What i s reso ur ce m anag e m e nt ? Re source M anag e ment is using re source s e fficiently and e ffe ctive ly. While we talk of efficiency, we have some sort of input: output ratio in our mind. Supposing in yar n ma king, a 1 0% was te is norma l. I f we have 100 kg o f cotton, we can pr oduce 90 kg o f yar n, 10 kg be ing the norma l was te. I f we c an produce 91 kg o f yar n from 10 0 kg of cotton, we w ould be c onsidere d e fficie nt for having re duce d the wa stag e to 9%. Also , we would be co nside re d e ffi cient, if weuse only 99 kg o f co tton for producing 9 0 kg of  yarn.  To sum up, e ffic ie ncy is h av in g more ou t put fo r t h e same in pu t o r le ss in put fo r t h e same output. T he n wha t is e ff e ctivene ss ? I t is a cc e ptabil ity, use ful ness or suitability fr om the use rs or m arke t point of vie w. An ove rhead bridge ma y be cons tr ucted mo st e conom icall y and in record time. But it may not be effective, if few people make its use because they find an alternate route much convenient. What are Re so urce M ana g e ment Te chnique s? When we come to tec hnique s, we would once ag ain restrict ourse lve s to: R e source L oading and Re so urce L eve ling as follow s:  WHAT I S RES OU RCE L OAD ING? While making a budg et, we e stimate d “Cos t & Quantity” of e ach res ource . I f wewant to add a r oom to our pr e se nt se tup in the university, we e stim ate how m uch mone y, me n, materials and machines would be required. We would further estimate cost of furniture and gadgets for the room such as white-board, multimedia, clock, air-conditioners and tube- lights.  “R e so urceL oading” i s assigning re so urce s to ac tivitie s. I t i s the sa m e as budg e t but broke n down in terms of activities like (a) get approval of building extension, (b) lay foundations, (c) build super-structure, (d) put on a roof, (e) plaster the walls and (g) complete finishing.  The mone y , men, ma te rials and machines, as g iven in th e bud g et, w ould be re-distributed in terms of activities.  To sum up, “Re source L oa d in g is t h e process o f ass ig n in g resources fo r eac h an d eve ry ac tivity re quir e d for the proje ct.  WHAT IS RESOU RCE L EVELING? Re so urcele ve ling is a so rt of adjustme nt. I f reso urce s a re provide d as pe r sc hedule , there would be no ne e d for re source le ve ling. But whe n there is a mism atch be twe e n what is required and what is made available, we need to give priority to some activities, postpone

Transcript of PM 02-04-2012.pdf

Page 1: PM 02-04-2012.pdf

7/28/2019 PM 02-04-2012.pdf

http://slidepdf.com/reader/full/pm-02-04-2012pdf 1/9

What is resource management?

Resource Management is using resources efficiently and effectively.

While we talk of efficiency, we have some sort of input: output ratio in our mind.

Supposing in yarn making, a 10% waste is normal. If we have 100 kg of cotton, we canproduce 90 kg of yarn, 10 kg being the normal waste. If we can produce 91 kg of yarn from100 kg of cotton, we would be considered efficient for having reduced the wastage to 9%.Also, we would be considered efficient, if we use only 99 kg of cotton for producing 90kg of yarn.

 To sum up, efficiency is having more output for the same input or less input for the sameoutput. Then what is effectiveness? I t is acceptability, usefulness or suitability from theusers or market point of view. An overhead bridge may be constructed most economicallyand in record time. But it may not be effective, if few people make its use because they findan alternate route much convenient. What are Resource Management Techniques?

When we come to techniques, we would once again restrict ourselves to: Resource Loadingand Resource Leveling as follows: WHAT IS RESOURCE LOADING?

While making a budget, we estimated “Cost & Quantity” of each resource. I f we want toadd a room to our present setup in the university, we estimate how much money, men,

materials and machines would be required. We would further estimate cost of furnitureand gadgets for the room such as white-board, multimedia, clock, air-conditioners andtube- lights. “Resource Loading” is assigning resources to activities. It is the same as budget but brokendown in terms of activities like (a) get approval of building extension, (b) lay foundations,(c) build super-structure, (d) put on a roof, (e) plaster the walls and (g) complete finishing. The money, men, materials and machines, as given in the budget, would be re-distributedin terms of activities.

 To sum up, “Resource Loading” is the process of assigning resources for each and every

activity required for the project. WHAT IS RESOURCE LEVEL ING?

