEREMix Used | Trento | IT | Completed
London
M a n t o v a T r e n t o
Public RealmPiazza Castello revitalisation
Urban parkArea Boschetti revitalisation
CommercialWine Culture Center
EducationLearning from the Earth
RetrofitVeneat
Residential RetrofitMirafiori share housing
Public realmUrban Islands
Slum UpgradingFavela upgrading
ResidentialBramber House - Revit
2014
2015
2013
2012
2011 2010Mix-Used+Public RealmPiazza Duomo
Retrofit + Public RealmBorgo Ruga revitalisation
I D E A SC O M P E T I T I O N S
F U NC O M M I T M E N TE X P E R I E N C E
T e a m W o r k
A D A P T A B I L T Y
Public realmRemembrance Park revitalisation
Urban PlanningMirafiori urban revitalisation
14 THIRTY BROADWICK STREET | New Build | Facade Design - Stonework and Brickwork | London_UK | 2016
EY1 / 10
FA1 / 10
FB1 / 10
FC-FC1 : 10
020-7735 9995 FAX 020-7793 9800
369 KENNINGTON LANE
LONDON SE11 5QYVAUXHALL
SZERELMEY Ltd.
TITLE
PROJECT
CONTRACTOR
DWG No.
ARCHITECTS
APPROVED
CHECK:
DRAWN:
DATE:
SCALE:
REV.
DESCRIPTIONDATEREV DRN
RP
IJL
16/05/2016
N.T.S30 BROADWICK STREET
FIXING DETAILS
B
BAM
EMRYS
LOUVRE DOOR - LOCK SYSTEM
SZE-2807-MS-483 IJL
Stainless Steel EN 1.4307 304L S11
EY
FAFB
FC FC
Pig Nose Counterboresecurity Barrel Nut& Sex bolt with security opening tool
HANDLE SLOT n35x200WITH NO SHARPE EDGES
Proposed Door Lockwith key
UNION ASSA ALOYSTRONGBOLT type
with single cylinder deadlock 49mm Longn18x33 Slot
3090
156
45
26
40 55 40 55 40
97
27 213
26
52
31 26
Proposed Door Lockwith key
UNION ASSA ALOYSTRONGBOLT type
with single cylinderdeadlock 49mm Long
n18x33 Slot
41
67
412
597
41
18n
6
57
134
26
13
4
45
6826
UNION ASSA ALOYSTRONGBOLT DEADBOLTTYPE
23
4
.
19
Pig Nose Counterboresecurity Barrel Nut& Sex bolt with security opening tool
101081
276
285
Pig Nose Counterboresecurity Barrel Nut& Sex bolt with security opening tool
4
PIG NOSE SECURITYBARREL NUT M12x15& SEX BOLT M12x30
n32
n32
5
15
5
30
19
2
2
2
25
5
8
02_Second FloorSSL - 31.865 m
01_First FloorSSL - 28.465 m
03_Third FloorSSL - 35.265 m
9876
Section 17
Section 17
Section 91
Section 91
Section 148
Section 148
MJ 20MMBY DANE
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 10MMBYDANE
597
35
973
597
35
899
589
95
899
589
9
ARTWORK PANEL1220X475X160MM
ARTWORK PANEL1220X475X160MM
505
973
597
35
973
589
95
899
589
95
899
5
MORTAR JOINT 20MMBY SZERELMEY
MORTAR JOINT 20MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 20MMBY DANE
MJ 20MMBY SZERELMEY
MJ 20MMBY SZERELMEY
TOS - 35.297 m TOS - 35.297 m
SLIP PLANEMJ 6MMBY SZERELMEY
SLIP PLANEMJ 6MMBY SZERELMEY
875 875 875 1136 922 1136 875 875 875 875 1136 922 1136
MJ 10MMBYDANE
5 5 5 15 5 5 15 5 5 5 15 5 5 15
ARTWORK PANEL1220X475X160MM
ARTWORK PANEL1220X475X160MM
ARTWORK PANEL1220X475X160MM
ARTWORK PANEL1220X475X160MM
47
SLIP PLANEBY SZERELMEY
SLIP PLANEBY SZERELMEY
SLIP PLANEMJ 6MMBY SZERELMEY
SLIP PLANEMJ 6MMBY SZERELMEY
SLIP PLANEBY SZERELMEY
SLIP PLANEBY SZERELMEY
SLIP PLANESLIP PLANE
SLIP PLANESLIP PLANE
9876
A
Section 17
Section 17
Section 91
Section 91
Section 148
Section 148
5 875 5 875 5 875 15 1136 5 922 5 1136 15 875 5 875 5 875 5 875 15 1136 5 922 5 1136 15
987
6
A
Section 17
Section 17
Section 91
Section 91
Section 148
Section 148
4051350 405 1350 917 917 1350 405 1350 405 1350 917 917
5 5 5 5 15 5 15 5 5 5 5 15 5 15
9876
A
Section 17
Section 17
Section 91
Section 91
515 1250 515 1250 1970 1250 515 1250 515 1250 1970
Section 148
Section 148
11SZE-2807-GA-008
9876
A
515 1250 515 1250 1970 1250 515 1250 515 1250 1970
A
9SZE-2807-GA-008
10SZE-2807-GA-008
MJ 20MMBY SZERELMEY
MJBY DANE
101
Cou
rses
with
15.
