Pm Time Management

download Pm Time Management

of 78

Transcript of Pm Time Management

  • 8/8/2019 Pm Time Management

    1/78

    Project TimeProject Time

    ManagementManagement

    (14)

  • 8/8/2019 Pm Time Management

    2/78

    Project Time Management

    6.1 Activity Definition

    6.2 Activity Sequencing

    6.3 Activity Resource Estimating

    6.4 Activity Duration Estimating

    6.5 Schedule Development

    6.6 Schedule Control

  • 8/8/2019 Pm Time Management

    3/78

    6.1 Activities Definition

    Inputs

    .1 Enterprise environmental factors.2 Organizational Process assets

    .3 Project scope statement

    .4 Work breakdown structure

    .5 WBS dictionary

    .6 Project management plan

    Tools & Techniques

    .1 Decomposition.2 Templates

    .3 Rolling Waves Planning

    .4 Expert judgment

    .5 Planning components

    Outputs

    .1 Activity list.2 Activity attributes

    .3 Milestone list

    .4 Requested changes

  • 8/8/2019 Pm Time Management

    4/78

    Inputs,Inputs, (Activity Definition)(Activity Definition)

    ..1 Enterprise Environmental Factors1 Enterprise Environmental Factors Organizational Culture and StructureOrganizational Culture and Structure

    Government and Industry StandardsGovernment and Industry Standards

    The Organization InfrastructureThe Organization Infrastructure Existing Human ResourcesExisting Human Resources

    Personnel AdministrationPersonnel Administration

    Company Work Authorization StructureCompany Work Authorization Structure

    Market Place conditionsMarket Place conditions

    Stakeholders Risk TolerancesStakeholders Risk Tolerances Commercial DatabasesCommercial Databases

    Project management Information SystemProject management Information System

  • 8/8/2019 Pm Time Management

    5/78

    Inputs,Inputs, (Activity Definition)(Activity Definition)

    ..22 Organizational Process AssetsOrganizational Process Assets Organizational standard processes, i.e. safety and healthOrganizational standard processes, i.e. safety and health

    policies, project life cycle, quality policies and procedurespolicies, project life cycle, quality policies and procedures

    Standardized guidelines, i.e. work instruction, proposalStandardized guidelines, i.e. work instruction, proposalevolution criteria, and performance measurementsevolution criteria, and performance measurements

    Templates, i.e. risk templates, WBS templates, scheduleTemplates, i.e. risk templates, WBS templates, scheduletemplatestemplates

    Organization communication requirementsOrganization communication requirements

    Project closure guidelines and requirementsProject closure guidelines and requirements

    Financial control proceduresFinancial control procedures

    Change control proceduresChange control procedures

    Risk control proceduresRisk control procedures

    Organization available data basesOrganization available data bases

  • 8/8/2019 Pm Time Management

    6/78

    Inputs,Inputs, (Activity Definition)(Activity Definition)

    ..33 Project Scope StatementProject Scope Statement Describes in detail the projects deliverables andDescribes in detail the projects deliverables and

    the work required to create those deliverablesthe work required to create those deliverables

    ..44 Work Breakdown StructureWork Breakdown Structure It breaks the scope into manageable portions thatIt breaks the scope into manageable portions that

    allows us to assign cost, time and qualityallows us to assign cost, time and qualityrequirements for each activity or deliverablerequirements for each activity or deliverable

    ..55 WBS DictionaryWBS Dictionary Supporting document for the WBSSupporting document for the WBS

  • 8/8/2019 Pm Time Management

    7/78

    Inputs,Inputs, ((Activity Definition)Activity Definition)

    ..66 Project Management PlanProject Management Plan It contains the schedule management plan (ChapterIt contains the schedule management plan (Chapter

    66), which provides guidance on the development and), which provides guidance on the development and

    planning of schedule activities and the project scopeplanning of schedule activities and the project scopemanagement planmanagement plan

  • 8/8/2019 Pm Time Management

    8/78

    Tools and Techniques,Tools and Techniques, (Activity(Activity

    Definition)Definition)..11 DecompositionDecomposition

    Involves subdividing the work packages intoInvolves subdividing the work packages intosmaller, more manageable components calledsmaller, more manageable components called

    schedule activities.schedule activities.

    ..22 TemplatesTemplates A standard activity list that contains the activityA standard activity list that contains the activity

    attributes information, resource skillsattributes information, resource skillsrequirements, associated risks, expectedrequirements, associated risks, expecteddeliverables, and any other descriptivedeliverables, and any other descriptiveinformationinformation

  • 8/8/2019 Pm Time Management

    9/78

    Tools and Techniques,Tools and Techniques, (Activity(Activity

    Definition)Definition)..33 Rolling Wave PlanningRolling Wave Planning

    Is a form of progressive elaboration planningIs a form of progressive elaboration planningwhere the work to be accomplished in the nearwhere the work to be accomplished in the near

    term is planned in detail at a low level of theterm is planned in detail at a low level of theWBS, while work far in the future is planned forWBS, while work far in the future is planned forWBS components that are relatively high level ofWBS components that are relatively high level ofthe WBSthe WBS

  • 8/8/2019 Pm Time Management

    10/78

    Tools and Techniques,Tools and Techniques, (Activity(Activity

    Definition)Definition)..44 Expert JudgmentExpert Judgment

    We should always utilize our experts andWe should always utilize our experts andexperienced team embers skills and knowledgeexperienced team embers skills and knowledge

    in defining our activities and their attributesin defining our activities and their attributes

    ..55 Planning ComponentsPlanning Components When scope information is limited, we can utilizeWhen scope information is limited, we can utilize

    planning components at a high level in the WBS,planning components at a high level in the WBS,where we can assign cost, schedule and control,where we can assign cost, schedule and control,etc., i.e. LSTK project.etc., i.e. LSTK project.

