1.1 Design Control Procedure - Artwork
Notes:
Welcome to the Design Control Procedure - Controlled Artwork course.
Published by Articulate® Storyline www.articulate.com
1.2 Objectives
Notes:
At the end of this course, you will be able to:
Explain how Controlled Artwork Design fits into the Applied Business process
Explain key Controlled Artwork Design terms and definitions
Explain how Controlled Artwork requests and documents are added to the ER
Create, change, review, and approve Controlled Artwork requests
Published by Articulate® Storyline www.articulate.com
1.3 Controlled Artwork
Notes:
Controlled Artwork: Artwork printed on product labels, boxes, and pouches, that are tracked and protected through the document control process.
Two documents are used to track Controlled Artwork: Artwork Requests and ART Documents. After each document is completed, they are submitted and approved on their own DIR in an ER.
Examples of controlled artwork are, Pouch labels and Artwork, Box labels and Artwork, Instructions for Use or IFUs, manuals, Incision Templates, printing Plates, and Supplier Apps
Published by Articulate® Storyline www.articulate.com
Examples (Slide Layer)
1.4 ARQ Documents
Notes:
The ARQ Document is the Artwork Request form. It is used for both new artwork requests (major changes) and for changes to existing artwork (minor changes). It is filled out by the project lead/originator and processed through NWBC Workflow.
Published by Articulate® Storyline www.articulate.com
1.5 ARQ Document Status
Notes:
At any given time, an ARQ will have one of five statuses. Click the statuses on the left to learn more about each one.
In Work (Slide Layer)
Published by Articulate® Storyline www.articulate.com
Request Review (Slide Layer)
Completed (Slide Layer)
Published by Articulate® Storyline www.articulate.com
Canceled (Slide Layer)
Request Approved (Slide Layer)
Published by Articulate® Storyline www.articulate.com
1.6 ART Document
Notes:
The second document used for Controlled Artwork is the ART document. This document is filled out by Branding based on the information provided in the ARQ. Each request in an ARQ is then converted to its own ART document. Once the ARTs are complete, they are sent through the workflow approval process and attached to the ER.
1.7 ART Document Status
Published by Articulate® Storyline www.articulate.com
Notes:
An ART document will always have one of four statuses. Click the different statuses on the left to learn more about each one.
In Work (Slide Layer)
Final Review (Slide Layer)
Published by Articulate® Storyline www.articulate.com
First Article Inspection (Slide Layer)
Approved (Slide Layer)
Published by Articulate® Storyline www.articulate.com
1.8 ARQ and ART Process
Notes:
This is the process flow for ARQ and ART Docs. Please click on each process to learn more.
The artwork requestor creates an ARQ. A single ARQ may include requests for more than one item.
The ARQ status is "Request Review." The initiator's department manager as well as regulatory reviews it through the NWBC. The manager and regulatory must approve the ARQ before it can be forwarded to Branding.
The ARQ status is "Request Approved." Branding Manager receives the ARQ through NWBC and reviews it.
The Branding Manager creates ART docs for each item listed on the ARQ.
When creating the ART docs, the Branding manager fills out as much information as possible, including characteristics, model numbers, and whether it is a major or minor change.
The ART status is "In Work." The Branding team member receives a process route notification, alerting them to their assignment. They create the artwork and fill out the ART document.
Once all of the items on the ARQ are complete, the generated artwork is attached to the ART doc.
All assigned approvers (including the Initial Requestor) review and approve the ART docs using NWBC Workflow.
Published by Articulate® Storyline www.articulate.com
The ARQ status is set to 'Complete.'
Creates ARQ (Slide Layer)
ARQ Review (Slide Layer)
Published by Articulate® Storyline www.articulate.com
ARQ Approved (Slide Layer)
Branding creates ARTs (Slide Layer)
Published by Articulate® Storyline www.articulate.com
Create Artwork (Slide Layer)
ARQ Complete (Slide Layer)
Published by Articulate® Storyline www.articulate.com
1.9 Menu
Notes:
This is the course menu. Please start at the top, and click each topic to learn the ARQ and ART process.
Published by Articulate® Storyline www.articulate.com
2. ARQ Creation
2.1 Create an ARQ
Notes:
To request controlled artwork, the project lead/initiator must create an ARQ using the Create a Document process in NWBC.
Published by Articulate® Storyline www.articulate.com
2.2 Click the text box
Notes:
Once you have completed the ARQ request form provided by the branding team, you will need to create an ARQ doc in NWBC.
