Portfolio 2014 Nicole Miller
Transcript of Portfolio 2014 Nicole Miller
NICOLE MILLERNNNNNNIIIIIICCCCCCOOOOOOLLLLLLEEEEEE MMMMMMIIIIIILLLLLLLLLLLLEEEEEERRRRRRNICOLE MILLERNICOLE MILLERNICOLE MILLER
PORTFOLIO
Studio Projects
1 Riverfront Brewery 2 UrbaRn: Design-Build 3 Flagship 3 4 GAP Shed: Design-Build 5 Marine Research Center 6 Bloom: A Greener Greenhouse
Additional Work 7 Digital Fabrication 8 Wall Section 9 Custom Wooden Box 10 Sketches + Hand Renderings Professional + Community
11 Eddie Merlot’s Restaurant 12 Aiken Street Residence 13 Charleston International Airport 14 Chalk Walk
1 Riverfront Brewery
2 UrbaRn: Design-Build
3 Flagship 3
4 GAP Shed: Design-Build
5 Marine Research Center
6 Bloom: A Greener Greenhouse
NICOLE MILLERNNNNNNIIIIIICCCCCCOOOOOOLLLLLLEEEEEE MMMMMMIIIIIILLLLLLLLLLLLEEEEEERRRRRRNICOLE MILLERNICOLE MILLERNICOLE MILLER
STUDIO PROJECTS
The Riverfront Brewery is located on the French Broad River, in the River Arts District of Asheville, North Carolina. This unique location on the waterfront was a major design opportunity that I sought to take advantage of. Views toward the water and interaction with the river drove much of the design.
A primary design strategy for the Riverfront Brewery was to establish a woven relationship of spaces. The restaurant pierces through the brewery space, which opens up to views of the French Broad River. The design creates connections between visitors, process, and nature.
RIVERFRONT BREWERYGAP SHED
CLEMSON UNIVERSITY | ARCH 851 | DESIGN STUDIO | FALL 20121
[ RHINO + PHOTOSHOP ]
HIGHWAY
CRAVEN ST. SOUTH
RIVERSIDE DRIVE
HAZELMILL RD.
CRAVEN ST BRIDGE
RIVER
RIVER
RIVER
TREES TREES
TREES
HILL
S, H
OM
ES
BRID
GE
BOAT / RAFT
RAIL
GREENWAY
BUS
VEHICLE
PROPO
SED
GREENWAY
NEW
BUS
NEW
ROUTE
BOAT / RAFT
RAIL
GREENWAY
BUS
VEHICLE
RESEARCH + SITE ANALYSISRESEARCH + SITE ANALYSIS
30 BBL
BRITE
BEER
SERVICE
ENTRY
UP
HOT
LIQUOR
TURN
COLD
LIQUOR
TURN
GROUND LEVEL
30 BBL
FERMENT
30 BBL
FERMENT
30 BBL
FERMENT
30 BBL
FERMENT
VISITOR
ENTRY
BREW
KETTLE
MASH/
LAUTER
TURN
30 BBL
BRITE
BEER
UP
30 BBL
FERMENT
OFFICE
ENTRY
A
A
B
1
7
8
12
10
11
4
5
5
13
13
6
15
15
16
17
18
19
20
21
22
23
24
UP
OPEN TO
BELOW
DN
DN
DN
OPEN TO BREWERY BELOW
OPEN TO OFFICE BELOW
SECOND LEVEL
A
B
9
13
10
11
2
3
6
15
13
DN
BREWERY
RESTAURANT
BAR
LOBBY
SHOP
ELEVATOR
GRAIN STORAGE
COLD STORAGE
KITCHEN
MEN’S RESTROOM
WOMEN’S RESTROOM
MECHANICAL
1
2
3
4
5
7
8
9
10
11
STORAGE
OFFICE
RECEPTION
CONFERENCE
BREAK ROOM
BREW MASTER OFFICE
13
14
15
16
17
6 12 18
FINANCE
MARKETING
ASSISTANT DIRECTOR
EDUCATION
TERRACED GARDEN
PERFORMANCE SPACE
19
20
21
22
23
24
The structural strategy eliminates the need for columns below the restaurant, opening up the brewery floor for flexible uses. The structure allows the restaurant to interact with the brewery without interfering with the process.
