Portfolio of Selected Professional Work
description
Transcript of Portfolio of Selected Professional Work
![Page 1: Portfolio of Selected Professional Work](https://reader034.fdocuments.us/reader034/viewer/2022052505/55520d77b4c905852b8b4fcd/html5/thumbnails/1.jpg)
STEPHEN THOMAS HINES
PORTFOLIO OF
SELECTED PROFESSIONAL WORK
DESIGN
CONSTRUCTION
METHODS
BIM
SYSTEM
INTEGRATION
Problem Solving
Solution Driven
![Page 2: Portfolio of Selected Professional Work](https://reader034.fdocuments.us/reader034/viewer/2022052505/55520d77b4c905852b8b4fcd/html5/thumbnails/2.jpg)
5 - PROFESSIONAL PROJECTS
Stephen Thomas Hines � April 4, 2009 5.1
� CONTENTS� Centerpoint - Jackson, Wyoming 5.2� Averon Technologies - Mine Hill, New Jersey 5.2� Talley Residence - Fayetteville, Arkansas 5.3� Courtesy Dealership - McKinney, Texas 5.3� Serranos Salsa Company - Lafayette, Louisiana 5.4� Inspiring Body of Christ Church - Dallas, Texas 5.5� St. Matthew Cumberland Presbyterian Church
Fort Worth, Texas 5.6� Armstrong Ballroom - Sheraton Canal Street
New Orleans, Louisiana 5.6� Appelt Aggieland Visitors Center
Texas A&M University - College Station, Texas 5.7� La Belle Maison - New Orleans, Louisiana 5.7� Vet-At-The-Barn - Chestnut Ridge, New York 5.8� Southwood Welcome Center - Tallahassee, Florida 5.8� Besh Steakhouse - Harrah’s Casino
New Orleans, Louisiana 5.9� Windmark Welcome Home Center 5.9� Ganote Residence - Jackson Hole, Wyoming 5.10� Fire Station #5 - City of Plano, Texas 5.11� Southwood Swimming Pool - College Station, Tx. 5.11� Our Mother of Mercy School - Fort Worth, Texas 5.12
Armstrong Ballroom - Sheraton CanalStreet, New Orleans, LA.
![Page 3: Portfolio of Selected Professional Work](https://reader034.fdocuments.us/reader034/viewer/2022052505/55520d77b4c905852b8b4fcd/html5/thumbnails/3.jpg)
5 - PROFESSIONAL PROJECTS
Stephen Thomas Hines � April 4, 2009 5.2
Aviron Computer Technologies - Mine Hill, New
Jersey
� Program Accomplishments� Construction time reduced 4
months;� HRV Systems to recycle energy;� Energy consumption reduced
25%.� ArchiCAD Software - BIM Infused
� Program Accomplishments� Construction time reduced 6
months;� Building shell and systems were
30% below maximum allowed bythe New Jersey State EnergyCode requirements.
� Steel system reduced 45% fromconventional.
� ArchiCAD Software - BIM Infused
� Centerpoint Office Building - Jackson,Wyoming.� Project Highlights:
� 9,600 SF Speculative OfficeSpace - Two Floors
� 1,000 Common and Support � 10,600 SF - $2.2 Million - Not
Built� Construction Composition
� EPS Core SIPs for wall and roofconstruction;
� Half log veneer and stone;wainscot for exterior walls;
� Full log framing and accentsfrom burned forests;
� Concentric boilers
� Aviron Computer Technology, Inc. -Mine Hill Industrial Park, Mine Hill, NewJersey� Project Highlights:
� 8,000SF for Mezzanines� 57,000SF operational floor
space� 65,000 SF - $4.3 Million
� Construction Composition� 8" tilt-up concrete panels with
three zones of verticalreinforcement to also act asretaining walls;
� Rigid insulation for walls, roofand foundation perimeter;
� Building is partially buried.
Centerpoint Office Building - Jackson, Wyoming
![Page 4: Portfolio of Selected Professional Work](https://reader034.fdocuments.us/reader034/viewer/2022052505/55520d77b4c905852b8b4fcd/html5/thumbnails/4.jpg)
5 - PROFESSIONAL PROJECTS
Stephen Thomas Hines � April 4, 2009 5.3
Nissan of McKinney Courtesy Dealership
McKinney, Texas
� Program Accomplishments:� Construction time reduced 4 ½
months;� HRV Systems to recycle energy;� Energy consumption reduced
30%.� ArchiCAD Software - BIM Infused
� Program Accomplishments� Structural steel system reduced
40% from conventional;� Energy efficiency was 40% below
State of Texas maximum;� Construction time reduced 30%.
