AES Corporation: A Global Leading Power Company
Safe Harbor Disclosure Certain statements in the following presentation regarding AES’ business operations may constitute “forward-looking statements.” Such forward-looking statements include, but are not limited to, those related to future earnings growth and financial and operating performance. Forward-looking statements are not intended to be a guarantee of future results, but instead constitute AES’ current expectations based on reasonable assumptions. Forecasted financial information is based on certain material assumptions. These assumptions include, but are not limited to accurate projections of future interest rates, commodity prices and foreign currency pricing, continued normal or better levels of operating performance and electricity demand at our distribution companies and operational performance at our generation businesses consistent with historical levels, as well as achievements of planned productivity improvements and incremental growth from investments at investment levels and rates of return consistent with prior experience. For additional assumptions see Slide 41 and the Appendix to this presentation. Actual results could differ materially from those projected in our forward-looking statements due to risks, uncertainties and other factors. Important factors that could affect actual results are discussed in AES’ filings with the Securities and Exchange Commission including but not limited to the risks discussed under Item 1A “Risk Factors” and Item 7: Management’s Discussion & Analysis in AES’ 2014 Annual Report on Form 10-K, as well as our other SEC filings. AES undertakes no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.
AES Corporation: A Global Leading Power Company
US$39 bn in assets located across 18 countries
Total installed power generation capacity of 35,800 MW Distribution networks with capacity to serve over 10 mm customers 6 GW of assets under construction
The AES Corporation (NYSE: AES) is a Fortune 200 global power company
RECENT DEVELOPMENTS IN THE DR
$260M DPP Combined Cycle Conversion Project nearing completion providing additional 114MW of electricity
Completed $10M terminal reconfiguration to allow re-loading of LNG into small vessels. Installed pumps to allow for loading of LNG at a rate of 500cm/hour Upgraded jetty to allow for berthing of vessels of 10km3 and up
2 Distributed Energy Projects completed at Andres and Itabo in 2016 increases capacity by ~25MW.
Solar generation
Battery Installation
Mini Hydro
AES COSTA NORTE LNG RECEIVING TERMINAL
PPAs: 350 MW with Distributors Total investment: US $ 1,150 million Investors: AES (50.1%) Inv.Bahia (49.9%) COD: Mid 2018 Tank Completion: Mid 2019
Telfers Island, Colón, Panama Installed capacity: 381MW net Technology: Combined cycle (3 + 1) Terminal: Input / output terminal Tank: 180,000 m3
AES COSTA NORTE LNG RECEIVING TERMINAL
PANAMA CANAL Atlántico
PANAMA PORTS
Terreno (20 Héctareas)
AES Power Block y GNL Infraestructura (Terminal + Tanque)
Jamaica Curacao Aruba Guadeloupe Martinique St Lucia Barbados Caymans
Dominican Republic
440 370 373 521 562 587 677 688
AES REGIONAL LNG DISTRIBUTION HUBS
Costa Rica Nicaragua Honduras El Salvador Guatemala
Panama 192 695 747 869 928
*distances in miles
LNG AVAILABILITY & PRICES TIED TO US GAS MARKET Sabine Pass Cameron Freeport Corpus Christi Cove Point
~800 LNG cargos per year will flow from the US by end 2019
AES Dominicana is the closest large scale receiving terminal*
* Not including Altamira, Mexico, which is not expected to import material quantities of LNG due to increased pipe importation from the US
4,900 miles to the UK
1,650 miles to the DR
3,700 mile to Pecem, Brazil 14,000 miles to Japan via Suez
9,000 miles to Japan via Panama
~8 BCF/D or ~60MTA per year
~2 BCF/d or ~14 MTA
1,650 miles to Panama
DELIVERING SMALL SCALE LNG TO THE REGION
AES Small-Scale LNG Distribution
Infrastructure is Ready
ISO Containers – TODAY
Small Bulk Vessels – TODAY
LNG DELIVERY VIA ISO CONTAINERS
AES Andres currently configured to load LNG in ISO Containers
2 loading bays and a loading capacity of 68 m3/hour
Approximately 5,000 truck loadings per year serves a customer base of 65 manufacturers and 15,000 vehicles
34,851 trucks equivalent filled in past 7 years or approximately 25.7 TBTU (8.6 ships standard vessels), without any safety incident
AES Andres LNG ISO Containers Distribution
Proximity to an international ports. AES will truck the ISO Containers one mile to the port of Caucedo or 50 miles to Rio Haina
ISO containers can be easily transported on standard container vessels and offloaded at any container port
LNG ISO CONTAINER VALUE CHAIN
$9M infrastructure reconfiguration: AES Andres has completed the jetty modifications and added additional pumps to be capable of loading small vessels ranging in size from 10,000m3 and up.
ANDRES LNG TERMINAL RECONFIGURATION
* Estimated demand from plants of that size assuming a number of factors
AES Andres reconfiguration to load small vessels COMPLETED
Small vessel fleet growing with existing carriers available Yard availability and historically low prices for new-builds
takes 2-3 years for construction
ANDRES LNG TERMINAL RECONFIGURATION
* Estimated demand from plants of that size assuming a number of factors
PARTNERSHIP WITH ENGIE
ENGIE (formerly GDF Suez) and AES working together to develop downstream markets in the region.
ENGIE brings to the partnership availability of long term LNG supply and needed flexibility to manage downstream customer demand and pricing needs.
ENGIE has secured long term liquefaction capacity for 4MTPA from the Cameron LNG project in Louisiana, which is scheduled to begin operations in 2018.
AES LNG DISTRIBUTION BUSINESS MODEL
AES will deliver LNG to the customer
ENGIE
Large Volume received
Storage for large deliveries
Credit / Balance sheet
Term structure and flexibility
LNG Buyer
LNG Buyer
LNG Buyer
Smaller volume delivered
Smaller storage requirements
Flexible pricing structure and term
Infrastructure development
AES
SUMMARY
AES is ready to deliver LNG to the Caribbean
LNG delivery via small bulk carriers or ISO containers
Large-scale LNG procurement and relatively short distance to markets reduces cost and makes conversion to gas feasible for the Caribbean
AES will delivery the entire value chain in multiple forms:
1. LNG delivered to a port
2. Gas delivered to the burner tip
Flexible pricing and terms to match customer’s needs