[ RHINO + ILLUSTRATOR + PHOTOSHOP ]
This studio partnered with The Project School of Indianapolis to design an urban farm classroom out of two 40’ shipping containers. Nearly all construction was completed before the shipping containers were transported to the site, including
the large sliding doors, infill walls, custom furnishings, and all finishes. A deck spans between the two containers to create an outdoor classroom space.
Each student had their own responsibilities throughout the project. My major contributions were coordinating construction documents, drawing door details, as well as designing and building interior shelving.
URBARNGAP SHED
WINNER OF 2013 AIA INDIANAPOLIS EXCELLENCE DESIGN AWARDBALL STATE UNIVERSITY | ARCH 402 | DESIGN-BUILD STUDIO | SPRING 2012
2
A B C D
1
2
3
4
5
URBAN FARM CLASSROOM
19'-8" 19'-8" 19'-8"
7'-5"
7'-314"
7'-314"
7'-5"
URBAN FARM CLASSROOM
DECK
T.O.ROOF10'-0"
DOME FABRIC2x10 RECLAIMED WD FRAME
EXISTING CONTAINER WALL3/4" OSB FINISHED FLR
5/4" WD DECKING6x6 PRESSURE TREATED WOOD
FINISHED ROOF PAINTMATERIAL / SUPERTHERM
COMPACTED GRAVEL
T.O.ROOF10'-0"
GRADE0'0"
DOME FABRIC2x10 RECLAIMED WD FRAMESTEEL SQUARE TUBE AT 4' O.C.
[ AUTOCAD ]
I designed and constructed the interior shelves for the classroom. The interior furnishings were built entirely out of reclaimed barn lumber. The boards were planed, cut, and assembled with dado joints.
Flagship 3 will include leasable workspaces for technology companies. This new facility is intended as an environment in which emerging technology companies can work and be mentored by more established companies.
The Urban Room, an outdoor space between the two building forms, encourages tenant interaction. It serves as the interface between private and public space, the energetic path of entry from both the street and the parking garage.
FLAGSHIP 3GAP SHED
CLEMSON UNIVERSITY | ARCH 857 | DESIGN STUDIO | FALL 20133
[ RHINO + ILLUSTRATOR + PHOTOSHOP ]
265 SPACES
(5 FLOORS)
DROP-OFF
STOR /
FLEX
STOR /
FLEX
MEC
H
MEC
H
PORTICO
ENTRY /
TOUCHDOWN
FS1FS3
FS3
FS1
FS1
FS1FS2
FS2
FS2
PORTICO
FS2
PORT
ICO
PORT
ICO
DN
DN
UP
RAM
P
RAMP
UP
UP
STIMULATING INTERACTION
ENGAGING THE COMMUNITY
INTERFACE: BETWEEN PRIVATE AND PUBLIC
CHOREOGRAPHING CIRCULATION
0 8' 16' 32' 64'
DROP-OFF
(FUTURE
(REURE
UTU(FUT
EXPANSION)
EXPAE
ONSION
ANSIXPAN
N)
DN
UP UPDN
A
B
3
2
12
MORRISON
ROMNEY
17
26
URBAN
SITE
BUILDING
SITE PLAN
STRUCTURAL PRECAST CONCRETE LOUVERS
LIGHTWELL
GROWING WALL
PERFORATED METAL SCREEN
PERFORATED METAL SCREEN
NEW TREES
EXISTING TREES
FUTURE EXPANSION
PEDESTRIANS
MO
RR
ISO
N D
RIV
E
VEHICLE
S
CONROY STREET
ROMNEY STREET
Interior light quality was a main focus in the design of the façade. Louvers provide a soft filtered light to the interior.
[ RHINO + ILLUSTRATOR + PHOTOSHOP ]
[ PHYSICAL MODEL ]
For farmers on leased land, permanent structures are not a smart investment. The challenge of this course was to design and build a relatively low-cost farming structure that could be disassembled and moved if a tenant farmer must relocate.
Not only is the shed portable, it also allows the small tenant farmer to meet Good Agricultural Practices (GAP) certification: a growing requirement in food safety standards.
The project was completed in four months by only seven students. Past design-build experience enabled me to take on a role of leadership in the studio. My most important responsibility was creating and managing all construction documents in Revit.
GAP SHEDGAP SHED
CLEMSON UNIVERSITY | ARCH 852 | DESIGN-BUILD STUDIO | SPRING 20134
4 x 4 WOOD POST
FOUNDATION
2 X 8 FLOOR RIMJOIST, PAINTED
2 X 6 WALL
3/4" PLYWOODSHEATHING
2 X 8 DECKJOISTS
LAG BOLTS,16" O.C.