� Talley Residence - Fayetteville,Arkansas� Project Highlights:
� Four Bedrooms, 3 ½ Baths,Formal Living Room, FormalDining Room, Great Room,Kitchen, Study, Bonus Roomover Garage, Lanai, PoolCabana, 3 Car Garage
� 6,400 SF - $650,000.� Construction Composition
� Light Gauge Steel Frame forwalls and roof;
� Spray applied Bio-baseUrethane insulation for wallsand roof structure;
� Climate Controlled SealedAttic;
� Courtesy Dealership - McKinney,Texas� Project Scope
� New Nissan and BuickAutomobile Dealerships Side-by-Side
� Seven Buildings includingShowrooms,
� 93,000 SF - $10 Million� Construction Composition
� 4" Spray applied urethaneroof system;
� Spray applied urethane foaminsulation;
� Energy Star light fixtures;� Central chiller plant for
optimum efficiency.
Talley Residence - Fayetteville, Arkansas
Lonestar Buick Courtesy Dealership - McKinney, Tx.
![Page 5: Portfolio of Selected Professional Work](https://reader034.fdocuments.us/reader034/viewer/2022052505/55520d77b4c905852b8b4fcd/html5/thumbnails/5.jpg)
5 - PROFESSIONAL PROJECTS
Stephen Thomas Hines � April 4, 2009 5.4
� Serranos Salsa Company - Lafayette,Louisiana� Project Highlights:
� Stand-alone Brand marqueerestaurant for company asshowcase image across theI-10 Louisiana Corridor servingLatin American Cuisine
� 3 dining areas and patio, barand bar patio; kitchen andoffice
� 6,000 SF - $1.4 Million� Construction Composition
� EPS core SIPs for walls androof deck construction;
� Spray applied Bio-baseUrethane Foam insulation forentry stick-built walls;
� 3" Spray applied bio-basedUrethane foam roofmembrane;
� Mechanical equipment sizereduced 25%.
� Program Accomplishments:� Construction time reduced 3
months;� HRV Systems to recycle
energy;� Energy consumption reduced
30%.� ArchiCAD Software - BIM
Infused.
Serranos - Main Bar Dining
Serranos - Main Entry and Dining Patio
Serranos - Accent and Banquette Dining
![Page 6: Portfolio of Selected Professional Work](https://reader034.fdocuments.us/reader034/viewer/2022052505/55520d77b4c905852b8b4fcd/html5/thumbnails/6.jpg)
5 - PROFESSIONAL PROJECTS
Stephen Thomas Hines � April 4, 2009 5.5
� Inspiring Body of Christ Church (IBOC)Dallas, Texas� Project Highlights:
� 4,200 Seat Auditorium� Fellowship Hall to Seat 400
with Dining Patio and FullCommercial Kitchen;
� Choir Practice Room; Youthand Teen Facilities,
� Administration and PastoralSuite
� 172,677 SF - $34 Million � Construction Composition
� 9" tilt-up concrete panels;� Rigid insulation for panel walls
and roof;� TPO membrane roof for lower
roofs - white reflective color;� 70,000 gallon salt water
aquarium used as heat sink;� Three Trane air-cooled chillers
with scroll compressors thatwill load shed and ramp-upas required for optimumefficiency;
� Trane EMS to balance andmanage energy consump-tion goals which also controlslighting
� Program accomplishments� Building shell energy
consumption is 40% betterthan State of Texas EnergyCode requirements;
� Energy consumption to beapproximate 25% less thanconventional
� ArchiCAD Software - BIMInfused
IBOC - Inside South Entry through 70,000 Gallon
Saltwater Aquarium
IBOC - East Aerial - Dallas, Texas
IBOC - South (Main) Entrance from Fountain
![Page 7: Portfolio of Selected Professional Work](https://reader034.fdocuments.us/reader034/viewer/2022052505/55520d77b4c905852b8b4fcd/html5/thumbnails/7.jpg)
5 - PROFESSIONAL PROJECTS
Stephen Thomas Hines � April 4, 2009 5.6
� St. Matthew Cumberland PresbyterianChurch - Fort Worth, Texas (Not Built)� Project Highlights
� 1,000 Seat Sanctuary� Renovated Lobby, � Classrooms and Offices;� New Church and Facade
Image� 20,000 SF - $2.9 Million
� Construction Concepts� Insulated Concrete Forms
(ICF) exterior walls;� Glu-Laminated arch and
deck structural system forsanctuary and addition;
� Spray applied bio-basedurethane foam insulation toretrofit existing fellowship hall.
