Portfolio
-
Upload
sean-gross -
Category
Documents
-
view
215 -
download
2
description
Transcript of Portfolio
portfoliosean gross
university of detroit mercyschool of architecture
Summer InternWilliam Morris & Sons Inc.Employers: Bruce Roetman, Chris EstepMay 14, 2012-Present; May 2, 2011 - August 24, 2011Worked on construction documents including residential design work. Field experience, working hands on performing concrete work, wall construction
Ward Evangelical Presbyterian Church in Northville, MIEmployer: Jeff MitchellWinter 2010Volunteered to help in recreating the “You-Are-Here” mapCreated a 3D model of the Church with all rooms and officesRender images to be made into a map posted in the Church
Crew TrainerMcDonalds Restaurant (Ionia, MI)July 2005-December 2010Trained new employees in all areas of the restaurantJunior managementPerformed responsibilities associated withmanagement positionsLead as an example for others
Volunteered at a COTS Soup KitchenHabitat for HumanitySandwich Bus, a service program through Alpha Phi Omega to make lunches for people in needSpecial Olympics Volunteer
Justin Wieber, Josh Reisbig Mark FarlowAIA, LEED AP BD+C Supervisor PrincipalMentor William Morris Victor Saroki & AssociatesSHW Group & Sons Inc. Architects PC Berkley, MI 48072 Ionia, MI 48846 Birmingham, MI 48009T: 248.336.4778 T: 616.527.0700 T: 313.993.1495
Objective
Education
Skills
Honors and Leadership
Full-time employment in a firm where I can work in a collaborative environment and develop a better understanding of the architecture profession in order to pursue my goal of becoming a licensed architect.
Masters of Architecture, expected graduation University of Detroit Mercy, GPA 3.28 Fifth Year of StudyRelevant Courses: Design Studios, Graphic Design, Urban Theory/Urban Form, Construction Documentation
Undergrad Completion April 2011University of Detroit Mercy, GPA 3.40Relevant Courses: 3Ds Max, AutoCAD/Revit, Structures, Construction Techniques, Environmental Technology, Design Studios, History and Theory of Architecture
Adobe Photoshop, Illustrator, Premier, InDesign, AutoCAD, Revit, 3Ds Max, MicroStation, Microsoft Word, PowerPoint, Excel, OutlookServe in leadership roles and train others in the work environment. Works proficiently with added responsibilities in the work environment
AIAS Member (2009-2010)Brother of Alpha Phi Omega (National Co-ed Service Fraternity)National Honors Society (Ionia High School)(3) 2nd place finishes in the State Level of the M.I.T.E.S. (Michigan Industrial & Technological Educational Society) CompetitionDean’s List (2011)
Employment History
CommunityExperience
References
resume
August 2012
Dear Potential Employer,
I am inquiring with you regarding a potential position with your firm. I am in the process of completing my Master’s in Architecture at the University of Detroit Mercy and working towards becoming a licensed Architect. I am looking for an internship with possibility of full time employment.
My strongest assets include being well organized, dependable and self-motivated. I strive to learn more about the architecture profession as a product of creative thinking amongst a community to further better our environments. I am versatile in many computer programs including: AutoCAD, Revit, 3Ds Max, Microstation, Photoshop, Illustrator and InDesign. I have a strong motivation to learn/succeed; driving to a higher standard of excellence.
I am seeking a full-time position in a collaborative environment in the architecture profession. I look forward to speaking with you regarding possible opportunities.
Sean Gross
University of Detroit MercyGraduate StudentT: 616.822.1990Email: [email protected]
contents:
university of detroit mercy architecture library p. 3
billboard project p. 11
micro-brewery p. 13
ymca community center p. 15
smith ship p.19
coffee cafe p.23
culinary school and restaurant p.25
construction documentation p.30
P. 3
univeristy of detroit mercy: architecture librarypu
blic/p
rivate
lighti
ngen
gagin
g
vertical studio winter 2011 professor joe odoerfor
programs applied: illustrator, photoshop, revit
P. 4
(right) main entrance rendering (above) site plan
(left) bird’s eye view of site
The University of Detroit Mercy Architecture Library is an addition to the current campus library. The project is an activation of key areas around the renovated Fisher Plaza. The key areas, the entrance of
the library and cafe entrance, are along the two most traveled paths leading across the campus. Pockets of green spaces create pockets
of semi-private areas that can be used for studying, lounging or recreational activities.
vertical studio winter 2011 professor joe odoerfor
(above) floor plan level one (left) atrium rendering
Similar to the exterior design, the interior focuses on the private and public spaces of the
library. Entrances are located on the east and west sides of the building. An elongated curtain wall at
the base level charges the library displaying its interior and activities. The main entrance opens
up to an atrium that allows the library to breathe. The auditorium located along the east wall creates a flow into the atrium from the east entrance near the cafe. A third entrance from the existing library moves along the courtyard and joins two libraries.
room identification:1. atrium
2. main office3. cafe
4. auditorium5. computer lab
floor plan, structure, hvac
P. 5
1
23
45
P. 6
structure:post and beam
structure withfloor slabs
hvac systemcomposite: structural system and hvac
(left) cafe rendering(right) section a
Occupying the second level is the archived collection of books. The stacks are illuminated creating a central focus in the middle at the
research node. The most private floor is the third level with large and small
conference rooms for individual or group studying. An outdoor patio is
open to students to study or socialize overlooking the Fisher Plaza.
floor plans, section, rendering
P. 7 vertical studio winter 2011 professor joe odoerfor
P. 8
floor plan level threefloor plan level two
7
8
9
10
11
room identification continued:
6. stacks7. study lounge8. study lounge
9. conference rooms10. outdoor patio
Sound Boards: a+b-c < 23
Sound Panel 1: 6'2" + 14'3" - 9' = 11'5"
Sound Board 2: 9' + 15'11" -14'8" = 10'3"
Sound Board 3: 13'8" + 15'4" - 19' = 10'
Sound Board 4: 18'10" + 14'4" - 24'1" = 9'1"
Sound Board 5: 24' + 12'2 - 28'4" = 7'10"
Sound Board 6: 29'3" + 9'5" - 32'6" = 6'2"
Sound Board 7: 34'10" + 9'5" - 37'5" = 6'10"
Lecture Hall Volume:
V= ((piD²) x H)/4 = 37,444 CU. FT.
Cu. Ft. Per Person:
37,444 Cu. Ft./250 = 149 Cu. Ft.
Sabines:
Sabines = Surface Area x Absorption Coefficient
Side Walls = 1718.34 Sq. Ft. x .1 = 171.83 Sabines
Rear Wall = 1189.22 Sq. Ft. x .82 = 975.16 Sabines
Stage = 319.42 Sq. Ft. x .07 = 22.36 Sabines
Ceiling = 1053.74 Sq. Ft. x .56 = 52.69 Sabines
Seating (Empty) = 771.46 Sq. Ft. x .56 = 432.02 Sabines
Seating (Full) = 771.46 Sq. Ft. x .8 = 617.17 Sabines
Total # of Sabines: 2690.4
Reverberation Time:
(.05 x Volume)/ Total # of Sabines
(.05 x 37444)/2690.4 = .7
auditorium and acoustics
P. 9
acoustics: section plan
vertical studio winter 2011 professor joe odoerfor
P. 10
(top right) acoustics: floor plan (bottom right) auditorium rendering (below) reflected ceiling plan auditorium
The auditorium provide gathering space for three hundred people. The space is designed for optimum site lines and auditory comprehension. Lighting integrated between acoustical ceiling panels allow adequate light to each row of seating. Recessed down lights illuminate both aisles.
wrap
ping
trans
pare
nten
gagin
gbillboard project
P. 11 foundation studio fall 2008 professor tom roberts
programs applied: 3ds max, model making, photoshop
WOODWARD AVE & GREENDALE ST. W.DETROIT, MI
The billboard project is the development of a cultural music center. The idea of one’s surroundings and reflections creates an environment developed from
the quality of music. On lower levels, the user experiences music in rooms composed of various materials producing altering effects on the music. The upper levels, offers a glimpse into the research of music. The design allows the user to reflect on the environment and provides the views to the exterior
allowing them to reflect on the building’s environment.