2 X 4 DECKSUPPORT LEDGE,OPTIONAL
FLOOR BOLTEDTO POST
SIMPSONCONNECTOR
1 1/2" = 1'-0"1 Foundation to Floor to Deck
PLAN VIEW OF FOUNDATION SECTION OF FOUNDATION
STEEL PIPESBELOW GROUND
TOP OF PIPES
ANCHOR BOLT
TOP EDGESCHAMFERED
STEEL PIPES DRIVEN INTOGROUND. LENGTH DEPENDS ONSOIL CONDITION. APPROX 50"
ANCHOR BOLT
GRADE
6' -
7 1/
8"
1 X 6 FACE, SCREWED TO PLYWOOD,OVERHANGING EDGE OF PLYWOOD
1/2" ON ALL SIDES
1/2" PLYWOOD
2" RIGID INSULATION
USE 1 X 8 AT ANGLED EDGE
THIN PLYWOOD ORVENEER, COVERED WITH
FRP AT INTERIOR
2" RIGID INSULATION
1 X 6 DOOR FRAME
2 X 4 FRAME
POCKETSCREW, TYP.
3/4" = 1'-0"1 Cool Room Door
[ REVIT ]
We built the GAP shed in Johns Island, South Carolina on leased land farmed by Sweetgrass Garden, a nonprofit that provides local produce to charitable food-distribution agencies in South Carolina.
The facility is designed to obscure the boundary between indoor and outdoor spaces, connecting users directly to nature. Spaces transition from permanent, controlled lab areas into flexible open-air terraces. This strategy
greatly reduces the facility’s energy use. Only lab spaces are actively cooled, buried into the hillside for maximum insulation, while the rest of the site allows for cross-ventilation cooling.
Water serves as a centerpiece to the Marine Research Center. The campus captures, treats, stores, and returns its fresh water resources in a manner beneficial to the neighboring ecosystems. A centrally-located
living machine naturally filters wastewater with natural vegetation for gray water reuse, thereby avoiding pollution and conserving the limited water resources.
MARINE RESEARCH CENTERCRIPE SENIOR CAPSTONE COMPETITION WINNER: BEST-IN-SHOWBALL STATE UNIVERSITY | ARCH 401 | DESIGN STUDIO | FALL 2011
5
[ PHYSICAL MODEL ]
3 5421
CIRCULATION
A
STUDY NOOK
FLEXIBLE WORK SPACE
STUDY NOOK
STORAGE
COLLABORATION SPACE
SU
PP
OR
T
COMMUNITY SPACE BELOW
STORAGE
FLEXIBLE WORK SPACE
GROUNDA
“DISSOLVE” INTERIOR TO EXTERIOR
INFORMALGATHERING SPACE
TOUCH TANKS
PV PANEL CANOPY
VENTS
COMMUNITY EXHIBITS
DRY LAB
HVAC
PV ROOF PANELS
HVAC
WET LAB
TYPICAL LAB MODULE
This greenhouse is designed as a sculptural art piece. It’s purpose is to conserve rare and endangered species of orchids, providing a setting for research and education. Visitors would
not only learn about the plants, but also about sustainable building strategies used to create their growing environ-ment. The building form is meant to “bloom,” expressing the
energy of plant growth. The glulam supports spring out of the ground in a way that resembles a bending tree trunk. They then hover overhead as a delicate canopy.
