PLTU 2 x 3 MW NIAS SELATAN

26
PLTU 2 x PLTU 2 x 3 3 MW MW NIAS SELATAN NIAS SELATAN SITE SELECTION SITE SELECTION with with PLN CABANG NIAS and PLN Enjiniring PLN CABANG NIAS and PLN Enjiniring 1 1 6 6 -2 -2 0 0 March March 2010 2010

description

PLTU 2 x 3 MW NIAS SELATAN. SITE SELECTION with PLN CABANG NIAS and PLN Enjiniring 1 6 -2 0 March 2010. Peta GPS PULAU NIAS. LOKASI IPP PLTU NIAS 2x7 MW. FOTO LOKASI IPP PLTU NIAS 2x7 MW GUNUNG SITOLI UTARA. LOKASI 1 PLTU NIAS SELATAN 2x3 MW. LOKASI 2 - PowerPoint PPT Presentation

Transcript of PLTU 2 x 3 MW NIAS SELATAN

Page 1: PLTU 2 x  3  MW NIAS SELATAN

PLTU 2 x PLTU 2 x 33 MW MWNIAS SELATANNIAS SELATAN

SITE SELECTIONSITE SELECTION withwith

PLN CABANG NIAS and PLN EnjiniringPLN CABANG NIAS and PLN Enjiniring

1166-2-200 March March 2010 2010

Page 2: PLTU 2 x  3  MW NIAS SELATAN

Peta GPSPeta GPSPULAU NIASPULAU NIAS

Page 3: PLTU 2 x  3  MW NIAS SELATAN

LOKASI IPP PLTU NIAS 2x7 MW

Page 4: PLTU 2 x  3  MW NIAS SELATAN

FOTO LOKASI IPP FOTO LOKASI IPP PLTU NIAS 2x7 MWPLTU NIAS 2x7 MWGUNUNG SITOLI UTARAGUNUNG SITOLI UTARA

Page 5: PLTU 2 x  3  MW NIAS SELATAN

LOKASI 2PLTU NIAS SELATAN

2x3 MW

LOKASI 1PLTU NIAS SELATAN

2x3 MW

Page 6: PLTU 2 x  3  MW NIAS SELATAN

FOTO LOKASI 1FOTO LOKASI 1DESA SIWALUBANUADESA SIWALUBANUA

Page 7: PLTU 2 x  3  MW NIAS SELATAN

FOTO LOKASI 2FOTO LOKASI 2DESA TETEZOUDESA TETEZOU

Page 8: PLTU 2 x  3  MW NIAS SELATAN

LOKASI ALT 1 PLTU NIAS SELATAN

2x3 MW

LOKASI 3PLTU NIAS SELATAN

2x3 MW

Page 9: PLTU 2 x  3  MW NIAS SELATAN

FOTO LOKASI 3 DAN ALT - 1FOTO LOKASI 3 DAN ALT - 1DESA BALOHODESA BALOHO

LOKASI 3PLTU NIAS SELATAN

2x3 MW

LOKASI ALT - 1PLTU NIAS SELATAN

2x3 MW

Page 10: PLTU 2 x  3  MW NIAS SELATAN

LOKASI ALT 2 PLTU NIAS SELATAN

2x3 MW

Page 11: PLTU 2 x  3  MW NIAS SELATAN

FOTO LOKASI ALT - 2 FOTO LOKASI ALT - 2 GUNUNG SITOLI IDANOIGUNUNG SITOLI IDANOI

Page 12: PLTU 2 x  3  MW NIAS SELATAN

LOKASI ALT 3 PLTU NIAS SELATAN

2x3 MW

Page 13: PLTU 2 x  3  MW NIAS SELATAN

FOTO LOKASI ALT - 3FOTO LOKASI ALT - 3DESA BOZIHONADESA BOZIHONA

Page 14: PLTU 2 x  3  MW NIAS SELATAN

Rencana Lokasi PLTURencana Lokasi PLTU

 IPP

PLTU NIAS 2x7 MW

LOCATION 1 LOCATION 2 LOCATION 3

Village Desa AfiaDesa

SiwalubanuaDesa Tetezou

Desa Baloho (Teluk)