� Program Accomplishments� Construction time reduced 6
months;� Building shell energy
consumption is 40% betterthan State of Texas EnergyCode requirements.
� ArchiCAD Software - BIMInfused
� Armstrong Ballroom - Sheraton CanalStreet New Orleans, Louisiana� Project Highlights
� Restore and renovate to theroom Armstrong resultingdamage caused byHurricane Katrina.
� Work included ballroom,cabana rooms, corridor andbreak-out rooms
� 20,000 SF - Cost notdisclosed
St. Matthew CPC - Aerial Showing New Sanctuary
St. Matthew CPC - Main Entry
Armstrong Ballroom - Sheraton Canal Street
![Page 8: Portfolio of Selected Professional Work](https://reader034.fdocuments.us/reader034/viewer/2022052505/55520d77b4c905852b8b4fcd/html5/thumbnails/8.jpg)
5 - PROFESSIONAL PROJECTS
Stephen Thomas Hines � April 4, 2009 5.7
� Appelt Aggieland Visitor Center inRudder Tower, Texas A&M UniversityCollege Station, Texas� Project Highlights
� Provide a new and invitingsingle point of service forvisitors to Texas A&MUniversity.
� Multi-media mini-theater with16 screen computer-generated program andmusic
� Three computer stations foruser interactive applicationproviding information tostudents and visitors aboutthe university, the communityand the region
� Information Desk, CommonsArea and Storage.
� 3,500 SF - $1.3 Million
� La Belle Maison - New Orleans,Louisiana - Fairfield Timeshare Resorts� Project Highlights:
� 134 Key TimeshareCondominium incorporatingfour civil war era masonrystructures and adding floorsup to nine stories;
� 228,000 SF +, $28 million� Construction Concepts
� Unreinforced masonry wallsinsulated and strengthenedwith 4" spray applied bio-based urethane foam;
Visitor Center - Information
Desk
Aggieland Visitor Center - Main Entry
La Belle Maison - Magazine
Street Elevation
![Page 9: Portfolio of Selected Professional Work](https://reader034.fdocuments.us/reader034/viewer/2022052505/55520d77b4c905852b8b4fcd/html5/thumbnails/9.jpg)
5 - PROFESSIONAL PROJECTS
Stephen Thomas Hines � April 14, 2009 5.8
� Vet-At-The-Barn - Chestnut Ridge,New York� Project Highlights:
� Eight Exam Rooms. Lobby,Retail Sales, TreatmentArea, Surgical Suite,Boarding Kennel,Amenities,
� 9,400 SF - $1.5 Million� Construction Composition
� 8" EPS Core SIPs for walland roof construction;
� Mechanical equipmentsize reduced 25%;
� Program Accomplishments� Construction time
reduced 4 months;� HRV System to recycle
energy;� Energy consumption
reduced 25%;� ArchiCAD Software- BIM
Infused.
� Southwood Welcome Home CenterTallahassee, Florida - St. Joe LandCompany� Project Highlights:
� Prototype facility for a newconcept in thedevelopment of healthycommunities and sellinghomes utilizing electronictechnology to link all theSt. Joe communitiestogether
� 9,800 SF - $750,000.00including specialtyinteractive technology
Vet-at-the-Barn - Main Entrance
Southwood - Reception Area
Southwood - Living Room
![Page 10: Portfolio of Selected Professional Work](https://reader034.fdocuments.us/reader034/viewer/2022052505/55520d77b4c905852b8b4fcd/html5/thumbnails/10.jpg)
5 - PROFESSIONAL PROJECTS
Stephen Thomas Hines � April 14, 2009 5.9
� Besh Steakhouse at Harrah’s Casino -New Orleans, Louisiana � Project Highlights
� Renovation and Additionenlarging the existingrestaurant and adjacentpublic restrooms;
� Renovate kitchen, staffareas and dining facilities
� Re-opened after HurricaneKatrina
� WindMark Beach Welcome Center -Port St. Joe, Florida for St. Joe Townsand Resorts.� Project Scope Included:
� The second of a newconcept in the develop-ment of healthy commu--nities and selling homesutilizing electronictechnology to link all theSt. Joe communitiestogether.