  • 8/8/2019 Pm Time Management

    11/78

    Output,Output, ((Activity Definition)Activity Definition)

    .1 Activity List Acomprehensive list of all the project scheduled

    activities that are planned to be performed on the

    project

    .2Activity Attributes Activity identifier, activity code, activity

    description, predecessor activities, successoractivities, logical relationships, leads and lags,resource requirements, imposed dates,constraints, and assumptions.

  • 8/8/2019 Pm Time Management

    12/78

    Output,Output, ((Activity Definition)Activity Definition)

    .3 Milestone List A list of the schedule milestone (mandatory or

    optional)

    .4 Requested Changes Any new activities that was approved by the

    Integrated Change Control Process

  • 8/8/2019 Pm Time Management

    13/78

    6.2 Activities Sequencing

    Inputs

    .1 Project Scope Statement

    .2 Activity List

    .3 Activities Attributes

    .4 Milestone List

    .5 Approved Change Requests

    Tools & Techniques

    .1 Precedence Diagramming

    Method (PDM)

    .2 Arrow Diagramming Method (ADM)

    .3 Schedule Network Templates

    .4 Dependency Determination

    .5 Applying Leads and Lags

    Outputs

    .1 Project Schedule Network Diagram

    .2 Activity list (updates)

    .3 Activity attributes (updates)

    .4 Requested changes

  • 8/8/2019 Pm Time Management

    14/78

    Inputs,Inputs, (Activities(Activities

    Sequencing)Sequencing)..11 Project Scope Statement (Covered)Project Scope Statement (Covered)

    ..22Activity List (Covered)Activity List (Covered)

    ..33Activities Attributes (Covered)Activities Attributes (Covered)

    ..44 Milestone List (Covered)Milestone List (Covered)

    ..55Approved Change Requests (Covered)Approved Change Requests (Covered)

  • 8/8/2019 Pm Time Management

    15/78

    Tools and Techniques,Tools and Techniques,(Activities Sequencing)(Activities Sequencing)

    ..11 Precedence Diagramming Method (PDM)Precedence Diagramming Method (PDM)

    The same asThe same as Activity on NodeActivity on Node (AON), utilizes(AON), utilizesFinish to Start, Finish to Finish, Start to Start,Finish to Start, Finish to Finish, Start to Start,

    and Start to Finish relationships. Finish to Startand Start to Finish relationships. Finish to Startis the most commonly used relationship.is the most commonly used relationship.

    Start

    GA

    F

    D

    B

    C E

    Finish

  • 8/8/2019 Pm Time Management

    16/78

    Tools and Techniques ,Tools and Techniques , (Activities(Activities

    Sequencing)Sequencing)..22Arrow Diagramming Method (ADM):.Arrow Diagramming Method (ADM):.

    Activities are represented by arrows (Activities are represented by arrows (Activity onActivity onArrowArrow, AOA) and the circle shows the activity, AOA) and the circle shows the activity

    duration, usesduration, uses onlyonly Finish to Start relationshipsFinish to Start relationships,,and dummy activitiesand dummy activities

    Start End

    2 3

    2

    5

    1

    4

    1

    A

    B

    C J

    G

    F I

    K

    LN

    E

  • 8/8/2019 Pm Time Management

    17/78

    Tools and Techniques ,Tools and Techniques , (Activities(Activities

    Sequencing)Sequencing)..33 Schedule Network TemplatesSchedule Network Templates

    Standardized project schedule network diagram templatesStandardized project schedule network diagram templatesare used to expedite the preparation of the entire network,are used to expedite the preparation of the entire network,(sub(sub--network are used for repetitive group of activities)network are used for repetitive group of activities)

    ..44 Dependency DeterminationDependency Determination

    Mandatory dependencies, discretionaryMandatory dependencies, discretionarydependencies, and external dependenciesdependencies, and external dependencies

    ..55Applying Leads and LagsApplying Leads and Lags Leads and lags are applied to accurately define the logicLeads and lags are applied to accurately define the logic

    relationship, and are documentedrelationship, and are documented

  • 8/8/2019 Pm Time Management

    18/78

    OutputsOutputs

    (Activities Sequencing)(Activities Sequencing)..11 Project Schedule Network DiagramProject Schedule Network Diagram

    See PDM and ADM, either one can be utilized forSee PDM and ADM, either one can be utilized fordeveloping the entire networkdeveloping the entire network

    ..22Activity list (updates)Activity list (updates)

    ..33Activity attributes (updates)Activity attributes (updates)

    ..44 Requested changesRequested changes Some changes to the activities may be requiredSome changes to the activities may be required

    during the process, they have to be documentedduring the process, they have to be documentedand approvedand approved

