Portfolio for LAHC
-
Upload
chris-thorn -
Category
Documents
-
view
216 -
download
0
description
Transcript of Portfolio for LAHC
1TAble of contents
1
pages
2
3
4-7
8-9
10-11
12-15
prefix
102
201
freehand drawing
e7 studio
101
202
I first got int into architecture in high school when i had to select an elective my ssenior year. From there i decided to continue the path of drafting at Los Angeles Harbor College, so i enrolled in a drafting class. While at Harbor College i learned of the design classes they have to offer, so i decided to enroll in one of the 101 classes. This is when i
found my passion for architecture. the weight it bears on civilizion and how it has
influcenced the course on man was bewildering to me, which into empowered me to pursue this field on work and study. so i continued my education into the design series along with computer aided programs that are needed to attain my A.s. along with G.E. classes.
During my 202 semester i joined the team at e7 architecture studio in l.a. and helped them
with projects in the LACCD. While working at e7 i gain the insight and knowledge that
goes behind building and designing a project. The amount of man power and cordination
that is required is amazing and as furthured my pursuite into the field.
Prefix
2
floor plan
1/8” scale
10’ 20’ 30’
1 2
1. sleeping space2. living space
Env 102Project:Hab unit.square ft.:600Site:200’ x 150’
During the semester we where give the task of creating our own hab unit. The location was along a cliff. The minimum requirements where that 400 sq. devoted to living space. While 200 squre feet be dedicated to sleep-ing space. Kitchen and bathroom where not to included in the design.
During the course of Env. 101 we givin projects to explore spacial order, nega-tive space, team work, and the golden mean.
west elevation1/16” scale 1/16” scale
east elevation
3
54
Env. 201
Case study
WE where given a Architect and had to create a case study from their work.
I was given Mies Van Der roheBarcelona Pavilion
Env. 201 Infill
Project:Infill on 3rd st.
Location:Santa Monica prome-nade
Parameters:9000 sq. ft. allocated for office space
9000 sq. ft. allocated for reatail space
2000 sq ft. allocated for cafe space.
7Using what i learned from Mies architecture, the infill i designed was 50 percent mies and 50 per-cent chris. This was a great project for explor-
ing seperation of
planes and how they
interact with the space around them. Store fronts where the major conserin of the infill, so placing the
businesses was a stra-tigic dilemma that proved
to be a great learning experience.
1/4" = 1'-0"Section 2
1/4" = 1'-0"
Section 3
50’0”
45’0”
36’0”
16’0”
0’0”
36’0”
16’0”
0’0”retail
OFFICE SPACE
bATHROOM
PATHWAY
aTRIUM
1
6
3
4
5
6
café
1
6 6
6
6
45
5
5
1
3
4
2
2
ribbed decking
section 3 detail
6
98
Selected works done for perspective drawing 121 and drawings that i did on my own time
Free Hand Drawings
1110 E7 Architecture Studio While working at E7 Architecture studios i had the plea-
sure of working with great people on projects
would that help build the infastructure of the
LACCD campuses. Some of the projects i got to work on included the CDC at VAlley college, SBS at east lA, General class rooms at west LA, and THe science build-ing at harbor. These project expanded my knowledge of the industry by ten fold and how much work goes into the
projects. It was a great learning experience that
gained me great knownledge in computer programs.
While at E7 architecture stu-
dio i got the oppertunity to work on R&D work. The studio is testing a real time rendering engine that could replace the use of 3ds max animations therefore getting rid of the lengthly rendering time.
This work was complex yet fun at the same time we discov-ered it was possiable to put an entire campus into one build.
All that information locked into a single build was a great break through.
1312 Project:Ceramica Museum
Location:6th st. and AlamitosLong Beach
Parameters:7000 sq. ft. for museum
1250 sq. ft for adminis-traion
5200 sq. ft. for community
7650 sq. ft. for parking
For this project i used the process that is done when creating clay and forming it. I wanted each space which included Sculpture garden, administration, community center, and the museum to represent
the four stages of creating ceramic art. The sculpture garden
would represent the digging of the clay, The administraion
would represent the sorting of the clay, The community cen-
ter would repersent the forming of the clay, Finally the museum
would represent the firing of the clay, Through this concept i hoped to attract the community into these spaces while keeping them in the spac-es that are meant for them.
ENV. 202Ceramics Museum
1514
east elevation
south elevation 10 30 60
section a
section b
section c
section d
section e10 30 60
section e roof deatail