� 10,000 SF - $1.1 millionincluding interactivetechnology
Besh Steakhouse - Horseshoe Bar
Besh Steakhouse - Main Dining Area
Windmark Beach - Living Room
![Page 11: Portfolio of Selected Professional Work](https://reader034.fdocuments.us/reader034/viewer/2022052505/55520d77b4c905852b8b4fcd/html5/thumbnails/11.jpg)
5 - PROFESSIONAL PROJECTS
Stephen Thomas Hines � April 14, 2009 5.10
� Ganote Residence - Jackson,Wyoming� Project Highlights:
� Main HouseFour Bedrooms, FormalLiving Room, FormalDining RoomArea: 7,100 SF
� Guest HouseTwo Bedrooms, Kitchen,Great Room, Two CarGarageArea: 1,000 SF
� Construction Composition:� Wood Frame Walls, Half
Log Siding:� Log Roof Purlins and
Elements� Interior Full Log Walls, River
Rock Wainscot.� 8,100 SF - $4.4 Million
Ganote Residence - Main Entry Stair
Ganote Residence - Rear (West) Elevation
![Page 12: Portfolio of Selected Professional Work](https://reader034.fdocuments.us/reader034/viewer/2022052505/55520d77b4c905852b8b4fcd/html5/thumbnails/12.jpg)
5 - PROFESSIONAL PROJECTS
Stephen Thomas Hines � May 14, 2009 5.11
� Program Accomplishments� Increased filter system
efficiency by 50%;� Stopped leaking through shell
and construction joints;� Reduced pool operation costs
30%.
� Fire Station #5 - Plano, Texas� Project Highlights:
� Three apparatus bays� Day Room, Kitchen,
Watch Room, Dorm Area,Dressing and Showers
� Equipment Storage, SiteWork
� 6,000 SF - $555,000� Construction Composition
� Structural Steel Frame;� Light Gauge Steel Walls
with Brick Veneer� CMU for apparatus bays
with Brick Veneer;� 4 Ply Roof Membrane
� Southwood Swimming Pool - CollegeStation, Texas� Project Highlights:
� Repairs to Pool Shell andBeach Entry
� Install new stainless steel (OGRS); overflow gutterrecirculating system;
� Install Chemical Injectionand Monitor System, FlowMeter and Automatic FillSystem
� Replace Valves andupper layer of sand in theexisting Filter System
� Service Pumps andreplace catch basket.
� Pool Size: 145,000 Gallons- $225,000
Fire Department #5 - Plano, Texas
Southwood Swimming Pool - College Station. Tx.
Fire Station #5 - Plano, Texas
![Page 13: Portfolio of Selected Professional Work](https://reader034.fdocuments.us/reader034/viewer/2022052505/55520d77b4c905852b8b4fcd/html5/thumbnails/13.jpg)
5 - PROFESSIONAL PROJECTS
Stephen Thomas Hines � May 14, 2009 5.12
� Program Accomplishments� Energy consumption reduced
30%;� Energy efficiency is reduced
30% better than State of Texasrequirements;
� ArchiCAD Software - BIM Infused
� Our Mother of Mercy School - FortWorth, Texas� Project Highlights:
� Demolition of the existingPre-World War II Facility
� New Facility is for K-8. � 8 Classrooms, Library,
Music Room, CafeteriaCommercial Kitchen,Administration Offices
� 16,000 SF - $2.4 Million� Construction Composition
� 8" ICF Exterior Walls withEIFS Coating;
� Wood Truss Roof withComposition Shingles;
� 4" Spray applied UrethaneInsulation for Roof
� Mechanical EquipmentSize Reduced 25%
� Classroom and Gymnasium Additionto Caldwell Middle School -McKinney ISD� Project Highlights:
� Replacement after fireburned fifty year oldgymnasium
� Four Classrooms, TeacherLounge
� Restrooms and Junior HighGymnasium
� 9,200 SF - $550,000
Our Mother of Mercy School - Fort Worth, Texas
Our Mother of Mercy School - Fort Worth, Texas
Caldwell Middle School - McKinney, Texas