Portfolio Nieves Fernández
description
Transcript of Portfolio Nieves Fernández
5
INDEX 00 PREFACE 6
Urban Design. 01 DOMESTICITY 8 Slowmadness/Juan Herreros 02 PLAYING IN A STRUCTURE 20 Play in the city/Francisco Burgos 03 MAD-BUILDING 26 Residential urban design/Bernardo Ynzenga 04 SLUM UPGRADING 34 Low cost/Emergency housing María Teresa Diniz
Housing Design
05 18 METRES DEPTH 44 Deep house experiments/Andrea Deplazes 06 MR. OTTER AND I 52 Live with/like animals/Hrvoje Njiric 07 INHABITING A SKYLIGHT 62 Inhabited screens/Cino Zucchi 08 HOUSING: A WORKING METHODOLOGY 68 From city to house/Dietmar Eberle 09 SHARE 74 Quality of life/Anne Lacaton
Housing Systems
10 METABOLIC HIGHPOINT ONE 78 Construction and Technology/Ramón Araujo 11 ENERGY AND SUSTAINABILITY 90 Javier García German
12 SUMMARY 100
6
00 PREFACE
This booklet is the result of an in-tensive work during this year. The main topics addressed here go from the urban to housing de-sign. Housing is not easy, from my point of view is the most difficult part in architectu-re, because is the place where the people spends the most parte of their time. Housing should be rethinked and adapted to the current ways of living. We should think in new construction methods, in sustainability, and of cours in comfort.
There are several ways to face architec-ture, this Master tries to open your mind and think in architecture as something that can be approached from the most functional to the most utopic way. Who would imagine that housing can be design from the house of an animal?
I would like to say thank you to all the teachers involved in this project, to the Direc-tor of the MCH for creating an excellent Master, to Sevastian Severino and María José Manga for all the help, and specially to all my classmates and friends for this wonderful year.
8
01
SLOWMADNES Juan Herreros
When the speed is decreased, it affects the different scales and provides a new inter-est to the domestic space, its surroundings and the rest of the city understanding it as a con-tinuous transition. The models of quality, pres-tige and confort established during the “boom” have failed, but it is necessary to act quickly inventing new options.
Considering the urban tissue, preserva-tion values of the catalogued buildings and the social richness, we will work with total freedom to design at a scale that is somewhere in bet-ween a building and an urban plan. These condi-tions will generate advanced residential pro-jects that can read the diversity of its users and the demand of the of the building and hou-sing types excluded by traditional real estate. Facilities, colective programs and public space will be main ingredients of this project.
The location is in Embajadores, Madrid. This neighborhood is the most dense in the city (500inh/ha). The blocks in Embajadores have ar-chitectural treasures from a preservation point of view, but also sub-standard housing and over-crowding.
DomestiCITY
Madrid city centre
Embajadores
LAVAPIES
LOCATION
9
DomestiCITY
50% dwellingsare between
30m2-60m2
4-10 inha-bitants per apartment
1 park in all the
neighborhood
65% of the population
over 60 years old
1 multisportcourt for 150.000
inhabitants
1 bascketballcourt for 150.000
inhabitants
NO space for
visitors
small courtyards inside the buildings
narrow streets and
alleys
NO space for
gardens
NO panoramic
views
NO space for
laundryline
NO space for
storage
NO space for
bikes
What is the situation in Embajadores?
10
DomestiCITYpreserve the existing
use the existing facilities
add a new city on top
Strategies
The main intention of the proyect is preserve the existing con-ditions in the neighborhood. Embaja-dores and Lavapies have a unique and special atmosphere that you can not find anywhere else in Madrid; lab-yrinthic streets, people form diffe-rent nationalities, exotic shops, bohemian cafés and bars... The strategies followed tries to keep these atmosphere and take them to a new elevated level that does not compete with the current fabric, but take advantages of the existing facilites inside and outside the buildings to work in a synergis-tic way.