Open the Product Engineering Menu
Published by Articulate® Storyline www.articulate.com
2.3 Click the text box
Notes:
Open the Document Menu
2.4 Click the Create Document link
Notes:
Published by Articulate® Storyline www.articulate.com
Click Create Document
2.5 Click the text box
Notes:
Enter the document type.
In this example we are creating an ARQ doc
Published by Articulate® Storyline www.articulate.com
2.6 Click the Continue link
Notes:
Click Continue
2.7 Click the text box
Notes:
Published by Articulate® Storyline www.articulate.com
Enter the Document description
2.8 Type ARQ: Request Approva
2.9 Click the Add Original link
Notes:
Click add original to attach the completed ARQ form
Published by Articulate® Storyline www.articulate.com
2.10 Click the Browse... link
Notes:
Follow these steps to attach the file
2.11 Click Choose file
Published by Articulate® Storyline www.articulate.com
2.12 Click Choose file
2.13 Click the OK link
Notes:
Click Ok
Published by Articulate® Storyline www.articulate.com
2.14 Click the text box
Notes:
Select the application type for the attached document
2.15 Click the OK link
Published by Articulate® Storyline www.articulate.com
2.16 Click the text box
Notes:
Select the document we just attached
2.17 Click the link
Notes:
Published by Articulate® Storyline www.articulate.com
Click Check in. you will notice the lock icon goes from unlocked to locked once the document is checked in
2.18 Click the cell
2.19 Click the text box
Notes:
Published by Articulate® Storyline www.articulate.com
Open the Characteristics tab
2.20 Click the text box
Notes:
Open the Class drop down menu
Published by Articulate® Storyline www.articulate.com
2.21 Click the image
Notes:
Here we will select the change level of ARQ document we are submitting.
Please see SOP 1-0104 for more information on major and minor changes.
2.22 Click the OK link
Published by Articulate® Storyline www.articulate.com
2.23 Click the text box
Notes:
Open the reviewers/ notes tab
2.24 Click the Add Reviewer link
Notes:
Published by Articulate® Storyline www.articulate.com
Please refer to the Approval Matrix Charts when adding reviewers. For more information regarding these Charts, please see SOP 1-0104.
Add reviewers to the ARQ,
We will be adding two reviewers, Review requestor and Branding Manager
2.25 Click the cell
Published by Articulate® Storyline www.articulate.com
2.26 Click the text box
2.27 Type rjoshi
Published by Articulate® Storyline www.articulate.com
2.28 Click the group
2.29 Click the cell
Notes:
The Branding Manager will always be added as a reviewer so that both the reviewers and branding manager are in agreement of the redlines before work begins.
Published by Articulate® Storyline www.articulate.com
2.30 Click the text box
2.31 Type Branding Manager's Name
Published by Articulate® Storyline www.articulate.com
2.32 Click the Check Entries link
Notes:
Click Check entries
2.33 Click the Save Document Number link
Notes:
Published by Articulate® Storyline www.articulate.com
Verify Entry validation, and click save
2.34 Click the text box
Notes:
Return to the General Data tab
Published by Articulate® Storyline www.articulate.com
2.35 Click the text box
Notes:
At this point we are going to update the document status from in work to request review
2.36 Click the table
Published by Articulate® Storyline www.articulate.com
2.37 Click the Save Document Number link
Notes:
Click save
2.38 Click the Read Only link
Notes:
Published by Articulate® Storyline www.articulate.com
This is the end of the creating an ARQ document simulation
3. Create ART Shell DIR
3.1 Create an ART Document
Notes:
The Branding Manager creates an ART doc for every artwork requested in the ARQ. Each ART is assigned to a Branding Team Member.
Published by Articulate® Storyline www.articulate.com
3.2 Click the Index pane
Notes:
This simulation will review the branding manager creating an ART document shell which included entering as much information as possible, assigning reviewers, and starting a process flow to assign this document to a member of the branding team.
