PORTFOLIO

30
FEDERICA CAVAGNA PORTFOLIO

description

here are a few work of my own experience

Transcript of PORTFOLIO

Page 1: PORTFOLIO

FEDE

RICA

CAV

AGNA

PORT

FOLIO

Page 2: PORTFOLIO

14th July 1985

Via Carlo Cattaneo, 90_20099 Sesto S. GiovanniMilan

Italy

+39 02 24 82 642+39 (0) 333 19 80 352

Environmental Architecture Degreeat Politecnico di Milano_2008

Sustainability Architecture Master Degree at Politecnico di Milano_ 2012

_DATE OF BIRT_L I V I N G I N

_ P H O N E

_ E D U C A T I O N

THIS

IS MY

WOR

LDI

AA RCHITECTURE

DesignDrawingb o u t

Me

E nv i

r onm

ent

Page 3: PORTFOLIO

OFTWARESS

Great passion forM A T E R I A L S

& D E T A I L S

W O R K EX P E R I E N C EAG&P S.r.l. _ Via Savona, 50_20144 Milan

West 8 urban design & landscape architecture_ Schiehaven 13M_Rotterdam

Studio AGALMATA_Via Pomponazzi, 19_20134 Milan

Town Hall_Piazza della Resistenza, 5_20099 Sesto San Giovanni (Milan)

Corbellini Engineering office_Strada ottava, 6_20090 San Felice _Segrate (Milan)

Alter Studio Architetti Associati_Via Cadolini Giovanni, 32_20137 Milan

Dell’Orto Arch. Franco_Via Ausonio, 9/A_20123 Milan

Autocad

Office utilities

Rhinoceros

3D Studio Max

Sketchup

Adobe Photoshop

Adobe Illustrator

Adobe Indesign

THIS IS MY

LIFE. DO WHAT I LOVE

Live my dream and wear my passion

CVTH

IS IS

MY W

ORLD

II

Page 4: PORTFOLIO

THIS

IS MY

WOR

K04

Page 5: PORTFOLIO

THIS

IS MY

WOR

K05

INDEXPROJECTS

NATURE/ARTIFICELOW OR HIGH?

SILK LANDTHE CEMETERYURBAN PUZZLE

WORKURBAN EXECUTIVE PROJECT

RENOVATIONS

COMPETITIONSH2OUSE

ABITARE A MILANO_2

RENDERING

Page 6: PORTFOLIO

THIS

IS MY

WOR

K06

Page 7: PORTFOLIO

THIS

IS MY

WOR

K07

Page 8: PORTFOLIO

THIS

IS MY

WOR

K08

Page 9: PORTFOLIO

This script aims at facing the problems concerning outdoor paving. As for the paving structure I took into consideration the fact that paving is not only a matter of floor covering, but also a complex series of elements, all different for characteristics and performances. There-fore, the subject was analyzed also from a more operational point of view, where the correct design, according to the national and Euro-pean regulations, as well as the exhaustive knowledge of materials did make the difference. However, the problem I encountered is that both the economic and environmental component tend to prevail on the quality and final design of these works. The consequent expendi-ture of money for more and more frequent maintenance interventions, due to weak design, and the exploitation of non-renewable resources are playing a fundamental role in the choice of paving systems, es-pecially as regards outdoor spaces for public use. For this work I considered as resources what at the present time are deemed waste materials, trying to optimize the materials that, for different reasons, have been put aside.

WOOD, STONE, TERRACOTTA and SOIL. In any case, the material is the real protagonist. It is vital to study, know and inquire it in order to utilize it at best and enhance it through a correct laying according to its characteristics . The challenge was that of using the above cited materials in a context of high ecological interest, such as PMVL. Its complex position, between the built-area of 4 cities in the province of Milan, gives the possibility to use those paving systems in connection with the surrounding landscape, which can be more or less naturalistic, in order to realize paving areas, roads, tracks and ways.