11
DomestiCITY
Masterplan
The idea is to im-plant a new multilayer city in the top of the building providing new rooms for those who already live here (bigger kitchen, extra be-droom, storage room,etc...) and dwellings for new resi-dents.
Vertical connectionSTORAGE
Block 1 & 2DWELLINGSEXTRA-ROOMS:
Roof TopCOMMUNITY FACILITIES
12
DomestiCITY
What means DomestiCITY?
DomestiCITY
SpaceComfort
Ownership
Relation-ship
connec-tion
family
agree-ment
intimacy
interac-tion
well-being
area
quiet
relax
rest
ease
room
extent
posse-ssion
home
resi-dence
occupancy
control
SPACECOMFORT
RELATIONSHIPOWNERSHIP
14
DomestiCITY
BBQing
To project DomestiCITY, we start from redefining the spa-ce, looking for new optimum spaces based on everyday activities and others based on the new ways of living.
VIEW
PANORAMIC VIEW
SKY VIEW
NATURAL LIGHT
PRIVACY
SPACE ADAPTABILITY
NON PHASED ACTIVITY
STEPED SPACES
FLEXIBILITY
OPEN SPACE
Activities Space Features
16
Dwelling typology
public corridor
sleepingstudying
sleepingstudying
relaxingrelaxing
entrancehobbyreading
watching TVgamingentrance
hobbyreading
watching TVgaming
cookingeating
cookingeating
84 m2 168 m2 252 m2
Entrance level 1 level 0
More inhabitants, more space to live
DomestiCITY
20
PLAY IN THE CITY Francisco Burgos
When we talk about the design of objects for children, designers often make the mistake of over-figuration: a duck-shaped seat, a seesaw that is a horse, a frog or an elephant.
But we all know that for a child just any stone can be a boat, a branch can be a horse and a lot of sand a castle. Those shapes that are not completely certain are the ones that stimulate more the imagination and the creative development of a child. Because one day a stone is a boat and the next day that same stone is a turtle or a race car.Is then a wise move to sha-pe the slides as elephants in city playgrounds?
The aim of this project is to imagi-ne places where objects appear with a suffi-cient degree of abstraction as to not limit the child’s imagination. Any element can be whate-ver a child wants at any moment or even nothing specific, but simply that of which hangs, jumps, passes, or whatever that allows all kinds of ga-mes and movements
02 Playing in a structure
21
Playing in a structure
In dense cities all over the world there are lots of empty and abandoned plots in-between buildings usually long, dark and very narrow. This spaces are dirty voids in the urban fabric, wasted areas that can be used by the neighbors. Sometimes these narrow gaps are use just to prop-ping up the buildings on each side with scaffol-dings but, How about using the scaffoldings as a playground? How about creating a space for kids, neighbors, elders just around the corner? How about solving those forgotten areas and turn them on im-portant points in the city?
What happend with 1 support?.............................and 2?............and 3 or more?
22
Playing in a structure
R 0,75 m
R 0,55m
R 0,45m
Strategies
OPENINGS FOR LIGHT
CONTINUITY IN GROUNDFLOOR
AREAS TO STAY / RESTDENSER AREA FOR SAFETY
SKYLINE VIEW
The strategies are simple. The distances between the sticks are the minimum that allow adults and children to climb and move through the whole structures in a safe way. The spaces that are created not just in the ground floor but in different heights are easily reached and provide areas of rest, enjoyment, and stay.
25
Playing in a structure
We believe in a playground that have the appropriate risk to deve-lop children personality and give them more challen-ges, more fun and enjoyment but without forgetting the safety in the whole pla-ce. This play area is not just focused in kids, it is a place for teenagers, or youngsters to work out, for adults that can stay there while watching up their children, for el-ders to stay and chat. This structure allows the enti-re neighborhood to climb to the top and enjoy the skyline view of the whole city.
This is a structure that solves a gap in the city. This is a structure that solves a gap in the neighbor-hood. This is a plays-cape.