P. 12
(left) sketch model series(above) sketch model in site (right) final model in site
UP
UP
UP
STORAGESTORAGE
STORESTORE
BREWERYBREWERY
RESTROOMRESTROOM RESTROOMRESTROOM
WELCOME DESKOFFICE
WELCOME DESKOFFICE
LIFTLIFT
-2.00
0.00
view
core
buffe
rmicro-brewery
P. 13 vertical studio/polish exchange winter 2010 professor justyna zdunek
(below) site model(top right) site rendering (bottom right) floor plan
programs applied: 3ds max, autocad, illustrator, model making, photoshop
GRZYBOWSKA & WRONIAWARSAW, POLAND
The restaurant and brewery is part of a collaborative design. The project, an urban block development, is geared towards engaging public activity into the community. A green way wraps the site createing an interior public plaza for
performances, gathering and socializing. The brewery embodies the greenway as the restaurant wraps around the brewery making it the central focus of the interior.
P. 14
(below) section a(above) rendering of brewey
(right) rendering of buffer
volum
eint
erac
tion
lightymca community center
P. 15 vertical studio fall 2009 professor wladek fuchs
(left) aerial rendering(bottom) ariel rendering rear
(top) site rendering
programs applied: 3ds max, autocad, illustrator, photoshop
W. 11 MILE RD & MAXWELL AVE.ROYAL OAK, MI
The Royal Oak YMCA Community Center, located on 11 Mile, focuses on the revitalization of the previous center.
Large open spaces allow the building and its users to breathe. The YMCA is an important connection between
11 Mile and Sherman Rd. engaging the community. Upon entering the YMCA are a series of terraces creates a public
path. The pathway provides glimpses into the natatorium and gymnasium to observe activities.
(below) section a
Entering the YMCA, the user feels the weight of the building pushing them into the atrium. The atrium then opens up to the interior, allowing itself to breathe. The large
bearing walls are broken up with expansive glazing creating a light feeling to the building and allow natural light to enter the building.
interior renderings, floor plans, sections
P. 17 vertical studio fall 2009 professor wladek fuchs
(left) first floor plan (right) natatorium rendering
1
2 3 4
6
5
room identification:
1. entrance2. day-care
3. women’s locker room4.natitorium
5. men’s locker room6.gymnasium
7. ballet rooms8. weight room
9. terrace entrance/studio
P. 18
(top) pedestrian path rendering(right) second floor (bottom) section b
7
8
9
cano
pyop
enflo
atingsmith shop
P. 19 foundation studio winter 2009 professor tom roberts
(top) final model(top right) sketch model(right) group models
programs applied: hand drawing, illustrator, model making, photoshop
HARMONIE PARK, DETROIT, MI
The bookend project, a collaborative design between members of the studio, is the work/residence of a craftsman. The smith shop
is perched above the ground level, imitating a canopy of forest. As one transverses up through the building, more of the
surroundings are exposed, like that of climbing a tree.
P. 20
(left) model(bottom left) section a
(bottom) model, plaza view
plans, sections, model
P. 21 foundation studio winter 2009 professor tom roberts
The smith shop offers three levels of public spaces; a plaza at the ground level, a public shop to watch the wood carving process, and a roof top community that is joined by all six designs.
P. 22
(top) floor plan(bottom) models(top left) section b(bottom left) section c
interior design studio/polish exchange winter 2010 professor karolina tulkowska
warm
comf
ort
invitin
gcoffee cafe
P. 23
(bottom) interior renderings(right) floor plan
(bottom right) section a
programs applied: 3ds max, autocad, illustrator, photoshop
The coffee cafe feels warm and inviting embodying the feeling of home. The floor plan compartmental in plan for customers who choose to stay and those quickly
stopping by. On the upper level, there is lounge style seating
P. 24
trams
pare
ntpe
rspec
tive
culinary school and restaurant
P. 25
orga
nic
vertical studio fall 2010 professor dorian moore
(bottom) aerial rendering(top) conceptual sketch(right) grand circus figure grounds
programs applied: 3ds max, autocad, illustrator, photoshop
grand circus with design
grand circus present day
grand circus with tuller hotel
The culinary school on Washington Boulevard is located off Grand Circus Park. The string rectilinear facade along Washington, allows a more organic form to
give way on the interior of the site. The interior courtyard encompasses a vegetative wall draping over the structure of the existing buildings on the site.
WASHINGTON BLVD & GRAND CIRCUS PARKDETROIT, MI
P. 26
(left) floor plan (bottom) rendering of
washington boulevard
1
2
3
4
5
room identification:
1. atrium2. offices
3. auditorium4. restaurant
5. interior courtyard
Urban farming in the courtyard and on the gardens on the lower roofs provide ingredients to the culinary school. Glazing facing out to the courtyard allows a peaceful backdrop against the fast pace environment of the city. Bridging the gap of the renovation and existing structure, a library resides, and serves as a termination of the vegetative wall.
renderings, section, elevations
P. 27 vertical studio fall 2010 professor dorian moore
(bottom) west elevation rendering(right) courtyard rendering
P. 28
(left) section a(below) east elevation
rendering
construction documentationarch 5950-01
winter 2012professor mark karaba
CONFEREMNCE
101
A B C D
1
2
2A-6
1A-6
4A-6
A-63
1A-7
2A-7
11
3
NOTE INS
TALL
ED
FUR
NIS
HE
D
ITEMB.A. NO.
ACCESSORY SCHEDULE(SEE SPEC. 10801)
GRAB BARS - 36"
SEMI RECESSED AUTOMATICHAND TOWEL DISPENSER ANDDISPOSAL
C C
C C
O C31
MIRROR
TELEVISION (TENANT) O C
O CTELEVISION MOUNT (TENANT)
4 GRAB BARS - 42" C C
NOTE 1:
LEGEND: C-CONTRACTOR O-OWNER E-EXISTING
NOTE 2:
REFER TO MOUNTING DIMENSIONS ON THIS SHEET FORADDITIONAL INFORMATION
REFER TO DRAWING DETAIL 10 ON SHEET A-11 FOR WALL REINFORCEMENT DETAIL
REFER TO DETAIL 4/A-12 FOR WALL MOUNTED TELEVISION DETAILS
MFG
R.
MO
DE
L #
BY OWNERS MAINTENANCECONTRACTOR
1
BOBRICK B-6806; NOTE 1
BOBRICK
2
GRAB BAR-18" C C5
26
BY OWNER NOTE 2
BY OWNER NOTE 2
--- -
7 C CWALL HUNGURINAL SCREEN
13 FLOOR MOUNTEDTOILET PARTITIONS C C --- NOTE 4
--- NOTE 4
8 C CHANDS FREEHAND DRYER
DYSON AIRBLADE
BOBRICK
TOILET PAPER HOLDER O C
25COUNTER MOUNTEDSOAP DISPENSER C C BOBRICK
NOTE 3B-82216
19 SEAT COVER DISPENSER O C
BY OWNERS MAINTENANCECONTRACTOR
BY OWNERS MAINTENANCECONTRACTOR- NOTE 5
NOTE 3: REFER TO BID ALTERNATE SECTION AND TOILET ACCESSORIES SPECIFICATIONSFOR ALTERNATE PRICING FOR AUTOMATIC SOAP DISPENSER.
B-6806; NOTE 1
B-6806; NOTE 1
NOTE 4: REFER TO DETAIL 8 ON SHT A-7 FOR WALL REINFORCING AND PARTITION SUPPORT DETAIL.