BLOOM: A GREENER GREENHOUSEGAP SHED
BALL STATE UNIVERSITY | ARCH 401 | DESIGN STUDIO | FALL 20116
[ RHINO + HAND SKETCH + PHOTOSHOP ]
[ STUDY MODELS]
NICOLE MILLERNNNNNNIIIIIICCCCCCOOOOOOLLLLLLEEEEEE MMMMMMIIIIIILLLLLLLLLLLLEEEEEERRRRRRNICOLE MILLERNICOLE MILLERNICOLE MILLER
ADDITIONAL WORK
7 Digital Fabrication
8 Wall Section 9 Custom Wooden Box
10 Sketches + Hand Renderings
1.CLAY TILE BUILT AND 3D-SCANNED
2. 3D-MESH GEOMETRIES REFINED IN RHINOCEROS
3. TILE ROTATED AND REPEATED
4. REPEATED FORM 3-D PRINTED
DIGITAL FABRICATIONGAP SHED
DIGITAL FABRICATION: UNDULATING WALLBALL STATE | ARCH 263 | FALL 2009
7
WALL SECTIONGAP SHED
BALL STATE | ARCH 214 | BUILDING TECHNOLOGY | FALL 20098
[ AUTOCAD ]
CUSTOM WOODEN BOXGAP SHED
CLEMSON UNIVERSITY | ARCH 677 | INTRODUCTION TO CRAFT | FALL 20139
(4) 1/2" WALNUT EDGES
1 1/
4"
0 1/4"
0 3/8"
4"
1 1/2"
0 1/
2"0
1/4"
10 1/4"
I built my custom-designed box from rough sawn lumber, walnut-faced plywood, and figured walnut veneer. Careful attention was given to the material selection and wood joinery techniques, including miter-and-spline joints and hand crafted hinges.
[ RHINO ]
SKETCHES + HAND RENDERINGSGAP SHED
2008 - 201310
MONTREAL 2009 NAPERVILLE 2008CHARLESTON 2013 VENICE 2010
SKETCHES + HAND RENDERINGSGAP SHED
BALL STATE UNIVERSITY | ARCH 261 | DESIGN COMMUNICATION MEDIA | SPRING 201010
STILL LIFE | 2010 [Colored Pencil on Bond ]
NICOLE MILLERNNNNNNIIIIIICCCCCCOOOOOOLLLLLLEEEEEE MMMMMMIIIIIILLLLLLLLLLLLEEEEEERRRRRRNICOLE MILLERNICOLE MILLERNICOLE MILLER
PROFESSIONAL + COMMUNITY
11 Eddie Merlot’s Restaurant
12 Aiken Street Residence
13 Charleston International Airport 14 Chalk Walk
EDDIE MERLOT’S RESTAURANTGAP SHED
DESIGN COLLABORATIVE INTERNSHIP | SUMMER 201211
Working closely with the project manager, I completed every architectural drawing, including Floor Plans, Ceiling Plans, Interior Elevations, Door and Casework Details, and Plan Details. I created 3D Revit components for custom casework, doors, artwork, and light fixtures.
10' -
6"
6A7.2
6"2'
- 10 1
/2"3'
- 7 1/
2"3"
5"2'
- 2"
5"3"
3"5"1' - 1"3' - 0"1' - 0"6"3"
3' - 0"3' - 0"
6A7.2
3"6' - 0"3"
TYP.6"
TYP.6"
TYP.6"
TYP.6"
SIM.
SIM.
6A7.2
6A7.21
A7.2
14A7.2
MW-2
MW-2
MW-2
MW-2TYP.
MW-2
MW-2
MW-2
ML-3
WT-3
ML-3
MT-1
MW-2
1
1 1
PLAN AND SECTION DETAILS
CUSTOM DOOR ELEVATIONS
3
E
7 1/2"
2' - 0
"
7 1/2"
1' - 0"
1' - 0
"
51200-192216-4
64000-292900-2
64000-14
64000-2
64000-14
64000-2
64000-14
64000-14
1' - 0
"1'
- 0"
1' - 0" 1' - 0"
92216-7
INTERIOR PERSPECTIVE
UP
C
D
B
A
.9 2 3 4 5 6
F
125A12
4A
126A
102A
C.5
1 1.4 1.8
D.9
104A
111A
106A
2/A10.1
3/A3.1
MEN104
T106
T105
T111
T110
T109
T108
WOMEN107
MERLOT ROOM112
