Portfolio 2009 3b (Oct)

download Portfolio 2009 3b (Oct)

of 31

Transcript of Portfolio 2009 3b (Oct)

  • 8/14/2019 Portfolio 2009 3b (Oct)

    1/31

  • 8/14/2019 Portfolio 2009 3b (Oct)

    2/31

  • 8/14/2019 Portfolio 2009 3b (Oct)

    3/31

    2006

    2007

    2008

    2009

    Model of

    Abstracon

    2006 1a term

    creang an abstract model through

    images of landscapes

    pencil on strathmore

    foam core and cardboard

    through abstracng pictures of landscape

    an idea of an abstract model of a building was developed.

    shapes became alive as structural support and decoraons on both exterior and interior

  • 8/14/2019 Portfolio 2009 3b (Oct)

    4/31

    2006

    2007

    2008

    2009

    Oasis Poolhouse

    2007 Summer

    Google SketchUp Model

    an oasis that one can enjoy by swimming in a pool build by natural

    materials , such as, gravelled lled ground, furthermore, one can sun

    tan on the green roofs - it is a place to enjoy your vacaon

    sunlight could be enjoyed on the roofs during January and stored as

    warmth during June

  • 8/14/2019 Portfolio 2009 3b (Oct)

    5/31

    2006

    2007

    2008

    2009

    Sport Facility

    2006 1b term

    sport facility in cambridge pencil on vellum

    Section A

    a sport facility where spectators and

    athletes are able to enjoy their

    environment with their own needs. Spec-

    tators are able to grab a cup of coeefrom the cafe while watching games in the

    courts of basketball, squash, etc. As they

    reach the

    boundary line entering the

    basement, spectators change their roles

    to being an athlete - a place to sasfy both

    the spectator and

    athletes to

    accommodate their separate needs

  • 8/14/2019 Portfolio 2009 3b (Oct)

    6/31

    2006

    2007

    2008

    2009

    Swimming Pool

    Gallery Space Grou

  • 8/14/2019 Portfolio 2009 3b (Oct)

    7/31

    2006

    2007

    2008

    2009

    Elevation

    Section B

    Section B

    Language Centre

    2007 1b term

    language centre designed for site on the intersecon of Queen St East and Soho St

    pen on mylar

    hand made model (foamcore, musuem board, plexi-glass

    this space is designed for the community to enjoy a cultural environment and at the

    same me be able to make use of the centre to interact with other people in the

    community

  • 8/14/2019 Portfolio 2009 3b (Oct)

    8/31

    2006

    2007

    2008

    2009

    Third Floor Plan

  • 8/14/2019 Portfolio 2009 3b (Oct)

    9/31

    2006

    2007

    2008

    2009

    First Floor Plan

  • 8/14/2019 Portfolio 2009 3b (Oct)

    10/31

    2006

    2007

    2008

    2009

    Writers block2007 2a term

    Autodesk Revit Architecture 2008

    Prefabricated homes on the roof of an exisng building. It

    was designed to have beer insulaon, protecon from bugs,

    environmentally friendly, and beer equipped to handle natural

    disasters.

  • 8/14/2019 Portfolio 2009 3b (Oct)

    11/31

    2006

    2007

    2008

    2009

    Dwelling Unit for two single

    families

    2007 2a term

    AutoCad Draing

    Google SketchUp Modelling

    hand made model

    Autodesk Revit Architecture 2008 draing and rendering

    a unit that contains a custom exible

    living unit.

    mobile. screen.

    it acts as a barreir for the bunk bed and

    also a desk for the child to use.

    bunk bed is design so that the child can

    sll get their privacy , at the same me

    making use of every available space

    for the childs acvity area in his or her

    room

  • 8/14/2019 Portfolio 2009 3b (Oct)

    12/31

    2006

    2007

    2008

    2009 Coded Units Building Se

    Coded Units Building S

    Coded Units Building Ele

  • 8/14/2019 Portfolio 2009 3b (Oct)

    13/31

    2006

    2007

    2008

    2009

    The S building

    The S-building, located at the intersecon of Lower

    Sherbourne and Esplanade in downtown Toronto,

    is a thirteenth storey single loaded building consist-ing of four unique unit variaons. These, combined,

    form a single module that is repeated throughout the

    building . The module consists of a custom unit for

    single parent family, a three- storey family unit, a two

    bedroom unit, and a bachelor unit.

    The main goal of this design is to provide comfortable

    outdoor and indoor spaces for residents to enjoy and

    to promote social interacon within said spaces to

    create a community within a community.

  • 8/14/2019 Portfolio 2009 3b (Oct)

    14/31

    2006

    2007

    2008

    2009

    i l i

    tric

    l :

    Fa

    FirstFlSecondFloo

    ThirdFlooSca

    2bedrooms - FirstFloor

    Scale1:100

    2bedrooms - SecondFloorScale1:100

  • 8/14/2019 Portfolio 2009 3b (Oct)

    15/31

    2006

    2007

    2008

    2009

    residentialcourtyard + communnity space

    shops + parking

    circulation

    residential

    courtyard + community

    space

  • 8/14/2019 Portfolio 2009 3b (Oct)

    16/31

    2006

    2007

    2008

    2009

    Vignees - The H

    2008

    draing

    vignees in ph

  • 8/14/2019 Portfolio 2009 3b (Oct)

    17/31

  • 8/14/2019 Portfolio 2009 3b (Oct)

    18/31

    2006

    2007

    2008

    2009

  • 8/14/2019 Portfolio 2009 3b (Oct)

