PORTFOLIO

54
ANDRÉS JOSÉ BARRÓS- VELÁZQUEZ CIVIL ENGINEER CAREER September 2011

description

PORTFOLIO WHICH SHOWS MY PROFESSIONAL CAREER

Transcript of PORTFOLIO

  • 1. CIVIL ENGINEERCAREER September 2011

2. INTRODUCCINCIVIL ENINEERING Civil engineering is the branch of engineering that applies theknowledge of physics, chemistry, calculus and geology to thedevelopment of infrastructure, transport and hydraulic works. Theterm "civil" is used because of the origin of civil engineering is distinctfrom military engineering. It also has a strong organization component that achieves itsapplication in the management of urban environment mainly ruraland often, not only in terms of construction, but also themaintenance, control and operation of the built and in planning life inthe environment designed from the same. This includes territorialorganization plans such as disaster prevention, traffic control andtransportation, water management, utilities, waste and all activitiesthat guarantee the welfare of humanity that develops life built on civilworks and operated by engineers.Andrs Jos Barrs Velzquez Civil Engineer 3. INTRODUCTIONCIVIL ENGINEERINGAndrs Jos Barrs Velzquez Civil Engineer 4. MAIN QUALIFICATIONCIVIL ENGINEERING DEGREE Andrs Jos Barrs VelzquezCivil Engineer 5. MAIN QUALIFICATION ACCREDITATION OF FYP NOTE Andrs Jos Barrs VelzquezCivil Engineer 6. TRAINING Andrs Jos Barrs VelzquezCivil Engineer 7. TRAINING Andrs Jos Barrs VelzquezCivil Engineer 8. TRAINING Andrs Jos Barrs VelzquezCivil Engineer 9. TRAINING Andrs Jos Barrs VelzquezCivil Engineer 10. TRAINING Andrs Jos Barrs VelzquezCivil Engineer 11. EMPLOYMENT CREDENTIALS Andrs Jos Barrs VelzquezCivil Engineer 12. EMPLOYMENT CREDENTIALS Andrs Jos Barrs VelzquezCivil Engineer 13. EMPLOYMENT CREDENTIALS Andrs Jos Barrs VelzquezCivil Engineer 14. EMPLOYMENT CREDENTIALS Andrs Jos Barrs VelzquezCivil Engineer 15. MAIN WORKS PROJECT ENGINEER TECHNICAL PROJECT MANAGEMENT AT SITE HEALTH AND SAFETY MANAGER AT SITE TECHNICAL OFFERS RESEARCHER R+D+I CONSTRUCTION ENGINEER INTERNSHIP (PRODUCTION YTECHNICAL OFFICE) PARTICIPATION IN NATIONAL AND INTERNATIONALTENDERS Andrs Jos Barrs VelzquezCivil Engineer 16. DETAILED WORKS PROJECT ENGINEER Engineering projects Hydraulics Roads Maritime Engineering Railway Structural design Building Airport engineering TECHNICAL PROJECT MANAGER AT SITE Civil works and buildings project management at site HEALTH AND SAFETY MANAGER Health and safety manager at project phase Health and safety manager at site (Civil work and building) TECHNICAL OFFERS Offer preparation for technical assintances, engineering project s, technical project and health and safety manager a site for Public Administrations (Govern Balear, Junta de Andaluca, Consell Insular de Mallorca, Consell Insular dEivissa, Aquamed, Aena, Puertos del Estado, Ministerio de Fomento) Offer preparation for works for construction companies (Ferrovial-Agromn, FCC, Amer e Hijos, Llull Sastre, Pyocsa, Astilleros Amilibia. Public tender redaction for administrative concessions(Basic Project, Financial-economic studies) RESEARCHER R+D+I Development of research in hydrology and maritime