  • 8/8/2019 Pm Time Management

    19/78

    6.3Activities ResourceEstimating

    Inputs

    .1 Enterprise EnvironmentalFactors

    .2 Organizational Process assets

    .3Activity List

    .4Activities Attributes

    .5 Resource Availability

    .6 Project management Plan

    Tools & Techniques

    .1 Expert Judgment

    .2Alternative Analyses

    .3 Published Estimating Data

    .4 Project managementSoftware

    .5 Bottom-up Estimating

    Outputs

    .1Activity ResourceRequirements

    .2Activity attributes (updates)

    .3 Resource BreakdownStructure

    .4 Resource Calendar(updates)

    .5 Requested changes

  • 8/8/2019 Pm Time Management

    20/78

    Inputs, (Inputs, (Activities Resource Estimating)Activities Resource Estimating)

    ..11 Enterprise Environmental FactorsEnterprise Environmental Factors(Covered)(Covered)

    ..22 Organizational Process assets (Covered)Organizational Process assets (Covered)

    ..33Activity List (Covered)Activity List (Covered)

    ..44Activities Attributes (Covered)Activities Attributes (Covered)

    ..55 Resource Availability (Covered)Resource Availability (Covered)

    ..66 Project Management Plan (Covered)Project Management Plan (Covered)

  • 8/8/2019 Pm Time Management

    21/78

    Tools & Techniques, (Tools & Techniques, (ActivitiesActivities

    Resource Estimating)Resource Estimating)..11 Expert JudgmentExpert Judgment

    The experienced employees in the organization,The experienced employees in the organization,and out of the organization experts orand out of the organization experts or

    consultantsconsultants ..22Alternative AnalysesAlternative Analyses

    Explore different methods ofconstruction( Hand Tools vs.Explore different methods ofconstruction( Hand Tools vs.Machinery, Make or Buy decisions, resources skills, etc.)Machinery, Make or Buy decisions, resources skills, etc.)

    ..33 Published Estimating DataPublished Estimating Data There many information sources for unit cost,There many information sources for unit cost,

    production rates, laborcost, etc. Means is anproduction rates, laborcost, etc. Means is anexampleexample

  • 8/8/2019 Pm Time Management

    22/78

    Tools & Techniques, (Tools & Techniques, (ActivitiesActivities

    Resource Estimating)Resource Estimating)..44 Project Management SoftwareProject Management Software

    There are several software packages that areThere are several software packages that arecustomized for project management use such as;customized for project management use such as;

    Microsoft Scheduler, Primavera, etc.Microsoft Scheduler, Primavera, etc...55 BottomBottom--up Estimatingup Estimating

    We can get better estimates when the scheduledWe can get better estimates when the scheduledactivities broken down to lower levels. It allowsactivities broken down to lower levels. It allowsus to estimate each activity resourcesus to estimate each activity resourcesrequirements separately, then we can aggregaterequirements separately, then we can aggregatethe estimates into a total estimate. Its a usefulthe estimates into a total estimate. Its a usefulmethod for large scale projectsmethod for large scale projects

  • 8/8/2019 Pm Time Management

    23/78

    Outputs,Outputs, (Activities Resource(Activities Resource

    Estimating)Estimating)..11Activity Resource RequirementsActivity Resource Requirements

    Identification and description of the types and quantities ofIdentification and description of the types and quantities ofresources required for each scheduled activity in a workresources required for each scheduled activity in a workpackagepackage

    ..22Activity attributes (updates)Activity attributes (updates)

    ..33 Resource Breakdown Structure (RBS)Resource Breakdown Structure (RBS) A hierarchical structure of the identified resources byA hierarchical structure of the identified resources by

    resource category and typeresource category and type

    ..44 Resource Calendar(updates)Resource Calendar(updates) Working days and nonWorking days and non--working days for each type ofworking days for each type ofresource and availability periodsresource and availability periods

    ..55 Requested changesRequested changes

  • 8/8/2019 Pm Time Management

    24/78

    6.4Activities DurationEstimating

    Inputs

    .1 Enterprise Environmental Factors

    .2 Organizational Process assets

    .3 Project Scope Statement

    .4Activity list

    .5Activity Attributes

    .6Activity Resources Requirements

    .7 Resource Calendar

    .8 Project Management Plan. Risk Register.Activity Cost Estimates

    Tools & Techniques

    .1 Expert Judgment

    .2Analogous Estimating

    .3 Parametric Estimating

    .4 Three-Point Estimates

    .5 Reserve Analysis

    Outputs

    .1Activity Duration Estimates

    .2Activity Attributes (updates)

  • 8/8/2019 Pm Time Management

    25/78

    Inputs,Inputs, (Activities Duration Estimating)(Activities Duration Estimating)

    ..11 Enterprise Environmental Factors (Covered)Enterprise Environmental Factors (Covered)

    ..22 Organizational Process assets (Covered)Organizational Process assets (Covered)

    ..33 Project Scope Statement (Covered)Project Scope Statement (Covered)

    ..44Activity list (Covered)Activity list (Covered)

    ..55Activity Attributes (Covered)Activity Attributes (Covered)

    ..66Activity Resources requirements (Covered)Activity Resources requirements (Covered)

    ..77 Resource Calendar(Covered)Resource Calendar(Covered)

  • 8/8/2019 Pm Time Management

    26/78

    Inputs,Inputs, (Activities Duration Estimating)(Activities Duration Estimating)

    ..88 Project Management PlanProject Management Plan Risk Register:Risk Register: has information on identifiedhas information on identified

    project risks that the project team will considerproject risks that the project team will considerwhen producing estimates of activity durationswhen producing estimates of activity durationsand adjusting those duration for risks.and adjusting those duration for risks.