Resource leveling is a sort of adjustment. I f resources are provided as per schedule, therewould be no need for resource leveling. But when there is a mismatch between what isrequired and what is made available, we need to give priority to some activities, postpone

Page 2: PM 02-04-2012.pdf

7/28/2019 PM 02-04-2012.pdf

http://slidepdf.com/reader/full/pm-02-04-2012pdf 2/9

some acprojectactivitiegiven be

A qu

 J ust a c

two worwould ewe needwould d

 

ivities or dithin the swithin ma

low: 

stion?

rsory glan

kers each dceed the ato find outraw a Gant

the job iname cost argin or sla

e on the q

ay. Beforeailability.which actit Chart as

small lots.d time conks availabl

estion wou

B finishes,o we needities are crollows:

he ultimatraints. Fo. Let us fi

ld reveal th

C & D wousome re-scitical and

e objectiver this purprst take an

at activity

ld also stareduling. Bhich are n

would be tse, we slipxample of 

has five d

t and laborefore, we ct. For this

o completeor split theSlipping as

ays and ne

requiremen attemptpurpose, w

the

ds

tsit,e

Page 3: PM 02-04-2012.pdf

7/28/2019 PM 02-04-2012.pdf

http://slidepdf.com/reader/full/pm-02-04-2012pdf 3/9

 

We obs

total dufollowin

It is evi

last day,level or

Obvioushift womovingas there

rve that B

ation beyog picture: 

ent that on

two workemooth out

ly, activitield affect swould no

is free floa

E activiti

nd seven da

third day,

rs would bthe excesse

s B & E caart of linket make anyfor the sa

es are on t

ys. We ma

we would e

surplus. If s and short

not be mod activitiesdifference.e period.

e critical p

k them re

perience s

we can mages. 

ed. MovinC & D. Ev This leaveut it woul

th. Movin

. We can

hortage of 

ke necessa

A wouldn if thereC & D. Wresult in i

 

g them wo

ow insert l

wo worker

y adjustm

ot solve thas no such

e can movecrease of l

ld increas

bor and g

 

while on t

nt, we wou

problem alinkage,C for twobor

the

t the

he

ld

s its

ays

Page 4: PM 02-04-2012.pdf

7/28/2019 PM 02-04-2012.pdf

http://slidepdf.com/reader/full/pm-02-04-2012pdf 4/9

requireGantt C

 

ent for thhart would

subsequenappear as

t period. Sollows: 

moving D for one da is cure-all. The revis

 

d

Page 5: PM 02-04-2012.pdf

7/28/2019 PM 02-04-2012.pdf

http://slidepdf.com/reader/full/pm-02-04-2012pdf 5/9

Wha

In slippiIn splittidays, it

row. If any macan arrcushion

A Q

 The follavailabl

 

is Slip

ng, an acting, an actian only be

ant to traners. Whilnge their tavailable. 

ESTIO

wing charagainst n

ing an

ity is moveity wouldslipped to

sport say toriginally,

ansportati

N ON

shows: (i)n-critical a

 

Splitti

to anothee broken iome other

enty packthese packn in two o

PLITT

Resource Lctivities. 

ng?

r day. In otto small pates but w

ges to a faages werethree or f 

ING?

oading, (ii)

her words,rts. If therould be car

r-off place,o be transur lots dep

Critical A

it is postpoe is a seminried out fo

we can traorted on thending upo

tivities and

ned or skipar for threthree day

sport thee same dayn the slack

(iii) Slack

ped.

in a

in, weor

Page 6: PM 02-04-2012.pdf

7/28/2019 PM 02-04-2012.pdf

http://slidepdf.com/reader/full/pm-02-04-2012pdf 6/9

RES

 We canthe follo

LEV

 

URCE

easily splitwin :

LED

LOAD

activities U

 

ING

& X withi the available slack a would be bserved fr

 

m

Page 7: PM 02-04-2012.pdf

7/28/2019 PM 02-04-2012.pdf

http://slidepdf.com/reader/full/pm-02-04-2012pdf 7/9

A tri ky que tion

Page 8: PM 02-04-2012.pdf

7/28/2019 PM 02-04-2012.pdf

http://slidepdf.com/reader/full/pm-02-04-2012pdf 8/9

SOL

Both reone case

Duratioproject

 TION

ource loadithe activit

). Please nithin the

ng and levhad to be

te there caiven time t

ling chartsdjusted wi

n many solrough a lo

are giventhin its Tot

ution not jical adjus

elow: It wal Float (L

st one. Thment. 

uld be obste Finish -

aim is to

rved that iEarly Star

omplete th

n-

Page 9: PM 02-04-2012.pdf

7/28/2019 PM 02-04-2012.pdf

http://slidepdf.com/reader/full/pm-02-04-2012pdf 9/9