Details
26
03 MAD-BUILDING
RESIDENTIAL URBAN DESIGN Bernardo Ynzenga
The three chosen plots are located bet-ween Atocha´s and Delicias´s neighborhoods. The main problem of these areas are the total disconnection with the surrounding due to the railroads, the break in the topography and a not well resolved urbanism due to the change from the old industrial fabric to an new one made from offices and services which results in some empty spaces.
According to this, our answer is dealing, on the one hand, with these problems; but on the other hand trying to find how people want to live in the 21st century and giving a common and total response to the three zones.
In the 21st century people from the town is moving the city. People nowadays want to be collective, wants to be compact in the sense of having their work and the basic services near their house. In contrast to this feeling, the urban planning of the 21st century is creating huge city expansions along the suburbs with very low density and where the car is becoming more and more necessary.
27
MAD-BUILDING
Strategies
10,7 ha
12,4 ha
6,2 ha
-increase the connectivity with the metro sta-tions.
-solve the railroad gap.
-create more connections between the 3 areas.
-Apply the same strategy to the 3 zones.
1
2
2
1
28
MAD-BUILDING
We believe in a compact, sustai-nable and collective city, where the pedestrian is the protago-nist. A compact city means less roads for cars, fewer resources used, less transportation and less impact in the environment. We believe in the ancient Kash-ba, the traditional Chinese hou-se, the patio-houses in Seville, with a completely different and independent world in the inte-rior. Our proposal is based on all these typologies; we want to create a mix-use neighborhood with patio-building typologies and a sense of collectivity in the entire area. Our project is composed by three “mat-buil-dings” that solves the railroads barriers and creates more con-nections with the current fa-bric.
CONNECTIVITY
DIFFERENT TYPOLOGIESHOUSING 265,000 sqm
DENSITY
Total area: 36,2 haDensity: 244 p/ha Housing: 265,000 sqmUrban facilities: 84,000 sqm
COMMUNTY LIFECOMMUNITY SPACE
MIX-USE
COMMUNITY
BASIC SE
RVIC
ES
CAR
URBA
N FA
CILI
TIES
PEDE
STRI
AN
COMPACT CITY
SHORT DISTANCES
SOCIAL COHESION
SUSTAINABILITY
PEDESTRIAN / CAR
Compact City
HEALTHCARE1,827 sqm
EDUCATIONAL10,879 sqm
COMMERCE41,580 sqm
OFFICE 16,990 sqm
PUBLIC SPACE
30
MAD-BUILDING
Density compare to other cities
The importance to the public space first is given by the organization into a hierarchy of the different public spaces; streets, alleys, squares, patios…, which connects the inner spaces in-between the “MAD-building” with the urban space in a free and permeable way. All these allow the compatible connection between the pedestrians, cars and buildings.
32
MAD-BUILDING
The “MAD-building” is a three-story building with a series of diffe-rent collective housing sizes, services and streets. The aim of the project is a completely functional 72x72 meters cell which is multiplied and spread all over the surface trying to take advantage of every available meter connecting and sewing the different pieces of the exis-ting fabric.
Cell System
72 m
72 m
34
04
SLUM UPGRADING
LOW COST/EMERGENCY HOUSING María Teresa Diniz
More than the half of the world’s dwe-llings have been built with any regulation. This is the case of Sao Paolo, Brazil, where one third of the population lives in favelas.
This is a problem that must be solved, people is building in any available squared me-ter. This slums are erected in high-risk areas (near rivers or slopes) and most of the time are in precarious conditions due to the lack of the infrastructures and facilities required.
The intervetion area is located in Vila Cristina. This zone is surrounded by a river where all the sewage and drainage is going and contaminating it.
The aim of this project is definying the priorities in this settlement, preparing diffe-rent programs to reactivate the zone, optimi-zing all the resources and stablish new systems of roads, sewage, drainage and water supply in order to reorganize and clean the entire neigh-borhood.
LOCATION
Sao Paolo
Vila Cristina
35
SLUM UPGRADING
What is the situation in Vila cristina?