    Activity Cost Estimates:Activity Cost Estimates: sufficient detailssufficient detailsabout estimated resources quantities for eachabout estimated resources quantities for each

    schedule activity.schedule activity.

  • 8/8/2019 Pm Time Management

    27/78

    Tools & Techniques,Tools & Techniques, (Activities(Activities

    Duration Estimating)Duration Estimating)..11 Expert JudgmentExpert Judgment

    ..22Analogous EstimatingAnalogous Estimating

    Using the actual duration of a previous similarUsing the actual duration of a previous similarscheduled activity as the estimate of a futurescheduled activity as the estimate of a futurescheduled activity. Used when limitedscheduled activity. Used when limitedinformation about the project is availableinformation about the project is available

    ..33 Parametric EstimatingParametric Estimating A quantitative estimate, determined byA quantitative estimate, determined by

    multiplying the quantity of work by themultiplying the quantity of work by theproductivity rateproductivity rate

  • 8/8/2019 Pm Time Management

    28/78

    Tools & Techniques,Tools & Techniques, (Activities(Activities

    Duration Estimating)Duration Estimating)..44 ThreeThree--Point EstimatesPoint Estimates

    Mathematical calculation of the durationMathematical calculation of the durationestimate, considering the amount of risk in theestimate, considering the amount of risk in theoriginal estimate. Expected duration is obtainedoriginal estimate. Expected duration is obtained

    by Pert Formulaby Pert Formula

    Expected Duration = (P+Expected Duration = (P+44M+O)/M+O)/66Standard Deviation PerActivity (SD) = (PStandard Deviation PerActivity (SD) = (P--O)/O)/66Pert Variance = [(PPert Variance = [(P--O)/O)/66]]

    Most Likely Duration (M), Optimistic Duration (O),Most Likely Duration (M), Optimistic Duration (O),Pessimistic Duration (P)Pessimistic Duration (P)

  • 8/8/2019 Pm Time Management

    29/78

    Tools & Techniques,Tools & Techniques, (Activities(ActivitiesDuration Estimating)Duration Estimating)

    ..55 Reserve Analysis (Critical chainReserve Analysis (Critical chainmanagement)management)

    additional time is allocated into the overalladditional time is allocated into the overallproject schedule as contingency reserve,project schedule as contingency reserve, timetimereserve or buffers.reserve or buffers. Usually determined as aUsually determined as apercentage of the estimated activity duration, orpercentage of the estimated activity duration, orcan be obtained by risk analysiscan be obtained by risk analysis

  • 8/8/2019 Pm Time Management

    30/78

    Outputs,Outputs, (Activities Duration(Activities DurationEstimating)Estimating)

    ..11Activity Duration EstimatesActivity Duration Estimates A quantitative assessment of the likely number ofA quantitative assessment of the likely number of

    work periods that will be required to complete awork periods that will be required to complete a

    scheduled activityscheduled activity

    ..22Activity Attributes (updates)Activity Attributes (updates) updates include activity duration, assumptions,updates include activity duration, assumptions,

    and contingency reservesand contingency reserves

  • 8/8/2019 Pm Time Management

    31/78

    6.5 Schedule Development

    Inputs

    .1 Organizational Process assets

    .2 Project Scope Statement

    .3 Activity list

    .4 Activity Attributes

    .5 Project Schedule Network Diagram

    .6 Activity Resources Requirements

    .7 Resource Calendar

    .8 Activity Duration Estimates

    .9 Project Management Plan

    . Risk Register

    Tools & Techniques

    .1 Schedule Network Analysis

    .2 Critical Path Method

    .3 Schedule Compression

    .4 What-If Scenario Analysis

    .5 Resource Leveling

    .6 Critical Chain Method

    .7 Project Management Software

    .8 Applying Calendars

    .9 Adjusting Leads and Lags

    .10 Schedule Model

    Outputs

    .1 Project Schedule

    .2 Schedule Model Data

    .3 Schedule Baseline

    .4 Resource requirements (updates)

    .5 Activity Attributes (updates)

    .6 Project Calendar (updates)

    .7 Requested Changes

    .8 Project Management Plan (updates)

    . Schedule Management Plan (updates)

  • 8/8/2019 Pm Time Management

    32/78

    Inputs,Inputs, (Schedule(Schedule

    Development)Development)..11 Organizational Process Assets (Covered)Organizational Process Assets (Covered)..22 Project Scope Statement (Assumptions andProject Scope Statement (Assumptions and

    Constraints)Constraints)..33Activity list (Covered)Activity list (Covered)

    ..44Activity Attributes (Covered)Activity Attributes (Covered)

    ..55 Project Schedule Network Diagram (Covered)Project Schedule Network Diagram (Covered)

    ..66Activity Resources Requirements (Covered)Activity Resources Requirements (Covered)

    ..77 Resource Calendar(Covered)Resource Calendar(Covered)

    ..88Activity Duration Estimates (Covered)Activity Duration Estimates (Covered)..99 Project Management Plan (Identified Risks and RiskProject Management Plan (Identified Risks and RiskResponse Plan, will be covered in Project RiskResponse Plan, will be covered in Project RiskManagement)Management)

  • 8/8/2019 Pm Time Management

    33/78

    Tools & TechniquesTools & Techniques,, (Schedule(ScheduleDevelopment)Development)

    ..11 Schedule Network AnalysisSchedule Network Analysis Several techniques can be utilized for the Network Analysis.Several techniques can be utilized for the Network Analysis.

