Project Management
Professional
Wasim Khalil
Project Manager
EMP ACADEMY
![Page 2: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/2.jpg)
PROJECT TIME MANAGEMENT
![Page 3: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/3.jpg)
Time Management Process
Process Done During
Plan Schedule Management Planning
Define Activities Planning
Sequence Activity Planning
Estimate Activity Resources Planning
Estimate Activity Durations Planning
Develop Schedule Planning
Control Schedule Monitoring and Controlling
![Page 4: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/4.jpg)
Time Management Process
• One of the key responsibilities of the
project manager is to see if the needed
end date for the a project can be met
and to create options to make it happen
![Page 5: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/5.jpg)
Plan Schedule Management
• Who will be involved
• What approach will take to plan the
schedule
• How will create the schedule
![Page 6: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/6.jpg)
PLAN SCHEDULE MANAGEMENT INCLUDE:
Schedule Methodology
Schedule software
Rules how estimate like : hours, Days
Performance measures
What the acceptance variances
![Page 7: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/7.jpg)
DEFINE ACTIVATES
Decomposing the WBS , Work Packages into Activities
The Activities Small Enough to estimate, schedule and
control
![Page 8: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/8.jpg)
![Page 9: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/9.jpg)
Rolling Wave Planning
• When Project has too many unknown
components
• Not plan the lowest details in advance
but instead to plan the higher level and
then wait until the project work has
begun and the work is clearer to plan
lower level
![Page 10: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/10.jpg)
Milestone
• Are Significant events within the project
schedule
• They are not work activities and have
no duration
Example
• Completed Design
• Contract Signed
![Page 11: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/11.jpg)
Milestone
![Page 12: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/12.jpg)
Sequence Activities
• Sequencing activities and Milestones in
the order in which the work will
complete
• The Result is Network Diagram
![Page 13: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/13.jpg)
![Page 14: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/14.jpg)
Leads and Lags
• Activities can start before predecessor
activities is completed
• Lag is waiting time inserted between
activities
![Page 15: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/15.jpg)
Estimate Activity Resources
• Resources include equipment's and
Materials as well As People
![Page 16: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/16.jpg)
Estimate Activity Durations
• How Much each activates will take
• I have No idea how long it will be take
• I do not even know what I am being ask
So what I do Say??
I will take my best guess and double it!!
![Page 17: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/17.jpg)
How is Estimating Done?
• Analogous Estimating (Top-Down)
• Parametric Estimating
• Three-Point Estimating
![Page 18: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/18.jpg)
Three-Point Estimating
• Sample Average
P+O+M/3
• PERT
P+4M+O/6
Optimistic(O), Pessimistic(P), Most Likely(M)
![Page 19: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/19.jpg)
Develop Schedule
Put All information in schedule tools to
create a schedule Model
![Page 20: Pm training day 4](https://reader034.fdocuments.us/reader034/viewer/2022042716/55cd513abb61ebfa4b8b47e9/html5/thumbnails/20.jpg)
Control Schedule
Project Manager Measuring against the
Plan taking action as needed to control
the project