NOTE 5: PROVIDE ONE SEAT COVER DISPENSER AT EACH WATER CLOSET
BUILDING CHARACTERISTICS
Number of Stories: 1 Story
Building Area of Renovated Floor Area: 1,055 sq. ft.
Construction Classification: 5B
Use Group and Occupancy: B - Business
Maximum Occupancy Load: - 420 Calculated through 2006 MBC Section (Table) T 1004.1.1 215 Actual
Applicable Construction Codes: 2006 Michigan Building Code Incorporating the 2006 Edition of the International Building Code
Barrier Free ICC/ANSI A117.1-2003 as referenced in the International Building Code 2006 and the Americans With Disabilities Act Accessibility Guidelines
2009 Michigan Mechanical Code
2009 Michigan Plumbing Code
National Electrical Code (NEC) 2008
PROJECT GENERAL NOTES
VERIFY QUANTITY, SIZE AND LOCATION OF ALL FLOOR,ROOF AND WALL OPENINGS FOR MECHANICAL ANDELECTRICAL WORK WITH THE APPROPRIATE TRADE.PROVIDE ALL OPENINGS SHOWN OR REQUIRED FORCOMPLETION OF WORK.
PROVIDE POSITIVE SLOPE TO ALL FLOOR DRAINS WHILEKEEPING FLOOR LEVEL AT WALL BASE CONDITION.
D.
C.
B.
A.
E.
F.
IT SHALL BE EACH TRADE CONTRACTORSRESPONSIBILITY TO VISIT THE SITE AND FIMILARIZEHIMSELF/HERSELF WITH ALL EXISTING CONDITIONS.EACH CONTRACTOR SHALL TAKE ALL NECESSARY FIELDMEASUREMENTS AND OTHERWISE VERIFY ALLDIMENSIONS AND EXISTING CONSTRUCTION CONDITIONSINDICATED AND/OR SHOWN ON THE DRAWINGS. SHOULDANY ERROR OR INCONSISTANCEY EXIST, THECONTRACTOR SHALL NOT PROCEED WITH THE WORKAFFECTED THEREBY UNTIL REPORTING THE SAME TOTHE ARCHITECT AND THE OWNERS REPRESENTATIVEFOR CLARIFICATION AND/OR CORRECTION.
COORDINATE SIZE AND LOCATION OF ALL ACCESSPANELS WITH APPROPRIATE TRADES.
G.
H.
I.
PROVIDE FIRE WATCH DURING FIELD CUTTING ANDWELDING OPERATIONS, MEETING OWNERSREQUIREMENTS
PROVIDE FIRE RETARDANT WOOD BLOCKING AND/OR 18GA METAL PLATES BETWEEN STUDS AT ALL LOCATIONSREQUIRING BLOCKING IN WALL. THESE LOCATIONSINCLUDE BUT ARE NOT LIMITED TO GRAB BARS, CRASHRAILS, CABINETS, WALL HUNG SHELVES, ARTWORK, ETC.
THE EXTENT OF HATCHING ON DRAWINGS IS ONLYSUFFICIENT TO INDICATE THE NATURE OF THECONSTRUCTION OR MATERIALS. TERMINATION OF THEHATCHING SHALL NOT BE CONSTRUED TO REPRESENT ACHANGE OR TERMINATION OF MATERIAL.
THE CONTRACTOR SHALL VERIFY THE EXISTENCE,LOCATION AND ELEVATION OF ALL UNDERGROUNDUTILITIES IN WORK AREAS PRIOR TO PROCEEDING WITHCONSTRUCTION. ALL DISCREPANCIES SHALL BEDOCUMENTED AND FORWARDED TO ARCHITECT ANDOWNERS REPRESENTATIVE FOR ACTION
IT IS THE CONTRACTORS RESPONSIBILITY TOINVESTIGATE FIELD CONDITIONS AND PROVIDE ASNEEDED TEMPORARY SUPPORTS, SHORING AND / ORPROTECTION OF EXISTING STRUCTURES ANDUNDERGROUND UTILITIES DURING EXECUTION OF WORK
ALL WORK TO COMFORM TO THE REQUIREMENTS OF THELOCAL AND STATE CODES. COORDINATE WITHSPECIFICATIONS, DIVISION 1.
RELEVANT DIMENSIONS AND ELEVATIONS FOREQUIPMENT INSTALLATIONS SHALL BE VERIFIED AGAINSTMANUFACTURERS CERTIFIED EQUIPMENT DRAWINGS
ALL PENETRATIONS TO FLOORS, CEILINGS AND WALLSSHALL BE SEALED AND FIRE STOPPED TO A FIRE RATINGEQUAL TO THE CONSTRUCTION BEING PENETRATED.
J.
K.
L.
M.
N.
O.
COORDINATE SIZE & LOCATION OF ALL HOUSE- KEEPINGPADS AND/OR EQUIPMENT SUPPORTS WITHAPPROPRIATE EQUIPMENT MANUFACTURER.
DO NOT SCALE DRAWINGS TO DETERMINE SIZES ANDDIMENSIONS. USE FIGURED DIMENSIONS ONLY.DIMENSIONS ARE TO FINISHED FACE OF WALLS UNLESSOTHERWISE NOTED. ALL PERIMETER DIMENSIONS AREFROM FACE OF PERIMETER WALLS.
ALL NECESSARY ADJUSTMENTS MADE PRIOR TOFABRICATION AND/OR INSTALLATION OF WORK. NOTIFYPROCEEDING WITH THE WORK.
METALS
FINISH WOOD
RIGID INSULATION
BLANKET OR BATTINSULATION
GASKET MATERIALOR JOINT FILLER
ACOUSTIC PANELSOR CEILING TILE
CARPET
Material Designations
MATERIAL
BRICK
EARTH
CONCRETE
SAND FILL
STONE
SEALANT W/BACKER ROD
SEALANT W/ BOND BREAK TAPE
GYPSUM BOARDOR PLASTER
PLYWOOD ORPARTICLE BOARD
WOOD BLOCKING,NAILER, ETC. (CONTINUOUS)
CONCRETEMASONRY UNIT
FILL
SOLID CONCRETE MASONRY UNITW/ FILLED CORES
PLASTIC LAMINATEON PLYWOOD
"X""1/2 X"
WOOD BLOCKINGINTERRUPTED OR SHIMS
XSHEET WHERE ELEVATION IS DRAWN
SECTION IDENTIFICATION LETTER
REFERENCE SYMBOLS
1
SCALE:IDENTIFYING TITLE
SECTION IDENTIFICATION LETTER ORDETAIL IDENTIFICATION NUMBER
DIRECTION OF VIEW
ELEVATION IDENTIFICATION NUMBER
ACCESSORY NUMBER AS SHOWN ON THIS SHEETAND SPECIFICATION SECTION 10801-B
DEMOLITION KEYNOTEIDENTIFICATION NUMBER1
A
SHEET WHERE DETAIL/SECTION IS DRAWN
SHEET WHERE DETAIL OR SECTION IS REFERENCED FROM
SHEET WHERE SECTION IS DRAWN
.
DETAIL IDENTIFICATION NUMBER
DETAIL AND SECTION IDENTIFICATION
DETAIL/SECTION LOCATOR
BUILDING SECTION LOCATOR
INTERIOR ELEVATION LOCATOR
PARTITION TYPE IDENTIFICATION
TOILET ACCESSORY IDENTIFICATION
KEYNOTE IDENTIFICATION
SCALE:KEY PLAN
1/8" = 1'-0"
COMPOSITE PLAN AND NOTES
A-1
WEEK 3 ASSIGNMENT SG 1/24/12WEEK 4 ASSIGNMENT SG 1/31/12
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
P. 31 construction documentation winter 2012 professor mark karaba
CONFERENCE
1016"
6"
8'-5
"
14'-0" 13'-8" 14'-0" 1'-10"1'-10"
45'-4"
1'-1
0"24
'-4"
1'-1
0"
28'-0
"
6'-6"6"
8'-1
1"
6"
11'-6
"3'
-4"
6"
4'-10" 3'-4" 4'-10"
4'-0"4'-0"
6'-6"
A B C D
1
2
B
D
C
C
GG
G
1'-4"
2'-0
"
10'-0" 10'-0" 10'-0" 7'-0"
4'-0" 6" 5'-6" 4'-0"
R.C. R.C. R.C. R.C.