    (See Below)(See Below)

    ..22 Critical Path MethodCritical Path Method Used to determine the amount of schedule Float on variousUsed to determine the amount of schedule Float on various

    logical network paths, and to determine the minimum total projectlogical network paths, and to determine the minimum total projectduration.And, to calculate the activities and project Float by theduration.And, to calculate the activities and project Float by theforward pass and backward pass.(Total Float and Free Float)forward pass and backward pass.(Total Float and Free Float)

    ..33 Schedule CompressionSchedule Compression it shortens the project schedule without changing the projectit shortens the project schedule without changing the project

    scopescope Crashing:Crashing: cost and schedule tradeoffs are analyzed to obtaincost and schedule tradeoffs are analyzed to obtain

    the greatest amount ofcompression for the least incrementalthe greatest amount ofcompression for the least incrementalcost. Usuallycost. Usually more resourcemore resource will be requiredwill be required

    Fast Tracking:Fast Tracking: activities are performed inactivities are performed in parallelparallel instead of ininstead of insequence. Usually Risk will increasesequence. Usually Risk will increase

  • 8/8/2019 Pm Time Management

    34/78

    Tools & TechniquesTools & Techniques,, (Schedule(ScheduleDevelopment)Development)

    ..44 WhatWhat--If Scenario AnalysisIf Scenario Analysis

    A schedule Network analysis utilizingA schedule Network analysis utilizingdifferent scenariosdifferent scenariosMonte Carlo Analysis:Monte Carlo Analysis: A techniques thatA techniques that

    computes, or iterates, the project cost orcomputes, or iterates, the project cost orproject schedule many times using inputproject schedule many times using inputvalues selected at random from probabilityvalues selected at random from probabilitydistribution of possible costs or durations,distribution of possible costs or durations,to calculate a distribution of possible totalto calculate a distribution of possible totalcost orcompletion datescost orcompletion dates

  • 8/8/2019 Pm Time Management

    35/78

    Tools & TechniquesTools & Techniques,, (Schedule(ScheduleDevelopment)Development)

    ..55 Resource LevelingResource Leveling Scheduling decisions are driven by recourses constraintsScheduling decisions are driven by recourses constraints

    (i.e. limited resources availability). It produces a resources(i.e. limited resources availability). It produces a resources--limited schedulelimited schedule

    ..66 Critical Chain MethodCritical Chain Method a technique that modifies the project schedule to accounta technique that modifies the project schedule to account

    for limited resources. It mixes deterministic andfor limited resources. It mixes deterministic andrealistic approaches to schedule network analysisrealistic approaches to schedule network analysis

    ..77 Project Management SoftwareProject Management Software Several software packages are available for scheduleSeveral software packages are available for schedule

    development (i.e. Primavera, Microsoft Project, etc.)development (i.e. Primavera, Microsoft Project, etc.)

  • 8/8/2019 Pm Time Management

    36/78

    Tools & TechniquesTools & Techniques,, (Schedule(ScheduleDevelopment)Development)

    ..88Applying Calendars (Discussed)Applying Calendars (Discussed)

    ..99Adjusting Leads and LagsAdjusting Leads and Lags

    Adjust of leads and lags to develop a viableAdjust of leads and lags to develop a viablescheduleschedule

    ..1010 Schedule ModelSchedule Model schedule data and information are compiled intoschedule data and information are compiled into

    the schedule model for the project (Bar Chartthe schedule model for the project (Bar ChartSchedule).Barchart is known also as GanttSchedule).Barchart is known also as Ganttchart.example in sheet nochart.example in sheet no 3838

  • 8/8/2019 Pm Time Management

    37/78

    Outputs,Outputs, (Schedule(Schedule

    Development)Development)

    ..11 Project ScheduleProject Schedule

    It contains project schedule network diagram, barcharts,It contains project schedule network diagram, barcharts,and milestone chartsand milestone charts

    ..22 Schedule Model Data(updates)Schedule Model Data(updates)

  • 8/8/2019 Pm Time Management

    38/78

  • 8/8/2019 Pm Time Management

    39/78

    Outputs,Outputs, (Schedule(Schedule

    Development)Development)..33 Schedule BaselineSchedule Baseline A specific version of the schedule that isA specific version of the schedule that is

    approved by the project team as the baseline,approved by the project team as the baseline,

    and project progress is measured against itand project progress is measured against it..44 Resource requirements (updates)Resource requirements (updates)

    ..55Activity Attributes (updates)Activity Attributes (updates)

    ..66 Project Calendar(updates)Project Calendar(updates)

    ..77 Requested Changes (Covered)Requested Changes (Covered)

    ..88 Project Management Plan (updates)Project Management Plan (updates) Schedule Management Plan (updates)Schedule Management Plan (updates)

