Portfolio 4

14
1 Portfolio stakeholders dealt with: I worked as a Site Engineer as starter at highly respected frame in Emirates for finishing and fit out, there I gained my work field experience. I worked in an international organization and dealt with significant stakeholders in highlight projects. After the economic crisis in U.A.E. I moved to Qatar along with the same company and team where I was promoted as Project Engineer and gained more experience in the field. My next step was to develop my experience in a consultant company where I am still working till present. ARCHITECTURE MOSTAFA IBRAHIM

description

Portfolio 4

Transcript of Portfolio 4

  • 1 Portfolio

    stakeholders dealt with:

    I worked as a Site Engineer as starter at highly respected frame in Emirates for finishing and

    fit out, there I gained my work field experience.

    I worked in an international organization and dealt with significant stakeholders in highlight

    projects. After the economic crisis in U.A.E. I moved to Qatar along with the same

    company and team where I was promoted as Project Engineer and gained more

    experience in the field. My next step was to develop my experience in a consultant

    company where I am still working till present.

    ARCHITECTURE

    MOSTAFA IBRAHIM

  • 1 Portfolio

    Contact Information

    Address: EL Markhiya, Doha - Qatar

    Cell. s +974 3392 9459

    e-mail [email protected]

    Nationality Egyptian

    UPDA Grade Grade C 9 yrs. experience

    Career objective

    Seeking an extraordinary professional position in Projects management field, achieving

    Versatility among multiple disciplines. Employing my progressive experience enhanced skills

    and developed academic knowledge. Providing extreme benefits and contribution to the

    organization, clients and stakeholders by achieving top quality deliverables, with impressive

    performance.

    Personal Data

    Current residence Doha - Qatar

    Birth date 31st Aug 1983

    Driving License Qatar, UAE, Egypt

    Availability Immediate with NOC

    Marital Status Married

  • 1 Portfolio

    ROTANA & CENTRO HOTEL

    YAS ISLAND, ABU DHABI, UAE

    - Rotana Hotel, Depa Project.

    - Job position: Site Engineer

    It was located in Yas Island

    near Yas marina and

    formula Abu Dhabi.

    It was done within 9 months

    where my responsibilities

    were finishing and fit-out

    for around 240 guest

    rooms and public areas.

  • 1 Portfolio

  • 1 Portfolio

    FERRARI THEME PARK

    YAS ISLAND, ABU DHABI,

    - Ferrari Theme Park, Depa

    Project.

    - Job position: Section

    Engineer.

    It was located in Yas Island

    beside formula Abu Dhabi.

    It was done within 15

    months where my

    responsibilities were

    finishing and fit out.

  • 1 Portfolio

    11

  • 1 Portfolio

    RUMAILAH HOSPTIAL, HAMAD MEDICAL COROPORATION

    AL DOHA, QATAR

    Rumailah Hospita

    Job position: Project

    Engineer

    One of the main branches

    of Hamad Medical

    Corporation.

    It was done within 18

    months where my

    responsibilities were

    renovating of old public

    areas and main entrance.

  • 1 Portfolio

  • 1 Portfolio

    3 PALACES & MAJLIS AT UMM QARN

    AL DOHA, QATAR

    Three Palaces

    Job position: Project

    Engineer.

    Series of main architectural

    work , finishing and fit out.

    It was done with 12

    months.

  • 1 Portfolio

  • 1 Portfolio

    AL JAZEERA ARABIC CHANNEL

    AL DOHA, QATAR

    - Al Jazeera Arabic Channel

    - Job position: Sr. architect

    Main responsibilities were

    to supervise Redco the

    main contractor work in Al

    Jazeera Arabic Channel

    facility which is about 7000

    m2.

    it was done within 12

    months.

  • 1 Portfolio

  • 1 Portfolio

    WEDDING HALL COMPLEX

    AL DAAYEN, DOHA, QATAR ( ongoing )

    -

    - Wedding Hall

    - Job position: Sr. architect

    - Main responsibilities were

    to supervise Combined

    Group company ( CGC )

    work in Al Zaaien which is

    about 20000 m2.

    - Still working till present ,

    approximate finishing time

    15 months.

  • 1 Portfolio