5 M
orta
r Joi
nt
CILL EDGE LEVEL - 35.232 m
A
MJ 20MMBY SZERELMEY
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJBY DANE
CILL EDGE LEVEL - 35.232 m
BOS - 34.825 m
CILL EDGE LEVEL - 28.431 m
A
12SZE-2807-GA-008
MJ 20MMBY SZERELMEY
MJBY DANE
A
5015
.5
6511
1
EPDMBY SZERELMEY
DUPONT AIRGUARDREFLECTIVEBY SZERELMEY
INSULATION PANELKINGSPANEL K15
DPCBY SZERELMEY
WEEP HOLESAT 1.5MT CRS
HAND SETROMAN BRICKS115X50MM
CAVITY BARRIER120MM
PORTLAND SILLJORDANS BASEBED
600
176
DUPONT AIRGUARDREFLECTIVEBY SZERELMEY
TOS - 35.297 m
SUPPORT BRACKETBY SZERELMEY
2/3 BrickLength
C CHANNEL100X50MM
C CHANNEL100X50MM
MJ 20MM BYSZERELMEY
TOS - 35.101 m
RWA45 ROCKWOOL 50MMINTERNAL INSULATION
RWA45 ROCKWOOL 50MMINTERNAL INSULATION
A
111
65
6
50
414
600
PORTLAND FASCIAJORDANS BASEBED
PORTLAND SILLJORDANS BASEBED
176
EPDM MEMBRANEBY SZERELMEY
DUPONT AIRGUARDREFLECTIVEBY SZERELMEY
DPCBY SZERELMEY
WEEP HOLESAT 1.5MT CRS
CAVITI BARRIER120MM
DPC BY SZERELMEY
5015
.5
SUPPORT BRACKET
2/3 BrickLength
SLIP PLANEMJ 6MM BYSZERELMEY
MJ BY DANE
100
BOS - 27.900 m
RWA45 ROCKWOOL 50MMINTERNAL INSULATION
98
A
240
5020 240 20 115 20
50
525
140
115
54
25 835 834 2525 515 25
MJ 10MMBY DANE
115240
115 145
115240
1152401250 50 50
1818
145
RWA45 ROCKWOOL 50MMINTERNAL INSULATION
RWA45 ROCKWOOL 50MMINTERNAL INSULATION
A
6511
1
6
414
500
WEEP HOLESAT 1.5MT CRS
DPCBY SZERELMEY
100 100
EPDMBY SZERELMEY
DPCBY SZERELMEYMJ BY DANE
PORTLAND SILLJORDANS BASEBED
PORTLAND FASCIAJORDANS BASEBED
260
50
2/3 BrickLength
SUPPORT BRACKETBY SZERELMEY
7
C CHANNEL100X50MM
RWA45 ROCKWOOL 50MMINTERNAL INSULATION
DESIGN RISK ASSESSMENT:
THE SIZE AND SHAPE OF INDIVIDUAL STONES FOR THISPROJECT HAVE BEEN DESIGNED TO SATISFY THEOVERALL DESIGN REQUIREMENTS FOR THE BUILDING.ALL PERSONS HANDLING AND INSTALLING SUCH STONESSHOULD BE AWARE THAT THERE ARE RISKSASSOCIATED WITH THIS TYPE OF WORK THAT CANNOTBE DESIGNED OUT.
RISK REDUCTION:FIXERS MUST BE SUITABLY EXPERIENCED IN THEHANDLING OF STONES AND EMPLOY LIFTING METHODSAPPROPRIATE TO THE SIZE AND SHAPE OF THE STONE.ACCESS AND WORKING PLATFORMS MUST BE TO THESTANDARD REQUIRED BY CURRENT LEGISLATION.REFERENCE MUST ALWAYS BE MADE TO COSSHINFORMATION FOR THE MATERIALS BEING USED.
CDM REGULATIONS
020-7735 9995 FAX 020-7793 9800
369 KENNINGTON LANE
LONDON SE11 5QYVAUXHALL
Project
REVISIONS
Dwg Title
Architects
Size
Contractor
Scale Date
Drawn Check Approved
Rev. No. Drawing No.
A1 As indicated
07/03
/2016
10:20
:48
F
BROADWICK STREET - BRICKS -AREA 8 - GRID 6-9
30 BROADWICK STREET
EMRYS
IARP
28.07.15
BAM CONSTRUCTION LTD
SZE-2807-GA-008
JH
Rev. Description DateA ISSUED FOR
APPROVAL28.07.15
B ARCHITECTCOMMENTSINCORPORETED
26.08.15
C BRICK PATTERNELABORATED
15.01.15
D ARCHITECTCOMMENTSINCORPORETED
26.02.16
E BRICK PATTERNREVIEWED + INTERNALINSULATION ADDED
02.03.16
F SLIP PLANE ADDED 04.03.16
1 : 30
Broadwick Street Elevation - Area 81
1 : 30
01_First Floor - Fascia Level2
1 : 30
01_First Floor - Sill Level3
1 : 30
01_First Floor - GA Area 84
1 : 30
02_Second Floor GA cut plane -300 - Area 85
1 : 30
Section 14861 : 30
Section 1771 : 30
Section 918
1 : 10
Section 148 - Callout 19 1 : 10
Section 148 - Callout 210
1 : 20
01_First Floor - GA Area 8 - Callout 111
1 : 10
Section 91 - Callout 112
03_Third FloorSSL - 35.265 m
05_Fifth FloorSSL - 42.065 m
04_Fourth FloorSSL - 38.665 m
532 4
Section 20
Section 20Section 73
Section 73
To underside MJ - 35.101 m
MJ 20MMBY SZERELMEY
MJ 15BY SZERELMEY
MJ 15BY SZERELMEY
MJ 15BY SZERELMEY MJ 15
BY SZERELMEY
TOS - 35.297 m
200147818301478200156520014771830
TOS - 42.510 m
TOS - 42.341 m
TOS - 38.698 mTOS - 38.698 m
To underside MJ - 38.306 m
TOS - 35.297 m TOS - 35.297 m
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 20MMBY SZERELMEY
MJ 20MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 20MMBY SZERELMEY
MJ 20MMBY SZERELMEY
MORTAR JOINT 20MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 20MMBY SZERELMEY
MJ 20MMBY SZERELMEY
812
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
100
75 75
SOFFIT1600X328X75MM
SOFFIT1759X328X100MM
SOFFIT1440X328X75MM
SOFFIT1600X328X75MM
976
597
65
976
5
SOFFIT1600X328X75MM
SOFFIT1759X328X100MM
965
2098
05
980
SLIP PLANESLIP PLANE SLIP PLANE
SOFFIT SOFFIT
5
SLIP PLANE