CHARDONNAY ROOM113
WALL OF WINES117
COATS102
KITCHEN124
CABERNET ROOM120
HALL103
HALL118
HALL119
LOUNGE122
WINE CELLAR121
LOUNGE123
ENTRY101
HALL114
MAIN DINING115
DINING116
EXISTING ELECTRICAL125
EXISTING SPRINKLERROOM
126
4/A1
0.1
3/A1
0.4
6/A10.3
1/A10.3
7/A10.3
7/A10.1
6/A10.1
1/A10.4
2/A10.4
5/A1
0.1
1/A1
0.21/A10.1
5/A1
0.2
4/A10.2
3/A1
0.2
2/A10.26/A10.2
9/A1
0.2
8/A10.2
7/A1
0.2
3/A10.3
4/A1
0.3
2/A1
0.3
5/A1
0.3
8/A10.1
5/A1
0.4
4/A10.4
3/A10.1
E
117A
1' - 11 3/8" 5' - 9 1/8" 2' - 6"
3' - 0 1/2"1' - 0"
4' - 8" 2' - 0" 18' - 4" 2' - 0" 27' - 6" 21' - 1"
4' - 8
5/8"
5' - 1
0"2'
- 0"
25' -
9"2'
- 0"
6' - 1
1"1'
- 0"
9' - 2
3/8"
6' - 9
"14
' - 1 1
/2"
4' - 6"6"
1' - 1" 2' - 10" 3' - 2" 6' - 1 1/2" 6' - 8 1/2"
3' - 2 1/2" 6' - 6" 2' - 0" 8' - 7 1/2" 2' - 0" 28' - 6" 2' - 0" 25' - 3"1' - 6"
26' - 10 3/8"
4' - 8
5/8"
7' - 0
"5'
- 9 1/
8"5'
- 9 1/
8"7'
- 0"
2' - 0
"
1' - 7 1/2"11' - 3 3/4" 16' - 2 1/4" 2' - 0" 28' - 6" 2' - 0" 18' - 6" 2' - 0" 5' - 8 1/2" 3' - 0" 22' - 11 5/8"
1' - 5 3/8"
1' - 7
1/2"
7' - 6
"2'
- 0"
8' - 7
"9'
- 5"
7' - 0
"4'
- 8 5/
8"25
' - 6 3
/8"2'
- 0"
16' -
1"3'
- 8 1/
4"5'
- 5"
1' - 1
1"5'
- 5"
3' - 7
1/4"
8/A10.3
CF-
17C
F-16
CF-15
CF-21
CF-22
CF-23
CF-24
CF-3
CF-4
CF-5
CF-6
CF-
12
CF-14
CF-8
CF-
11C
F-2
CF-
1
CF-28
7/A10.4
127A
128A
MECH./ELECT.127
OFFICE128
CF-7
STAFF TOILET129
CF-
20
CF-
13
129A
112A
121A
120A
122A
3' - 4"
8' - 0"
3' - 4"
122B
123B
CF-25CF-26
CF-27
CF-
10C
F-9
CF-
18C
F-19
1' - 6
"
5' - 1
0"21
' - 5 5
/8"4"
38' -
6 1/8"
1' - 0
"2"
2' - 4
"4'
- 2 5/
8"9'
- 3 1/
2"2'
- 2 1/
2"2'
- 4"
15' -
7 3/8"
1' - 7
1/2"
113A
108A
109A
110A
105A
7' - 0 1/4" 16' - 4" 16' - 4" 10' - 3 3/4"
A6.11
A6.14
107A
A6.27
A6.12
A6.13
A6.15
A6.16
A6.17
A6.18
A6.19
A6.21
A6.22
A6.23
A6.24
A6.25
A6.26
8' - 3" 6" 8' - 3" 8"
3' - 0
"5"
1' - 9
"5'
- 0"
5' - 1
3/4"
26' -
11 3/
4"8'
- 1 1/
8"
112B
P2
P1
P2
P2
P2
P2
P2
P4P4
P4TYP.
TYP
.
TYP
.
P3
P3
P3P3P3P3
P5P5
104400-2
16' - 4" 9' - 7 5/8" 7' - 1 7/8"
P4
104400-1
100000-2
104400-1
P4
115213-1
115213-1
115213-1
120000-4
107313-1
107313-1
107313-1
101400-2
101400-1
321313-2
321313-1
64000-34
92900-7TYP.
107313-1107313-1
8A10.9
TYP.
9A10.9
TYP.
A6.28
OPENING ABOVE OPENING ABOVE
103A
EXISTING GARAGE130
120000-4
100000-2
4' - 6" 1' - 9"
7A10.9
TYP.
100000-2
100000-2
P1TYP.
FP-1
104400-1
A10.104
104400-1
5' - 9 1/8" 8' - 4 7/8" 3' - 5" 3' - 5" 3' - 5" 5' - 6 5/8"
3' - 9 7/8" 5' - 4" 5' - 8 1/8" 3' - 5" 5' - 6 5/8"
P5
Existing Stair131
321313-2321313-2
321313-2321313-2
321313-2321313-2
321313-2
5' - 0" 2' - 0"
321313-2 321313-1
5' -0"
5' - 5
"
5' - 1
0" 2' - 5
5/8"
11' -
10 1/
2"
3' - 3"
3' - 3"
5' - 7"
80.000°
9A10.9
8A10.9
8A10.9
9A10.9
100' - 0"T.O. SLABEL.