CL CL CL CL
M.O. M.O.
8'-7
"M
.O.
M.O
.
EQ
.E
Q.
EQ
.E
Q.
2'-4
"
2'-4"13'-0"4'-2"6"
M.O
.
M.O. M.O. M.O.
6" 6"
4'-8"6'-11"
9"
1'-3
"
3'-0"
9'-2
"5'
-0"
1'-3
"E
Q.
EQ
.
2'-5"3'-6"
7'-1
"
6"
1'-4"3'-6"
F.E.C.
TYP.
TYP.
LINE OF CANOPIESABOVE- REFER TOSHEET A-3 FORCANOPY DIMENSIONSAND ADDITIONALINFORMATION
COAT SHELF AND ROD-REFER TO DETAIL 6 ONSHEET A-9 FOR ADDITIONALINFORMATION
1
D.W.
3A-2
1A-22
A-2
F.D.
107
108
109
101
100
102
106
104
6" T
YP
.
FLOOR PLAN LEGEND
FLOOR PLAN GENERAL NOTES
WALL REINFORCEMENT -SEE SHEET AX-XXX
FIRE EXTINGUISHER CABINETSEE DRAWING AX-XXX
PARTITION TYPE, SEE AX-XXX
SUFFIX DENOTES NUMBEROF ADDITIONAL DOOR IN ROOM
DOOR AND/OR ROOM NUMBER
100 ROOM NUMBER FOR SPACESNOT IDENTIFIED BY DOOR NUMBER
0001
A
4" TYP.(U.O.N.)
C.P.C.I. CONTRACTOR PURCHASED CONTRACTORINSTALLED
C.P.O.I.
O.P.O.I.
CONTRACTOR PURCHASED OWNERINSTALLED
T.B.
M.B.
NEW PARTITION
NEW DOOR
CL
O.P.C.I.
F.D. FLOOR DRAIN
OWNER PURCHASED CONTRACTORINSTALLED
F.E.C.
B.F. BARRIER FREE
A.
B.
C.
D.
E.
FOR TYPICAL BARRIER FREE TOILET ROOM TYPES ANDACCESSORIES REQ'MTS AND LOCATIONS - SEE DWG. A-1
ALL PARTITION TYPES ( ) ARE "x" TYPICALLYUNLESS OTHERWISE NOTED.
ALL WALLS TO RECEIVE 2" ACOUSTICAL INSULATIONU.O.N. - TYPICAL.
TYPICALLY INSTALL SOAP DISPENSERS & PAPER TOWELDISPENSER @ ALL SINKS UNLESS NOTED OTHERWISE.
NEW COLUMN LINE
FOR ALL CARPET TYPE CHANGES BETWEEN ROOMS -TRANSITION SHALL OCCUR @ CENTERLINE OF DOORFRAME TYPICALLY - U.N.O. SEE DWG. A-11
COORDINATE DIMENSIONS W/ ASTERISK (IE - *X' - X") W/EQUIPMENT VENDER
ALL DIMENSIONS ARE TO FACE OF GYPSUM BOARD ORMASONRY UNLESS OTHERWISE NOTED
PROVIDE WALL REINFORCEMENT PER DETAIL1, 2, 4 5 ONSHEET A-9 AT WALL-MOUNTED SHELVES AND STORAGEUNITS, MARKERBOARDS, BULLETIN BOARDS,TACKBOARDS,TELEVISIONS AND OTHER CONTRACTOROR OWNER FURNISHED WALL- MOUNTED ITEMS (REFERTO ACCESSORIES AND EQUIPMENT SCHEDULE) SEE DWGA-1
F.
G.
H.
J.
TACK BOARD - FROM 4" A.F.F. TO 7'-2" A.F.F.(MATCH DOOR FRAME HEIGHT) T.B.
MARKER BOARD - M.B. SEE ELEVATIONS
COORDINATE PARTITION FIRE RATED REQUIREMENTSAS INDICATED ON REFLECTED CEILING PLANS - DRAWINGSHEET A-4
OWNER PURCHASED OWNERINSTALLED
C
B
A
D
G
PARTITION LEGEND
SCALE:ARCHITECTURAL FLOOR PLAN
1/4" = 1'-0"
ARCHITECTURAL PLAN AND NOTES
A-2
WEEK 3 ASSIGNMENT SG 1/24/12WEEK 4 ASSIGNMENT SG 1/31/12
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
P. 32all designs and detail are done by mark karaba. student work consists of assembly into working drawings
CONFERENCE
101
A B C D
1
2
J
J
CONTRACTOR TO FIELD VERIFYPOWER AND DATA OUTLETLOCATION WITH OWNER SUPPLIEDCONTRACTOR INSTALLED TVMONITOR. REFER TO DETAIL 5 ONSHEET A-10 FOR ADDITIONALINFORMATION
D.W.+42"
+42"
+72"
REFER TO MECHANICAL ANDELECTRICAL DESIGN BUILDCONTRACTORS DRAWINGS FORPOWER, VOICE AND DATA OUTLETSWITHIN THIS ROOM
ALL OUTLETS IN MILLWORKAREA TO BE "GFCI" PROTECTED
CORRIDOR
OPEN OFFICE
SINGLE POLE SWITCH
DOUBLE POLE SWITCH
DUPLEX CONVENIENCE RECEPTACLE - GROUNDED ( 1'-6" AFF UNLESSOTHERWISE NOTED)X
XDOUBLE DUPLEX CONVENIENCE RECEPTACLE - GROUNDED(1'-6" AFF, UNLESS OTHERWISE NOTED)
SPECIAL RECEPTACLE - TYPE AS NOTED ON DRAWINGS
SPECIAL RECEPTACLE - TYPE AS NOTED ON DRAWINGS
"C" MOUNTED 10" ABOVE COUNTER OR 42" AFF. COORDINATE EXACT MOUNTINGHEIGHT WITH ARCHITECTURAL DRAWINGS
"GFCI" GROUNG FAULT CIRCUIT INTERUPTER, PERSONAL PROTECTION
"W" WALL MOUNTED DEVICE AT 48" AFF UNLESS OTHERWISE INDICATED
+ XX DIMENSIONED HEIGHT
JUNCTION BOX IN FLOOR - WITH OUTLET COVER, OUTLET BOX TO ACCOMMODATECIRCUITS AND CONDUIT FOR 1 DOUBLE DUPLEX, 1 VOICE OUTLET AND 2 DATA OUTLETS.
OCCUPANCY SENSOR - WALL MOUNTED
TELEPHONE OUTLET
TELEPHONE OUTLET - WALL MOUNTED
TELE/DATA OUTLET
1. GENERAL CONTRACTOR/CONSTRUCTION MANAGER AND ELECTRICALDESIGN BUILD CONTRACTOR TO COORDINATE ELECTRICAL REQUIREMENTSWITH OWNER SUPPLIED (VW) FURNITURE. REFER TO SHEET A-03 FORPROPOSED FURNITURE LAYOUT. ELECTRICAL CONTRACTOR TO CONSULTWITH OWNER PRIOR TO START OF CONSTRUCTION.
