Poplar Street Bridge City Arch River Consultant Presentation

26
Poplar Street Bridge City Arch River Consultant Presentation December 16, 2011 Room 160, St. Louis District Office

description

Poplar Street Bridge City Arch River Consultant Presentation. December 16, 2011 Room 160, St. Louis District Office. MRB Phase 1 . MRB Phase 1 . PSB Interchange Scope. Remove EB I-70 Ramp Remove and Replace PSB ramp to Memorial/WB I-70 ramp - PowerPoint PPT Presentation

Transcript of Poplar Street Bridge City Arch River Consultant Presentation

Page 1: Poplar Street Bridge  City Arch River Consultant Presentation

Poplar Street Bridge City Arch River Consultant PresentationDecember 16, 2011Room 160, St. Louis District Office

Page 2: Poplar Street Bridge  City Arch River Consultant Presentation

MRB Phase 1

Page 3: Poplar Street Bridge  City Arch River Consultant Presentation

MRB Phase 1

Page 4: Poplar Street Bridge  City Arch River Consultant Presentation

PSB Interchange Scope Remove EB I-70 Ramp Remove and Replace PSB ramp to Memorial/WB I-70

ramp Remove and Replace SB I-55 Ramp with New Dual

Lane Ramp Remove and Replace NB I-55 Ramp with New Dual

Lane Ramp Convert I-70 Depressed Lanes from 4-Lane to 5-

Lane Section Add Auxiliary Lane Between PSB and New I-70 Exit

Ramp to Washington Avenue

Page 5: Poplar Street Bridge  City Arch River Consultant Presentation

2011 Improvements to PSB

Page 6: Poplar Street Bridge  City Arch River Consultant Presentation

2011 Proposed PSB Interchange Improvements

Page 7: Poplar Street Bridge  City Arch River Consultant Presentation

2011 Proposed PSB Interchange Improvements

Page 8: Poplar Street Bridge  City Arch River Consultant Presentation

I-70 Typical Section in Depressed Area

Page 9: Poplar Street Bridge  City Arch River Consultant Presentation

City Arch River 2015

Page 10: Poplar Street Bridge  City Arch River Consultant Presentation
Page 11: Poplar Street Bridge  City Arch River Consultant Presentation

Land Bridge Over I-70

Page 12: Poplar Street Bridge  City Arch River Consultant Presentation

City Arch River Land Bridge Scope

Improvements to I-70, Memorial Drive, and City Streets

Remove and Replace Walnut Street Bridge Remove Market, Chestnut, and Pine Street Bridges Construct Land Bridge over I-70 Between Market &

Chestnut Remove NB Memorial Drive between Walnut and

existing WB I-70 ramp

Remove SB Memorial Drive between Chestnut and Market

Page 13: Poplar Street Bridge  City Arch River Consultant Presentation
Page 14: Poplar Street Bridge  City Arch River Consultant Presentation

Land Bridge Over I-70

Page 15: Poplar Street Bridge  City Arch River Consultant Presentation

City Arch River I-70 Ramps and 3rd Street /MLK Bridge

Intersection Modifications Remove EB I-70 exit ramp to Memorial Drive and

Replace with new EB I-70 entrance ramp from Washington Ave.

Remove WB I-70 entrance ramp from Memorial Drive and Replace with a new WB I-70 exit ramp to Washington Ave.

Geometric revision to the 3rd Street / MLK Bridge Intersection.

Page 16: Poplar Street Bridge  City Arch River Consultant Presentation

I-70 Ramps to/from Washington Avenue

Page 17: Poplar Street Bridge  City Arch River Consultant Presentation

3rd Street / MLK Intersection Improvements

Page 18: Poplar Street Bridge  City Arch River Consultant Presentation

Schedule for CAR Proposals Due -

1/13/12 Interview Selection-

1/20/12 Interviews- 2/1/12 Final Selection- 2/3/12 Negotiations Done- 3/2/12 Notice to Proceed- 3/9/12

Page 19: Poplar Street Bridge  City Arch River Consultant Presentation

Schedule for PSB Proposals Due -

1/27/12 Interview Selection- 2/7/12 Interviews-

2/17/12 Final Selection-

2/21/12 Negotiations Done-

3/22/12 Notice to Proceed-

3/27/12

Page 20: Poplar Street Bridge  City Arch River Consultant Presentation

Schedule for Ramps & MLK

Proposals Due -2/17/12

Interview Selection- 2/24/12

Interviews- 3/2/12 Final Selection- 3/5/12 Negotiations Done- 4/4/12 Notice to Proceed-

4/11/12

Page 21: Poplar Street Bridge  City Arch River Consultant Presentation

AJR and NEPA Process Combined AJR for PSB / CAR Projects Separate NEPA documents AJR Submittal to FHWA by end of December NEPA for PSB Interchange requires Re-Evaluation

of NMRB EIS NEPA for City Arch River requires EA Approved AJR and Signed NEPA Documents by

May 2012 Some Risk in Moving Forward

Page 22: Poplar Street Bridge  City Arch River Consultant Presentation

Contingencies

CAR – Funding from TIGER Grant

PSB- Approval on TIP ALL 3 – Approval of NEPA and

AJR

Page 23: Poplar Street Bridge  City Arch River Consultant Presentation

Diversity

Page 24: Poplar Street Bridge  City Arch River Consultant Presentation

DBE & Workforce PSB – 20% DBE CAR (Land Bridge) – 20%

DBE Ramps & MLK – 20% DBE

Monthly Workforce Plan

Page 25: Poplar Street Bridge  City Arch River Consultant Presentation

Baseline Survey Control Points to be

provided by City Arch River to insure consistency on all projects.

Page 26: Poplar Street Bridge  City Arch River Consultant Presentation

newriverbridge.org

http://www.newriverbridge.org/newsroom-library.html#plans