PN 04-16 G I C W
Transcript of PN 04-16 G I C W
PUBLIC NOTICE (04-16)
All interested parties are notified that the Commander, Seventh Coast Guard District has received an application from the Florida Department of Transportation, requesting approval of the location and plans for a proposed replacement bridge over a navigable waterway of the United States. WATERWAY AND LOCATION: Gulf Intracoastal Waterway (GICW), mile 113.0, also known as Boca Ciega Bay at Tierra Verde, Pinellas County, FL. The proposed fixed bridge will replace a bascule lift bridge on Pinellas Bayway South (SR679) (aka Bayway structure E) between Isla Del Sol and Tierra Verde, FL, Lat 27.693775, Long -82.717781. CHARACTER OF WORK: The proposed project involves replacement of the existing two-lane, double-leaf bascule bridge, with a two-lane, high-level fixed bridge structure. The new bridge will be essentially along the same alignment 10 feet east of the existing bridge structure. The proposed typical section of the bridge includes two 12-foot vehicle lanes (one in each direction) with 10-foot shoulders. A 5-foot sidewalk is included on the west side of the bridge which is separated by a concrete barrier wall. A 12-foot sidewalk is provided on the east side to accommodate Pinellas County’s planned multi-use path. The out-to-out width of the proposed bridge is approximately 67 feet and the overall length is approximately 2890 feet. MINIMUM NAVIGATIONAL CLEARANCES: Existing Proposed Horizontal: 89 ft between face of fenders Horizontal: 100 ft between face of fenders Vertical: Vertical: 25 ft above Mean High Water (bascule closed) 65ft above Mean High Water Unlimited vertical clearance (bascule open) ENVIRONMENTAL CONSIDERATIONS: The Coast Guard, as lead Federal agency, has made a tentative determination that the bridge replacement is a categorical exclusion for the purposes of the National Environmental Policy Act (NEPA) because it satisfies criteria for such actions listed in Coast Guard NEPA Implementing Instructions. The documents are available for review at the above address, Monday through Friday, 7:30 a.m. to 4:00 p.m. The bridge is located in the floodplain. The 100-year flood elevation is 14 feet. The low member elevation of the bridge over the channel is proposed at 66.30 feet and the low member of the entire bridge is 16.38 feet, located over the seawall at the south abutment of the bridge; all elevations are reference to NGVD 29 datum. With the exception of the bridge support piers, no fill will be placed below mean high water elevation for
Commander United States Coast Guard Seventh District
909 SE 1st Avenue Miami, Florida 33131 Staff Symbol: (dpb) Phone: (305) 415-6736 Fax: (305) 415-6763 Email: [email protected] 16591/3870 May 19, 2016
2
the construction of the bridge and approaches. The project will result in impacts to 0.05 acres of wetlands to include mangrove and salt marsh. Wetland impacts have been offset by the purchase of mitigation credits from Desoto Park Mitigation Site. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The proposed project would affect approximately 0.05 acres of wetland (marsh and mangrove), 0.07 acres of seagrass and 0.19 acres of surface water used by various life stages of managed species including brown, pink and, white shrimp, red drum, black and gag grouper, gray snapper, gray triggerfish, and spiny lobster. EFH impacts have been offset by the purchase of mitigation credits from the Desoto Mitigation Site. NMFS has concurred with a MANLAA determination for the Green, Kemps ridley, and loggerhead sea turtles and for the gulf sturgeon and small tooth sawfish. USFWS has concurred with a MANLAA determination for the west Indian manatee. The Coast Guard’s initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries. Our final determination relative to project impacts and the need for additional mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. Water Quality Certification (WQC) pursuant to public law 92-500, 33 USC Section 1341, as amended was initial issued by the Southwest Florida Water Management District (SWFWMD) in an Environmental Resource Permit (ERP) # 43023803.002 dated 31 March 2009 and extended in ERP permit # 43023803.003 dated 3 September 2014. No parklands, wildlife refuges, or historic properties will be affected by the project. Temporary impacts to navigation during construction are anticipated. Navigational impacts include crane barges working in and around the navigation channel and intermittent reoccurring blockage of the navigation channel. Mariners will be notified of the details of in-water construction activities which will impact the navigation channel at and around the bridge site. Details of navigational impacts include dates and durations of full and partial channel blockage will be disseminated to mariners via the Coast Guard’s Local Notice to Mariners (LNM). To subscribe to the Coast Guard LNM and other free Coast Guard navigation notification services, please visit http://www.navcen.uscg.gov/ under “Subscribe / Report (free)” select the notifications you wish to receive; note this project is located in the Seventh Coast Guard District area. SOLICITATION OF COMMENTS: Mariners are requested to comment on the proposed vertical and horizontal navigational clearances and other navigational safety issues, including but not limited to impacts due to construction activities. Interested parties are requested to express their views, in writing, on the proposed bridge project including its possible impact on minority and/or low income population, if any, giving sufficient detail to establish a clear understanding of their reasons for support of, or opposition to, the proposed work. Comments will be received for the record at the office of: Commander (dpb), Seventh Coast Guard District, 909 SE 1st Ave., Ste 432, Miami, Florida 33131-3028, for a 30-day period from the date of this public notice. Our project manager for this application is Mr. Randall Overton. He can be contacted by telephone at (305) 415-6736, by mail at the above address, or e-mail at [email protected]. Comments received will be made part of the case record. Map of location and plans attached.