173 124 240 124 240 124 240 48 115240124240124240124240115
240124240124240124240115178 124 240 124 240 124 240 44 115
SLIP PLANEBY SZERELMEY
SLIP PLANESLIP PLANEBY SZERELMEY
A
MJ 20MMBY SZERELMEY
MJ 20MMBY SZEREMEY
MJ 20MMBY SZEREMEY
46 C
OU
RSE
S45
CO
UR
SES
03_Third FloorSSL - 35.265 m
05_Fifth FloorSSL - 42.065 m
04_Fourth FloorSSL - 38.665 m
A
10SZE-2807-GA-010
2SZE-2807-GA-010
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 20MMBY SZERELMEY
MJ 20MMBY SZEREMEY
532
A
4Section 20
Section 20
Section 73
Section 73
8SZE-2807-GA-010
9SZE-2807-GA-010
533
533
515
11SZE-2807-GA-010
MJ 15MMBY SZERELMEY
500 1287 1390 915 915 1477 139 61 1565 200 1478 915 915 1477 200
360
115
4424
024
0
115 240 124 240 124 240 124
115
240
240
115
115240
240 115 240 115 240 115 240 115 240
532
A
4Section 20
Section 20
Section 73
Section 73
1307 50 1250 50 935 935 50 1250 50 246 168 50 1250 50 415 50 1250 50 936 935 50 1250 50 415 50
355
50
173 124 240 124 240 124 240 48
400
600
115
4424
011
524
011
5
532
A
4Section 73
Section 73
4086 15 907 5 1611
700
346
700
100
15
5
1723 5 1570 5 6 1570 5915 915
500 466 15 806 5 1380 5 908 15 907 6 1570 5 1759 5 1570 5 908 15 907 6 1570 5
5
14
5
A
95 60
915 915
200
60 95
100
100
10 10
240
240
47 240 115 240 115 240 115 240 47
12 08
47
24
24
47
13 232321 212610 09 10
RWA45 ROCKWOOL 50MMINTERNAL INSULATION
RWA45 ROCKWOOL 50MMINTERNAL INSULATION
A
50 25 200 25 50
ø 55
214
150
25
21
A
511
232
2020
3
75 333
25 385
508 50 142
700
164
75
150
5910
TOS - 38.698 m
01
04
06
19
12
13
11
09
10
20
2147
15
2421
10
24
2050
A
150 75 275
562
511
249
25
590
290 100
110
30
40
TOS - 42.510 m
75 333
186
450 50
50
06
05
05
02
19
13
09
09
10
21
10
20
24
47
11
2
A
85
85
13
08 47
24
24
472323 26
21
21
115
4424
011
524
0
240 124 240 124 240 124 240
240
2020 20 20 2020
2120
2020
RWA45 ROCKWOOL 50MMINTERNAL INSULATION
DESIGN RISK ASSESSMENT:
THE SIZE AND SHAPE OF INDIVIDUAL STONES FOR THISPROJECT HAVE BEEN DESIGNED TO SATISFY THEOVERALL DESIGN REQUIREMENTS FOR THE BUILDING.ALL PERSONS HANDLING AND INSTALLING SUCH STONESSHOULD BE AWARE THAT THERE ARE RISKSASSOCIATED WITH THIS TYPE OF WORK THAT CANNOTBE DESIGNED OUT.
RISK REDUCTION:FIXERS MUST BE SUITABLY EXPERIENCED IN THEHANDLING OF STONES AND EMPLOY LIFTING METHODSAPPROPRIATE TO THE SIZE AND SHAPE OF THE STONE.ACCESS AND WORKING PLATFORMS MUST BE TO THESTANDARD REQUIRED BY CURRENT LEGISLATION.REFERENCE MUST ALWAYS BE MADE TO COSSHINFORMATION FOR THE MATERIALS BEING USED.
CDM REGULATIONS
020-7735 9995 FAX 020-7793 9800
369 KENNINGTON LANE
LONDON SE11 5QYVAUXHALL
Project
REVISIONS
Dwg Title
Architects
Size
Contractor
Scale Date
Drawn Check Approved
Rev. No. Drawing No.
A1 As indicated
07/03
/2016
10:19
:36
E
BROADWICK STREET - BRICKS -AREA 10 - GRID 2-5
30 BROADWICK STREET
EMRYS
ILRP
08/10/15
BAM CONSTRUCTION LTD
SZE-2807-GA-010
JH
1 : 30
Broadwick Street Elevation - Area 101 1 : 30
Section 2031 : 30
Section 734
1 : 30
04_Fourth Floor - Area 105
1 : 30
03_Third Floor - Area 106
1 : 30
05_Fifth Floor - Coping Area 1071 : 15
04_Fourth Floor - Callout 18
1 : 10
04_Fourth Floor - Callout 29
1 : 10
Section 73 - Callout 110
1 : 10
Section 73 - Callout 22
1 : 15
04_Fourth Floor - Callout 311
37 _MOVEMENT JOINT - 35MM ARBOSIL XL 1099"LIMESTONE" BY SZERELMEY
39 _CILL - PORTLAND FANCY BEACH40 _FASCIA - PORTLAND FANCY BEACH43 _FLAT PANEL - PORTLAND GROVE WHITBED45 _MOVEMENT JOINT - 25MM ARBOSIL XL 1099
"LIMESTONE" BY OTHERS47 _MOVEMENT JOINT - 10MM BRONZE ANODIZED
ARBOSIL XL 1099 "LIMESTONE" BY OTHERS48 _MOVEMENT JOINT - 15MM BRONZE ANODIZED
ARBOSIL XL 1099 "LIMESTONE" BY OTHERS49 _LONDON STOCK BRICKS - 103X65MM
01 _CILL - PORTLAND JORDANS BASEBED02 _SOFFIT - PORTLAND JORDANS BASEBED04 _SOFFIT - PORTLAND GROVE WHITBED05 _COPING - PORTLAND FANCY BEACH06 _FASCIA - PORTLAND JORDANS BASEBED08 _HANDSET ROMAN BRICKS - 115X50MM09 _EPDM MEMBRANE BY SZERELMEY10 _EPDM MEMBRANE BY OTHERS11 _DPC BY SZERELMEY12 _CAVITY BARRIER -120MM THICK13 _THERMAL INSULATION - KINGSPANEL K1514 _MOVEMENT JOINT - 15MM ARBOSIL XL 1099
"LIMESTONE" BY SZERELMEY15 _MOVEMENT JOINT - 20MM ARBOSIL XL 1099
"LIMESTONE" BY SZERELMEY16 _MOVEMENT JOINT - 10MM ARBOSIL XL 1099
