Plant Location Group 2

download Plant Location Group 2

of 14

Transcript of Plant Location Group 2

  • 8/3/2019 Plant Location Group 2

    1/14

    Law and best practices - Plant location exercise

    Group 2

    Adhaar Agarwal

    Ashima SrivasthavKiran Kumar N

    Prashanth Rathore

  • 8/3/2019 Plant Location Group 2

    2/14

    Country Sold Into: Freetradia Isolated States Freetradia

    Plant Location Freetradia Isolated States Freetradia

    Raw Materials from Freetradia Isolated States Developia

    Plant construction Costs $10,000,000 $8,000,000 $10,000,000

    Number of Units Made 1,000,000.00 1,000,000.00 1,000,000.00

    A Cost $ 2.00 $ 2.00 $ 2.00

    B Cost $ 6.00 $ 6.00 $ 4.00

    C Cost $ 10.00 $ 10.00 $ 7.00

    Total Material Cost $ 18.00 $ 18.00 $ 13.00

    Labor $ 12.00 $ 12.00 $ 12.00

    OH Applied $ 10.00 $ 8.00 $ 10.00

    Transportation cost

    Tariff

    Total Cost of Charger $ 40.00 $ 38.00 $ 35.00

    Total cost of production $ 40,000,000.00 $ 38,000,000.00 $ 35,000,000.00

    Total cost of project (

    production + plant) 50,000,000.00$ 46,000,000.00$ 45,000,000.00$

    Tariff in Isolated states protects the local manufacturers of Isolated states. Theses tproduction

    Baseline

    Cost of production in Freetadia when raw material imported from Developia has de

    Cost of production in Isolated States when raw material imported from Developia h

    Raw Materials

  • 8/3/2019 Plant Location Group 2

    3/14

    Isolated States Freetradia Isolated States

    Isolated States Developia Developia

    Developia Developia Developia

    8,000,000.00$ $4,000,000 4,000,000.00$

    1,000,000.00 1,000,000.00 1,000,000.00

    3.00$ $ 1.00 1.00$

    7.00$ $ 3.00 3.00$

    12.00$ $ 5.00 5.00$

    $ 22.00 $ 9.00 $ 9.00

    12.00$ $ 4.00 4.00$

    8.00$ $ 4.00 4.00$

    $ 4.00 4.00$

    13.00$

    $ 42.00 $ 21.00 $ 34.00

    $ 42,000,000.00 $ 21,000,000.00 $ 34,000,000.00

    50,000,000.00$ 25,000,000.00$ 38,000,000.00$

    riff minimise the difference between per unit cost of

    reased

    s increased

  • 8/3/2019 Plant Location Group 2

    4/14

    Country Sold Into: Freetradia Isolated States Freetradia Isolated States

    Plant Location Freetradia Isolated States Freetradia Isolated States

    Raw Materials from Freetradia Isolated States Developia Developia

    Plant constructionCosts

    $10,000,000 $8,000,000 $10,000,000 8,000,000.00$

    Number of Units

    Made1000000.00 1000000.00 1000000.00 1000000.00

    A Cost $ 2.00 $ 2.00 ` 3.25$

    B Cost $ 6.00 $ 6.00 $ 4.75 7.75$

    C Cost $ 10.00 $ 10.00 $ 8.25 13.25$

    Total Material Cost $ 18.00 $ 18.00 $ 13.00 $ 24.25

    Labor $ 12.00 $ 12.00 $ 12.00 12.00$

    OH Applied $ 10.00 $ 8.00 $ 10.00 8.00$

    Transportation cost

    Tariff

    Total Cost of Charger $ 40.00 $ 38.00 $ 35.00 $ 44.25

    Total cost of

    production$ 40,000,000.00 $ 38,000,000.00 $ 35,000,000.00 $ 44,250,000.00

    Total cost of project

    ( production + plant)$ 50,000,000.00 46,000,000.00$ $ 45,000,000.00 52,250,000.00$

    Raw Materials

    Its still cheaper for the company to setup plants in Developia and export assembled charges to Free