  • 8/8/2019 Pm Time Management

    40/78

    6.6 Schedule Control

    Inputs

    .1 Schedule Management Plan

    .2 Schedule Baseline

    .3 Performance Reports

    .4 Approved Change Requests

    Tools & Techniques

    .1 Progress reporting

    .2 Schedule Change Control System

    .4 Project Management Software

    .5 Variance analysis

    .6 Schedule Comparison Bar Charts

    Outputs

    .1 Schedule Model Data (updates)

    .2 Schedule Baseline (updates).3 Performance Measurements

    .4 Requested Changes

    .5 Recommended Corrective Actions

    .6 Organizational Process Assets

    (updates)

    .7 Activity List (updates)

    .8 Activity Attributes

    .9 Project Management Plan

  • 8/8/2019 Pm Time Management

    41/78

    Inputs,Inputs, ((Schedule Control)Schedule Control)

    ..11 Schedule Management Plan (Covered)Schedule Management Plan (Covered)

    ..22 Schedule BaselineSchedule Baseline

    Approved Project Schedule (Covered)Approved Project Schedule (Covered)..33 Performance ReportsPerformance Reports

    Schedule variance (Schedule variance (SVSV) and schedule) and scheduleperformance index (performance index (SPISPI) are utilized as a) are utilized as a

    performance measurement technique, andperformance measurement technique, andnecessary actions are taken accordinglynecessary actions are taken accordingly

    ..44Approved Change Requests (Covered)Approved Change Requests (Covered)

  • 8/8/2019 Pm Time Management

    42/78

    Tools & Techniques,Tools & Techniques, (Schedule(Schedule

    Control)Control) ..11 Progress reportingProgress reporting

    Utilizes Earned value analysis, and templates are createdUtilizes Earned value analysis, and templates are createdfor reportingfor reporting

    ..22 Schedule Change Control SystemSchedule Change Control System The system defines the procedure by which the scheduleThe system defines the procedure by which the schedulecan be changed, and its part of the Integrated Changecan be changed, and its part of the Integrated ChangeControl processControl process

    ..33 Performance MeasurementsPerformance Measurements

    Utilize Schedule Variance (SV) and Schedule PerformanceUtilize Schedule Variance (SV) and Schedule PerformanceIndex (SPI) to asses the schedule variations.A delay in anIndex (SPI) to asses the schedule variations.A delay in anactivity on the critical path will delay the project, andactivity on the critical path will delay the project, andcorrective action is requiredcorrective action is required

  • 8/8/2019 Pm Time Management

    43/78

    Tools & Techniques,Tools & Techniques, (Schedule(Schedule

    Control)Control) ..44 Project Management SoftwareProject Management Software

    ..55 Variance AnalysisVariance Analysis

    A key function for schedule control, it comparesA key function for schedule control, it comparesthe current progress with the baseline (target)the current progress with the baseline (target)

    ..66 Schedule Comparison Bar ChartSchedule Comparison Bar Chart This techniques allows us to see the currentThis techniques allows us to see the current

    schedule and the target on the top of each otherschedule and the target on the top of each otherin the Bar Chart Schedule, and allows us toin the Bar Chart Schedule, and allows us tographically see the progress against the plangraphically see the progress against the plan

  • 8/8/2019 Pm Time Management

    44/78

    ..11 Schedule Model Data (updatesSchedule Model Data (updates Any modification to the schedule will be reported andAny modification to the schedule will be reported and

    related document get updated as well as concernedrelated document get updated as well as concernedstakeholderstakeholder

    ..22 Schedule Baseline (updates)Schedule Baseline (updates) When the schedule get revised orchanged, the baseline isWhen the schedule get revised orchanged, the baseline is

    changed accordingly after updating itchanged accordingly after updating it

    ..33 Performance MeasurementsPerformance Measurements

    The SV and SPI get documented and communicatedThe SV and SPI get documented and communicated..44 Requested ChangesRequested Changes

    Performing the progress analyses may result in schedulePerforming the progress analyses may result in schedulechangeschanges

    Outputs, (Schedule Control)Outputs, (Schedule Control)

  • 8/8/2019 Pm Time Management

    45/78

    Outputs, (Schedule Control)Outputs, (Schedule Control)

    ..55 Recommended Corrective ActionsRecommended Corrective Actions Any future action that is expected to bring theAny future action that is expected to bring the

    schedule in line with the approved baselineschedule in line with the approved baseline

    (expediting, corrective actions)(expediting, corrective actions)..66 Organizational Process AssetsOrganizational Process Assets

    (Covered)(Covered)

    ..77Activity List (updates)Activity List (updates)

    ..88Activity Attributes (updates)Activity Attributes (updates)

    ..99 Project Management Plan (updates)Project Management Plan (updates)

  • 8/8/2019 Pm Time Management

    46/78

    1 . Define the Work

    Contract Budget Base

    MGT Reserve

    2. Schedule the Work $

    PM BASELINE

    3. Allocate Budgets Time

    100

    40

    80

    15

    20

    35

  • 8/8/2019 Pm Time Management

    47/78

    WBS

    OST OU T

    Budg t No. 1400

    Workkages

    20

    lanning

  • 8/8/2019 Pm Time Management

    48/78

    WBS

    ELEMENT

    Organization

    WORK

    PACKAGES

    WORK PACKAGE

    WP No: ORG. No:

    TASK DESCRIPTION:

    Schedule: Start: Finish:

