Portfolio Pc
-
Upload
ahmad-mian -
Category
Documents
-
view
197 -
download
1
Transcript of Portfolio Pc
PORTFOLIO
engineer Ahmad Mian
I am high-energy, enthusiastic and innovative engineer with a proven track record of having 10+ years of professional experience in the planning, design and construction of diverse project (Residential / Educational / Commercial / LEED ).
Specialties:
An ability to plan projects in order to accomplish its goals within constraints such as time, cost and agreed quality standards, Schedule tasks, deadlines and milestones for all stake holders and resources.· Thoroughly familiar with good engineering practices, economic practices, calculation methods, design details, critical thinking, standards and specifications.· Have strong written presentational and verbal communication skills; well developed work ethics and practical approach.· Documentation skills to document project schedules, familiar with book keeping software and basic Accounting.· Ability to work effectively under minimal supervision, Multi tasking, able to handle more than one project at a time.· A quick learner who enjoys keeping current with new developments.
Expert: in a variety of software such as AutoCAD, Sketch up, Adobe Photoshop, and MS Office.
[email protected]: +1 647-786-6064
Company: Nayyar Ali Dada & Associates ( NADA )Duration: 2003 – 2007Designation: Architect
Responsibilities: •Reported directly to Project Manager, responsible for coordination with electrical, plumbing, landscape engineers and with the client for Preparing designs, drawings, plans and specifications for projects.•Prepare and maintain a directory of suppliers and trade subcontractors.•Evaluate and recommend appropriate building and construction materials.•Prepare contract documents and review and evaluate tenders for construction projects•Supervise technicians, technologists and other engineers and review and approve designs, calculations and cost estimates.•Present work to the Project Manager, client (as applicable) at milestones throughout the production•Provided support to Engineering and on-site clients.•Managed successful relationships with sub-contractors and associate contractors.•Participate directly in the design, development and inspection.
In 1992, Dada received the President's Pride of Performance award for his services to architecture and conservation, he also received the Aga Khan Award for Architecture, in 1998 for Al-Hamra Arts Complex.
NADA Experience Certificate
Recommendation letter by Nayyar Ali Dada
Project: Office Building for Pakistan Nuclear Regulatory Authority (Islamabad)Project Designation: Project ArchitectCovered area: 54,250 sft.
Description:
Head office for PNRA. Radial plan used to reduce the circulation, and keep maximum check on circulation for most possible security. The building form symbolically represents both the purpose and the function. Restricted circulation for various functions catered innovatively through architectural design.
Project: Beaconhouse National University (Lahore)Project Designation: Project ArchitectCovered area: 263,846 sft.
Description: Concept closely follows the philosophy of a modern, dynamic & futuristic university. Conceived as a pedestrian campus. An environmental friendly campus surrounded by foliage and green landscaped areas.
The form of the building takes its shape from the orientation towards sun and semi surrounded multileveled intimate open spaces. The building forms are robust and drive their language from the séance of dynamics and movement in the plan.
Project: Beaconhouse National University (Lahore)Project Designation: Project ArchitectCovered area: 263,846 sft.
Working with both conservative and dynamic forms, robust with light, traditional with futuristic, strike the delicate balance required for appropriate architecture. The attempt was to capture architectural sensitivity to our economy, climate, culture, materials and location.
Project:Riffa Views (Bahrain)Project Designation: Coordinating ArchitectDescription: Middle-income housing project based in Bahrain. Perform conceptual architectural layout for Four-unit type, clubhouse and a mosque. The site is along the golf course with each unit type facing the golf course.
Company: Archcorp Architectural EngineeringDuration: February 2008 – November 2008Designation: Site Architect Project: Atlantis Management & Staff Accommodation (AMSA)
Responsibilities:•Schedule and monitor program activity to achieve an “on-time” result including follow-up with external suppliers to ensure timely response to action items.•Inspected work performed by subcontractors to ensure quality and conformity with plans and specifications•Coordinated multi-site work flow processes through procurement, shipping and receiving, staging, and installation.•Ensured construction plans met guidelines and specifications of building codes and other regulations.•Conducted field inspection mock-up approval.•Issued work permits, and change orders.•Proactively established key relationships and liaised with management, clients, contractors, subcontractors and vendors; tracked and reviewed project documents; contracts, and project specification.•Maintained and documented reports on a daily basis regarding the projects assigned to various departments.•Performed other assigned duties as deemed necessary by project manager/ Resident Engineer.