100000-2
123A
5' - 0
"2'
- 0"
4' - 0
3/8"
10' - 9 1/8"
321313-2321313-2
14' - 8"
3' - 8" 11' - 4 3/8"
8A10.9
TYP.
A3.12
Sim
A3.11
Sim
100000-2
WB1
WB2
WB2
WB2
WB2WB2
WB1, TYP.
WB1
WB1
WB1
WB1
WB1
WB2
WB2
WB1
P1
10A10.9
10A10.9
3
3A10.10
100000-2
101A
4A3.1
1A10.7
P3
P1 P1
P1
P1
P1
P1
P3
P3
P2
P2P6
P2
12A10.9
P3OUTDOOR DINING
131A
8/A10
.4
64000-39
64000-39
2
TA1TA5
TA2
TA4
TA3
P2
P2
104400-1
2A10.7
45.000°
3A10.9
1A10.9
2A10.9
5A10.9
110000-1 110000-1
110000-1R35
' -0"
6' - 0"
13' - 7 5/8"
North
SCALE: 3/16" = 1'-0"1 Floor Plan - Main Level
Note:Refer to KitchenEquipment drawings foradditional information inthis area.
[ REVIT ]
AIKEN STREET RESIDENCEGAP SHED
BYERS DESIGN GROUP INTERNSHIP | FALL 201312
I worked with the client and project manager on this single family residence, from schematic design through construction drawings. I was responsible for every drawing in the permit set, including plans, elevations, wall sections, details, schedules, and electrical plans. I also worked on the 3D model in SketchUp.
[ AUTOCAD ][ SKETCHUP ]
CHARLESTON INTERNATIONAL AIRPORTGAP SHED
LIOLLIO INTERNSHIP | SPRING 201313
This 390,000 SF project included a complete renovation and concourse extension of the existing Charleston International Airport in North Charleston, South Carolina. I worked for several months on construction documents with the airport team at Liollio Architecture (partnered with Fentress Architects). Revit was an essential tool in the coordination of such a large project. My major responsibilities included drawing plan details and roof details, adding keynotes, and organizing sheet layouts.
U V
12
22
22.1
6" EWS-02B
EXTERIOR
INTERIOR
07 9500 EXPANSION CONTROL
ESJ BELOW (ROOF TO WALL). SEESCHEDULE.
ISJ BELOW (FLOOR) - SEE SCHEDULE.
ISJ - SEE SCHEDULE.
07 9500 EXPANSION CONTROL
07 9500 EXPANSION CONTROL
05 1200.D STL TUBE
U V
13
23EWS
- 02B
EXTERIOR
INTERIOR
05 1200.D STL TUBE
07 9500 EXPANSION CONTROL
07 9500 EXPANSION CONTROL
ISJ BELOW (FLOOR) - SEE SCHEDULE.
ISJ (WALL TO CORNER) - SEE SCHEDULE.
074213.23.A
METAL COMPOSITEMATERIAL WALL PANEL
05 1200.D STL TUBE
POLYISOCYANURATE BOARD ROOF INSULATION07 5216.GG
WOOD CANT07 5216.MM
BASE FLASHING SHEET07 5216.EE
ROOFING MEMBRANE SHEET (MODIFIED ASPHALTSHEET)
07 5216.CC
GLASS-MAT COVER BOARD07 5216.AA
ROOF DECK05 3100.A
ROOFING CAP SHEET (MODIFIED ASPHALT SHEET)07 5216.DD
ALTERNATE CURBBEARING LOCATIONFOR HEAVY WEIGHT
LOADINGCONDITIONS
WOOD NAILERS
SEALANT07 9200.A
PRE-FINISHED ALUM COUNTER FLASHING07 6200.AB
REMOVABLE
GASKETED FASTENERS. MINIMUM TWOFASTENERS PER SIDE
FASTENERS APPROX. 8" O.C.
EXTENDED FIELD PLIES ABOVE HEAD OF CANT
RAISED CURB
WOOD NAILER
[ REVIT ]
CHALK WALKGAP SHED
DESIGN COLLABORATIVE INTERNSHIP | SUMMER 201114
A collaborative art piece for the Fort Wayne, Indiana Three Rivers Festival