    Budget Amount:

  • 8/8/2019 Pm Time Management

    49/78

    y Budget for 3 work packages scheduled to be accomplished - 28

    y Budget for 1 work package scheduled to be in-process - 6BCWS- 34

    BU ETE T HE ULE (B )

    6 T U T BU ET 100

    8

    14

    12

    12

    B 34 10

  • 8/8/2019 Pm Time Management

    50/78

    y Budg fo 2 wo kp k g sch du d co p d - 14

    y Budg fo 3 wo kp ck g s sch du d in-p ocess - 19

    BCWP - 33

    BUDG D COS OF WORK SC DULED BCWS

    6 COS ACCOUN BUDGET: 100

    8

    14

    12

    12

    BCWS : 34 10BCWP : 33

    VARIANCE : -1

  • 8/8/2019 Pm Time Management

    51/78

    BUDGETED COST

    FOR WORK 34

    SCHEDU ED

    BCWS SC EDULE

    VARIANCE

    BUDGETED COST

    FOR WORK 33PERFORMED

    BCWP COST

    VARIANCE

    ACTUAL COST

    FORWORK 35PERFORMED

    ACWP

  • 8/8/2019 Pm Time Management

    52/78

    Material Costs

    Material Order

    Material Received Ordered

    Invoices Paid $ Received

    Withdrawn from Stores Used

    Material Consumed

    TIME

  • 8/8/2019 Pm Time Management

    53/78

    ANALYSIS

    DEVELOP ESTIMATED COSTS AT COMPLETION

    ESTIMATED COST AT COMPLETION

    % COST EAC % COST

    110REPORT DATE ACV

    110

    BAC BUDGET AT COMPLETION FORECAST OVERRUN

    100 100

    ACWP

    50 BCWS 50

    BASE LINE

    BCWP

    EARNED VALUE TIME OVERRUN

    0 6 12

    TIME

    RECONCILE EAC WITH STATEMENT OF FUNDS REQUIRED

  • 8/8/2019 Pm Time Management

    54/78

    A KEY MANAGEMENT CONTROL POINT

    y FUNCTIONAL RESPONSIBILITY

    y WORK PLANNING AND ASSIGNMENT

    y COST COLLECTION

    y BCWS-BCWP DETERMINATIONy VARIANCE ANALYSIS

    y COST ELEMENT DELINEATION

    y CORRECTIVE ACTION

    y DATA SUMMARIZATION WBS/FUNCTIONAL

  • 8/8/2019 Pm Time Management

    55/78

    CSCSCBE E IT

    S

    1. CO I E CE I CO T CTO S I TE L

    M GEME T SYSTEM

    2. OBJECTI E CO T CT ST TUS I O M TIO

    3. COST IM CT O K OW OBLEMS

    4. I E TI ICATIO O OBLEMS OT E IOUSLY

    ECOG IZE

    5. CAPABILITY TO T ACE PROBLEMS TO SOURCE

    6. QUANTITATI E MEASURE O SCHE ULE E IATION IN

    OLLARS

    7. MEASUREMENT AGAINST ACONTRACT ORIENTE

    BASELINE

  • 8/8/2019 Pm Time Management

    56/78

    ExamplesExamples

  • 8/8/2019 Pm Time Management

    57/78

    Question #Question # 11

    The critical path in a schedule networkThe critical path in a schedule networkis the path that:is the path that:

    AA-- Takes the longest time to completeTakes the longest time to complete

    BB-- Must be done before any other tasksMust be done before any other tasksCC-- Allows some flexibility in scheduling a startAllows some flexibility in scheduling a start

    timetimeDD-- Is not affected by schedule slippageIs not affected by schedule slippage

    EE-- All the aboveAll the aboveA: Is the longest path with no floatA: Is the longest path with no float

  • 8/8/2019 Pm Time Management

    58/78

    Question #Question # 22

    The first step in building a PERT/CPMThe first step in building a PERT/CPMnetwork is to:network is to:

    AA-- Create a flow ChartCreate a flow ChartBB-- Determine the critical pathDetermine the critical path

    CC-- Show task relationshipsShow task relationships

    DD-- Create a work break down structureCreate a work break down structure

    EE-- None of the aboveNone of the aboveDD: Create: Create a WBSa WBS

  • 8/8/2019 Pm Time Management

    59/78

    Question #Question # 33

    Resource leveling will often make theResource leveling will often make theproject:project:

    AA-- ShorterShorterBB-- LongerLonger

    CC-- More responsive to needsMore responsive to needs

    DD-- A & CA & C

    EE-- B & CB & CAA: Longer: Longer

  • 8/8/2019 Pm Time Management

    60/78

    Question #Question # 44

    A plan has budgeted three weeks ofA plan has budgeted three weeks ofconsultant effort, but the job was done in twoconsultant effort, but the job was done in twoweeks, calculate the variance:weeks, calculate the variance:

    AA-- 11..55%%

    BB-- 3333%%CC-- 7575%%DD-- 6767%%EE-- None of the aboveNone of the above

    Schedule Variance = BCWPSchedule Variance = BCWP BCWSBCWS== 33 wkswks 22 wks =wks = 11 wkwk