works. CONSTRUCTION ENGINEER INTERNSHIP (TECHNICAL OFFICE AND PRODUCTION) Support for excavating & trucking production unit and structures production unit Support for the technical office unit at site Support for te quality unit at site PARTICIPATION IN NATIONAL AND INTERNATIONAL TENDERS Participation in ideas contests both in Spain and abroad Andrs Jos Barrs VelzquezCivil Engineer 17. PROJECT ENGINEER Andrs Jos Barrs VelzquezCivil Engineer 18. GANTRY CRANE DESIGN IN SLAG TREATMENT AREHOUSECLIENT:TIRME S.A.SCOPE OF THE WORKS:Construction projectCOMPLETION PERIOD:June 2010 July 2010KEY INFORMATION:Span between pillars: 9 mOverload: 3 TonINVESTMENT BUDGET83.000 LOCATION:Palma (Mallorca). Balearic Islands,Spain. Andrs Jos Barrs VelzquezCivil Engineer 19. MA-30 ROAD CONVERSION IN A FOUR LANE-ROAD BETWEEN SON FERRIOL AND INCA ROAD (MA-13). ACCS PLA DE NA TESACLIENT:Consell Insular de MallorcaSCOPE OF THE WORKS:Basic and Construction ProjectCOMPLETION PERIOD:June 2010 December 2010KEY INFORMATION:3500 m of roadOverpass and underpass ProjetsContainment wallsINVESTMENT BUDGET:8.808.503,37 LOCATION:Palma andMarratx (Mallorca).Balearic Islands, Spain.GENERAL INFORMATION:Four-lane conversion and road surfacereplacementOne intersection with three branches.Four roundaboutsStructures (Overpass, underpass andcontainment walls)Andrs Jos Barrs Velzquez Civil Engineer 20. MASTER PLAN OF SANT ANTONI DE PORMANY HARBORCLIENT:Ports de les Balearic IslandsSCOPE OF THE WORKS:Master PlanCOMPLETION PERIOD:March 2010 Marzo 2011KEY INFORMATION:Infrastructures, land uses andoperations master planINVESTMENT BUDGET67.512,00 LOCATION:Sant Antoni de Portmany (Ibiza).Balearic Islands, Spain.GENERAL INFORMATION:Optimization of land usesandmooringsManeuverability studiesMaritime climate studiesStructures predimensioningAndrs Jos Barrs Velzquez Civil Engineer 21. MASTER PLAN OF ANDRATX HARBOR AND SECONDARY INSTALLATIONSCLIENT:Ports de les Balearic IslandsSCOPE OF THE WORKS:Master PlanCOMPLETION PERIOD:Marzo 2011KEY INFORMATION:Infrastructures, land uses andoperations master plan.It also includes the installations of SantElm, Estellencs, Banyalbufar and CalaLladINVESTMENT BUDGET:95.960,00 LOCATION:Andratx (Mallorca). BalearicIslands, Spain.DATOS GENERALES:Optimization of land usesandmooringsManeuverability studiesMaritime climate studies Andrs Jos Barrs VelzquezStructures predimensioningCivil Engineer 22. ACCESS TO A-315 ROAD FROM THE AREA OF THE PARTIAL PLAN P5 AT ZUJARCLIENT:Junta de Andaluca - Sa Costa deBunyola S.L.SCOPE OF THE WORKS:Construction ProjectCOMPLETION PERIOD:June 2011 - July 2011KEY INFORMATION:T intersection. Existing drainageimprovement and containment wall.INVESTMENT BUDGET:36.536,12 LOCATION:Zjar (Granada). Andalucia, Spain. Andrs Jos Barrs VelzquezCivil Engineer 23. PARKING AND OFFICES BUILDINGCLIENT:Autoritat Portuaria de Balears LaSavina Urbana S. L.SCOPE OF THE WORKS:Basic projectCOMPLETION PERIOD:September 2010 October 2010KEY INFORMATION:A four-story building with one of themsubterranean.INVESTMENT BUDGET:3.466.878,89 LOCATION:La Savina Harbor (Formentera).Balearic Islands, Spain. Andrs Jos Barrs VelzquezCivil Engineer 24. STABILITY REPORT