"ANTHRACITE" BY OTHERS18 _WEEP HOLES AT 1.5MT CRS19 _SUPPORT BRACKET BY SZERELMEY20 _BRACKET BY OTHERS21 _LOOSE FILL INSULATION BY OTHERS23 _SFS WALL BY OTHERS24 _ALLUMINIUM FLASHING BY OTHERS25 _MULLION - PORTLAND GROVE WHITBED26 _VAPOUR BARRIER - DUPONT AIRGUARD
REFELECTIVE BY SZERELMEY27 _GREEN GLAZED BRICK28 _RESTRAINT BY SZERELMEY29 _WHITE GLAZED BRICK30 _WHITE GLAZED BRICK CURVED REVEAL31 _DE LANK GRANITE34 _BLOCKWORK 140MM35 _ALLUMINIUM CLADDING 2MM BY OTHERS36 _RC UPSTAND
LEGEND
Rev. Description DateA ISSUED FOR
APPROVAL24.08.15
B ARCHITECTCOMMENTS
14.09.15
C BRICK PATTERNELABORATED
15.01.15
D BRICK PATTERNREVIEWED + INTERNALINSULATION ADDED
02.03.16
E SLIP PLANE ADDED 04.03.16
03_Third FloorSSL - 35.265 m
05_Fifth FloorSSL - 42.065 m
04_Fourth FloorSSL - 38.665 m
532 4
Section 20
Section 20Section 73
Section 73
To underside MJ - 35.101 m
MJ 20MMBY SZERELMEY
MJ 15BY SZERELMEY
MJ 15BY SZERELMEY
MJ 15BY SZERELMEY MJ 15
BY SZERELMEY
TOS - 35.297 m
200147818301478200156520014771830
TOS - 42.510 m
TOS - 42.341 m
TOS - 38.698 mTOS - 38.698 m
To underside MJ - 38.306 m
TOS - 35.297 m TOS - 35.297 m
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 20MMBY SZERELMEY
MJ 20MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 20MMBY SZERELMEY
MJ 20MMBY SZERELMEY
MORTAR JOINT 20MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 20MMBY SZERELMEY
MJ 20MMBY SZERELMEY
812
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
100
75 75
SOFFIT1600X328X75MM
SOFFIT1759X328X100MM
SOFFIT1440X328X75MM
SOFFIT1600X328X75MM
976
597
65
976
5
SOFFIT1600X328X75MM
SOFFIT1759X328X100MM
965
2098
05
980
SLIP PLANESLIP PLANE SLIP PLANE
SOFFIT SOFFIT
5
SLIP PLANE
173 124 240 124 240 124 240 48 115240124240124240124240115
240124240124240124240115178 124 240 124 240 124 240 44 115
SLIP PLANEBY SZERELMEY
SLIP PLANESLIP PLANEBY SZERELMEY
A
MJ 20MMBY SZERELMEY
MJ 20MMBY SZEREMEY
MJ 20MMBY SZEREMEY
46 C
OU
RSE
S45
CO
UR
SES
03_Third FloorSSL - 35.265 m
05_Fifth FloorSSL - 42.065 m
04_Fourth FloorSSL - 38.665 m
A
10SZE-2807-GA-010
2SZE-2807-GA-010
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 20MMBY SZERELMEY
MJ 20MMBY SZEREMEY
532
A
4Section 20
Section 20
Section 73
Section 73
8SZE-2807-GA-010
9SZE-2807-GA-010
533
533
515
11SZE-2807-GA-010
MJ 15MMBY SZERELMEY
500 1287 1390 915 915 1477 139 61 1565 200 1478 915 915 1477 200
360
115
4424
024
0
115 240 124 240 124 240 124
115
240
240
115
115240
240 115 240 115 240 115 240 115 240
532
A
4Section 20
Section 20
Section 73
Section 73
1307 50 1250 50 935 935 50 1250 50 246 168 50 1250 50 415 50 1250 50 936 935 50 1250 50 415 50
355
50
173 124 240 124 240 124 240 48
400
600
115
4424
011
524
011
5
532
A
4Section 73
Section 73
4086 15 907 5 1611
700
346
700
100
15
5
1723 5 1570 5 6 1570 5915 915
500 466 15 806 5 1380 5 908 15 907 6 1570 5 1759 5 1570 5 908 15 907 6 1570 5
5
14
5
A
95 60
915 915
200
60 95
100
100
10 10
240
240
47 240 115 240 115 240 115 240 47
12 08
47
24
24
47
13 232321 212610 09 10
RWA45 ROCKWOOL 50MMINTERNAL INSULATION
RWA45 ROCKWOOL 50MMINTERNAL INSULATION
A
50 25 200 25 50
ø 55
214
150
25
21
A
511
232
2020
3
75 333
25 385
508 50 142
700
164
75
150
5910
TOS - 38.698 m
01
04
06
19
12
13
11
09
10
20
2147
15
2421
10
24
2050
A
150 75 275
562
511
249
25
590
290 100
110
30
40
TOS - 42.510 m
75 333
186
450 50
50
06
05
05
02
19
13
09
09
10
21
10
20
24
47
11
2
A
85
85
13
08 47
24
24
472323 26
21
21
115
4424
011
524
0
240 124 240 124 240 124 240
240
2020 20 20 2020
2120
2020
RWA45 ROCKWOOL 50MMINTERNAL INSULATION
DESIGN RISK ASSESSMENT:
THE SIZE AND SHAPE OF INDIVIDUAL STONES FOR THISPROJECT HAVE BEEN DESIGNED TO SATISFY THEOVERALL DESIGN REQUIREMENTS FOR THE BUILDING.ALL PERSONS HANDLING AND INSTALLING SUCH STONESSHOULD BE AWARE THAT THERE ARE RISKSASSOCIATED WITH THIS TYPE OF WORK THAT CANNOTBE DESIGNED OUT.
RISK REDUCTION:FIXERS MUST BE SUITABLY EXPERIENCED IN THEHANDLING OF STONES AND EMPLOY LIFTING METHODSAPPROPRIATE TO THE SIZE AND SHAPE OF THE STONE.ACCESS AND WORKING PLATFORMS MUST BE TO THESTANDARD REQUIRED BY CURRENT LEGISLATION.REFERENCE MUST ALWAYS BE MADE TO COSSHINFORMATION FOR THE MATERIALS BEING USED.
CDM REGULATIONS
020-7735 9995 FAX 020-7793 9800
369 KENNINGTON LANE
LONDON SE11 5QYVAUXHALL
Project
REVISIONS
Dwg Title
Architects
Size
Contractor
Scale Date
Drawn Check Approved
Rev. No. Drawing No.