Expand the Product Engineering Menu
Published by Articulate® Storyline www.articulate.com
3.3 Click the PLM Control Center link
Notes:
Open the PLM Control Center
3.4 Click the group
Notes:
Published by Articulate® Storyline www.articulate.com
Select a workflow item to Execute
3.5 Click the Execute link
Notes:
Click Execute
Published by Articulate® Storyline www.articulate.com
3.6 Click the link
Notes:
Open and review the attached ARQ
3.7 Click and drag
Notes:
Published by Articulate® Storyline www.articulate.com
Review the ARQ document. For each request in this document, the branding manager will create 1 ART doc
3.8 Click the Close button
Notes:
Once you have reviewed the document, close the PDF
Published by Articulate® Storyline www.articulate.com
3.9 Click the Index label
Notes:
Return to the NWBC Index page
3.10 Click the text box
Notes:
Published by Articulate® Storyline www.articulate.com
Expand the Engineering Record menu
3.11 Click the Change Engineering Record link
Notes:
Click Change Engineering Record
Published by Articulate® Storyline www.articulate.com
3.12 Click the text box
Notes:
Enter the engineering record number, and click continue
3.13 Type 30030400
Published by Articulate® Storyline www.articulate.com
3.14 Click the Continue link
3.15 Click the text box
Notes:
Click the documents tab
Published by Articulate® Storyline www.articulate.com
3.16 Click the You can also link
Notes:
Click 'You can Also'
3.17 Click the text box
Notes:
Published by Articulate® Storyline www.articulate.com
Click Create Document
3.18 Click the text box
Notes:
Enter the Document type, we are creating an ART doc
Published by Articulate® Storyline www.articulate.com
3.19 Type art
3.20 Click the Continue link
Notes:
Click Continue
Published by Articulate® Storyline www.articulate.com
3.21 Click the text box
Notes:
Enter the document description
3.22 Type ART Document
Published by Articulate® Storyline www.articulate.com
3.23 Click the Add Original link
Notes:
Now we will link our art doc back to original ARQ document.
Click Object Links
3.24 Click the Add Object link
Published by Articulate® Storyline www.articulate.com
Notes:
Click add Objects
3.25 Click the group
Notes:
Select the Object type you are adding, and click ok
Published by Articulate® Storyline www.articulate.com
3.26 Click the OK link
3.27 Click the text box
Notes:
Enter the document information
Published by Articulate® Storyline www.articulate.com
3.28 Type 17495
3.29 Type ARQ
Published by Articulate® Storyline www.articulate.com
3.30 Type 000
3.31 Type 01
Published by Articulate® Storyline www.articulate.com
3.32 Click the text box
Notes:
Open the Characteristics tab
3.33 Click the text box
Notes:
Published by Articulate® Storyline www.articulate.com
Enter the category information for the document
3.34 Click the cell
Published by Articulate® Storyline www.articulate.com
Notes:
select the type of ART doc the team member will be creating
3.35 Click the OK link
Notes:
Click OK
Published by Articulate® Storyline www.articulate.com
3.36 Click the text box
Notes:
Click Class
3.37 Click the image
Published by Articulate® Storyline www.articulate.com
Notes:
Here we are identifying if the ART doc will be a new or Major change or if the ART doc is an update or Minor Change
3.38 Click the OK link
Notes:
Click ok
Published by Articulate® Storyline www.articulate.com
3.39 Click the text box
Notes:
When assigning characteristics to your document, it is important to fill out the Model number field. The regulatory team searches for documents by model number. With this field filled out, the Regulatory team will be able to pull all documents related to a technical file
Next we will add reviewers to our document.
Open the Reviewers/Notes tab
Published by Articulate® Storyline www.articulate.com
3.40 Click the cell
3.41 Click the cell
Published by Articulate® Storyline www.articulate.com
3.42 Click the cell
3.43 Click the text box
Published by Articulate® Storyline www.articulate.com
3.44 Type rjoshi
3.45 Click the Add Reviewer link
Published by Articulate® Storyline www.articulate.com
3.46 Click the cell
3.47 Click the text box
Published by Articulate® Storyline www.articulate.com
3.48 Click the text box
3.49 Type cst
Published by Articulate® Storyline www.articulate.com
3.50 Click the text box
3.51 Click the Add Reviewer link
Published by Articulate® Storyline www.articulate.com
3.52 Click the group
3.53 Click the text box
Published by Articulate® Storyline www.articulate.com
3.54 Click the text box
3.55 Type rjos
Published by Articulate® Storyline www.articulate.com
3.56 Click the text box
3.57 Click the Add Reviewer link
Published by Articulate® Storyline www.articulate.com
3.58 Click the group
3.59 Click the cell
Published by Articulate® Storyline www.articulate.com
3.60 Click the text box
3.61 Type ts
Published by Articulate® Storyline www.articulate.com
3.62 Click the text box
3.63 Click the Save Document Number link
Published by Articulate® Storyline www.articulate.com
3.64 Click the text box
Notes:
Open the Process Route tab
3.65 Click the Add Sequential Task link
Notes:
Published by Articulate® Storyline www.articulate.com
Click add sequential task to assign this ART doc to a member of the branding team.