1. NATURE / ARTIFICE

THIS

IS MY

WOR

K09

Page 10: PORTFOLIO

THIS

IS MY

WOR

K10

Page 11: PORTFOLIO

THIS

IS MY

WOR

K11

TECHNOLOGIES

CLIENT_Politecnico di Milano A.A. 2010/2011

TUTOR_Prof. Arch. Andrea Campioli

SUBJECT_”IL BORGO SOSTENIBILE MILANO-FIGINO” HOUSING ESTATE REALIZED WITH THREE DIFFERENT TECHNOLOGIES

Page 12: PORTFOLIO

THIS

IS MY

WOR

K12

VASCA DI RACCOLTA ACQUEE METEORICHE

FRANGI SOLE

POMPA DI CALORE

SISTEMA DI OSCURAMENTO

CENTRALE FOTOVOLTAICA

POMPA DI CALORE

PLAN AND SOUTH ELEVATION - SCALE 1:500

Page 13: PORTFOLIO

THIS

IS MY

WOR

K13

It’s a project of social housing based in Figino, a residential quarter located north-west of Milan next to other 3 cities: Pero, Rho and Settimo Milanese. The project surface is situated in the southern part of the Figino built-up area and takes up part of a town agricultural area. The project envisages the realization of one private housing estate con-

sisting in 16 apartments available in three principal typologies: simplex two-roomed flat, duplex and four-roomed flat. It’s com-posed of 4 floors above ground and the apartments are served by one central staircase with an elevator that connects all floors. Moreover, the entrance at the single unity is guaranteed by a landing which is structurally independent from the house and is located on the north side of the build-ing. Lastly, on the roof there is a bioclimatic glasshouse that both allows the placement of a heat pump for the heating/cooling system of rooms and offers the possibility to have a space for social aggregation.

The project theme can be described by the motto “Low or High? Me-dium Technologies”. Indeed, my goal was to make the building as sus-tainable as possible through the medium technologies, which I consider to be the best. The priority was to introduce technological solutions in three

different materials - WOOD, CONCRETE and STEEL - that

respect the environment, are innovative and always with an eye on sus-tainability, dominant feature of all the materials involved.

The main characteristics of the project are the PREFABRICATION, an easier system of construction with the technologies in wood and steel , as well as the realization of a unique open space for SOCIAL AGGREGATION made available for the entire building. I decided to create this open space on the roof because the presence of the park on the ground floor is already an opportunity to meet people. That’s why a big CONSERVATORY was created which performs the above cited function, having also bioclimatic features: the air that warms up inside the conservatory in winter is used to heat the apartments, together with a heat pump. By means of the pipes that pass through the slots, the warm air is piped into the rooms of the building, where the ventilation grids are located in correspondence with services.

2. MEDIUM TECHNOLOGIES

Page 14: PORTFOLIO

THIS

IS MY

WOR

K14

MODULE 1GLULAM BEAM UPRIGHTSCLADDING FORMED BY LARCH BATTENS sp. 2,7+2,7mmTIMBER LARCH JOISTS, sp.30mmWATERPROOF MEMBRANE, sp.1,6mmCELENIT AB PANEL, sp. 25mmGLULAM BEAM UPRIGHTS AND JOISTS SANDWICHING ROCKWOOL INSULA-TION, sp.100mmX-LAM PANELS WITH FUNCTION OF STIFFENER, sp.13\20\13mmGLULAM BEAM UPRIGHTS AND JOISTS SANDWICHING DOUBLE CELENIT AB IN-SULATION PANEL, sp.25+25mmFINISH INDOOR WITH WHITE PAINT

MODULE 2 - WINDOWGLULAM BEAM UPRIGHTSCLADDING FORMED BY LARCH BATTENS sp. 2,7+2,7mmTIMBER LARCH JOISTS, sp.30mmWATERPROOF MEMBRANE, sp.1,6mmCELENIT AB PANEL, sp. 25mmGLULAM BEAM UPRIGHTS AND JOISTS SANDWICHING ROCKWOOL INSULA-TION, sp.100mmX-LAM PANELS WITH FUNCTION OF STIFFENER, sp.13\20\13mmWINDOW WITH TIMBER FRAMES AND DOUBLE GLAZING SANDWICHING LU-MIRA AEROGELGLULAM BEAM UPRIGHTS AND JOISTS SANDWICHING DOUBLE CELENIT AB IN-SULATION PANEL, sp.25+25mmFINISH INDOOR WITH WHITE PAINT

14

Page 15: PORTFOLIO

THIS

IS MY

WOR

K15

DETAIL OF ROOFDECKING IN MAPLE TIMBER, sp.20mm, ON FRAME WORK OF GLULAM UP-RIGHTS AND JOISTS, sp. 350mmWATERPROOF MEMBRANE, sp.1,6mmTIMBER PANEL, sp.18mm ON GLULAM UPRIGHTS AND JOISTS, sp. 100mmPVC MEMBRANE, sp.1,2mmTIMBER PANEL, sp.24mm ON GLULAM BEAM UPRIGHTS AND JOISTS SAND-WICHING DOUBLE GLASS CELL FOAM INSULATION, sp.80+80mmROOFING FELT, sp.2mmX-LAM PANELS, sp.19\22\19mmTERRACOTTA TILES, sp. 27mmSTRUCTURE OF GLULAM BEAM (100X50mm) AND JOISTS (80X90mm)