    % variance =% variance = 11wk /wk /33 wks =wks = 3333%%B:B:3333%%

  • 8/8/2019 Pm Time Management

    61/78

    Question #Question # 55

    On DecemberOn December2323, $, $10001000 worth of task A wasworth of task A wassupposed to be done (BCWS); however, the earnedsupposed to be done (BCWS); however, the earnedvalue was $value was $850850. Calculate the schedule variance:. Calculate the schedule variance:

    AA-- --$$100100

    BB-- $$100100CC-- --$$150150DD-- $$150150EE-- 8585%%

    Schedule Variance = BCWPSchedule Variance = BCWP BCWSBCWS

    = $= $850850 $$10001000 == --$$150150

    C:C: --$$150150

  • 8/8/2019 Pm Time Management

    62/78

    Question #Question # 66

    Fast tracking means to:Fast tracking means to:

    AA-- SpeedSpeed--up the project through parallel tasksup the project through parallel tasksBB-- Swap one task for anotherSwap one task for anotherCC-- Reduce the number of tasks if possibleReduce the number of tasks if possibleDD-- B & CB & CEE-- A & BA & B

    AA:Accelerate schedule through:Accelerate schedule throughcarrying tasks in parallelcarrying tasks in parallel

  • 8/8/2019 Pm Time Management

    63/78

    Question #Question # 77

    How long will the shown project takes to complete:How long will the shown project takes to complete:

    AA-- 1010 daysdaysBB-- 1111 daysdaysCC-- 1212 daysdays

    DD-- 1313 daysdaysEE-- 1414 daysdays

    The critical path = TaskThe critical path = Task 11--44++ DummyDummy ++ TaskTask 33--66== 88 ++ 66 == 1414 daysdays

    E:E:1414 daysdays

    1

    2

    4

    3

    5

    63d

    3d6d

    8d3d

    2d

  • 8/8/2019 Pm Time Management

    64/78

    FORWARD PASS

    Question #Question # 77

  • 8/8/2019 Pm Time Management

    65/78

    BACKWARD PASS

    Question #Question # 77

  • 8/8/2019 Pm Time Management

    66/78

    Question #Question # 88

    ActivityActivity 33--66 reduced toreduced to 55 days; how long will theprojectdays; how long will theprojecttakes to complete,and name the criticalpath:takes to complete,and name the criticalpath:

    AA-- 1010 daysdaysBB-- 1111 daysdaysCC-- 1212 daysdays

    DD-- 1313 daysdaysEE-- 1414 daysdays

    The critical pathThe critical path 11 = Task= Task 11--44 + Dummy + Task+ Dummy + Task 33--66 == 88++55 == 1313The critical pathThe critical path 22 = Task= Task 11--44 + Task+ Task 44--55 + Task+ Task 55--66 == 88 ++ 33 ++ 22 == 1313

    D:D:1313 daysdays

    1

    2

    4

    3

    5

    63d

    3d 5d

    8d3d

    2d

  • 8/8/2019 Pm Time Management

    67/78

    FORWARD PASS

    Question #Question # 88

  • 8/8/2019 Pm Time Management

    68/78

    BACKWARD PASS

    Question #Question # 88

  • 8/8/2019 Pm Time Management

    69/78

    HOW MANY PATHSARE THERE?

    Question #Question # 99

  • 8/8/2019 Pm Time Management

    70/78

    WHAT IS THE LENGTHOF THECP?

    FORWARD PASS.

    Question #Question # 1010

  • 8/8/2019 Pm Time Management

    71/78

    WHAT IS THE LENGTHOF THECP?

    BACKWARD PASS.

    Question #Question #1010

  • 8/8/2019 Pm Time Management

    72/78

    WHAT IS THEEXPECTEDFINISHDATE?

    Question #Question # 1111

  • 8/8/2019 Pm Time Management

    73/78

    WHAT IS THEFLOATFORACTIVITYC?

    Question #Question # 1212

  • 8/8/2019 Pm Time Management

    74/78

    WHAT IS THE LATEFINISHFORACTIVITYE?

    Question #Question # 1313

  • 8/8/2019 Pm Time Management

    75/78

    IF THERE ISAN IMPOSEDDATEFORFINISHING THE PROJECT IN 25 DAYS,WHAT IS THE TOTAL FLOATOF THIS

    PLAN?

    Question #Question # 1414

  • 8/8/2019 Pm Time Management

    76/78

    WHENWILL ACTIVITY CFINISH?

    ACT TYACT TY DURAT NDURAT N SUCCESSORSUCCESSOR R ELAT ONSH PRELAT ONSH P LEADLEAD LAGLAG

    AA 55 BB FSFS 22

    BB 77 CC FSFS 44

    CC 66

    Question #Question # 1515

    A.ENDOFDAY 19B

    .ENDOFDAY 20.C.ENDOFDAY 16D.ENDOFDAY 18

  • 8/8/2019 Pm Time Management

    77/78

    GRAPHICAL SOLUTION

    A.ENDOFDAY 19B.ENDOFDAY 20.C.ENDOFDAY 16D.

    END

    OF

    DAY

    18

    ACT TYACT TY DURAT ONDURAT ON SUCCESSORSUCCESSOR R ELAT ONSH PRELAT ONSH P LEADLEAD LAGLAG

    AA 55 BB FSFS 22

    BB 77 CC FSFS 44

    CC 66

  • 8/8/2019 Pm Time Management

    78/78

    Q & AQ & A