2. PROVIDE POWER/ELECTRICAL OUTLETS AT ALL EXTERIOR SIGNAGE ANDLIGHTING
1
TYPICAL RECEPTACLE NOTATION
TELEPHONE AND DATA SYMBOLS
MISCELLANEOUS SYMBOLS
SWITCHES AND SENSORS
RECEPTACLE SYMBOLS - WALL MOUNTED
ELECTRICAL PLAN GENERAL NOTES:
THIS SHEET ISSUED FOR REFERENCE BYTHE DESIGN BUILD CONTRACTOR AND FORARCHITECTURAL DESIGN INTENT ONLY. ALLELECTRICAL WORK TO BE PER THE FINALELECTRICAL DRAWINGS ISSUED BY THEELECTRICAL DESIGN BUILD CONTRACTOR
ELECTRICAL / FURNITURE PLAN
A-3
SCALE:ELECTRICAL/FURNITURE PLAN
1/4" = 1'-0"
N
FURNITURE AND EQUIPMENT ARE ISSUEDFOR REFERENCE ONLY. REFER ANDCOORDINATE WITH OWNERS FURNITUREVENDOR. ALL FURNITURE IS PROVIDEDAND INSTALLED BY OWNER'S FURNITUREVENDOR. CONTRACTOR TO COORDINATEFURNITURE INSTALLATION WITH ALL NEWCONSTRUCTION.
WEEK 3 ASSIGNMENT SG 1/24/12WEEK 4 ASSIGNMENT SG 1/31/12
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
P. 33 construction documentation winter 2012 professor mark karaba
MECH.ROOM
107
A B C D
1
2
CONFERENCE
101
E.C.
E.Q. 4'-3" E.Q.
E.Q
.E
.Q.
FLUORESCENT UTILITYFIXTURE CHAIN HUNGFROM STRUCTUREABOVE
GYPSUM BOARDSOFFIT @ 7'-0" AFF.TYPICAL
LINE OF DESK BELOW-CENTER PENDANTHUNG LIGHT FIXTUREOVER DESK
LINE OF CANOPIESABOVE - REFER TOSHEET A-3 FORCANOPY DIMENSIONSAND ADDITIONALINFORMATION
GYPSUM BOARDSOFFIT @ 8-'0" AFF -TYPICAL
PENDANT HUNG LIGHTFIXTURE SUSPENDEDFROM STRUCTUREABOVE - TYPICAL OF 2
E.C. - PAINT BLACKABOVE 9'-0" TYP.
1A-4
2' x 2' LAY-IN CEILING
CJ CONTROL JOINT
ACCESS PANELS(24" x 24" U.O.N.)
EC
LINEAR DIFFUSER
GYP BD CEILING (PT-2)
CEILING PLAN LEGEND
CEILING HEIGHT (CH) IS X'-X" UNLESS OTHERWISE NOTED.
EXPOSED CONSTRUCTION
DOWN LIGHT
PROVIDE ACOUSTICAL INSULATIONABOVE THE LAY-IN CEILING SYSTEM
FLUORESCENT UTILITY FIXTURE (SEE ELEC.DWGS)
SUPPLY AIR DIFFUSER - QUANTITY AND LOCATIONARE SHOWN ON PLAN FOR DESIGN INTENT ONLY.DESIGN-BUILD MECHANICAL CONTRACTOR ISRESPONSIBLE FOR DESIGN AND IMPLEMENTATIONOF THE HVAC SYSTEM. FINAL DIFFUSER LAYOUTTO BE APPROVED BY THE ARCHITECT AND OWNERPRIOR TO THE START OF CONSTRUCTION.
RETURN AIR DIFFUSER - QUANTITY AND LOCATIONARE SHOWN ON PLAN FOR DESIGN INTENT ONLY.DESIGN-BUILD MECHANICAL CONTRACTOR ISRESPONSIBLE FOR DESIGN AND IMPLEMENTATIONOF THE HVAC SYSTEM. FINAL RETURN AIR GRILLELAYOUT TO BE APPROVED BY THE ARCHITECT ANDOWNER PRIOR TO THE START OF CONSTRUCTION.
EXIT LIGHT, CLG-MTD (SEE ELEC DWGS)
EXIT LIGHT, WALL-MTD (SEE ELEC DWGS)
WALL WASHING DOWN LIGHT
2'-x4' FLUORESCENT FIXTURE(SEE ELEC. DWGS)
PENDANT HUNG LIGHT FIXTURE
NOTE:REFER TO INTERIOR LIGHTING SCHEDULE BELOWFOR ADDITIONAL LIGHTING INFORMATION.
NEW 1 HR FIRE RATED PARTITION
PARTITION FIRE RATINGS CEILING PLAN GENERAL NOTESCOORDINATE FINAL SIZE AND FINAL LOCATION OF ALLACCESS PANELS WITH TRADE REQUIRING SAME.
ALL EXISTING WALLS IN PROJECT AREA TO MEET FIRERATINGS INDICATED ON REFLECTED CEILING PLAN.
CEILING GRID SYSTEM TO BE CENTERED IN ROOM INBOTH DIRECTIONS UNLESS NOTED OTHERWISE.
AT CONDITIONS WHERE CEILING TILE PADS EXCEED 2'-0"TRIM 2' X 4' CEILING PADS AS REQUIRED TO FIT.
SPRINKLER HEADS TO BE LOCATED IN THE CENTER OFCEILING PANELS TYPICALLY.
VERIFY EXACT LOCATIONS OF SOFFIT & CEILINGCONTROL JOINTS WITH THE ARCHITECTSREPRESENTATIVE IN THE FIELD.
COORDINATE THE LOCATION OF ESCUTCHEON PLATESAT CEILING PANEL PENETRATIONS WITH ELECTRICALAND MECHANICAL TRADES.
A.
B.
C. ALL WALL PARTITIONS ARE TYPE "A"UNLESS NOTED OTHERWISE.
D.
E.
F.
G.
H.
J.
K.
L.
M.
NO CEILING PAENL TO BE CUT TO LESS THAN 6" WIDTH@ CEILING PANEL INSTALLATION TYPICAL.
COORDINATE CEILING SUSPENSION SYSTEMS WITHOTHER CEILING SPACE EQUIPMENT SUPPORTINGDEVICES.
REFER TO ELECTRICAL DESIGN BUILD DRAWINGS FORFIXTURE TYPES AND NIGHT LIGHT LOCATIONS
PROVIDE EMERGENCY LIGHTING TO MEET CURRENT CODEAS REVIEWED BY THE AUTHORITY HAVING JURISDICTION - NOT SHOWN ON PLAN. EMERGENCY LIGHTING TO BEDESIGNED BY ELECTRICAL DESIGN BUILD CONTRACTOR.TO INCORPORATE 90 MINUTE BATTERY AND PUSH TO TESTBUTTON.
EXISTING BUILDING IS FULLY PROTECTED BY AN EXISTING WETPIPE SPRINKLER SYSTEM.
1.
FIRE SUPPRESSION GENERAL NOTES:
NEW WORK SHALL INCLUDE REMOVAL OF EXISTINGSPRINKLERS, MODIFICATION OF EXISTING BRANCH PIPING, ANDTHE INSTALLATION OF NEW CONCEALED TYPE SPRINKLERSNECESSARY TO ACCOMMODATE THE NEW FLOOR PLANARRANGEMENT, LIGHTING AND MECHANICAL PLANS. WHENCOMPLETE, ALL PROJECT AREAS SHALL BE FULLYSPRINKLERED.
2.
FIRE SUPPRESSION SYSTEM SHALL BE HYDRAULICALLYDESIGNED FOR ORDINARY HAZARD, GROUP 1 CLASSIFICATIONAS DEFINED BY NFPA 13.
3.
SPRINKLER HEADS SHALL BE CONNECTED TO BRANCH PIPINGWITH FLEXIBLE PIPE CONNECTORS, TO FACILITATECOORDINATION WITH DUCTWORK AND LIGHTING IN CEILINGSPACE.
4.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS,INCLUDING PIPE SIZES, PRIOR TO COMMENCEMENT OF WORK.