OF A PILOTED JETTYCLIENT:Ports de les Balearic Islands Amer ehijos, Obres i ServeisSCOPE OF THE WORKS:Technical reportCOMPLETION PERIOD:April 2011KEY INFORMATION:Justification of the chosen solution inthe modified project.AWARDING BUDGET:-LOCATION:Pollena Harbor (Mallorca). BalearicIslands, Spain.Andrs Jos Barrs Velzquez Civil Engineer 25. THREE SILOS FOR CEMENT STORAGECLIENT:Autoritat Portuaria de Balears SitgesReunides S. L.SCOPE OF THE WORKS:Construction projectCOMPLETION PERIOD:January 2010 May 2010KEY INFORMATION:2.200 m2 of surface3 silos with storage capacity of 5.000 tof cementINVESTMENT BUDGET:14.575.367,39 LOCATION:Alcudia Harbor (Mallorca). BalearicIslands, Spain.Andrs Jos Barrs Velzquez Civil Engineer 26. TWO WAREHOUSES FOR STORAGING CHEMICAL PRODUCTSCLIENT:TIRMESCOPE OF THE WORKS:Construction projectCOMPLETION PERIOD:January 2010 Mayo2011KEY INFORMATION:Two warehouses for storaging chemicalproducts.Surface of 400m2PRESUPUESTO DE EJECUCIN:121.425,05 + 116.135,35 LOCATION:Palma (Mallorca). Balearic Islands,Spain.Andrs Jos Barrs Velzquez Civil Engineer 27. PLOT ADAPTATION FOR RENT A CARCLIENT:Goldcar RentalSCOPE OF THE WORKS:Construction projectCOMPLETION PERIOD:April 2010 May 2010KEY INFORMATION:Plot and installations(plumbing, ellectrical) adaptation forrent a car.INVESTMENT BUDGET:446.796,79 LOCATION:Palma airport (Mallorca). BalearicIslands, Spain. Andrs Jos Barrs VelzquezCivil Engineer 28. LEVEL CROSSING DISMANTLING. JACKED UNDERPASS SYSTEM ICLIENT:Serveis Ferroviaris de MallorcaSCOPE OF THE WORKS:Construction projectCOMPLETION PERIOD:September 2010 February 2011KEY INFORMATION:Underpass project usingjackedunderpass systemINVESTMENT BUDGET:999.632,63 LOCATION:Pont dInca (Mallorca). BalearicIslands, Spain.Andrs Jos Barrs Velzquez Civil Engineer 29. LEVEL CROSSING DISMANTLING. JACKED UNDERPASS SYSTEM IICLIENT:Serveis Ferroviaris de MallorcaSCOPE OF THE WORKS:Construction projectCOMPLETION PERIOD:September 2010 February 2011KEY INFORMATION:Underpass project using jackedunderpass systemINVESTMENT BUDGET:612.565,48 LOCATION:Marratx (Mallorca). BalearicIslands, Spain. Andrs Jos Barrs VelzquezCivil Engineer 30. LEVEL CROSSING DISMANTLING. OVERPASSCLIENT:Serveis Ferroviaris de MallorcaSCOPE OF THE WORKS:Construction ProjectCOMPLETION PERIOD:September 2010 February 2011KEY INFORMATION:Overpass of prestressed concreteINVESTMENT BUDGET:352.197,51 LOCATION:Petra(Mallorca). BalearicIslands, Spain.Andrs Jos Barrs Velzquez Civil Engineer 31. REFORM OF FUEL SUPPLY FACILITY FOR SHIPSCLIENT:Marina de Formentera S.L. AutoritatPortuaria de BalearsSCOPE OF THE WORKS:Basic projectCOMPLETION PERIOD:September 2010KEY INFORMATION:Reform of fuel supply facility for shipsINVESTMENT BUDGET:317.980,80 LOCATION:La Savina Harbor(Formentera).Balearic Islands, Spain.Andrs Jos Barrs Velzquez Civil Engineer 32. MEDITERRNEO JETTYCLIENT:Port Ebussus S.L. Autoritat Portuariade BalearsSCOPE OF THE WORKS:Basic PojectCOMPLETION PERIOD:September 2010 October 2010KEY INFORMATION:Reorganization and reform of jettyINVESTMENT BUDGET:1.505.469,38 LOCATION:Palma Harbor (Mallorca). BalearicIslands, Spain. Andrs Jos Barrs VelzquezCivil Engineer 