SustainableDevelopmentPolymer Processing ‐ Cost Savings Potential in the Process
Ciaran O'Reilly Chartered Engineer
Process
Chartered Engineer
Technical AdviserSustainable DevelopmentSustainable Development
M i i iMaximisingEfficiencies 5 ProgrammersEfficiencies
(1) Resource Efficiency Audit (2) P j t M t F k(2) Project Management Framework (3) Energy Efficiency Loan Scheme (4) Capital Grants for SME’s of up to £40 000(4) Capital Grants for SME s of up to £40,000 (5) Industrial Symbiosis
Sustainable Development
M i i iMaximisingEfficiencies
Progress Last 3 YearsEfficiencies Last 3 Years
850 Audits Completed
£60,000,000
of Identified SavingsSustainable Development
CostCost Savings Hidden Potentialdde o e a
Polymer Processing ‐ Cost Savings Potential in the Process
Areas of High Process Energy ConsumptionAreas of High Process Energy Consumption.
Actions that can be taken to reduce Consumption.
S t i bl D l t
Indicative Potential Investment Costs and Cost Savings
Sustainable Development
EnergyEnergy Process Energy v Carbon
Manufacturing Factory Polymer Processing
80%
100%
120%
80%
100%
120%
Polymer Processing
40%
60% Heating
Electric
40%
60%
80%
Heating
Electric
S t i bl D l t
0%
20%
Carbon Energy0%
20%
Carbon Energy
Sustainable Development
CostCost Savings Energy used in an
t d b iextruder business
66% Processing
Manufacturing business16% Processing equipment
10%
5%5% 2%1%
66% Processing equipment
11% Chillers
10% Compressed Air
16%
5%
10%
5% Chillers
10% Compressed Air
66%
11%
5% Water Pumps
5% Lighting
2% Factory & office
5%
10%
5%
34%
5% Water Pumps
20% Lighting
S t i bl D l t
yheating
1% Offices20% 34% Factory & office heating
10% Offices
Sustainable Development
CostCost Savings
Extrusion Blow MouldingInjection Stretch Moulding
45%
16%
8%45% Extruder
31% Hydrulics
3% 3%
94% Infra Red Lamps
31%
16% Heat
3% Ventilation
3% Motion
S t i bl D l t
8% Granulator94%
Sustainable Development
CostCost Savings
Process 325 KW1 000 kg/h
Specific energy to raise the temperature of the plastic is typically 0 16 kWh/k f i t lli l ti (lik PE PP)
1,000 kg/h
• 0.16 kWh/kg for semi-crystalline plastics (like PE or PP)• 0.10 kWh/kg for amorphous plastics (e.g., PVC, PS).
The actual specific energy consumption will be higher because of losses in the motor, gearbox,thrust bearings cooling the feed housing and extruder barrelthrust bearings, cooling the feed housing and extruder barrel,
• 0.20 to 0.25 kWh/kg semi-crystalline plastics• 0.15 to 0.20 kWh/kg for amorphous plastics
d i i t t li d i l ti t t k
S t i bl D l t
• a dryer, resin conveying system, water cooling and circulation system, take-up0.20 to 0.25 kWh/kg
Sustainable Development
Energy 55 KW / HEnergy Savings
55 KW / Hour£7.70 / Hour
Process powerExtruder 125kw
/
Extruder 125kwHeat per hour 160kwCooling 40kwTotal 325kwTotal 325kw
Heat recovery 25% 40kwProduct stored at 30C 16kw
S t i bl D l t
Product stored at 30C 16kwEnergy Savings 56kw
17%
Sustainable Development
WhatNo 1Energy Efficiency
WhatWorks Energy Efficiency
Plant ReplacementInsulationInduction HeatingInduction HeatingHeat RecoveryM&TM&T
FinanceFinanceAvailable
No and Low InterestInterest
Interest free Loans Invest-NIGrowth Loan Fund Invest-NIE h d C i l AllEnhanced Capital AllowanceROC’s & RHI for RenewablesRegulator Grants through the Utility providersRegulator Grants through the Utility providers
S t i bl D l tSustainable Development
Top 10 Investments All SPB
Less 24 months
Sustainable Development
RenewablesRenewablesEconomics Appraisal:PV Array 50kWCAPITAL COST £65,000 PV Array 50kW SPB 2 yearsSupply and install 50kWp system
EXISTING ELECTRICITY COSTS
Existing electricity consumption 1,387,040kWh
Existing electricity consumption cost £194 186Existing electricity consumption cost £194,186
TOTAL COST SAVINGS
Estimated annual output of PV system 41,080kWh
INCOME
Electricty generated and used on site 90% 36,972kWh
(36,972 kWh X £0.14/p/kWh) £5,176
ROC's payment (41,080 kWh X £0.1696) £6,984
E t U it 10% (4 108 kWh X £0 0559) £246Export Units 10% (4,108 kWh X £0.0559) £246
TOTAL SAVINGS £12,406
Simple pay back 5.24 Years
Enhanced Capital Allowance £30,000
Sustainable DevelopmentIntrest Free Loan Invest‐NI (by CT) £13,063
CAPITAL OUTLAY SPB 2 Years £21,937
SustainableSustainableDevelopment What Are We Doing
Next For YouNext For You
Implementation AuditsPolymer Sector Studyy y
Special Energy Task GroupISO 50001 W k hISO 50001 Workshops
Sustainable Development
Sustainable MaximisingSustainableDevelopment
Maximising Efficiencies
Next EventsInvest-NI Sustainex 9th &10th April La Mon Hotel
Bombardier June Joint SeminarISO 50001 Workshops
Sustainable Development