5.
5/8" GYP. BD. ANDMET.SUSPENSIONSYSTEM
SE
E R
FC P
LAN
S
SE
E R
FC P
LAN
S
SE
E R
FC P
LAN
S
CEILING AS SCHEDULED
CORNER BEAD
SEE RFC PLANS
METAL STUDDIAGONALBRACING
5/8" GYP. BD. ON METAL STUDS@ 16" O.C. - SECURE TOSTRUCTURE ABOVE
4" M
IN. SEE STANDARD
CLG. DETAILS NOTES
SCALE:
1A-4
CEILING DETAIL1-1/2" = 1'-0"
REFLECTED CEILING PLAN
A-4
SCALE:REFLECTED CEILING PLAN
1/4" = 1'-0"
N
WEEK 3 ASSIGNMENT SG 1/24/12WEEK 4 ASSIGNMENT SG 1/31/12
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
P. 34all designs and detail are done by mark karaba. student work consists of assembly into working drawings
A B C D
1
2
4'-3
"9'
-2"
2'-0
"9'
-2"
3"
2'-7"
2'-10"
14'-5"
9'-8
"
ROOF HIGH POINT
ROOF LOW POINT
HVAC UNIT BY MECH. TRADESCOORDINATE UNIT SIZE WITHASSOCIATED ROOF CURB WITHSTRUCTURAL STEEL. REFER TODETAIL 5 ON THIS SHEET FORMORE INFORMATION.
V.T.R. REFER TODETAIL 2 ON THISSHEET FOR ADDITIONALINFORMATION.
7'-0"10'-0"10'-0"10'-0" CLCLCLCL
S.C. S.C. S.C. S.C.
ROOF SCUPPER-REFER TO DETAILS7 AND 8 ON THIS SHEETFOR ADDITIONALINFORMATION.
ELECTRICAL CONDUIT FORHVAC UNIT. REFER TO DETAIL 1ON THIS SHEET FOR ADDITIONALINFORMATION. COORDINATE EXACTLOCATION WITH APPROVED ASNOTED SHOP DRAWINGS.
LINE OF CANOPYBELOW REFER TODETAILS ON SHEETA-7 AND A-8 FORCANOPY AND ROOFINGMATERIALS - TYPICALOF 3 LOCATIONS.5
A-5
6A-5
7'-0
"
5'-2
"
5'-2"ROOF ASSEMBLY TYPE "A"REFER TO DETAIL 4 ON THISSHEET FIR ADDITIONALINFORMATION - TYPICAL
ROOF PLAN GENERAL NOTES
COORDINATE FINAL SIZE AND FINAL LOCATIONOF ALL EQUIPMENT SUPPORT WITH THEAPPROPRIATE EQUIPMENT MANUFACTURER.
PROVIDE POSITIVE SLOPE TO ALL ROOFDRAINS. ROOF SLOPE TO BE 1/4 " PERFOOT MINIMUM.
REFER TO MECHANICAL AND ELECTRICALDOCUMENTS FOR ALL PIPES, CURBS, VENTS,DUCTS, CONDUITS, AND OTHER FEATURESEXTENDING THROUGH ROOF SURFACESWHICH REQUIRE FLASHING AND COORDINATESIZE AND LOCATION OF SAME.
INSTALL ROOF FRAMES PRIOR TO CUTTING &REMOVING OF ANY METAL DECK.
S.C. - SCUPPER
SEE DRAWING A-5 FOR ROOF DETAILS. ROOFINGCONTRACTOR TO VERIFY ALL ROOF DETAILSCOMPLY WITH APPROVED ROOFING SYSTEM.IT IS THE RESPONSIBILITY OF THE ROOFINGCONTRACTOR TO SUPPLY ANY ADDITIONALDETAILS AND/OR MATERIALS TO ENSURECOMPLIANCE WITH WARRANTY
ALL ROOF DETAILS ARE BASED ON CARLISLEFULLY ADHERED SINGLE-PLY ROOFING SYSTEM.ALL OTHER ROOF MANUFACTURERS TO SUPPLYANY ADDITIONAL MATERIALS FOR THEIR SYSTEMAS REQUIRED.
INDICATES SLOPE DIRECTION
V.T.R. - VENT THRU ROOF
H.P. - HIGH POINT
B.
A.
C.
D.
E.
F.
G.
PROVIDE SPLASHBLOCKS AT ALL PRIMARYTERMINATIONS ONTO SINGLE-PLYMEMBRANE ROOFING.
CONT. SEALANT BEDADJUSTABLESTAINLESS STEELDRAW BAND
PIPE OR CONDUIT(VERIFY SIZEAND LOCATION)
ARCH. NOTE:SHOW SUPPORTSIF REQUIRED.
CL
6" MIN
.
EPDM SINGLE-PLYROOFING SYSTEM
LAP JOINTSEALANT
PRE-MOLDED EPDM BOOT
OPENING SIZEPER MECHANICAL
CL
METAL DECK
LAP JOINT SEALANT
EPDM SINGLE-PLYROOFING SYSTEM
PREMOLDED PIPE SEAL
OPENING SIZEPER MECHANICAL
STAINLESS STLDRAWBAND
MAX DIA PIPEIS 6 1/2"
VENT PIPE (VERIFYSIZE AND LOCATION)
PREFAB INSULATED ROOFHATCH AND CURB
ROOF OPENING
MIN
BASE FLASHING
ARCH. NOTE:VERIFY FRAMINGW/ STRUCTURAL
METAL DECKCLOSURE (4 SIDES)
PAINT CURB FLANGEWITH BITUMINOUS PAINT
ARCH NOTE:DELETE NOTE IF CURB& METAL DECK ARETHE SAME MATERIAL
12"
ANCHORS
METAL DECK
LAP JOINTSEALANT
EPDM SINGLE-PLYROOFING SYSTEM
CUT TOP OF INSULATEDMETAL PANEL
2 LAYERS OF 3/4" EXTERIORGRADE PLYWOOD SECUREDTO COLD FORMED FRAMINGWITH 1/2" STUD ANCHORS @2'-0" O.C.
CONT. 3"x3"x 14 GA.SUPPORT
T.O. PARAPETELEV.
T.O. PANEL MODULEELEV.
SEALANT
COMPRESSIBLEGASKET
COLD FORMED METALFRAMING AT 24" O.C.GLASS MATT GYPSUM
SHEATHING BOARDVERTICAL "Z" CLIPS
PRE-FORMED METALCOPING SYSTEM "A"
FACTORY FOAMEDINSULATED METALPANEL
SCALE:
3A-7
ENLARGED COPINGDETAIL TYPE A
1 1/2"=1'-0"
VERT. JOINT GASKET
INSULATEDMETAL PANEL
NOTE:REFERENCE METAL PANELSYSTEM PER APPLICATIONFOR ADDITIONAL INFORMATION
CONTINUOUS HSS "X"(BY EXTERIOR METALWALL SYSTEM CONTRACTOR)VERIFY SPACING WITHAPPROVED SHOP DWGS.
STEEL COLUMN (REF.STRUCTURAL DRAWINGS)
3/8" GYP. BOARD
COL
SCALE:
4A-7
ROOF ASSEMBLYTYPE A DETAIL
1 1/2"=1'-0"
SCALE:
5A-7
ROOF CURB DETAIL1 1/2"=1'-0"
& SCUPPER ISOMETRIC 8
WALL ASSEMBLY
STAINLESS STEEL WALLFLASHING (BEYOND)
ROOF ASSEMBLY "A"
WOOD BLOCKING
TWO PIECE STAINLESSSTEEL FLASHING
EXTEND ROOFING INTO SCUPPER
EXTEND FLASH'G 4" PAST CANT.