1,240FAMILIES
78% BRICK CONSTRUCTION
22% WOOD CONSTRUCTION
590.43 in/ha
37
SLUM UPGRADING
New Infrastructurewater proposal sewage proposal drainage proposal
StrategiesNODALLINK TO THE CITY ENVIRONMENTAL
PHYTOREMEDIATION
PHYTOREMEDIATION
39
SLUM UPGRADING
After removing 488 families, the aim of the project is located them the closest as possible as they were before, so the new housing is projected near the river and in the south west slope. The proposal is based in a linear park surroun-ding all the neighborhood and linking it. It is a nodal system that starts and ends with two important points: the Agora/library and the Environmental school. This to buildings creates a circular movement throughout the entire settlement and give the same importance to all the facilities. Along the river we can find commerce, sport facillties, and shops to make the linnera park alive. Two phytoremediation pools are located where the river emerge in order to clean the water that comes out. An environmental school will teach the neighbor-hood how to take care of the river, and make them take part in all the process.
PARK UPGRADED FAVELASNEW SERVICES
40
SLUM UPGRADING
Housing typology6,5
850 m2
Basic unit 50 m2
Increased unit 61 m2
Decreased unit 41 m2
44
05
18 METRES DEPTH
DEEP HOUSE EXPERIMENTS Andrea Deplazes
The layout of a 100 m2 house changes de-pending on the depth of the building. The main problems that we have to deal with are the light and the space. When we talk about 6m or 18 m depth these problems are harder to solve.
The investigation of deep plan houses leads us to understand that many depths have common qualities and how a plan must be addapted to achieve good housing conditions.
In addition to this, there are some other question that must be solved in this workshop. The housing project must have at least 3 diffe-rent sizes of dwellings, adding or substracting a room from the prototype. Besides, the building complex must be fitted in an imaginary plot of 100x100m.
This project is an 18 m depth atelier where the open and double-height space is the protagonist, allowing all the light go through the house.
18 m
15 m
12 m
9 m
0 m
5,5
6,6
8,3
11
16,5
100 sqm
45
18 METRES DEPTH
115
m2
85 m
2
100
m2
115
m2
85 m
2
100
m2
Dwelling assamblage Evolution of the prototype
Prototype
The double-height allows the entrance to the pro-totype 1 trough a tunnel.
1
23
TUNNEL
46
18 METRES DEPTH
3,82,23,83,8 2,2
1,8
2,1
3,7
2,1
2,7
3,1
2,2
18
6
Type 2 Type 1
Section 1
1
2
The housing complex consist of 3 different typologies that can be repited n times.This prototypes consist in 2 basic pieces: an open double-hight volume, and a closed 2,5m height piece hosting all the housing facilities in niches.
48
18 METRES DEPTH
Kitchen
Loggia
Loggia
Toilet
Sink
Shower
Toilet
Sink
Wardrobe
Bedroom
Bedroom
Bedroom
Entrance
Niches
51
18 METRES DEPTH
Archetype catalogue
CLOSED SQUARE
Permeability (green areas)
CHESSOpenness (city)Permeability (green areas)Equal conditions (dwellings)
Adapatability (urban conditions)
STRIPESOpenness (city)Permeability (green areas)Equal conditions (dwellings)
OPEN SQUAREOpenness (city)Permeability (green areas)
144 units 72 units 24 units
54 units 54 units 54 units
54 units 72 units 144 units 144 units
45 units 48 units 45 units 57 units
52
MR. OTTER AND I06
LIVE WITH/LIKE ANIMALSHrvoje Njiric
Housing is a topic that can be explo-red in many ways. But, What happend when your client is an animal? The first step in designing a dwelling is understanding your client´s needs and terms. How is his way of living?How big must be the required space? Does he live in water? in trees? in caves?
Six animales where choosen for this in-vestigation: crab, moles, quetzal, otter, moun-tain goat and polar bear.