S.R. 679 (Pinellas Bayway Structure E) at lntracoastal Waterway Bridge No: 150049
Pinellas County, Florida
WPI Segment No :410755-1 PROJECT LOCATION MAP
-0
...... P £CT LOCATION
END PROJECT STA. 312+13.96 (+
CONST. S.R. 519
'".!'!'.!...,
END BRIDGE STA. JOS+I0.40 l;t.J
CONST. S.R. 679
BEGIN BRIDGE ST A. 276+/9.50 l:t.J
CONST. S.R. 519
BEGIN PROJECT STA. 260+17.77 (+J
CONST. S.R. 519
APRIL 2-0IS SHUT I OF 4
STATE OF FLORIDA GIJLF INTRACOASTAL
WATERl'IAY IGICWJ, /JIL£ llJ.0 SR lil9 !PINELLAS
8AYWAY STRUCTURE EJ IATJ TIERRA VERDt:,
PINELLAS COUNTY, FLORIDA
LOCATION UAP
0 '50 - - 200
Feet
PROPERTY OWNfR: EXIST/NC SEAWALL TO BC REMOVCD ¥ HOLOINCS LLC ,-- CHANNEL
TO £X/STINC CROUNO UN£ IN FRONT OF WALL
TIERRA V£ROE MARINA - - - - - - - (,: { EXIST/NC
+ t--- ---- - --- -- -1 ~ UEXISTINC 8RJOC£ J \......._ I CX/Sr/NC SfAWALL /I ANO FENDER SYSTEM
- - - - - -- - - ,_ - - - ~ BE REPLACE!!_ - - - E .... cc II <TO BE REMOVED>
- ~...::: - J_ -=--=...:.'=--=-- -=--=--=--=--=--=--= ~ ~- = -- ~ = - = - - - - = -------i
I
----w t:i-------7
~~~~~~~==~====~======~:::::::;:::j:::~::==~~~~~~~~~ -.----- J !!!Ill ____!!t__ ' a: ~~~__;,~~===~::=:::::::!f:::::::::::::::::::::::::::t:::::~::::::::::::::::J;;.::
'.? ~ " i..: "'~
PROPOSED FENDER SYSTEM
~ c::i
~ PROPERTY OWNfR: ~ ....... :il
, I
PROPOSED BRIDGE
g~ BURCH TRAD/NC INC.
... ~ . a: Q ~ !!( ~ ~ ~ ~"' i3 i3 ~ ............ II) II) V)
SPAN LENGTHS VARY: 115'-D" fJ5.052mJ MIN.
1
100 80 60 40 20 0 -20 -40
- ___c::_ - - -
NOTES:
/. ELEVATIONS ARE BASED ON NCVD29 DATUM.
2. ML W EL. -0.25.
J. TH£ AMOUNT OF FILL PLACED BELOW MEAN HIGH WATER ELEVATION • 0.0 C. Y.
NOT£: PIERS NOT SHOWN
l APPROX. EXIST/NC CROUNO LINE
LEGEND:
/00'-0" (J0.480m)
HORIZ. CLEAR.
PLAN
2890'-IOJ'." BRIDGE LENGTH f88U46mJ
....... ~ti :~ C> I
;:.., ~
i: CONSTRUCT/ON
160'-0" (M/N.J SPAN LENGTHS VARY: 115'-0" (J5.052mJ MIN. (48.168mJ NOT£: PIERS NOT SHOWN
/~ 65' (f9.8/2mJ MIN. VERT. CLEAR.
A ,
f:J ___ !. MHW EL. I .JO \ EL. 14
[JOO-YR FLOODPLAIN
-j i_! -
--~·
/00 '-0" f.J0.480mf .. -.· ~ , • · • • .-'V_ -.,.,
HORIZ. CLEAR. .. 00 . . \ ~::. E. N s ,l\. •• ~\. .... .. . .. ,.... . .\--- --...,. 'v ... ELEVATION :~· '":o.208~0 •. ': ... 1-~·*-- ~ . -- -- . • • c-- :T • -
~""O·.~~~\ : .. -:.~· .... ,~ ~.-!!;~ " .. .,C:-:-.. , ... . OR\?. ··(3-~ ......