33. BUILDING ADAPTATIONCLIENT:Marina de Formentera S.L. AutoritatPortuaria de BalearsSCOPE OF THE WORKS:Basic and Construction projectCOMPLETION PERIOD:January 2011 February 2011KEY INFORMATION:Bricklaying reformPlumbling, electric an gas installationsINVESTMENT BUDGET:208.455,66 LOCATION:La Savina Harbor(Formentera).Balearic Islands, Spain. Andrs Jos Barrs VelzquezCivil Engineer 34. STRUCTURE FOR PLOT ACCESSCLIENT:Private - ABAQUASCOPE OF THE WORKS:ConstructionCOMPLETION PERIOD:April 2011 June 2011KEY INFORMATION:Concrete underpass for crossingstreamHydrological studyINVESTMENT BUDGET:16.893,23 LOCATION:Sencelles (Mallorca). BalearicIslands, Spain.Andrs Jos Barrs Velzquez Civil Engineer 35. NOISE MAPS AND CORRECTIVE MEASURES FOR ROADSCLIENT:Consell Insular dEivissaSCOPE OF THE WORKS:Preparation of noise mapsProposition of corrective measuresCOMPLETION PERIOD:July 2010 KEY INFORMATION:PHASE A: Noise Maps (phonograms)FASE B: Proposition of correctivemeasuresAWARD BUDGET:133.945,20 LOCATION:Ibiza . Balearic Islands, Spain.Andrs Jos Barrs Velzquez Civil Engineer 36. INSTALLATION AND EMERGENCY PROJECTSCLIENT:Ajuntament de CalviSCOPE OF THE WORKS:Installation and emergency projects ofpublic buildingsCOMPLETION PERIOD:April 2010 KEY INFORMATION:Installation and emergency projects of49 public buildingsAWARD BUDGET:97.754,71 LOCATION:Calvi (Mallorca). BalearicIslands, Spain.Andrs Jos Barrs Velzquez Civil Engineer 37. TECHNICAL AND OPERATIVE REORGANIZATIONCLIENT:Autoridad Portuaria de SantanderSCOPE OF THE WORKS:Economic and technical viability study.Basic Project of reorganizationCOMPLETION PERIOD:Diciembre 2009 KEY INFORMATION:814 moorings.18.000 m2 superficie construida.42.000m2 de superficie a desarrollar65.000m2 de espejo de agua24.000 m2 de superficie de amarrePRESUPUESTO DE INVERSIN8.000.000,00 LOCATION:Santander. Cantabria, Spain. Andrs Jos Barrs VelzquezCivil Engineer 38. GEOTECHNICAL AND ESTRUCTURAL DESIGN SPECIALIST: REMODELING OF AIRPORT PLATFORMCLIENT:UTE TYPSA GPB AENASCOPE OF THE WORKS:Technical reportsCOMPLETION PERIOD:June 2011KEY INFORMATION:Report about submerged concretestructure which will contain ahydrocarbonseparator plant.tablestacasssssssssssssssINVESTMENT BUDGET:27.603.542,14LOCATION:Palma Airport(Mallorca). BalearicIslands, Spain.GENERAL INFORMATION:Obra Remodelacin de la PlataformaA, Fase II de Aeropuerto de Palma deMallorca. Andrs Jos Barrs VelzquezCivil Engineer 39. PORT FACILITIES INSPECTIONSCLIENT:Autoritat Portuaria de BalearsSCOPE OF THE WORKS:Development of inspection systems ofthe bathymetry and infrastructurerelated to defense and maritimeberthing works rates and for obtainingthe status of port operations.COMPLETION PERIOD:December 2008 June 2010KEY INFORMATION:11.000 ml of docks4.000 ml of breakwatersINVESTMENT BUDGET:197.890 LOCATION:Palma Harbor (Mallorca). BalearicIslands, Spain.Andrs Jos Barrs Velzquez Civil Engineer 40. STRUCTURE OF SINGULAR TOWERCLIENT:delCorral ArquitectosSCOPE OF THE WORKS:Structural designCOMPLETION PERIOD:October 2008 January 2009KEY INFORMATION:Helicoid structure designThyssen Krupp International ContestINVESTMENT BUDGET-LOCATION:Al-Jazaabel Park (Dubai). UnitedArabian