    Scenario 1

  • 8/3/2019 Plant Location Group 2

    5/14

    Freetradia Isolated States

    Developia Developia

    Developia Developia

    $4,000,000 4,000,000.00$

    1000000.00 1000000.00

    $ 1.25 1.25$

    $ 3.75 3.75$

    $ 6.25 6.25$

    $ 11.25 $ 11.25

    $ 5.00 5.00$

    $ 4.00 4.00$

    $ 4.00 4.00$

    13.00$

    $ 24.25 $ 37.25

    $ 24,250,000.00 $ 37,250,000.00

    $ 28,250,000.00 41,250,000.00$

    radia and Isolated States

  • 8/3/2019 Plant Location Group 2

    6/14

    Country Sold Into: Freetradia Isolated States Freetradia

    Plant Location Freetradia Isolated States Freetradia

    Raw Materials from Freetradia Isolated States Developia

    Plant construction Costs $10,000,000 $8,000,000 $10,000,000

    Number of Units Made 1000000.00 1000000.00 1000000.00

    A Cost $ 2.00 $ 2.00 $ 2.00

    B Cost $ 6.00 $ 6.00 $ 4.00

    C Cost $ 10.00 $ 10.00 $ 7.00

    Total Material Cost $ 18.00 $ 18.00 $ 13.00

    Labor $ 12.00 $ 12.00 $ 12.00

    OH Applied $ 10.00 $ 8.00 $ 10.00

    Transportation cost

    Tariff

    Total Cost of Charger $ 40.00 $ 38.00 $ 35.00

    Total cost of production $ 40,000,000.00 $ 38,000,000.00 $ 35,000,000.00

    Cost after adding return

    cost of 25%

    Total cost of project (

    production + plant)$ 50,000,000.00 $ 46,000,000.00 $ 45,000,000.00

    Raw Materials

    In this scenario its cheaper to produce the material in isolated states and sell in isola

    Developia and export it to Freetradia

    Scenario 2

  • 8/3/2019 Plant Location Group 2

    7/14

    Isolated States Freetradia Isolated States

    Isolated States Developia Developia

    Developia Developia Developia

    $ 8,000,000.00 $4,000,000 $ 4,000,000.00

    1000000.00 1000000.00 1000000.00

    $ 3.00 $ 1.00 $ 1.00

    $ 7.00 $ 3.00 $ 3.00

    $ 12.00 $ 5.00 $ 5.00

    $ 22.00 $ 9.00 $ 9.00

    $ 12.00 $ 4.00 $ 4.00

    $ 8.00 $ 4.00 $ 4.00

    $ 4.00 $ 4.00

    $ 13.00

    $ 42.00 $ 21.00 $ 34.00

    $ 42,000,000.00 $ 21,000,000.00 $ 34,000,000.00

    $ 26,250,000.00 $ 42,500,000.00

    $ 50,000,000.00 $ 30,250,000.00 $ 46,500,000.00

    ted states. For Freetradia, its still cheaper to produce in

  • 8/3/2019 Plant Location Group 2

    8/14

    Country Sold Into: Freetradia Isolated States Freetradia Isolated States

    Plant Location Freetradia Isolated States Freetradia Isolated States

    Raw Materials from Freetradia Isolated States Developia Developia

    Plant construction

    Costs

    $10,000,000 $8,000,000 $10,000,000 8,000,000.00$

    Number of Units Made 1000000.00 1000000.00 1000000.00 1000000.00

    A Cost $ 2.00 $ 2.00 $ 1.25 2.25$

    B Cost $ 6.00 $ 6.00 $ 3.25 6.25$

    C Cost $ 10.00 $ 10.00 $ 5.50 10.50$

    Total Material Cost $ 18.00 $ 18.00 $ 10.00 $ 19.00

    Labor $ 12.00 $ 12.00 $ 12.00 12.00$

    OH Applied $ 10.00 $ 8.00 $ 10.00 8.00$

    Transportation cost

    Tariff

    Total Cost of Charger $ 40.00 $ 38.00 $ 32.00 $ 39.00

    Total cost of

    production$ 40,000,000.00 $ 38,000,000.00 $ 32,000,000.00 $ 39,000,000.00

    Total cost of project

    ( production + plant) 50,000,000.00$ 46,000,000.00$ 42,000,000.00$ 47,000,000.00$

    Raw Materials

    The cost to produce in developia and sent to isolated states is higher than that of producing the char

    material. All though the cost of plant in Developia is the lowest, this is just a one time cost and thus f

    negligible.