~t <:"-,r-. ·.' • '• • • G~ .,..,. .. . .. )NA\.. -v , .... -,,,
APRIL 2015 SHEET 2 OF 4
JOO I 80 60 40 20
0 -20 -40
a CC z CLEARANCE GAUGE. I Jose s! Ji>~Nguez, P.E. #20810
ATKlllS «IJO lfMI ~ Sallil EM., Suite 700 T_, Florida J.!li07
STATE OF FLORIDA GULF INTRACOASTAL
WATEFMAY (G/CWJ, UILE 113.0 SR 679 (PINELLAS
BAYWAY STRUCTURE EJ (ATJ TIERRA VERDE,
PINELLAS COUNTY, FLORIDA
FBPR Cerl/floale or Aulttorlzollon No. 2-4 PLAN AND ELEVATION (J OF 2J
USER: Jyv-6300 J /Jl/20l5 9:49:54 All F :'COiii.iON\$ TRUCTVR£SVllllllllll'Sl rucf\/31Plafl£1ev0/.DGN
~ CONSrRUCTION PROPOSED BRlOGE
PLAN
2890'-10}'4" BRIDGE LENGTH (881.146m)
SPAN LENGTHS VARY: 115'-0" (35.052m> MIN. NOTE: PIERS NOT SHOWN
°' " i
;\;~~ Sl ~ ... -..,o ..., C> ~ ... -~
~
0 50
Feet
200 ~
PROPERTY OWNER: ¥ TRUS TffS OF THE INTERNAL IMPROVEMENT TRUST FUND
~~~1~ o"'. . ln ..., r
': ~ '.:t
TRUSTEES OF THE INTERNAL IMPROVEMENT TRUST FUND
80
~JOO
80 60 40 20 0 -20
I !!:07,YR FLOODPLAIN
~ ~-~ ------ - - - - -'C APPROX. EX/STIN-:-- - - - - - - - - - - -- - - - - - - -
100 I 60 40 20
0 - 20
-40
NOTES:
I. ELEVATIONS ARE BASED ON NGVD29 DATUM.
2. ML W EL. -0.25.
.3. THE AMOUNT OF Fill PLACED BELOW MEAN HIGH WATER ELEVATION a D.D C. Y.
GROUND LINE
USER: lyrei!iJOO J/Jl/2015 9:49:fl AJI
Jose s. Rodriguez, P.E. #ZOBIO ATKINS 4030 ll'asl Eb/ SaJUI EM., Su/le 700 T06f111, fl0tldt1 JJ61)l FBPR Cerllflcola of Alllflorlzallon No. 24
F:'>C(}j,lllOJl\STRUCTUllES\/llllll/J/l\Slrucl'81P/(/nE/tJVOZ.DGN
-40
APRIL 2015 SHEET 3 OF 4
STATE OF FLORIDA GULF INTRACOASTAL
WATERNAY <GICWJ, MILE 113.0 SR 679 (PINELLAS
BAYWAY STRUCTURE £J <ATJ TIERRA VERDE,
PINELLAS COUNTY, FLORIDA
PLAN AND ELEVATION f2 OF 2J
l'-0" <0.305m) PEDESTRIAN/ BICYCLE RAILING
f EXISTING BRIDGE NO. 150049
n
~---=~l I. 10'-D" .I
<J.048m) MAXIMUM
67'-0" f20.422m>
30'-0" f9.J44m)
r{ CONST.
37'-0" (JJ .278m)
l'-BYz" (0.52/m) l'-BYz" ro.52JmJ l TRAFFIC RAILING BARRIER TRAFFIC RAILING BARRIER J 5'-30"
12'-30" (J.747mJ (/.6/Jm) '-0" <J.048mJ 12'-0" <J.658mJ 12'-0" (J.658m> 10'-0" <J.048mJ SOWK.
0.02 n
SHOULDER LANE .
LANE SHOULDER SIDEWALK
~ t VPRDFILE GRADE
POINT n 0.02 0.02 0.02 0.02 0.02
TYPICAL SECTION SR 679 (PINELLAS BAYf(AYu6TflUCTURE EJ
STA. 276+19.50 (±J TO ~~~q~~~~lo''!fJ f£. CONST .
USER: lyve6JOO
.... ~ • E • '/ _ .. , .. 0 .· \C NC\ •• ~ .. .. .....:., \J..(\.•\' ...
~: .J: v , , ·.-' ~
" N ~ 0 • .'~ 4. .
: ~ ... 4
µs :A.TE o . -:. /'::a • l ~ : t;; :
# ... I • 4lt .. , .. ~ • <· 0 R \ C,.;.. #f .... .. "'" IS's .•••••• .._\0" .. .. ,,,, '0NAL ~'~,~ .. .. .,,,,,. .. ~,,~
Jose S. Rodriguez, P.E. #208/0 ATKINS .:JJ() lf15J &,, Solid /Jlld., Suire 700 T#IPl/1 FIOrldtl JJ601 FBPR Cerllflet1le of hJlhOrlzollon No. Z-4
J / J// 2()15 9:52:31AM F :'lXJMAION'ISTRUCTURESV/111111111\SI rucl\ T ypStJCOJ.dgn
'
J'-0" f0.J05m> PEDESTRIAN '/ BICYCLE RAILING
APRIL 2015 SHEET 4 OF 4
STATE OF FLORIDA GULF INTRACOASTAL
WATERWAY lGICWJ, MILE 113.0 SR 679 f PINELLAS
8AYWAY STRUCTURE EJ (ATJ TIERRA VERDE,
PINELLAS COUNTY, FLORIDA
BRIDGE TYPICAL SECTION