    19/31

    2006

    2007

    2008

    2009

    CHORA

    2008 2b term

    architectural performave installaon art

  • 8/14/2019 Portfolio 2009 3b (Oct)

    20/31

    2006

    2007

    2008

    2009

    West elevation

    The Ribbon - oce

    building

    2009 3a term

    draing in revit

    vignees in photoshop

    diagrams in illustrator and sketchup

    interveaving of

    circulaon between

    dierent users

    to provide public

    spaces at the area

    they cross paths

  • 8/14/2019 Portfolio 2009 3b (Oct)

    21/31

    Design DrawingCasino

    2008 2a Co-op term

    draing in AutoCad

    Climans Green Liang Artchitects

    2006

    2007

    2008

    2009

    Working Drawings

    Condominiums

    2008 2a Co-op term

    incorporate plumbing on all oors

    adding details to elevaons

    edited drawings for consultants meengs

    draing in AutoCad

  • 8/14/2019 Portfolio 2009 3b (Oct)

    22/31

    2006

    2007

    2008

    2009

    Working

    Drawing

    Custom House2008 2a Co-op term

    coordinate plans and secons with consultants

    draing in AutoCad

    Climans Green Liang Artchitects

    producing s

  • 8/14/2019 Portfolio 2009 3b (Oct)

    23/31

    2006

    2007

    2008

    2009

  • 8/14/2019 Portfolio 2009 3b (Oct)

    24/31

    2006

    2007

    2008

    2009

    Model Making - Irvine

    2008 2b Co-op term

    building site model and individual building study and presentaon models

    Robert A.M. Stern Architects

  • 8/14/2019 Portfolio 2009 3b (Oct)

    25/31

    2006

    2007

    2008

    2009

    2BR 2BR

    2BR+ 2BR+2BR

    B B

    C CB

    RC RC

    WD

    W D WD

    W

    D

    WD

    1,991SF 1,991

    2,444SF 2,601SF1,995F

    P:2,000sf P:2,000sf

    P:2,400sf P:2,400sf P:2,000sf

    B:452sf

    B :3 51sf B:282sf B:351sf

    B : 4 f

    B:282sf

    F L 4 -5 ( 2) 5 U I TS E F L ( 10 )

    G SF F L L AT E ( / A L C I E S )12,946sq.ft.

    G SF F L L AT E ( / A L C I ES ) 15,116sq.ft.

    S A LA L E S F ( / A L C I E S) 11,022 sq.ft.

    S A LA L E S F ( / A L C I E S) 13,192 sq.ft.

    C E + U L I C C I C U L AT I 1,924 sq.ft.

    P A SA LA L E 10,800sq.ft.

    EF F ICIEC 85%

    3BR+ 3BR+

    3BR

    E E

    D

    RC RC

    D

    W

    D

    W

    D

    W

    P:3,500sf P:3,500sf

    P:2,850sf

    B:174sf

    B:516sf

    B:174sf

    B:219sf B: f

    3,456 SF 3,456 SF

    3,018SF

    F L 1 2 - 14 ( 3) 3 U I TS E F L ( 9)

    S FF L L AT E ( / A LC I ES )11,995 sq.ft.S FF L L AT E ( / A L C I E S) 13,297sq.ft.

    S AL A L E S F( / A L C I E S ) 9,901 sq.ft.S AL A L E S F( / A L C I E S) 11,203sq.ft.C E + U L I C C I C U L AT I 2,094 sq.ft.

    A S A LA L E 9,850sq.ft.

    EFFICIE C 83%

    Plans and secons eding - Irvine

    2008 2b Co-op term

    Eding and Preparing drawings for presentaon to clients and area calculaons

    Robert A.M. Stern Architects

  • 8/14/2019 Portfolio 2009 3b (Oct)

    26/31

    2006

    2007

    2008

    2009

    Monographs - Crescent Plaza2008 2b Co-op term

    combining oor plans with site plans and M-coloring all oor plans

    Robert A.M. Stern Architects

  • 8/14/2019 Portfolio 2009 3b (Oct)

    27/31

    2006

    2007

    2008

    2009

    Model Making -

    Yale University/Gurgaon/ Boulder

    2008 2b Co-op term

    Producings site models and study and presentaon models for Bob Stern meengs

    and client meengs

    Robert A.M. Stern Architects

  • 8/14/2019 Portfolio 2009 3b (Oct)

    28/31

    2006

    2007

    2008

    2009

    Compeon -

    Pavillion & Pedestrian Street

    2009 3a Co-op term

    designing public facilies

    building 3d models in google sketchup pro 7.0

    producing vignees in photoshop

    Atelier FeiChang JianZhu

  • 8/14/2019 Portfolio 2009 3b (Oct)

    29/31

    2006

    2007

    2008

    2009

    Egg Museum - PingGu, Beijing2009 3a Co-op term

    designing an egg museum

    producing concept drawings for client

    prepared project documents and proposal

    building 3d models in google sketchup pro 7.0

    Atelier FeiChang JianZhu

  • 8/14/2019 Portfolio 2009 3b (Oct)

    30/31

    2006

    2007

    2008

    2009

    Qianmen Stre

    transformaon of HuTung into commercial ar2009 3a Co-op

    designing public fac

    building 3d models in google sketchup pr

    producing vignees in photo

    Atelier FeiChang Jia

  • 8/14/2019 Portfolio 2009 3b (Oct)

    31/31

    2006

    2007

    2008

    2009