Re: Application of Public Service Company of New Hampshire DIB/A
Eversource Energy for a Ce巾ficate of Site and Faciiity
Docket No. 2015置04
Dea「 Ms. Monroe:
Please find enclosed an original and one copy ofa Motion to intervene fiied on behaIfofthe′′L圃e Bay / Durham Point Abutters’’that we wish to file at this time with the New Hampshire Site
Evaluation Committee.
A copy ofthis letter and the encIosed Motion has this day been forwarded to the SEC
Dist「ibutionしist.
SincereIy,
Matthew Fitch
Enciosure
CC: SEC Distribution List (via e-maii)
」effrey & Vivian M紺er
Lawrence & Anne Gans
丁homas & Yael DeCapo
Deborah Moore
STATE OF NEW HAMPSHIRE
B各FoR各丁Hさ
NEW HAMPSH書RE SITE EVAしuATION COMMIT「駈
SEC Docket No. 2O15-04
AppIication of Public Service Company of New Hampshire d/b/a Eversource ene「gy
For a Certificate of Site And Fac描ty for the ConstI.uCtion of a New l15 kV
Transmissionしine from Madbury Substation to Portsmouth Substation
Petition to Intervene on BehaIf of the
坦叫ham Point /し同e Bav Ab刑はer§竺
NOW COMES Matthew & Amanda Fitch (291 Durham Point Rd., Durham, NH〉, 」e冊ey& Vivian M紺er
(297 Durham Point Rd・′ Durham′ NH)′ Lawrence &Anne Gans (289 Durham Point Rd,, Durham, NH) and
Deborah Moore (305 Durham Point Rd.′ Durham′ NH) (col-ectively the ′′Durham Point /皿e Bay
Abutters’’) respectfu=y and jo剛y petition the New Hampshire Site Evaluation Committee
(’’committee′′) for Ieave to interve=e aS One Party in the above-CaPtioned proceeding under N.H. Admin.
Ruie Site 202・11 and RSA 541-A:32. 1n support ofthis petition, the Durham Point/ L圃e Bay Abutters
represent that:
1. On Apr冊2, 2015 the Committee received an App-ication for a Certificate of Site and Fac冊y
from Everousrce for the construction of a new l15 kVTransmissionしine from the Madbury Substation
to Portsmouth Substation 〈′′AppIication′′〉・ The proposed Project described in the AppIication w冊e
located in the Towns of Madbury′ Durham′ Newington and the City of Portsmouth and a portion ofthe
Project w用run through property owned by the parties comprisi=g the Durham Po而/しittIe Bay
Abutters. The Committee accepted the A師Cation as being administratively complete on 」une l, 2016.
5ee RSA 162-H:7, VI
2. The statuto'γ Standards for intervention are set forth i両SA 541-A:32, I and帖First, a
Petition for intervention must be granted if the petitioner states facts demonstr∂ting how its rights,
duties′ P「ivileges′ immunities or other substantia=nte「ests may be affected by the proceeding (or the
Petitioner qu描es under any provision of law) and interests ofjustice and orderly and prompt conduct
Ofthe proceedings would not be impaired bv訓owing intervention. See RSA 541-A:32,一(b) and (C).
Second′ the Committee may grant a petition to intervene ′′at any time′ uPOn determining that such
intervention would be in the inte「ests ofjustice and wouId not impair the orderly conduct ofthe
PrOCeedings.’’RSA 541-A:32′ Il. See o極N・H. Admin. R. Site 2O2.11 (requi「ing the presiding officer to
grant One Or mOre Petitions to intervene in accordance with the standards of RSA 541-A:32). For the
reaSOnS PreSented beIow the Durham Point /し圃e Bay Abutters meet both ofthe foregoing mandatory
and discretionary intervention standards.
3. The Durham Point/ L軸e BayAbutters have 「ights, duties, P画Ieges, immunities or other
Substantia=nterests that may be affected bv this proceeding as property owners and/or abutters with
Right of Way (ROW〉 easements as indicated in studies included with the Appiication (Application,
Appendix 5′ Engineering Design Drawings, Page 8, Drawing Number: FlO743008) for an approximateIy
2,738 1inear foot portion ofthe Seacoast Reliab冊y Project,
4. Further′ the interests ofjustice and the o「derly and prompt conduct ofthe proceedings
WOuId not be impaired by a=owing intervention.
WHEREFORE, the Durham Point /し圃e Bay Abutters respectfu=y request that the Site EvaIuation
Committee grant them intervenor status in the proceeding and grant such other relief as the Committee
deemsjust and equitable.
Respectfu=y submitted,
The Durham Point / Littie Bay Abutters
BY:
Matthew Fitch
291 Durham Point Rd.
Durham, NH O3824
(919〉 773-2383
mfitch@cai{hem.com
Dated: 」uIy20, 2016
Cert絹cate of Service
I hereby certify that a copv of the foregoing Petition has on this 」⊇L2__ day of」uly, 2016 been
Sent Via first class maii to the New Hampshire Site EvaIuation Committee and via eIectronic ma旧o the
SEC Dist「ibution =st in the SEC Docket No, 2015-04.
Matthew Fitch