When understanding all this, we can go further and start thinking how can we adapt this houses for humans, or the other way around, how humans and animals can share the same spa-ce. Starting from this particular house we can continue with a building complex, and even go further on and start exploring how all this buildings can be part of a masterplan.
This project is a ZOOTOPIA.
53
MR. OTTER AND I
- Mustalidae- Semiaquatic- Tolerate both freshwater andcoastal marine- Dont dig dens- Renowed for their sense ofplay-They form family structures- 1 to 3 Pups- Cooperate while fishing
Hierarchy of activitiesTime
Space
LAND 40% WATER 60%
LAND 40% WATER 60%
+ -
sleeping swiming eating playing exploring cleaning breeding
swiming eating playing exploring sleeping cleaning breeding
40-60 cm
54
MR. OTTER AND I
Swimming
Sleeping
Eating
Exploring
Breeding
Playing
Mr. Otter house
Low tide: 40% water 70% water
HIGH TIDE
HIGH TIDE
LOW TIDE
DEN
LOW TIDE
HIGH TIDE
HIGH TIDE
LOW TIDE
DEN
LOW TIDE
Section 1
Section 2
55
MR. OTTER AND I
high tide: 92% water
Mr Otter wanted a 100 m2 house with a minimun of 40 m2 for swimming and at least a small space for sleeping and breeding. He also insisted in a house where playing and exploring were different each day. According to this, the project is settled near a shore where the changing tides hide or show different parts of the dwelling. The house is design to have at least 40 m2 of water when the tide is low and 8 m2 of dry land when the tide is high.
56
MR. OTTER AND I
Mr. Otter like people, so he was agree in living with humans in community as long as the building complex allows permeability and connectivity between the water and the land. Therefore the house for a person should stick to those principals but changing the scale and the needs.
Living with Mr. Otter Building arrangement
???
??
?
!
62
07 INHABITING A SKYLIGHT
INHABITED SCREENSCino Zucchi
What happend in the “interface” or “bu-ffer” between the private and public space in a building? How does a façade fit in the urban context? How do a specific material or technolo-gy change the layout of an elevation? How does a building touch the gorund?
The target of this proyect is to find new ways of housing design starting from the exte-rior, from the intermidiate space between the façade and the dwelling. The layout of the house is not necessary at this point, but a research must be done in this buffer zone.
How does the housing complex interact with the street? or the sky? or the city?
The masterplan, located in Madrid, con-sist in 9 plots in which each group have to design an “inhabited screen” conversing at the same time with the buildings or surrounding pro-jects.
64
INHABITING A SKYLIGHT
The project is based on both strate-gies, light and measures. Is about inhabiting a skylight. Sometimes this skylight is just for catching the light, sometimes is a room usable at a certain moment in the day, sometimes the skylight is big enough to host a dwelling on it.
Ronchamp, Le corbusier
The light is an important feature in a house. The way it changes along the day and the seasons, in both the inner and outer space. We can manage how the light comes and create different atmospheres in the same place through different strategies. Depending on the size and depth of a window it can be just a window, a balcony or a gallery.
Rouen Cathedral, Monet
References
65
INHABITING A SKYLIGHT
N
-Open as much as possible to the south.
-Locate the main rooms in south façade.
-Catch the western light through skylights in north façade and locate the bathrooms there.
- Close as much as possible the façades facing the east and west buildings.
Strategies Light studies
68
08 HOUSING: A WORKING METHODOLOGY
FROM CITY TO HOUSEDietmar Eberle
Before starting to design a project there are some hypothesis dealing with building that must be kept in mind:
New time-frames: A building must lasts 100 years or more, not 20 or 30 year for commer-cial intentions.
Quantity and quality: quantity is the process of transfering knowledge into quality.
Efficency: Use what we already have in a more efficent way.
In order to create long-lasting and effi-cent building we must first think in the local background of the site and the contribution of our building to the place. Besides we must take into account the construction method and other interior features such as the comfort and flexi-bility of the design.
Regarding to the settlements, the effi-cency and the time-frame is given by the envi-ronment and the individual well-being. All this can be achieve by thinking in densifyng, the construction of open buildings and the efficency use of the resources.