A1 As indicated
07/03
/2016
10:19
:36
E
BROADWICK STREET - BRICKS -AREA 10 - GRID 2-5
30 BROADWICK STREET
EMRYS
ILRP
08/10/15
BAM CONSTRUCTION LTD
SZE-2807-GA-010
JH
1 : 30
Broadwick Street Elevation - Area 101 1 : 30
Section 2031 : 30
Section 734
1 : 30
04_Fourth Floor - Area 105
1 : 30
03_Third Floor - Area 106
1 : 30
05_Fifth Floor - Coping Area 1071 : 15
04_Fourth Floor - Callout 18
1 : 10
04_Fourth Floor - Callout 29
1 : 10
Section 73 - Callout 110
1 : 10
Section 73 - Callout 22
1 : 15
04_Fourth Floor - Callout 311
37 _MOVEMENT JOINT - 35MM ARBOSIL XL 1099"LIMESTONE" BY SZERELMEY
39 _CILL - PORTLAND FANCY BEACH40 _FASCIA - PORTLAND FANCY BEACH43 _FLAT PANEL - PORTLAND GROVE WHITBED45 _MOVEMENT JOINT - 25MM ARBOSIL XL 1099
"LIMESTONE" BY OTHERS47 _MOVEMENT JOINT - 10MM BRONZE ANODIZED
ARBOSIL XL 1099 "LIMESTONE" BY OTHERS48 _MOVEMENT JOINT - 15MM BRONZE ANODIZED
ARBOSIL XL 1099 "LIMESTONE" BY OTHERS49 _LONDON STOCK BRICKS - 103X65MM
01 _CILL - PORTLAND JORDANS BASEBED02 _SOFFIT - PORTLAND JORDANS BASEBED04 _SOFFIT - PORTLAND GROVE WHITBED05 _COPING - PORTLAND FANCY BEACH06 _FASCIA - PORTLAND JORDANS BASEBED08 _HANDSET ROMAN BRICKS - 115X50MM09 _EPDM MEMBRANE BY SZERELMEY10 _EPDM MEMBRANE BY OTHERS11 _DPC BY SZERELMEY12 _CAVITY BARRIER -120MM THICK13 _THERMAL INSULATION - KINGSPANEL K1514 _MOVEMENT JOINT - 15MM ARBOSIL XL 1099
"LIMESTONE" BY SZERELMEY15 _MOVEMENT JOINT - 20MM ARBOSIL XL 1099
"LIMESTONE" BY SZERELMEY16 _MOVEMENT JOINT - 10MM ARBOSIL XL 1099
"ANTHRACITE" BY OTHERS18 _WEEP HOLES AT 1.5MT CRS19 _SUPPORT BRACKET BY SZERELMEY20 _BRACKET BY OTHERS21 _LOOSE FILL INSULATION BY OTHERS23 _SFS WALL BY OTHERS24 _ALLUMINIUM FLASHING BY OTHERS25 _MULLION - PORTLAND GROVE WHITBED26 _VAPOUR BARRIER - DUPONT AIRGUARD
REFELECTIVE BY SZERELMEY27 _GREEN GLAZED BRICK28 _RESTRAINT BY SZERELMEY29 _WHITE GLAZED BRICK30 _WHITE GLAZED BRICK CURVED REVEAL31 _DE LANK GRANITE34 _BLOCKWORK 140MM35 _ALLUMINIUM CLADDING 2MM BY OTHERS36 _RC UPSTAND
LEGEND
Rev. Description DateA ISSUED FOR
APPROVAL24.08.15
B ARCHITECTCOMMENTS
14.09.15
C BRICK PATTERNELABORATED
15.01.15
D BRICK PATTERNREVIEWED + INTERNALINSULATION ADDED
02.03.16
E SLIP PLANE ADDED 04.03.16
03_Third FloorSSL - 35.265 m
05_Fifth FloorSSL - 42.065 m
04_Fourth FloorSSL - 38.665 m
532 4
Section 20
Section 20Section 73
Section 73
To underside MJ - 35.101 m
MJ 20MMBY SZERELMEY
MJ 15BY SZERELMEY
MJ 15BY SZERELMEY
MJ 15BY SZERELMEY MJ 15
BY SZERELMEY
TOS - 35.297 m
200147818301478200156520014771830
TOS - 42.510 m
TOS - 42.341 m
TOS - 38.698 mTOS - 38.698 m
To underside MJ - 38.306 m
TOS - 35.297 m TOS - 35.297 m
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 20MMBY SZERELMEY
MJ 20MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 20MMBY SZERELMEY
MJ 20MMBY SZERELMEY
MORTAR JOINT 20MMBY SZERELMEY
MJ 15MMBY SZERELMEY
MJ 20MMBY SZERELMEY
MJ 20MMBY SZERELMEY
812
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
100
75 75
SOFFIT1600X328X75MM
SOFFIT1759X328X100MM
SOFFIT1440X328X75MM
SOFFIT1600X328X75MM
976
597
65
976
5
SOFFIT1600X328X75MM
SOFFIT1759X328X100MM
965
2098
05
980
SLIP PLANESLIP PLANE SLIP PLANE
SOFFIT SOFFIT
5
SLIP PLANE
173 124 240 124 240 124 240 48 115240124240124240124240115
240124240124240124240115178 124 240 124 240 124 240 44 115
SLIP PLANEBY SZERELMEY
SLIP PLANESLIP PLANEBY SZERELMEY
A
MJ 20MMBY SZERELMEY
MJ 20MMBY SZEREMEY
MJ 20MMBY SZEREMEY
46 C
OU
RSE
S45
CO
UR
SES
03_Third FloorSSL - 35.265 m
05_Fifth FloorSSL - 42.065 m
04_Fourth FloorSSL - 38.665 m
A
10SZE-2807-GA-010
2SZE-2807-GA-010
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 10MMBY DANE
MJ 20MMBY SZERELMEY
MJ 20MMBY SZEREMEY
532
A
4Section 20
Section 20
Section 73
Section 73
8SZE-2807-GA-010
9SZE-2807-GA-010
533
533
515
11SZE-2807-GA-010
MJ 15MMBY SZERELMEY
500 1287 1390 915 915 1477 139 61 1565 200 1478 915 915 1477 200
360
115
4424
024
0
115 240 124 240 124 240 124
115
240
240
115
115240
240 115 240 115 240 115 240 115 240
532
A
4Section 20
Section 20
Section 73
Section 73
1307 50 1250 50 935 935 50 1250 50 246 168 50 1250 50 415 50 1250 50 936 935 50 1250 50 415 50
355
50
173 124 240 124 240 124 240 48
