Poplar Street Bridge City Arch River Consultant PresentationDecember 16, 2011Room 160, St. Louis District Office
![Page 2: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/2.jpg)
MRB Phase 1
![Page 3: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/3.jpg)
MRB Phase 1
![Page 4: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/4.jpg)
PSB Interchange Scope Remove EB I-70 Ramp Remove and Replace PSB ramp to Memorial/WB I-70
ramp Remove and Replace SB I-55 Ramp with New Dual
Lane Ramp Remove and Replace NB I-55 Ramp with New Dual
Lane Ramp Convert I-70 Depressed Lanes from 4-Lane to 5-
Lane Section Add Auxiliary Lane Between PSB and New I-70 Exit
Ramp to Washington Avenue
![Page 5: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/5.jpg)
2011 Improvements to PSB
![Page 6: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/6.jpg)
2011 Proposed PSB Interchange Improvements
![Page 7: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/7.jpg)
2011 Proposed PSB Interchange Improvements
![Page 8: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/8.jpg)
I-70 Typical Section in Depressed Area
![Page 9: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/9.jpg)
City Arch River 2015
![Page 10: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/10.jpg)
![Page 11: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/11.jpg)
Land Bridge Over I-70
![Page 12: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/12.jpg)
City Arch River Land Bridge Scope
Improvements to I-70, Memorial Drive, and City Streets
Remove and Replace Walnut Street Bridge Remove Market, Chestnut, and Pine Street Bridges Construct Land Bridge over I-70 Between Market &
Chestnut Remove NB Memorial Drive between Walnut and
existing WB I-70 ramp
Remove SB Memorial Drive between Chestnut and Market
![Page 13: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/13.jpg)
![Page 14: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/14.jpg)
Land Bridge Over I-70
![Page 15: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/15.jpg)
City Arch River I-70 Ramps and 3rd Street /MLK Bridge
Intersection Modifications Remove EB I-70 exit ramp to Memorial Drive and
Replace with new EB I-70 entrance ramp from Washington Ave.
Remove WB I-70 entrance ramp from Memorial Drive and Replace with a new WB I-70 exit ramp to Washington Ave.
Geometric revision to the 3rd Street / MLK Bridge Intersection.
![Page 16: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/16.jpg)
I-70 Ramps to/from Washington Avenue
![Page 17: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/17.jpg)
3rd Street / MLK Intersection Improvements
![Page 18: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/18.jpg)
Schedule for CAR Proposals Due -
1/13/12 Interview Selection-
1/20/12 Interviews- 2/1/12 Final Selection- 2/3/12 Negotiations Done- 3/2/12 Notice to Proceed- 3/9/12
![Page 19: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/19.jpg)
Schedule for PSB Proposals Due -
1/27/12 Interview Selection- 2/7/12 Interviews-
2/17/12 Final Selection-
2/21/12 Negotiations Done-
3/22/12 Notice to Proceed-
3/27/12
![Page 20: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/20.jpg)
Schedule for Ramps & MLK
Proposals Due -2/17/12
Interview Selection- 2/24/12
Interviews- 3/2/12 Final Selection- 3/5/12 Negotiations Done- 4/4/12 Notice to Proceed-
4/11/12
![Page 21: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/21.jpg)
AJR and NEPA Process Combined AJR for PSB / CAR Projects Separate NEPA documents AJR Submittal to FHWA by end of December NEPA for PSB Interchange requires Re-Evaluation
of NMRB EIS NEPA for City Arch River requires EA Approved AJR and Signed NEPA Documents by
May 2012 Some Risk in Moving Forward
![Page 22: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/22.jpg)
Contingencies
CAR – Funding from TIGER Grant
PSB- Approval on TIP ALL 3 – Approval of NEPA and
AJR
![Page 23: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/23.jpg)
Diversity
![Page 24: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/24.jpg)
DBE & Workforce PSB – 20% DBE CAR (Land Bridge) – 20%
DBE Ramps & MLK – 20% DBE
Monthly Workforce Plan
![Page 25: Poplar Street Bridge City Arch River Consultant Presentation](https://reader034.fdocuments.us/reader034/viewer/2022051518/56816320550346895dd399aa/html5/thumbnails/25.jpg)
Baseline Survey Control Points to be
provided by City Arch River to insure consistency on all projects.