AMSA Project
A Residential Project of app 1,300,000 sq ft to accommodate 4500 staff of the Atalantis the Palm Hotel (Dubai).The project compromise of 4 buildings (B+G+10-16 Floors)Total project cost is $ 230 M
Company: Archcorp Architectural EngineeringDuration: February 2008 – November 2008Designation: Site Architect Project: Atlantis Management & Staff Accommodation (AMSA)
AMSA Project Experience Certificate
AMSA Project
Master plan:•MB-1,2•S- 1,2,3•S- 4•S- 5
(MB-1,2) Level 2Playing area and swimming pool
Management Building (MB- 1,2)2B+G+10,16 story
Company: Archcorp Architectural EngineeringDuration: February 2008 – November 2008Designation: Site Architect Project: Atlantis Management & Staff Accommodation (AMSA)
Staff BuildingS-4 (2B+G+10) Story
S-1,2,3Commercial center
Staff BuildingS-1,2,3 (2B+G+ 10,16)Story
Staff BuildingS-4 (2B+G+10) Story
Management BuildingMB-1&2 (2B+G+10,16)Story
Staff BuildingS-1,2,3 (2B+G+ 10,16)Story
Staff BuildingS-5 (2B+G+10) Story
Company: ARAMCO (Ranhill Bersekutu Saudi Ltd)Duration: 2009 – 2011Designation: Project Engineer Project: King Abdullah University of Science & Technology (KAUST) (platinum Lead Project)
Responsibilities:
•Worked closely with project managers and project engineer to support the successful development and implementation of project schedules.•Direct and supervises other engineering activities, train or arrange for training of workers,•Supervise technical/progress meeting, survey or field engineering teams. •Responsible for control of work-in-progress, ensures accurate client billings, monitors outstanding accounts receivable and collection efforts on related projects.•Resolve work problems and recommend measures to improve productivity.•Provided quality control for client deliverable to ensure project documents were complete and current.•Coordinated and supported the transfer of all equipment and installations to the end user client.•Worked with the project team members, clients and vendors to coordinate activities like supply, installation, commissioning and testing, monitored work permits, and change orders.•Created project presentation, reports, minutes of meeting and various site documentations.
KAUST:
KAUST’s new campus is Saudi Arabia’s first LEED-certified project, earning LEED Platinum. In addition, it is the largest certified project of its kind in the world to date, as a 496 000 square metre project,.
Company: ARAMCO (Ranhill Bersekutu Saudi Ltd)Duration: 2009 – 2011Designation: Project Engineer Project: King Abdullah University of Science & Technology (KAUST) (platinum Lead Project)
KAUST Project Experience Certificate
Recommendation letter by Senior Project Engineer
Company: ARAMCO (Ranhill Bersekutu Saudi Ltd)Duration: 2009 – 2011Designation: Project Engineer Project: King Abdullah University of Science & Technology (KAUST) (platinum Lead Project)
LEED Registered Project Experience Confirmation Letter
Bridge between Administration building and the Auditorium
Library and Lab. Buildings facing the Red Sea view
Lab. Building corridor
KAUST: Breakwater Beacon
Company: USAID (IRG)Duration: 2011 – July 2012Designation: Computer Design Specialist Project: Power Distribution Program
Responsibilities:•Coordinated with project managers to design construction drawings, established project standards for each project, scope of work and site inspection.•Planed and prepared construction schedules and milestones and monitor progress against established schedules.•Developed and implement quality control programs.•Developed construction specifications and procedures.•Establish and monitor construction work schedules.•Acted as project / site supervisor for construction work.•Coordinated with the technical team leader in additional assignments and small projects.
The USAID Power Distribution Program is a $170 million, three-year, USAID (IRG)-financed project designed to facilitate improvements in electric power distribution utilities across nation to improve their performance and provide better service to their 120 million customers. The project began in September, 2010
Myk Manon Mr. Manon is NRECA International’s Engineer and Operation Manager for Nigeria project. Mr. Manon has over 35 years of experience in supervising and managing rural electrification assignments for government and private clients. Mr. Manon has managed USAID-funded programs in Southern Sudan, El Salvador, Dominican Republic, Bolivia, and Nicaragua that encompass rural line design, construction and supervision; utility organizational development, privatization analysis, and training support.
Mr. Manon has developed work plans, coordinated task assignments with multiple subcontractors, provided overall substantive administrative and logistical support to short term and long term teams in developing countries focusing on donor agencies’ strategic objectives and targets and indicators. Mr. Manon has a strong cooperative sector background in promoting rural electrification projects utilizing innovative technology in developing countries.Mr. Manon received his M.S. and B.S. University of California, Davis.
Manufacturing Drawings developed for one of the projects for the installation methodology of single phase and three phase meters on H-Type poles, using U-Clamp
Arrangement drawing for the installation of four ,single phase meter on a pole, using customized steel strips.
Illustration of low Voltage drops and meter installation
•Enrolled in in-house Management Certificate Program(L-3), IRG Completed “FCPA: PART-1”,
April 2012 Completed “FCPA: PART-2”,
April 2012 Completed “EXPORT CONTROL” ,
MARCH 2012 Completed “ LABOR CHARGING”,
MARCH 2012 Completed “DRUG FREE WORK PLACE”,
MARCH 2012 Completed “INFORMATION SECURITY”,
FEB. 2012 Completed “CODE OF ETHICS AND BUSINESS CONDUCT”,
MAY 2012•Certificate “What Leaders Do” , BBC, June 2008•Bachelors of Architectural Design, National College of Arts, 2003.•Bachelors of Commerce, Punjab College of Commerce, 1998.
Education & Professional Development [email protected]: +1 647-786-6064