To start thinking in housing design we must start thinking in the site; regulations, norms standards, orientation, local background, etc.
Design process of a housing building
Madrid Principe Pio
1 Site
69
HOUSING: A WORKING METHODOLOGY
What is the relation of the plot with the context and regulations? Which kind of volume fits the best in this are? In this case, the plot is isolated, just with some buildings infront of them. The entire are is full of greenery and open space, and is connected with MAdrid rio and the railway station. The plot is limited in the south by a 3m wall that separates it from the street.This wall go all along the edge of the street.
As a starting point the proposed volume tries to speak the same language of the surroundigs not compiting either in height or size.
70
7 m
3 m
10,5 m²
14 m
17,5 m
21 m
2 Envelope/Structure
HOUSING: A WORKING METHODOLOGY
In realtion with the volume and the con-text, the next step is to think in the façade, ma-terials, construction method, climatic condition, orientation, etc.
57,3 m²
80 m² 48,41 m² 80m²
71
HOUSING: A WORKING METHODOLOGY
3 Layout
Divide the building according to the program thinking in the possible entrances to the site and the number and the size of the apartment per floor. The key to make this puzzle is placing the core in the right possition in order to make the most efficent and flexible layout.
57,3 m²
80 m² 48,41 m² 80m²
72
7 m
3 m
10,5 m²
14 m
17,5 m
21 m
4 Improve
HOUSING: A WORKING METHODOLOGY
58,8 m²
80 m² 48 m² 80m²
73
HOUSING: A WORKING METHODOLOGY
We hove to work over the results and im-prove them until achiving the target and ideas settled at the begginig.
58,8 m²
80 m² 48 m² 80m²
74
09 Share
QUALITY OF LIFE Anne Lacaton
Quality of life is the starting point when thinking of the quality of housing. The quality of the housing has to do with pleasure, well-being, comfort, space. All this conditions are nothing but atmospheres created for that purpose.
To create this atmosphere is not neces-sary the architect´s traditional way of thin-king. A housing project can be made by frag-ments, using images or situations showing the main ideas and intentions.
This housing project should talk about good conditions to live in the private and pu-blic space, in the individual or collective spa-ce, in how the project interact with the city.
The main intend for this projecct is to generate sequences of spaces by different images (collages, accumulation, addition...) getting the sense of the environment that we want to achive.
75
Share
Collective Space
City
Nature Community
Quality of life mean sharing because sharing is the beggining of the community and the community makes people be part of something. Quality of life means na-ture and city. Sharing nature we see more light. Sharing the city we create more life. The city should be part of different communities. The com-munity should contain a place of belonging, a place to enjoy natu-re, a place for sharing.
78
10 METABOLIC HIGHPOINT ONE
CONSTRUCTION AND TECHNOLOGY Ramon Araujo
Berthold Lubetkind projected Highpoint one in London in 1935. This building was desig-ned following the principles of Le Corbusier.The cruciform scheme allowed cross ventilation and good views in every dwelling, and maximum open space in ground floor.
The construction system used for this building was the climbing formwork, concrete walls built with a system of removable platforms that eliminated the need for scafolding and ma-king the walls and floors monolithic. This was the first time that this system was applied in building construction.
What happend if Highpoint I were built today? How can we tranform that building in an industrial and prefabricated one? Which systems would be the best for that?