400
600
115
4424
011
524
011
5
532
A
4Section 73
Section 73
4086 15 907 5 1611
700
346
700
100
15
5
1723 5 1570 5 6 1570 5915 915
500 466 15 806 5 1380 5 908 15 907 6 1570 5 1759 5 1570 5 908 15 907 6 1570 5
5
14
5
A
95 60
915 915
200
60 95
100
100
10 10
240
240
47 240 115 240 115 240 115 240 47
12 08
47
24
24
47
13 232321 212610 09 10
RWA45 ROCKWOOL 50MMINTERNAL INSULATION
RWA45 ROCKWOOL 50MMINTERNAL INSULATION
A
50 25 200 25 50
ø 55
214
150
25
21
A
511
232
2020
3
75 333
25 385
508 50 142
700
164
75
150
5910
TOS - 38.698 m
01
04
06
19
12
13
11
09
10
20
2147
15
2421
10
24
2050
A
150 75 275
562
511
249
25
590
290 100
110
30
40
TOS - 42.510 m
75 333
186
450 50
50
06
05
05
02
19
13
09
09
10
21
10
20
24
47
11
2
A
85
85
13
08 47
24
24
472323 26
21
21
115
4424
011
524
0
240 124 240 124 240 124 240
240
2020 20 20 2020
2120
2020
RWA45 ROCKWOOL 50MMINTERNAL INSULATION
DESIGN RISK ASSESSMENT:
THE SIZE AND SHAPE OF INDIVIDUAL STONES FOR THISPROJECT HAVE BEEN DESIGNED TO SATISFY THEOVERALL DESIGN REQUIREMENTS FOR THE BUILDING.ALL PERSONS HANDLING AND INSTALLING SUCH STONESSHOULD BE AWARE THAT THERE ARE RISKSASSOCIATED WITH THIS TYPE OF WORK THAT CANNOTBE DESIGNED OUT.
RISK REDUCTION:FIXERS MUST BE SUITABLY EXPERIENCED IN THEHANDLING OF STONES AND EMPLOY LIFTING METHODSAPPROPRIATE TO THE SIZE AND SHAPE OF THE STONE.ACCESS AND WORKING PLATFORMS MUST BE TO THESTANDARD REQUIRED BY CURRENT LEGISLATION.REFERENCE MUST ALWAYS BE MADE TO COSSHINFORMATION FOR THE MATERIALS BEING USED.
CDM REGULATIONS
020-7735 9995 FAX 020-7793 9800
369 KENNINGTON LANE
LONDON SE11 5QYVAUXHALL
Project
REVISIONS
Dwg Title
Architects
Size
Contractor
Scale Date
Drawn Check Approved
Rev. No. Drawing No.
A1 As indicated
07/03
/2016
10:19
:36
E
BROADWICK STREET - BRICKS -AREA 10 - GRID 2-5
30 BROADWICK STREET
EMRYS
ILRP
08/10/15
BAM CONSTRUCTION LTD
SZE-2807-GA-010
JH
1 : 30
Broadwick Street Elevation - Area 101 1 : 30
Section 2031 : 30
Section 734
1 : 30
04_Fourth Floor - Area 105
1 : 30
03_Third Floor - Area 106
1 : 30
05_Fifth Floor - Coping Area 1071 : 15
04_Fourth Floor - Callout 18
1 : 10
04_Fourth Floor - Callout 29
1 : 10
Section 73 - Callout 110
1 : 10
Section 73 - Callout 22
1 : 15
04_Fourth Floor - Callout 311
37 _MOVEMENT JOINT - 35MM ARBOSIL XL 1099"LIMESTONE" BY SZERELMEY
39 _CILL - PORTLAND FANCY BEACH40 _FASCIA - PORTLAND FANCY BEACH43 _FLAT PANEL - PORTLAND GROVE WHITBED45 _MOVEMENT JOINT - 25MM ARBOSIL XL 1099
"LIMESTONE" BY OTHERS47 _MOVEMENT JOINT - 10MM BRONZE ANODIZED
ARBOSIL XL 1099 "LIMESTONE" BY OTHERS48 _MOVEMENT JOINT - 15MM BRONZE ANODIZED
ARBOSIL XL 1099 "LIMESTONE" BY OTHERS49 _LONDON STOCK BRICKS - 103X65MM
01 _CILL - PORTLAND JORDANS BASEBED02 _SOFFIT - PORTLAND JORDANS BASEBED04 _SOFFIT - PORTLAND GROVE WHITBED05 _COPING - PORTLAND FANCY BEACH06 _FASCIA - PORTLAND JORDANS BASEBED08 _HANDSET ROMAN BRICKS - 115X50MM09 _EPDM MEMBRANE BY SZERELMEY10 _EPDM MEMBRANE BY OTHERS11 _DPC BY SZERELMEY12 _CAVITY BARRIER -120MM THICK13 _THERMAL INSULATION - KINGSPANEL K1514 _MOVEMENT JOINT - 15MM ARBOSIL XL 1099
"LIMESTONE" BY SZERELMEY15 _MOVEMENT JOINT - 20MM ARBOSIL XL 1099
"LIMESTONE" BY SZERELMEY16 _MOVEMENT JOINT - 10MM ARBOSIL XL 1099
"ANTHRACITE" BY OTHERS18 _WEEP HOLES AT 1.5MT CRS19 _SUPPORT BRACKET BY SZERELMEY20 _BRACKET BY OTHERS21 _LOOSE FILL INSULATION BY OTHERS23 _SFS WALL BY OTHERS24 _ALLUMINIUM FLASHING BY OTHERS25 _MULLION - PORTLAND GROVE WHITBED26 _VAPOUR BARRIER - DUPONT AIRGUARD
REFELECTIVE BY SZERELMEY27 _GREEN GLAZED BRICK28 _RESTRAINT BY SZERELMEY29 _WHITE GLAZED BRICK30 _WHITE GLAZED BRICK CURVED REVEAL31 _DE LANK GRANITE34 _BLOCKWORK 140MM35 _ALLUMINIUM CLADDING 2MM BY OTHERS36 _RC UPSTAND
LEGEND
Rev. Description DateA ISSUED FOR
APPROVAL24.08.15
B ARCHITECTCOMMENTS
14.09.15
C BRICK PATTERNELABORATED
15.01.15
D BRICK PATTERNREVIEWED + INTERNALINSULATION ADDED
02.03.16
E SLIP PLANE ADDED 04.03.16
FEA AnalysisDisplacement Safety Factor
13 Riverwalk Apartments | New Build | Ground Floor Facade and Hard Landscape | London_UK | 2015
SSL +8.110SSL (TBC ON SITE)
+9.230 TOS
+8.835 TOS
EDGE OF SLAB
+1300
SSL +6.450
SSL +7.750
TREE PIT.