EmiratesAndrs Jos Barrs Velzquez Civil Engineer 41. CICCP NEW HEADQUARTERSCLIENT:delCorral ArquitectosSCOPE OF THE WORKS:Structural designCOMPLETION PERIOD:October 2009 December 2009KEY INFORMATION:Concrete structure designCICCP new Headquarters contestINVESTMENT BUDGET:-LOCATION:Granada. Andaluca, Spain.Andrs Jos Barrs Velzquez Civil Engineer 42. TECHNICAL PROJECT MANAGER AT SITEHEALTH AND SAFETY MANAGER AT SITE Andrs Jos Barrs VelzquezCivil Engineer 43. ADECUACIN DE EDIFICIOCLIENT:Marina de Formentera S.L. AutoritatPortuaria de BalearsSCOPE OF THE WORKS:Basic and Construction projectCOMPLETION PERIOD:April 2011 June 2011KEY INFORMATION:Bricklaying reformPlumbling, electric an gas installationsINVESTMENT BUDGET:208.455,66 LOCATION:La Savina Harbor(Formentera).Balearic Islands, Spain.Andrs Jos Barrs Velzquez Civil Engineer 44. ENCLOSURE FOR INSTALLING METAL STRUCTURE TO LIFT AT WASTE TREATMENT PLANT EXISTINGCLIENT:TIRME S.A.SCOPE OF THE WORKS:Technical project manager at siteHealth and safety manager al siteCOMPLETION PERIOD:March 2011 October 2011KEY INFORMATION:Steel structure of 39 m highConcrete slab foundation and concretewallsINVESTMENT BUDGET:119.185,40 LOCATION:Palma (Mallorca). BalearicIslands, Spain.Andrs Jos Barrs Velzquez Civil Engineer 45. WORKS EXPERIENCE Andrs Jos Barrs VelzquezCivil Engineer 46. A7 HIGHWAY: POLOPOS ALBUOL TRAMCLIENT:Ministerio de FomentoBUILDER:Ferrovial Agromn S. A.SCOPE OF THE WORKS:Quality assuranceProductionTechnical office at siteCOMPLETION PERIOD:2007 -KEY INFORMATION:14.000 m highway7 bridgers2 tunnelsExcavation & truckingINVESTMENT BUDGET:200.000.000,00 LOCATION:Granada. Andaluca, Spain. Andrs Jos Barrs VelzquezCivil Engineer 47. RESEARCH EXPERIENCEAndrs Jos Barrs Velzquez Civil Engineer 48. PILOT PROJECT FOR INTEGRATED MANAGEMENT OF GUADALFEO RIVER BASINCLIENT:Junta de Andaluca - UGRSCOPE OF THE WORKS:Hydrological studiesComputer programmerCOMPLETION PERIOD:December 2004- August 2005KEY INFORMATION:General characterization odf the rverbasin(biological, urbanistic,meteorological)GIS integratio of the river basinSedimentological studiesScale model studiesASSIGNED BUDGET:2.437.620,00 LOCATION:Granada. Andaluca, Spain. Andrs Jos Barrs VelzquezCivil Engineer 49. DESIGN, CONSTRUCTION AND START UP OFMULTIDIRECTIONAL WAVE TANKCLIENT:UGRSCOPE OF THE WORKS:Structural designTechnical project manager at siteComputer programmerCOMPLETION PERIOD:January 2005 June 2005KEY INFORMATION:Design, construction, start up andprogramming of control and dataacquisition system in multidirectionalwave tank in ETSICCP hydraulicslaboratory, Universidad de GranadaASIGNED BUDGET10.000,00 LOCATION:Granada. Andaluca, Spain.Andrs Jos Barrs Velzquez Civil Engineer 50. STABILITY STUDIES, USING A SCALE MODEL INMULTIDIRECTIONAL WAVE TANK MULTIDIRECCIONALCLIENT:Autoridad portuaria de Gijn - UGRSCOPE OF THE WORKS:ProgrammerResults interpretationCOMPLETION PERIOD:Mayo 2005 Agosto 2005KEY INFORMATION:Stability studies, using a scale model inmultidirectional wave tank for theTorres Dam (Gijn)INVESTMENT BUDGET:-LOCATION:Granada. Andaluca, Spain.Andrs Jos Barrs Velzquez Civil Engineer 51. CIVIL ENGINEER September 2011