Highpoint one
81
METABOLIC HIGHPOINT ONEPR
OD
UC
IDO
PO
R U
N P
RO
DU
CTO
ED
UC
ATI
VO D
E A
UTO
DES
KPRODUCIDO POR UN PRODUCTO EDUCATIVO DE AUTODESK
PRO
DU
CID
O PO
R U
N PR
OD
UC
TO ED
UC
ATIVO
DE A
UTO
DESK
Section
82
METABOLIC HIGHPOINT ONE
10,31 6,65 7,37 10,316,657,375,87
20,6
7,23 7,17
7,2
2,12,12,12,121,11 2,12,1 2,1 2,1 2,1 2,1
2,1
2,1
2,1
2,1
2,1
2,1
2,1
2,1
2,1
2,1
2,1
2,1
Structural plan
83
METABOLIC HIGHPOINT ONE
New housing typology
CC
A
B B
CC
A
B B
type A: 3 bedroom 87m2
type B: 2 bedroom 60m2
type C: 1 bedroom 41m2
90
11 ENERGY AND SUSTAINABILITY
ENERGY & SUSTAINABILITYJavier García Germán
Sustainability is becoming more and more important nowadays, even though still has little influence in architectural design. We must take into account the energy considerations since the preliminar decisions, because just with the sha-pe or the constructive system we can build in a more efficent way.
The aim of this project is start working with an abstract housing block of 50m x 50m x 50m. This block would be located in New York and de objective is to adapt it to the local clima-tic conditions through concrete design strate-gies.
The block would be a mix-use building with around 200 dwellings of 100m2 and other uses.
New York LAT: 40.78º N , LON: 73.97º W , ALT: 10 msnm
may to october (summer)comfort 69% of the time through passive strate-gies
novemeber to april(winter)comfort 24% of the time through passive strate-gies
91
ENERGY AND SUSTAINABILITY
comfort zone
sun protection
Avg. Temperature
During summer time sun protection is needed, while in winter the average temperature is under the comfort zone, therefore the per-fect strategy will be sun protec-tion in summer and sun radiation gain in winter.
Sun path
winter
summer
Sun’s altitude in winter goes from 25º to 50º while in sum-mer reaches 73º. The better exposition for the winter is the south trying to collect all the sun. In summer the best strategy will be re-ducing the south and west orientation.
wind direction
probability (%)
speed (kms)temperature (ºC)
wind direction
probability (%)
speed (kms)temperature (ºC)
Rose wind Humidity
jan febmaraprmayjunjulaugsepoctnovdec
595961586260586567626564
month %
There are two main wind directions. In summer comes from the south at an average temperature of 22ºC. In winter the mainly direction is north west at an average temperature of 5ºC. The building must be protected from northwes-tern winds and open to the south.
There’s a high perce-tage of humidity all year long. Venti-lation and evapora-tive cooling should be included in the building’s design.
92
ENERGY AND SUSTAINABILITY
Position, external chape and orientation in relation to the climate
12 amdic 21th
WINTER
SUMMER
50
50
100
50
25
50
100
50
25
50
Orientation
Priorities:- collect solar radiation in south façade during winter.- reduce solar radiation in western face in summer.
1 2 3 4
Steps:-enlarge south face for a better solar collection.-turn the building 10º to the west to reduce western overheat.r.
-Split the volume in 2 slabs.-increase the height of the slab behind and reduce it the front for more solar gain.-separate volumes to avoid shading.r.
93
ENERGY AND SUSTAINABILITY
jun 21th
12:00 AM
19:00 AM
jun 21th
12:00 AMjun 21th
5 6 7
-put cantilevers on top for summer shading-taller slab on the west for solar protection of the whole building.
-split slabs to increase ven-tilation and reduce humidity accumulation
Conclusions:-winter solar collection in south façade.-summer shading in south façade.-protection from western overheat.-ventilation to reduce humidity accumulation.
Shape
94
12:00 AMjun 21th
12:00 AMdec 21th
ENERGY AND SUSTAINABILITY
Solar Radiation + Active systems
SUM
MER
WINTER
PASSIVE MESSURES.-Cantilevers to protect from solar radiation in summer while in winter allows the solar incidence.-Program will be located in the coldest zones of the buildings.
95
ENERGY AND SUSTAINABILITY
ACTIVE MESSURES.-Green roofs to protect solar radiation in summer and isolate the building in win-ter.-Green house to absorbe more radiation during winter.e -The vertical connection works as a heat chimney that brings hot air from the pro-ducers in the bottom to the dwellings throuh convection.