DETAIL OF FLOORTERRACOTTA TILES, sp.25mm WATERPROOF MEMBRANE, sp.1,6mm DOUBLE TIMBER PANEL, sp.10+10mm ON GLULAM UPRIGHTS AND JOISTS SANDWICHING PSE INSULATION, sp.100mm,PVC MEMBRANE, sp.1,2mmTIMBER PANEL, sp.24mm ON GLULAM BEAM UPRIGHTS AND JOISTS SAND-WICHING DOUBLE GLASS CELL FOAM INSULATION, sp.80+80mmLIGHTWEIGHT CONCRETE, sp.50mmCARDBOARD BITUMEN, sp.1mmX-LAM PANELS, sp.19\22\19mmTERRACOTTA TILES, sp. 27mmSTRUCTURE OF GLULAM BEAM (100X50mm) AND JOISTS (80X90mm)

Page 16: PORTFOLIO

THIS

IS MY

WOR

K16 16

Page 17: PORTFOLIO

ILK LAND

THIS

IS MY

WOR

K17

Page 18: PORTFOLIO

3. RIVERSIDE

THIS

IS MY

WOR

K18

Page 19: PORTFOLIO

SEZIONE VERTICALE1-

2-

3-

4-

5-

Tappeto di usura sp. 3 cm, strato tout-venant di base sp. 10cm, strato di col-legamento (binder) sp. 7cm, strato di fondazione in granulare sta-bilizzato sp.30cmCordolo in “pietra del paese”, dim. 10x50xh.25cmPavimentazione in Porfido di Trento sp. 2,5cm, malta di allettamento sp. 3cm, soletta in calcestruzzo armato con rete elettrosapldata sp. 10cmLastre in Porfido di Trento sp. 2,5cm, piastra in acciaio inossidabile sp. 3cm, putrella calandrata in acciaio IPE140 saldata a montante tubolare in acciaio di ancoraggio al suolo diam. 5cmIPE120 di irrigidimento della struttura, cavi d’acciaio come supporto alla rampicante (vite americana)

THIS

IS MY

WOR

K19

Page 20: PORTFOLIO

“(...) un luogo architettonico dove la forma e la razionalità delle costruzioni, interpreti della pietà e del significato del cim-itero, siano un’alternativa alla crescita brutta e disordinata della città moderna. Un luogo architettonico, il cimitero come gli altri edifici pubblici, capace di costruire la memoria e la volontà collettiva della città”.

Aldo Rossi

THIS

IS MY

WOR

K20

Page 21: PORTFOLIO

THIS

IS MY

WOR

K21

THE CEMETERY: MONUMENTALITY

STORYART

PERCORSI NELL’ARCHITETTURA FUNERARIA DI CASALPUSTERLENGO

Page 22: PORTFOLIO

4. REGENERATION CEMETERYTH

IS IS

MY W

ORK

22

Page 23: PORTFOLIO

THIS

IS MY

WOR

K23

Page 24: PORTFOLIO

THIS

IS MY

WOR

K24

Page 25: PORTFOLIO

URBAN PUZZLE

THIS

IS MY

WOR

K25

Page 26: PORTFOLIO

THIS

IS MY

WOR

K26

Page 27: PORTFOLIO

5. URBAN PUZZLE

THIS

IS MY

WOR

K27

Page 28: PORTFOLIO

THIS

IS MY

WOR

K28

6. WORK

“H2Ouse - LIVING ON THE WATER”

7. COMPETITIONS“ABITARE A MILANO/2: nuovi spazi urbani per gli insediamenti di edilizia sociale” Capogruppo: Arch. Paolo Giacomo Vasino

Page 29: PORTFOLIO

THIS

IS MY

WOR

K29

8 . R E N D E R I N G

“RIQUALIFICAZIONE URBANA Piazza Umberto I e del centro storico di Besana in Brianza”Capogruppo: Prof. Arch. Anna Laura Pezzetti

Page 30: PORTFOLIO

FEDERICA CAVAGNAPORTFOLIO