Airspace: Scotland’s first trampoline park contained within a 35,000sqſt facility with 100 interconnected trampolines, three dodgeball areas, two slamball hoops and one giant arena packed with somersaulng parkour specialists. AKP Scotland Ltd were challenged to turn an empty industrial unit into the excing and successful play zone. The works consisted of installing a new mezzanine area to house the mechanical plant and storage area. On the ground floor we constructed new male and female toilets, briefing area, café & food preparaon, office and booking/recepon area, including a special bespoke recepon desk. Associated full M&E installaon was carried out, featuring bespoke lighng, PA/sound system, AHU/venlaon & toilet facilies. In addion a raised steel access floor was installed over the 35,000sqſt area to house the trampoline, dodge ball and slamball hoop areas. We coordinated this installaon with the client and the delivery of the trampolines from America. We carried out alteraons to the main entrance, installing a roller door & shop front. Hard landscaping complete the external works. The successful compleon of the works was with the assistance of the Architect/Project Manager JVA James Barr & Atelierten M&E Consultants. Client Airspace Project Location East Kilbride Project Duration 10 weeks

Transcript of Playsport - Landscape

Page 1: Playsport - Landscape

Airspace: Scotland’s first trampoline park contained within a 35,000sqft facility with 100 interconnected trampolines, three dodgeball areas, two slamball hoops and one giant arena packed with somersaulting parkour specialists.

AKP Scotland Ltd were challenged to turn an empty industrial unit into the exciting and successful play zone. The works consisted of installing a new mezzanine area to house the mechanical plant and storage area. On the ground floor we constructed new male and female toilets, briefing area, café & food preparation, office and booking/reception area, including a special bespoke reception desk. Associated full M&E installation was carried out, featuring bespoke lighting, PA/sound system, AHU/ventilation & toilet facilities. In addition a raised steel access floor was installed over the 35,000sqft area to house the trampoline, dodge ball and slamball hoop areas. We coordinated this installation with the client and the delivery of the trampolines from America. We carried out alterations to the main entrance, installing a roller door & shop front. Hard landscaping complete the external works. The successful completion of the works was with the assistance of the Architect/Project Manager JVA James Barr & Atelierten M&E Consultants.

Client

Airspace

Project Location

East Kilbride

Project Duration

10 weeks