Sub District

Gunung Sitoli Utara

Lahusa Lahusa Teluk Dalam

DistrictKota Gunung

SitoliNias Selatan Nias Selatan Nias Selatan

Coordinate

N1 24 08.6 E97 32 31.2

N0 48 21.0 E97 54 26.8

N0 45 56.3 E97 53 26.0

N0 33 33.5 E97 48 17.2

• DIUSULKAN OLEH PLN WILAYAH SUMUT

• LOKASI DI GUNUNG SITOLI UTARA UNTUK RENCANA IPP; PLTU NIAS 2x7 MW

• LOKASI 1,2 DAN 3 UNTUK PLTU NIAS SELATAN 2x3 MW

Page 15: PLTU 2 x  3  MW NIAS SELATAN

Summary of Site SelectionSummary of Site Selection

ASPECTSIPP

PLTU NIAS 2x7 MW

LOCATION 1 LOCATION 2 LOCATION 3

Technical 69.20 64.04 64.95 65.22

Socio-Economic 32.00 26.00 30.00 32.00

Environmental 37.90 35.90 34.90 39.90

TOTAL 139.10 125.94 129.85 137.12

Page 16: PLTU 2 x  3  MW NIAS SELATAN

Rencana Lokasi Rencana Lokasi Alternatif PLTUAlternatif PLTU

DI SURVEY OLEH PLN CABANG NIAS DAN PLN E

UNTUK RENCANA PLTU NIAS SELATAN 2x3 MW

  ALTERNATIF

1 ALTERNATIF

2ALTERNATIF 3

Village Desa Baloho Desa Simanere Desa Bazihona

Sub District

Teluk DalamGunung Sitoli

IdanoiHidanogawo

District Nias Selatan Gunung Sitoli Nias

Coordinate

N0 32 56.0 E97 48 34.8

N1 12 18.5 E97 40 47.1

N1 05 54.7 E97 49 53.4

Page 17: PLTU 2 x  3  MW NIAS SELATAN

Summary of Site SelectionSummary of Site Selection

ASPECTS ALT 1 ALT 2 ALT 3

Technical 65.02 65.42 59.62

Socio-Economic 32.00 40.00 28.00

Environmental 39.90 36.90 33.90

TOTAL 136.92 142.32 121.52

Page 18: PLTU 2 x  3  MW NIAS SELATAN

diskusidiskusi

• DARI EMPAT (4) LOKASI YANG DIUSULKAN OLEH PLN WILAYAH SUMUT, PADA DI DESA AFIA,

KECAMATAN GUNUNG SITOLI UTARA, AKAN DIPERGUNAKAN UNTUK IPP PLTU NIAS 2x7 MW.

• UNTUK PLTU NIAS SELATAN 2x3 MW, BERDASARKAN PEMBOBOTAN, LOKASI 3 (DESA

BALOHO, KECAMATAN TELUK DALAM) LEBIH LAYAK DIBANDINGKAN LOKASI 1 DAN 2, AKAN

TETAPI SECARA VISUAL, KONDISI LAUT DI LOKASI 3 TERDAPAT BARRIER TERUMBU KARANG

(± 500 M DARI GARIS PANTAI), YANG DIKHAWATIRKAN DAPAT MENGHAMBAT AKSES COAL

BARGE, SEHINGGA PLN-E BERINISIATIF UNTUK MENCARI LOKASI ALTERNATIF DI SEKITAR

LOKASI 4.

• DARI HASIL SURVEY DIPEROLEH LOKASI ATERNATIF 1 (± 1.5 KM DARI LOKASI 3) YANG

SECARA VISUAL KEBERADAAN TERUMBU KARANG LEBIH SEDIKIT DIBANDINGKAN LOKASI 3.

• DARI PENJELASAN DIATAS DAPAT DISIMPULKAN BAHWA UNTUK PLTU NIAS SELATAN 2x3

MW, LOKASI ALTERNATIF 1 LEBIH LAYAK DIBANDINGKAN LOKASI 3 MESKIPUN SECARA

PEMBOBOTAN LOKASI ATERNATIF 1 (136.92) LEBIH SEDIKIT DIBANDINGKAN LOKASI 3

(137.12).

Page 19: PLTU 2 x  3  MW NIAS SELATAN

diskusidiskusi

• PADA SITE SURVEY KALI INI PLN-E JUGA MENDAPAT MASUKAN DARI PLN CABANG NIAS

UNTUK MENCARI ALTERNATIF LOKASI PLTU DENGAN MEMPERTIMBANGAN BEBAN

PENDISTRIBUSIAN KEBUTUHAN LISTRIK DI PULAU NIAS, DENGAN HARAPAN LOKASI PLTU

NIAS SELATAN 2x3 MW DAPAT DIPINDAHKAN KE LOKASI TERSEBUT, SEHINGGA DIPEROLEH

LOKASI ALTERNATIF 2 DAN 3.

• SECARA VISUAL DAN PEMBOBOTAN, LOKASI ALTERNATIF 2 (DESA SIMANERE, KECAMATAN

GUNUNG SITOLI IDANOI) LEBIH LAYAK UNTUK LOKASI PLTU NIAS SELATAN 2x3 MW.