OVERHEAT
GREEN ROOF
GREEN ROOF
PRODUCERS
GR
EEN
HO
USE
GR
EEN
HO
USE
Avg. hourly radiation
96
ENERGY AND SUSTAINABILITY
Humidity and ventilation
+++
+
---
-
The building is protected from the nor-thwest cold wind in winter. It is open to the south wind in summer to coold down the surface and reduce humidity accumulation.
PRODUCERS PRODUCERS
During winter windows and shelters are close to let the hot air from the producers go up to all the dwellings
In summer the shelters are open to ventilate the building and avoid the hot air from the producers go up. Every dwe-lling has cross ventilation.
Winter
Summer
97
ENERGY AND SUSTAINABILITY
Thermodynamic concept
FRO
M P
RO
DU
CER
S
GREEN HOUSE
WINTER sun
GREEN HOUSE
Producers are in the bottom of the buil-ding to provide heat to the dwellings.The vertical communication in every tower performs as a hot air chimeney that heats the dwellings through convection.
DIS
CO
DIS
CO
YOU
TH
CEN
TR
E
SPO
RTS
CO
URT
S
CO
M-
PUT
ERS
ROO
M
Winter
Summer
In the south face of the ver-tical connection, green houses are attached to increase the sun collection during the winter.During the summer the green hou-se
98
ENERGY AND SUSTAINABILITY
Climatic Typology
LIV
ING
LIV
ING
ROOMS ROOMS
KITCHEN KITCHENTERRACE
BATHBATH
VER
TIC
AL
CO
NN
ECT
ION
GREEN HOUSETERRACE
HIGH INERTIA MASS
GLASS SLIDING SHUTTERS
CROSS VENTILATION
Summer
Winter
materials
Rooms are faceing north whi-le living room and kitchen face south
Unit-All walls are made from concrete with high iner-tia mass to absorbe heat in winter and later radiate it into the dwelling
Materials-The window of the living room has sliding shutters to let the solar radiation in in winter, and protect from it in summerg
100
URBAN DESIGN
DOMESTICITY
Workshop LeaderJuan Herreros
AssistantMaría Auxiliadora Gálvez
Slowmadness
Duration7 days
LocationEmbajadores, MADRID
PLAYING IN A STRCTURE
Workshop LeaderFrancisco Burgos
AssistantJavier Malo
Play in the city
Duration6 days
LocationLavapies, MADRID
MAD-BUILDING
Specialty LeaderBernardo Ynzenga
Residential urban design
Duration8 days
LocationDelicias, MADRID
SLUM UPGRADING
Specialty LeaderMaría Teresa Diniz
AssistantBelen Gesto
Low cost/emergency
husing
Duration5 days
LocationSao Paolo, Brasil
101
HOUSING DESIGN
18 M DEPTH
Workshop LeaderAndrea Deplazes
AssistantFernando altozano
Deep house experiments
Duration5 days
MR. OTTER AND I
Workshop LeaderHrvoje Njiric
AssistantJose María Sanchez
Live with/like
animals
Duration5 days
LocationZootopia
INHABITING A SKYLIGHTInhabited screens
Duration5 days
LocationMADRID
HOUSING: A WORKING METHDOLOGY
Workshop LeaderDietmar Eberle
AssistantVictor Olmos
From city to house
Duration5 days
LocationPrincipe Pío, MADRID
Workshop LeaderCino Zucchi
AssistantBelen Hermida
102
HOUSING DESIGN
SHARE
Workshop LeaderAnne Lacaton
AssistantDiego García Setién
Quality of life
Duration5 days
METABOLIC HIGHPOINT
Specialty LeaderRamón Araujo
Construction and
technology
Duration6 days
LocationLONDON
ENERGY & SUSTAINABILITY
Specialty LeaderJavier García German
AssistantAlia García German
Duration10 days
LocationNEW YORK
HOUSING SYSTEMS
All material of tis book has been taken from group works or lectures explained by the teachers in each area.