PMF 14- Internal Project Progress Report

3
MHIVPL / PMF / xxx Issue Date: 01 Jan 2014 Rev 0 MPG Hotels Infrastructure Ventures Pvt. Ltd. Page 1 of 2 Internal Project Progress Report Summar Per!od" #o" Report $ate" Project name" %l!ent" Project Manager" Project Start $ate" &xpected %omplet!on" Project Status  ' es (o P)ase * Project Plan +General," 1. Have the objectives in the Phase or Project Plan changed 2. Have the assu!"tions in the Phase or P roject Plan changed #. Have the deliverables in the Phase or Project Plan ch anged 4. $re there an% !ajor issues &. Is the "r oject i!"acted b% e'ternal factors $el!vera-les" (. )ill the deliverables fail to !eet s"eci* cations +. $re ther e deliverables not envisaged earlier ct!v!t!es / &ort ,. $re there an% "r oble!s a-ecting the "roject tea!s abilit% to "erfor! the /or . Does the actual ti!e e'"ended to date var% signi* cantl% 3 105 fro! the "roject "lan Resourc!ng 10. $re ther e resour cing "roble!s Sc)edule 11. Is the es ti!ated schedule about to be !iss ed 0udget / Sav!ngs 12. )ill the a""roved budget be overrun 1#. )ill the "rojected savings not be r eali6ed %)ange Re1uests 14. $re there sign i*cant 3 2&5 changes to 7co"e re8ue sted &xplanat!on of c)ec2ed !tems" 9or ever% ite! ticed ; es< give a brief e'"lanation. Status Summar  e'"lain if ;es is checed5

Transcript of PMF 14- Internal Project Progress Report

Page 1: PMF 14- Internal Project Progress Report

7/25/2019 PMF 14- Internal Project Progress Report

http://slidepdf.com/reader/full/pmf-14-internal-project-progress-report 1/2

MHIVPL / PMF / xxxIssue Date: 01 Jan 2014

Rev 0

MPG Hotels Infrastructure Ventures Pvt. Ltd. Page 1 of 2

Internal Project Progress Report

Summar

Per!od" #o" Report $ate"

Project name" %l!ent" Project Manager"

Project Start $ate"&xpected %omplet!on"

Project Status

 'es (o

P)ase * Project Plan +General,"

1. Have the objectives in the Phase or Project Plan changed

2. Have the assu!"tions in the Phase or Project Plan changed

#. Have the deliverables in the Phase or Project Plan changed

4. $re there an% !ajor issues

&. Is the "roject i!"acted b% e'ternal factors

$el!vera-les"

(. )ill the deliverables fail to !eet s"eci*cations

+. $re there deliverables not envisaged earlier

ct!v!t!es / &ort

,. $re there an% "roble!s a-ecting the "roject tea!s abilit% to "erfor! the /or

. Does the actual ti!e e'"ended to date var% signi*cantl% 3 105 fro! the "roject "lan

Resourc!ng

10. $re there resourcing "roble!s

Sc)edule

11. Is the esti!ated schedule about to be !issed0udget / Sav!ngs

12. )ill the a""roved budget be overrun

1#. )ill the "rojected savings not be reali6ed

%)ange Re1uests

14. $re there signi*cant 3 2&5 changes to 7co"e re8uested

&xplanat!on of c)ec2ed !tems"

9or ever% ite! ticed ;es< give a brief e'"lanation.

Status Summar  e'"lain if ;es is checed5

Page 2: PMF 14- Internal Project Progress Report

7/25/2019 PMF 14- Internal Project Progress Report

http://slidepdf.com/reader/full/pmf-14-internal-project-progress-report 2/2

MHIVPL / PMF / xxxIssue Date: 01 Jan 2014

Rev 0

MPG Hotels Infrastructure Ventures Pvt. Ltd. Page 2 of 2

c)!evements

Major ct!v!t Status * &xpectat!ons

%)ange Re1uest nals!s

Major %)ange Re1uested Impact

R!s2 nals!s

R!s2 %ont!ngenc

Planned ct!v!t!es

Major ct!v!t &xpected M!lestone/ c)!evement

Project M!lestones

%omplet!on $ate Reason for var!ance

Rev!se ctual

Issued 0"

ro ec es ones ons s en3!t) )!g) level project plansummar ,

#arget+0asel!n