3.66 Click the cell
Notes:
Select SAP user to assign a process route to an applied team member
Published by Articulate® Storyline www.articulate.com
3.67 Click the text box
3.68 Click the text box
Published by Articulate® Storyline www.articulate.com
3.69 Click the text box
Notes:
When assigning the "Activity", be sure to select "Assign" when assigning it to a Branding "artist" Team Member. Select "review" if the Branding Manager wants to be notified when the artist is done.
In this simulation, we are selecting "review".
Published by Articulate® Storyline www.articulate.com
3.70 Click the text box
Notes:
Set the Task Priority
3.71 Click the text box
Published by Articulate® Storyline www.articulate.com
3.72 Click the OK link
Notes:
Click OK
3.73 Click the Save Document Number link
Notes:
Published by Articulate® Storyline www.articulate.com
Click Save
3.74 Click the Start Workflow link
Notes:
Highlight the line item, and click start Workflow. This will kick off the process route and send this item to the branding team members process route inbox.
Published by Articulate® Storyline www.articulate.com
3.75 Click the Save Document Number link
Notes:
Click save
3.76 Click the Read Only link
Notes:
Published by Articulate® Storyline www.articulate.com
Click Read Only
3.77 Click the Refresh link
Notes:
Click refresh, and verify the update of the status column
Published by Articulate® Storyline www.articulate.com
3.78 Click the cell
4. Add File to ART DIR
4.1 Add a File to an ART DIR
Notes:
Once the Controlled Artwork is created, the artwork documents are attached to the ART.
Published by Articulate® Storyline www.articulate.com
4.2 Click the text box
Notes:
This simulation will show the branding team member review the assigned process route of the ART, attaching the artwork files to the ART and starting the workflow review process.
Expand the Product Engineering Menu
Published by Articulate® Storyline www.articulate.com
4.3 Click the PLM Control Center link
Notes:
Click the PLM Control center
4.4 Click the Process Routing: Work Item (1) belonging to type Process
Routing Inbox: Work Item link
Published by Articulate® Storyline www.articulate.com
Notes:
Click Process Routing Inbox
4.5 Click the group
Notes:
Select the Process Route Line item
Published by Articulate® Storyline www.articulate.com
4.6 Click the Execute link
Notes:
Click Execute
4.7 Click the text box
Notes:
Published by Articulate® Storyline www.articulate.com
Click the Objects link tab
4.8 Click the text box
Notes:
Open the Object links type drop down
Published by Articulate® Storyline www.articulate.com
4.9 Click the cell
Notes:
Select the Document Info Record
4.10 Click the link
Notes:
Published by Articulate® Storyline www.articulate.com
Click the document link to review the ARQ
4.11 Click the link
Notes:
Open the PDF to review the ARQ and understand the requirements for your artwork
Published by Articulate® Storyline www.articulate.com
4.12 Click and drag
Notes:
review the ARQ
4.13 Click the Close button
Notes:
Published by Articulate® Storyline www.articulate.com
Close the Document
4.14 Click the Edit Document Number link
Notes:
After you have created the requested artwork, return to the NWBC. Display the ART doc and click edit.
Published by Articulate® Storyline www.articulate.com
4.15 Click the Add Original link
Notes:
Click Add original to attach the artwork you have created. You will need to attach both the native artwork file, and a PDF version for easy viewing
4.16 Click the Browse... link
Notes:
Published by Articulate® Storyline www.articulate.com
Click Browse to search for and attach your files
4.17 Click Choose file
4.18 Click Choose file
Published by Articulate® Storyline www.articulate.com
4.19 Click the OK link
Notes:
once you have found your file, click OK
4.20 Click the group
Notes:
Published by Articulate® Storyline www.articulate.com
Select the document type
4.21 Click the OK link
4.22 Click the group
Notes:
You will need to check in each item individually. Select the line item
Published by Articulate® Storyline www.articulate.com
4.23 Click the Check In link
Notes:
Click Check in
4.24 Click the text box
Published by Articulate® Storyline www.articulate.com
Notes:
Click Check in, and notice that the icon in the status icon, changes from unlocked to locked
4.25 Click the Add Original link
Notes:
add additional documents as needed
Published by Articulate® Storyline www.articulate.com
4.26 Click the Browse... link
4.27 Click Choose file
Published by Articulate® Storyline www.articulate.com
4.28 Click Choose file
4.29 Click the OK link
Published by Articulate® Storyline www.articulate.com
4.30 Click the group
Notes:
Make sure you check in the newly added document
4.31 Click the link
Published by Articulate® Storyline www.articulate.com
4.32 Click the text box
4.33 Click the Save Document Number link
Notes:
Click Save
Published by Articulate® Storyline www.articulate.com
4.34 Click the text box
Notes:
Verify the save message. Open the document status menu from 'In Work' to Final Review.
