Caltrans Planning Horizons Meeting March 12, 2002 Gordon Palmer Port of Stockton.
Port of Stockton
-
Upload
asklesliemeredith -
Category
Business
-
view
398 -
download
0
description
Transcript of Port of Stockton
![Page 1: Port of Stockton](https://reader038.fdocuments.us/reader038/viewer/2022103115/55683410d8b42ab7198b52a8/html5/thumbnails/1.jpg)
![Page 2: Port of Stockton](https://reader038.fdocuments.us/reader038/viewer/2022103115/55683410d8b42ab7198b52a8/html5/thumbnails/2.jpg)
Port of Stockton
Port of StocktonApproved ProjectsValue of Projects $1.65 billion, 2,118 jobs
Ferguson DC $312.2mFerguson DC $312.2m
Castle & Cooke $56.8mCastle & Cooke $56.8m
Yara N. America $58.8m Yara N. America $58.8m
Lowes HIW $72.1mLowes HIW $72.1m
Pacific Ethanol $241mPacific Ethanol $241m
Windmill Components $47.7mWindmill Components $47.7m
Ferguson Pipe $96.3m Ferguson Pipe $96.3m
NuStar $35.2mNuStar $35.2m
DTE $199.8m DTE $199.8m
Community Fuels $61.2mCommunity Fuels $61.2m
Wilmar-Gavilon $65.8mWilmar-Gavilon $65.8m
ACX $49.2m ACX $49.2m
Marine Highway $172.5m Marine Highway $172.5m
Metro $181.8m Metro $181.8m
![Page 3: Port of Stockton](https://reader038.fdocuments.us/reader038/viewer/2022103115/55683410d8b42ab7198b52a8/html5/thumbnails/3.jpg)
Port of Stockton
Proposed Projects Value of Projects $1.74 billion, 1,100 jobs
Const. Materials $529m Const. Materials $529m
Energy $76.4m Energy $76.4m
Const. Materials $158.9m Const. Materials $158.9m
Energy $554mEnergy $554m
Bulk Liquids Terminal $191.3m Bulk Liquids Terminal $191.3m
Energy $230.5m Energy $230.5m
Port of Stockton
![Page 4: Port of Stockton](https://reader038.fdocuments.us/reader038/viewer/2022103115/55683410d8b42ab7198b52a8/html5/thumbnails/4.jpg)
M-580 Marine HighwayProject Overview $30 million TIGER grant supporting the
project. The Port of Stockton received $13.5 million.
Port of Stockton Purchased– 2 mobile harbor cranes– 2 barges (Cell Guides being
installed)– Invested in port infrastructure
improvements; Yard, Dock , Rail. Savage selected as the M-580
Management Company by the Port of Stockton.
Savage will provide overall management, marketing, logistics and operating services to the project.
4
![Page 5: Port of Stockton](https://reader038.fdocuments.us/reader038/viewer/2022103115/55683410d8b42ab7198b52a8/html5/thumbnails/5.jpg)
M-580 Marine HighwayOperating Plan Start date August 2012
Technology and EDI with Shipping Lines, Chassis Pool, Rail, Equipment network in place for Marine Highway
M-580A – 256 containers M-580B – 169 containers
3 Export barges per week at startup 750 containers per week Target exports
agricultural products waste paper scrap metals wine