NOTE:1. SEE STRUCTURE DRAWINGS FOR ROOF SYSTEM SUPPORT
DOUBLE SEALANTAND BACKER RODAROUND OPENING
1'-2"
9"
EXTEND FLASHINGOVER CONDUCTOR
CONDUCTOR HEAD
4" X 6" DOWNSPOUT
SCALE: 1 1/2" = 1'-0" A-5
CONDUCTOR HEAD
BOX PERCOLLECTION
SMACNA 5TH
FIGURE 1.25FEDITION
PARAPET WALL(BEYOND)
4" x 6" DOWNSPOUT
RETURN COPING ENDCAP AT SCUPPERLOCATION (BEYOND)
THIS SHT.SEE DETAIL X
2" M
IN.
COUNTER FLASHING
ROOF PLAN AND DETAILS
A-5
SCALE:ROOF PLAN
1/4" = 1'-0"
N
WEEK 3 ASSIGNMENT SG 1/24/12WEEK 5 ASSIGNMENT SG 2/07/12WEEK 6 ASSIGNMENT SG 2/14/12
WEEK 7 ASSIGNMENT SG 2/21/12WEEK 8 ASSIGNMENT SG 2/28/12
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
P. 35 construction documentation winter 2012 professor mark karaba
C.J.
FOR ALUMINUM FRAMED WINDOWS, STOREFRONTAND/OR CURTAINWALL TYPES REFERENCESPECIFICATIONS SECTION 08920
E.J.B. = ELECTRICAL JUNCTION BOX
EXTERIOR ELEVATIONGENERAL NOTES
= INDICATES LOCATION OF MASONRY CONTROL JOINT REFER TO DETAILS #X/A-X
WINDOW SYSTEM "A" - ALUMINUM CURTAIN WALLSYSTEM - INSULATED GLAZING PANELS WITH CAPTUREDHORIZONTAL MULLIONS.PROVIDE STEEL REINFORCING AT VERTICALSTRUCTURAL BUTT GLAZED MULLIONS AS REQUIRED BYTHE MANUFACTURER FOR THE SPANS NOTED ANDVERTICAL MULLIONS AS REQUIRED (CW-1)
WINDOW SYSTEM "B" - ALUMINUM CURTAIN WALLSYSTEM - INSULATED GLAZING PANELS WITH CAPTUREDHORIZONTAL & VERTICAL MULLIONS.
INDICATES TEMPERED GLAZED PANELST
WALL SYSTEM "A" - REFER TO WALL ASSEMBLY DETAILS ONSHEETS A-6 THROUGH A-8 FOR ADDITIONAL INFORMATION.
WINDOW SYSTEM LEGEND
WALL SYSTEM LEGEND
THE FOLLOWING COLOR OF SEALANT SHOULDBE USED WHEN JOINTING OF FILLINGBETWEEN MATERIALS
A.
B.
C.
JOINT SEALANT COLORGENERAL NOTES
VERTICAL CONTROL JOINTS IN INSULATED METAL PANELS -MATCH INSULATED METAL PANEL COLOR
JOINTS BETWEEN CURTAINWALL &INSULATED METAL PANELS-MATCH CURTAIN WALL COLOR
ALL OTHER JOINTS BETWEENSIMILAR MATERIALS-MATCH MATERIAL COLOR
GL - 1 MATERIAL: CURTAIN WALL - WINDOW SYSTEM A & B
MFR: YKK AP AMERICA
SPEC: CLEAR ANODIZED ALUMINUM MULLIONS, WITH "PPG" SOLARBAN 60 -CLEAR-
SOLAR CONTROL LOW E GLASS AS FOLLOWS:SHGC - 0.38
VISIBILITY - 69% MINIMUMSHADING COEFFICIENT - 0.44
U-VALUE - SUMMER DAY- 0.27U-VALUE - WINTER NIGHT- 0.29
OUTDOOR VISIBLE LIGHT REFLECTANCE - 11%
LOCATION: ALL - VISION GLASS
1 2D C B A
A B C D 2 1
LOW POINT OF ROOF12'-5"
FINISHED FLOOR0'-0"
FINISHED FLOOR0'-0"
BOTTOM OF FOUNDATION-3'-6"
BOTTOM OF FOUNDATION-3'-6"
HIGH POINT OF ROOF13'-6"
HIGH POINT OF ROOF13'-6"
LOW POINT OF ROOF12'-5"
FINISHED GRADEVARIES
FINISHED GRADEVARIES
TOP OF PARAPET PANEL15'-6"
TOP OF PARAPET PANEL15'-6"
6" 6"CL
8'-4
"
CL
WALL ASSEMBLY "A"COLOR "A" - TYPICAL
WALL ASSEMBLY "A"COLOR "B"
24" X 24" LOUVER - COLOR TOMATCH COLOR "B". REFER TO
MECHANICAL DRAWING FORADDITIONAL INFORMATION.
LINE OF CANOPY BEYOND
LINE OF CANOPY BEYOND
LINE OF HVACUNIT BEYOND
LINE OF ROOFSLOPE BEYOND
COPING TYPE"A" TYPICAL
T TT
T T T T
3A-8
4A-8
6A-8
3A-7
3'-0
"
2'-0
"2'
-0"
4'-0
"3'
-0"
3'-0
"2'
-0"
EXTERIOR LIGHTABOVE DOORRAIN CAP ATDOOR HEAD
2A-7
1A-7
1A-7
2A-7
4A-7
5A-75
A-8
WINDOW SYSTEM "A"
WINDOW SYSTEM "B"
SCALE:
4A-1
NORTH ELEVATION1/4" = 1'-0"
SCALE:
3A-1
SOUTH ELEVATION1/4" = 1'-0" SCALE:
1A-1
EAST ELEVATION1/4" = 1'-0"
SCALE:
2A-1
WEST ELEVATION1/4" = 1'-0"
EXTERIOR ELEVATIONS AND NOTES
A-6
WEEK 3 ASSIGNMENT SG 1/24/12WEEK 5 ASSIGNMENT SG 2/07/12WEEK 6 ASSIGNMENT SG 2/14/12
WEEK 7 ASSIGNMENT SG 2/21/12WEEK 8 ASSIGNMENT SG 2/28/12
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
P. 36all designs and detail are done by mark karaba. student work consists of assembly into working drawings
2 1
LOW POINT OF STEEL12'-0"
FINISHED FLOOR0'-0"
BOTTOM OF FOUNDATION-3'-6"
FINISED GRADEVARIES
HIGH POINT OF STEEL13'-0"
TOP OF PARAPET PANEL15'-6"
2A-8
1A-8
7A-5
8A-5
AT SCUPPER BEYOND
3A-5
A B C D
TOP OF STEELVARIES
FINISHED FLOOR0'-0"
BOTTOM OF FOUNDATION-3'-6"
FINISHED GRADEVARIES
TOP OF PARAPET PANEL15'-6"
8A-7
7A-7
6A-7
5A-7
3A-7
1A-8
2A-8
138" ROD W/ THREADED ENDS
#3 CLEVIS & PIN
WT5x30
C12x20.7
METAL DECK- SEE ARCHITECTURAL DRAWINGS
C5x9
C5x6.7 BETWEEN C5x9
MITER, WELD & GRIND SMOOTH ALL CORNERS
C12x20.7
WT5x30
#3 CLEVIS & PIN
516"
138" ROD W/ THREADED ENDS
#3 CLEVIS & PIN
WT5x30 CUT & GRIND SMOOTH TO 8" Ø
34"x1'-0"x1'-0" PLATE- GRIND SMOOTH
DECORATIVE BOLT HEADS WELDED TO PLATE
12"
6"
138" ROD W/ THREADED ENDS
# 3 CLEVIS & PIN
WT5x30 CUT & GRIND SMOOTH TO 8"Ø
34" x 1'-0" x 1'-0" PLATES
DECORATIVE BOLTS WELDED TO PLATE2"
3 1/4"
CONCRETE FOOTING
PREMOLD JOINTAND SEALANT
2" X 24" PERIMETERINSULATION (TYPE "B")
CONCRETE SLAB ONVAPOR BARRIERON COMPACTEDSAND FILL
VERIFY BASIS OF DESIGNMANUFACTURER AND SPECIFICMETAL PANEL SYSTEM
STEEL BEAM(SEE STRUCTURALDRAWINGS)
CONTINUOUS2x WOOD NAILER SECUREDTO HSS WITH 1
2" STUDANCHORS AT 2'-0" O.C.