This will kick off the workflow of the reviewers that the Branding managers assigned to the ART doc
4.35 Click the text box
Published by Articulate® Storyline www.articulate.com
4.36 Click the Save Document Number link
Notes:
Click Save and Return to the Work Center
4.37 Click the text box
Notes:
Published by Articulate® Storyline www.articulate.com
As a Branding Team Member you need to mark your task complete for the Branding Manager by using the e-signature on the Process Route.
Select the item you just saved
4.38 Click the Complete link
Notes:
Click complete, this will prompt you to enter your e-signature
Published by Articulate® Storyline www.articulate.com
4.39 Click the Digital Signatures for Process Route pane
Notes:
Expand the signature window
4.40 Click the text box
Notes:
Published by Articulate® Storyline www.articulate.com
Enter your NWBC log on information to sign the document
4.41 Type password
4.42 Click the text box
Notes:
Enter any comments as needed
Published by Articulate® Storyline www.articulate.com
4.43 Type File added to ART DIR
4.44 Click the Sign link
Notes:
Click Sign
Published by Articulate® Storyline www.articulate.com
4.45 Click the image
Notes:
Verify that the signature was accepted, and return to the work center tab
4.46 Click the Refresh Current Query link
Notes:
Published by Articulate® Storyline www.articulate.com
Click refresh
4.47 Click the Change Document: 17497 label
Notes:
Verify that the Line item has moved out of your inbox.
Return to the Change document tab
Published by Articulate® Storyline www.articulate.com
4.48 Click the text box
Notes:
Verify that the Status icon has changed, and the document status reflects Completed
4.49 Click the table
Notes:
Published by Articulate® Storyline www.articulate.com
This is the end of the simulation
5. Completed ARQ2
5.1 Completed ARQ
Notes:
Once all of the artwork requested in the ARQ is complete and approved, the status of the ARQ is changed to 'Complete.'
Published by Articulate® Storyline www.articulate.com
5.2 Click the cell
Notes:
This simulation will review the process of closing out the approved ARQ once the branding manager receives an alert that the ART document has completed the workflow process.
From your work center inbox, select the ARQ item that is associated with the ART document you received the approval notice for
Published by Articulate® Storyline www.articulate.com
5.3 Click the Execute link
Notes:
Click Execute
5.4 Click the text box
Notes:
Published by Articulate® Storyline www.articulate.com
Open the object links tab to view the associated ART doc
Published by Articulate® Storyline www.articulate.com
5.5 Click the text box
Notes:
Open the Object Link Type drop down
5.6 Click the cell
Notes:
Published by Articulate® Storyline www.articulate.com
Select 'Document Information Record'
5.7 Click the link
Notes:
Click the document number link
Published by Articulate® Storyline www.articulate.com
5.8 Click the text box
Notes:
Open the status tab
5.9 Click and drag
Notes:
Published by Articulate® Storyline www.articulate.com
Review the list of statuses that the document has moved through
5.10 Click the text box
Notes:
Open the Process Route Tab
Published by Articulate® Storyline www.articulate.com
5.11 Click the text box
Notes:
Ensure that the process route has been completed.
Once you are done reviewing the process route, return to the General Data tab
5.12 Click the image
Published by Articulate® Storyline www.articulate.com
Notes:
Close the Document Window
5.13 Click the text box
Notes:
Return to the General tab for the ARQ document
Published by Articulate® Storyline www.articulate.com
5.14 Click the text box
Notes:
Update the Document status to 'Completed'
5.15 Click the cell
Published by Articulate® Storyline www.articulate.com
5.16 Click the Save Document Number link
Notes:
Click Save
5.17 Click the image
Notes:
Published by Articulate® Storyline www.articulate.com
Close the document window
5.18 Click the Refresh Current Query link
Notes:
Click 'Refresh' and confirm that the ARQ item has left your inbox.
This is the end of the simulation
Published by Articulate® Storyline www.articulate.com
6. Summary
6.1 Summary
Notes:
You have completed the SAP Artwork course. You should now know how the Controlled Artwork Design fits into the Applied Business process. You should also know key Controlled Artwork Design terms and definitions, as well as how to explain how Controlled Artwork requests and documents are added to the ER. You should also be able to create, change, review, and approve Controlled Artwork requests.