TOC +7.500
SSL +4.300
STEPSLABEDGE
OF
SLAB
SSL +7.750
SLAB
+8.835 TOS
+8.820 TOS
+8.820 TOS
+8.835 TOS
+8.835 TOS
(TBC).
+8.835 TOS
+9.215 TOS
+8.835 TOS
SSL +8.110
SSL (TBC ON SITE)
SSL +4.300
+4.650 FFL
8.230 FFL
7.730 TOS
7.150 TOS
6.825 TOS
6.240 TOS
5.870 TOS
5.300 TOS
8.835 TOS
TOC +4.765
UOC +7.150UOS +7.155
TOS +4.800+4.800 TOS
BED. BED.
OVERSIZED STONES
6.825 TOS
6.240 TOS
5.870 TOS
5.300 TOS
CHAN
GE IN
DIR
ECTI
ON O
F CU
RVE.
MOVE
MNET
JOIN
T.
(TBC)
SSL +7.990
MOVE
MNET
JOIN
T.MO
VEMN
ET JO
INT.
8.380 TOS8.500 TOS
8.715 TOC
CHAN
GE IN
DIR
ECTI
ON O
F CU
RVE.
+9.230 TOS AND HR
S31 S31 S31 S31 S31 S31 S31 S31 S31 S31S31S31S31S31
TOC +7.500
SSL +6.450
SSL +6.345
8.130 FFL
+8.835 TOS
6.440 FFL
8.715 TOC 8.500 TOS
7.730 TOS
7.150 TOS
6.825 TOS
8.835 TOS8.757 TOS
6.590 TOS
7.980 UOS
HAUNCH
TOC +7.500
8.715 TOC
SSL (TBC on site).
8.130 FFL
+8.835 TOS
+4.650 FFL
8.500 TOS
7.730 TOS
7.150 TOS
6.825 TOS
6.240 TOS
5.870 TOS
5.300 TOS
8.835 TOS8.757 TOS
+4.800 TOS
HAUNCH
7.980 UOS
PLENUM
8.715 TOC
7.150 UOC
4.300 SSL
4.765 TOC
8.130 FFL
+8.835 TOS
+4.650 FFL
8.500 TOS
7.730 TOS
7.155 UOS
8.835 TOS8.757 TOS
+4.800 TOS
7.980 UOS
7.750 SSL HAUNCH
+8.835 TOS
8.715 TOC
+8.835 TOS
+8.835 TOS
8.270 TOS
7.980 UOS
8.757 TOS
TOC +7.500 TOC +7.500 TOC +7.500 TOC +7.500
50 STEP.
8.130 FFL
TREE PIT.
HAUNCH - BY OTHERS
8.715 TOC
CHAN
GE IN
DIR
ECTI
ON O
F CU
RVE.
CHAN
GE IN
DIR
ECTI
ON O
F CU
RVE.
+8.835 TOS
7.980 UOS
+9.230 TOS+9.215 TOS
S32 S32 S32 S32 S32 S32 S32 S32 S32 S32 S32 S32 S32 S32
+8.820 TOS
+8.820 TOS
+8.835 TOS
+8.835 TOS
+8.835 TOS
+8.820 TOS
+8.820 TOS
8.765 TOS
SSL +8.1108.230 FFL
7.500 TOC
8.130 FFL
7.980 UOS
(TBC)
SSL +7.990
8.715 TOC
+9.230 TOS+9.215 TOS
+4.800 TOS
+5.051
+4.765 TOC
+4.800 TOS
+4.800 TOS
12 Hospital Armonia | New Build | Interior and External Design | Porto Mantovano_Italy | psgpartners | 2014
KEY PLAN
Basement
Ground Floor
First Floor
A. Medical StaffZ. UKPN
B. DianosticC. Blood Test AreaD. Surgery E. Dentist - OpticianF. Conference Room Cafeteria
G. OfficesH. AmbulatoriesI. Gastroscopy
Waiting Areas Conference Room
GROUND FLOOR
11 Borgo Ruga Revitalisation | Ideas Competition | Retrofit + Public Realm | Ponzano Veneto_Italy | Eng.Pezzini | Eng.Sartori | 2015
Plan View
Common Allotment
Letting
Local BCO office
Professional School
10 Wine Culture Center | Young Architect Competition | Commercial | Negrar_Verona_Italy | Eng.Pezzini | Eng.Sartori | 2014
3D cross section
Sustainability | EnergyDesign Concept
Itinerary
Cut | Void
Push | Pull
Volume
Landscape | Facade | Vineyard
View points
Green roof | Rain water harvesting
Phytodepuration | Biogas
PV panels | Solar panels
Natural ventilation | Solar shading
09 Piazza Castello revitalisation | Competition | 2nd Prize | Public realm | Isorella_Brescia_Italy | Eng.Pezzini | Eng.Sartori | 2014
Materials
3D Model
Pebbles
Beola stone tiles
Cobblestones 10x10cm
Asphalt
Concrete
Green areas
Church Yard Urban Living Space Piazza
08 Mirafiori urban revitalisation | Exhibeted at Wonderlad 24H City All Inclusives exhibition | Master IED | Urban revitalisation | Mirafiori_Turin_Italy | Eng.Pezzini | 2013
08 Mirafiori urban revitalisation | Exhibeted at Wonderlad 24H City All Inclusives exhibition | Master IED | Urban revitalisation | Mirafiori_Turin_Italy | Eng.Pezzini | 2013
Mirafiori neighbourhood
Smart Mobility
New Parking Area
Concept
07 Mirafiori share housing | Master IED | Residential Retrofit | Mirafiori_Turin_Italy | Eng.Pezzini | 2013
07 Mirafiori share housing | Master IED | Residential Retrofit | Mirafiori_Turin_Italy | Eng.Pezzini | 2013
Existing Proposed
DetailBalcony extension on the south facade
Building Component Scheme
Existing Typology New Typology _ Share your flat
06 Remembrance Park revitalisation | Competition | 1st prize_Construction stage | Public realm | Rapino_Chieti_Italy | Eng.Pezzini | Eng.Sartori | Eng.Schievano | 2013
06 Remembrance Park revitalisation | Competition | 1st prize_Construction stage | Public realm | Rapino_Chieti_Italy | Eng.Pezzini | Eng.Sartori | Eng.Schievano | 2013
Key plan
Detail section C_1:20
Detail section D_1:20
Detail section A_1:20
13. Cobblestones 10x10cm11. Cobblestones 30x60cm18. Wood bench02. Gravel
21. Concrete12. Pebbles26. Cor-Ten
05 Learning from the earth | Master IED | Workshop | Arcò | Education | Gaza Strip_Nuseirat | Eng.Pezzini | 2012
Water system
Phytodepuration
Public water network