Page 20: PLTU 2 x  3  MW NIAS SELATAN

• PRAKIRAAN TOTAL KEBUTUHAN AIR PLTUAIR PENDINGIN = 1.200 m3/hariAIR DEMIN & SERVICE = 20 m3/hari

• PRAKIRAAN TOTAL KEBUTUHAN BATUBARASELAMA 1 HARI = 120 TonSELAMA 1 BULAN = 3600 Ton

PRAKIRAAN KEBUTUHAN LAHAN UNTUK COAL YARDAKTIVE STORAGE SELAMA 10 HARI = 0,07 HaDEAD STORAGE SELAMA 1 BULAN = 0,02 Ha

• PRAKIRAAN ABU YANG DIHASILKANSELAMA 1 TAHUN = 2.500,00 TonLUAS LAHAN YANG DISEDIAKAN = 0,04 Ha

INFORMASI UMUMINFORMASI UMUMPltu 2x3 MWPltu 2x3 MW

Page 21: PLTU 2 x  3  MW NIAS SELATAN

KONDISI PEMBANGKIT MARETKONDISI PEMBANGKIT MARET 20 201010PLTD GUNUNGSITOLIPLTD GUNUNGSITOLI

TPS MAMPU

DGS-1 DEUTZ BA12M816W 7106144 560 450

DGS-2 DEUTZ BA12M816W 7106150 560 400

DGS-3 CUMMINS KTA-50G-3 25285070 D 2883 1,005 800

DGS-4 DEUTZ KHD BV 8M 628 7208762 1,224 - Usulan ATTB

DGS-5 CUMMINS KTA-50G-3 25287111 D 2974 1,005 800

DGS-6 DEUTZ KHD BV 8M 628 7208762 1,224 - Rusak

DGS-9 DEUTZ MWM BV 8M 628 62808010330 1,530 950

DGS-10 DEUTZ MWM BV 8M 628 62808010331 1,530 1,100

DGS-11 DEUTZ MWM BV 8M 628 62808010333 1,530 - Rusak

DGS-12 CUMMINS KTA-50G-3 25287113 D 2985 1,005 - Pemeliharaan

DGS-13 CUMMINS KTA-50G-3 25285069 D 2880 1,005 800

JUMLAH 12,178 5,300

No MEREK

DAYA (KW)

KETERANGANTYPE NO. SERI JANUARI

Nyalakan Irit Awasi Selebihnya

Catatan :DGS-7 & DGS-8 sudah di usulkan menjadi material ATTB rusak karena gempa

Page 22: PLTU 2 x  3  MW NIAS SELATAN

KONDISI PEMBANGKIT MARETKONDISI PEMBANGKIT MARET 20 201010PLTD TELUK DALAMPLTD TELUK DALAM

TPS MAMPU

DTD-1 CUMMINS KTA-50G-3 25287112 D 2976 1,005 800

DTD-2 DAIHATSU 6DS-26D 6264166 750 400

DTD-3 MTU 12 V 4000 661 526101981 1,095 800

DTD-4 DAIHATSU 6PSHTC-26D 6264135 530 400

DTD-5 DAIHATSU 6PSHTC-26D 6264136 - - Usulan ATTB

JUMLAH 3,380 2,400

KETERANGANTYPE NO. SERI JANUARINo MEREK

DAYA (KW)

Nyalakan Irit Awasi Selebihnya

Page 23: PLTU 2 x  3  MW NIAS SELATAN

TYPE NO. SERI

TPS MAMPU

DTD-1 DEUTZ F10L413F 7113086 100 80 DTD-2 DEUTZ F10L413F 6711900 100 80 DTD-3 DEUTZ F10L413F - 100 80 DTD-4 DEUTZ F10L413F 94103D0160 100 - RusakDTD-5 DEUTZ F10L413F 84103AO020 100 80

JUMLAH 500 320

JANUARINo MEREK

DAYA (KW)

KETERANGAN

KONDISI PEMBANGKIT MARETKONDISI PEMBANGKIT MARET 20 201010PLTD PULAU TELLOPLTD PULAU TELLO

Nyalakan Irit Awasi Selebihnya

Page 24: PLTU 2 x  3  MW NIAS SELATAN

UNITMESIN DAYA (kW)

KETMerk Type No.Seri TPSG MPU

PLTD GUNUNGSITOLI 5MW

1 SWD 9FHD240 70481-2 1268 1014 DLM PLKS

2 SWD 9FHD240 70481-1 1268 1014 DLM PLKS

3 SWD 9FHD240 70546 1268 1014 DLM PLKS

4 SWD 9FHD240 70481-3 1268 1014 DLM PLKS

5 SWD 6FFHD 703893 1114 890 DLM PLKS

6 SWD 6FFHD 70389-2 1114 890 DLM PLKS

JUMLAH 7300 5836

PLTD GUNUNGSITOLI 3MW

1 CTRPILAR 750 450 OPERASI

2 CUMMINS 750 450 OPERASI

3 MTSHBISI 800 0 GANGGUAN

4 PARKINS 1000 600 OPERASI

5 PARKINS 1000 0 GANGGUAN

6 CUMMINS 800 450 OPERASI

JUMLAH 5100 1950

PLTD TELUK DALAM 3MW

1 CUMMINS KTA 50-G1 33125558 800 640 OPERASI

2 CUMMINS KTA 38-65 33148031 800 640 OPERASI

3 CUMMINS KTA 50-G2 33119834 800 640 OPERASI

4 CUMMINS KTA 50-G1 32688937 800 640 OPERASI

5 CUMMINS KTA 50-G2 331051830 800 640 OPERASI

6 CUMMINS KTA 50-G2 33128154 1260 1008 OPERASI

JUMLAH 5260 4208

KONDISI UNIT SEWA 3MW - 5MWPLTD GUNUNGSITOLI DAN PLTD TELUK DALAM

Page 25: PLTU 2 x  3  MW NIAS SELATAN

KONDISI ANGIN NIASKONDISI ANGIN NIAS

Page 26: PLTU 2 x  3  MW NIAS SELATAN