METAL COUNTER FLASHING(BY METAL PANEL CONTRACTOR)
BASE FLASHING-EXTENDFLASHING UP, ACROSS ANDDOWN METAL, PANEL ASSEMBLY
CONTINUOUS2x4 WOOD NAILER12" EXTERIOR GYPSUMBOARD SHEATHING
112" RIGID INSULATION
(BY ROOFING CONTRACTOR)
SPONGE TUBING
LAP JOINT SEALANT
ROOFASSEMBLY "A"
CX (REFERENCESTRUCTURAL DWGS.)
BACKER RODAND SEALANT
EXTENDED ALUMINUM COPING(BY METAL PANEL CONTRACTOR)FINISH TO MATCH METAL PANELSAND STRETCH FORMED AT RADIUSEDPANEL CONSTRUCTIONT.O. HSS "X"E.L. XXX-X
ROLLED HSS "X"CLIPPED TO VERT HSS "X"
6" COLD FORMED METALFRAMING AT 16" O.C.INFILL BETWEEN STEELTUBES
CONTINUOUS HSS "X"(BY EXTERIOR METALWALL SYSTEM CONTRACTOR)VERIFY SPACING WITHAPPROVED SHOP DWGS.PROVIDE WATER TIGHTWELD AT TOP OF HSS "X"INSULATED METAL PANEL-PROVIDE FORMED PANELSTO MATCH BUILDING RADIUSAT CURVED BUILDING FACE
T.O.S./B.O. HSS "X"EL. VARIES
ROLLED HSS "X" CLIPPEDTO VERTICAL HSS "X" (BYMETAL PANEL CONTRACTOR)
38" PLATE LATERAL BRACING(BY METAL PANEL CONTRACTOR)COORDINATE LOCATION ANDLOADING WITH STRUCTURALENGINEER
NOTE:REFERENCE METAL PANELSYSTEM PER APPLICATIONFOR ADDITIONAL INFORMATIONAT EXTRUDED COPING
VERIFY VERIFY VERIFY
12"
3"
12"
VERIFY DIMENSION
VERIFY STRUCTURALREQUIREMENTS
VERIFY CONCRETESLAB THICKNESS
LINE OF WALL (BEYOND)
GYPSUM BOARD RECEIVEREXTRUSION (BY EXTERIORMETAL WALL SYSTEMCONTRACTOR) FINISH TOMATCH ALUMINUM FRAME
58" GYPSUM BOARD ON35
8" METAL STUDS AT16" O.C. (INFILL BETWEENVERTICAL HSS "X")
INTEGRAL ALUMINUMFRAMING SYSTEM
BOTTOM OF MULLION
INSULATED METALWALL PANEL SYSTEM
FIRST FLOOREL. 0'-0"
METAL FLASHING BY PANELMANUFACTURERSEALANT
212" X 21
2" X 14" GALV.
CONT. W/ 38" Ø EXP.ANCS. @ 12" O.C.
NOTE:REFERENCE METAL PANELSYSTEM PER APPLICATIONFOR ADDITIONAL INFORMATIONAT BASE FLASHING
VERIFY SILL TYPE
VERIFY MANUFACTURERSFLASHING DETAILS
VERIFY BASIS OF DESIGNMANUFACTURER AND SPECIFICMETAL PANEL SYSTEM
VERIFY DIMENSION
VE
RIF
Y D
IME
NS
ION
X"
VERIFY BASIS OF DESIGNMANUFACTURER AND SPECIFICMETAL PANEL SYSTEM
6" COLD FORMED METALFRAMING AT 16" O.C.INFILL BETWEEN STEELTUBES
INSULATED METAL PANEL-PROVIDE FORMED PANELSTO MATCH BUILDING RADIUSAT CURVED BUILDING FACE
NOTE:REFERENCE METAL PANELSYSTEM PER APPLICATIONFOR ADDITIONAL INFORMATIONAT EXTRUDED COPING
8 1/4"
SCALE:
2A-1
BUILDING SECTION1/4" = 1'-0"
BUILDING SECTIONS AND DETAILS
A-7
SCALE:
1A-1
BUILDING SECTION1/4" = 1'-0"
SCALE:
3A-7
Canopy Detail1 1/2" = 1'-0"
SCALE:
4A-7
Hanger Detail1 1/2" = 1'-0"
SCALE:
5A-7
Hanger Plate Detail1 1/2" = 1'-0"
SCALE:
8A-7
Parapet Detail1" = 1'-0"
SCALE:
7A-7
Wall Assembly1" = 1'-0"
SCALE:
6A-7
Slab Detail and Wall Assembly1" = 1'-0"
WEEK 3 ASSIGNMENT SG 1/24/12WEEK 5 ASSIGNMENT SG 2/07/12WEEK 6 ASSIGNMENT SG 2/14/12
WEEK 7 ASSIGNMENT SG 2/21/12WEEK 8 ASSIGNMENT SG 2/28/12
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
P. 37 construction documentation winter 2012 professor mark karaba
COMPRESSIONGASKET
1" INSULATINGGLASS
WEDGE GASKET
TRIM EXTRUSIONINTERIOR
1" INSULATINGGLASS
COMPRESSIONGASKET
SETTINGBLOCK
SILLEXTRUSION
WEEP HOLE
FOAM TAPECONTINUOUS
INTERIORTRIM EXTRUSION
WEDGE GASKET
2"
1/2"
RE
VE
AL
X'-X
"
PA
NE
L M
OD
ULE
WIN
DO
W M
OD
ULE
X'-X
"
3"
WIN
DO
W M
OD
ULE
X'-X
"3"
1/2"
X'-X
"
PA
NE
L M
OD
ULE
2"
5' 5/32"
SCALE:
3 A-8
WINDOWSILL DETAIL
1 1/2" = 1'-0"
SCALE:
4 A-8
WINDOWHEAD DETAIL
1 1/2" = 1'-0"
7"1'-10"
11 3/4"
SCALE:
1 A-8
SECTION DETAIL ATWINIDOW SYSTEM SILL CONDITION
1 1/2" = 1'-0"
INSULATED METALPANEL SUPPORTSTEEL BY PANELMANUFACTURER
SOFFIT EXTRUSION - COLORTO MATCH INSULATED METALPANEL
1" INSULATINGGLASS
SEALANTFLASHING &
VERTICALJOINT GASKET
CLOSUREEXTRUSION
JAMB
EXTRUSIONMULLION
1/4"
5 5/
32"
1/8"5/8"NOM.
2"
3"
WINDOW MODULE
WINDOW SUPPORT STEELBY METAL PANELMANUFACTURER
SEALANT
SCALE:
5 A-8
OUTSIDECORNER PLAN DETAIL
1 1/2" = 1'-0"
SCALE:
6 A-8
WINDOWJAMB DETAIL
1 1/2" = 1'-0"
EXTERIOR DETAILS
A-8
WEEK 3 ASSIGNMENT SG 1/24/12WEEK 5 ASSIGNMENT SG 2/07/12WEEK 6 ASSIGNMENT SG 2/14/12
WEEK 7 ASSIGNMENT SG 2/21/12WEEK 8 ASSIGNMENT SG 2/28/12
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR
OD
UC
ED B
Y AN
AU
TOD
ESK ED
UC
ATIO
NA
L PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
P. 38all designs and detail are done by mark karaba. student work consists of assembly into working drawings