Water storage
Class W.C
Sports Area
Main entrance
Laboratories|Offices|LibraryClassrooms
Elevated path
Bar
Natural ventilation
05 Learning from the earth | Master IED | Workshop | Arcò | Education | Gaza Strip_Nuseirat | Eng.Pezzini | 2012
Site soil reuse | Rammed earth
Fragmentation
Open green spaces
Shading system
SustainabilityUNRWA|school program
30 classrooms
Science Laboratories
Computer laboratories
Library
Hand craft unit
Learning support center
Multipurpose room
Environmental section
21th December
21th June
Daylight analysis Insolation analysis
SUMMER
The tents protect the patio from the sun overheating, and the
presence of vegetation help to cool down the natural ventila-
tion that comes inside the class. The presence of openings on
all sides ensures the correct illumination of the classes and the
expulsion of the exousted air through window due to cross
ventilation, according to the season s prevailing wind direction.
The presence of wood mashrabiya on the main opening let to leave
always open the window.
WINTER
The sun rays come inside the patio so the thermal mass of the wall releases gra-
dually the heat during the afternoon. The tents have to be removed to ensure the
correct illumination of the class. All the windows are closed and the rammed earth
walls protect from the heat loss. All the year long the double insulation layer of
the roof, made in earth and strawbale, guarantee on optimal thermal and acustic
insulation.
04 Le Albere | Zintek | Renzo Piano Building Workshop | Construction drawings_Roofing | Trento_Italy | Eng.Pezzini | 2012
04 Le Albere | Zintek | Renzo Piano Building Workshop | Construction drawings_Roofing | Trento_Italy | Eng.Pezzini | 2012
1
2
34
57
6
8
9
10
11
12
Section
3D cross section
Legenda
1. Zinc titanium sheet
2. Water proof layer
3. Wood decking 24mm
4. Wood slats for natural ventilation 60x90mm
5. Vapour barrier
6. Fiber wool high density Insulation
7. OSB
8. Fiber wool medium density
9. Vapour barrier
10. Ceiling
11. Wood beam 80x120mm
12. Wood beam 160x320mm
Legenda
1. BBS timber
2. Wurth Assy plus VG diameter 8mm
3. Wood beam 160x320mm
Carbon Fiber
Sollecited Wood Fiber
03 Urban Islands | Competition | 1st prize | Public realm | Robecco sul Naviglio_Milan_Italy | Eng.Pezzini | Eng.Sartori | 2011
03 Urban Islands | Competition | 1st prize | Public realm | Robecco sul Naviglio_Milan_Italy | Eng.Pezzini | Eng.Sartori | 2011
Square Street
Green areas Urban islands
Parking Bike paths
New fluxesNew square | materials
Detail DD
1. Cobblestones 60x30cm
2. Cobblestones 10x10cm
3.Concrete bench
4. Pebbles
D
D
02 Favela upgrading | Master of Science degree | Thesis | Urban revitalisation of the central area of Favela Vila Fatima | Porto Alegre_Brazil | Eng.Pezzini | 2011
02 Favela upgrading | Master of Science degree | Thesis | Urban revitalisation of the central area of Favela Vila Fatima | Porto Alegre_Brazil | Eng.Pezzini | 2011
New green points
Pedestrian paths
Sports area
New connections New buildings
Commercial street
1| Public administration center 2 | Sports center 3 | Public park | Sports area
4 | Cultural center | Professional school
Urban Revitalisation
6 | Cultural center
Library | Digital room
Public trasportation
Pedestrian paths
Waste collection
Education
Green areas
Playgrounds
Professional institute
Public buildings
Habitants Public Administration
Specialists|NGOs
Cooperat ive
Project
Typology 1 Typology 2
Detail
First floor level
1. Ventilated ground floor
2. Precast slab
3. Ventilated Timber roof
4. External Wall made by ecologic bricks 30x15x7,5cm
5. Outdoor concrete pedestrian walkay
6. Water tank
Residential proposal
01 Piazza Duomo | Msc in Architectural Engineering | University Project | Mix Used Development + Public Realm | Padua_Italy | Eng.Pezzini | 2010
01 Piazza Duomo | Msc in Architectural Engineering | University Project | Mix Used Development + Public Realm | Padua_Italy | Eng.Pezzini | 2010
Concept
Office
1_45m2
2_80m2
3_76m2
4_126m2
5_100m2
Social Housing
1_72m2
76m2
2_110m2
96m2
90m2
3_139m2
125m2
120m2
110m2
Retail
1_114m2
2_100m2
3_84m2
4_76m2
5_57m2
6_43m2
7_28m2
Green Terraces
Public
1_232m2
Private
2_130m2
3_108m2
4_43m2
5_76m2
6_43m2
7_36m2
First Floor Level
Section B-B
Elevations
Courtyards
Open Ground Level
f a c a d e d e s i g n e r
p e z z i n i r o b e r t o
[email protected] +44(0)7476477737
a r c h i t e c t u r a l e n g i n e e r