    Scenario 3

  • 8/3/2019 Plant Location Group 2

    9/14

    Freetradia Isolated States

    Developia Developia

    Developia Developia

    $4,000,000 4,000,000.00$

    1000000.00 1000000.00

    $ 1.00 1.00$

    $ 3.00 3.00$

    $ 5.00 5.00$

    $ 9.00 $ 9.00

    $ 4.00 4.00$

    $ 4.00 4.00$

    $ 10.00 10.00$

    13.00$

    $ 27.00 $ 40.00

    $ 27,000,000.00 $ 40,000,000.00

    31,000,000.00$ 44,000,000.00$

    e

    er in isolated states with local raw

    r long term production it becomes

  • 8/3/2019 Plant Location Group 2

    10/14

    Country Sold Into: Freetradia Isolated States Freetradia

    Plant Location Freetradia Isolated States Freetradia

    Raw Materials from Freetradia Isolated States Developia

    Plant construction Costs $10,000,000 $8,000,000 $10,000,000

    Number of Units made beforerevolution

    1000000.00 1000000.00 200000.00

    Number of Units made after

    revolution

    A Cost $ 2.00 $ 2.00 $ 2.00

    B Cost $ 6.00 $ 6.00 $ 4.00

    C Cost $ 10.00 $ 10.00 $ 7.00

    Total Material Cost $ 18.00 $ 18.00 $ 13.00

    Labor $ 12.00 $ 12.00 $ 12.00

    OH Applied $ 10.00 $ 8.00 $ 10.00

    Transportation cost

    Tariff

    Total Cost of Charger $ 40.00 $ 38.00 $ 35.00

    Total cost of production $ 40,000,000.00 $ 38,000,000.00 $ 7,000,000.00

    Cost of Production

    Revenue Generated : Taking

    cost of risk into consideration

    (Weighted average)

    Cost of Risk

    Total cost of project (

    production + plant)50,000,000.00$ 46,000,000.00$ $

    $

    $

    $

  • 8/3/2019 Plant Location Group 2

    11/14

    Freetradia Isolated States Isolated States Freetradia Freetradia

    Freetradia Isolated States Isolated States Developia Developia

    Developia Developia Developia Developia Developia

    $10,000,000 8,000,000.00$ 8,000,000.00$ $4,000,000 $4,000,000

    200000.00 200000.00

    800000.00 800000.00 800000.00

    $ 2.00 3.00$ 3.00$ $ 1.00 $ 1.00

    $ 4.00 7.00$ 7.00$ $ 3.00 $ 3.00

    $ 7.00 12.00$ 12.00$ $ 5.00 $ 5.00

    $ 13.00 $ 22.00 $ 22.00 $ 9.00 $ 9.00

    $ 12.00 12.00$ 12.00$ $ 4.00 $ 4.00

    $ 10.00 8.00$ 8.00$ $ 4.00 $ 20.00

    $ 4.00 $ 4.00

    $ 35.00 $ 42.00 $ 42.00 $ 21.00 $ 37.00

    $ 28,000,000.00 $ 8,400,000.00 $ 33,600,000.00 $ 4,200,000.00 $ 29,600,000.00

    Scenario 4

    Raw Materials

    45,000,000.00 50,000,000.00$ 37,800,000.00$

    35,000,000.00 $ 42,000,000.00 $ 33,800,000.00

    12,250,000.00 $ 14,700,000.00

    22,750,000.00 $ 27,300,000.00 $ 23,250,000.00

    $ 10,550,000.00

  • 8/3/2019 Plant Location Group 2

    12/14

    Isolated States Isolated States

    Developia Developia

    Developia Developia

    4,000,000.00$ 4,000,000.00$

    200000.00

    800000.00

    1.00$ 1.00$

    3.00$ 3.00$

    5.00$ 5.00$

    $ 9.00 $ 9.00

    4.00$ 4.00$

    4.00$ 20.00$

    4.00$ 4.00$

    13.00$ 13.00$

    $ 34.00 $ 50.00

    $ 6,800,000.00 $ 40,000,000.00

    50,800,000.00$

    $ 46,800,000.00

    $ 31,700,000.00

    $ 15,100,000.00

  • 8/3/2019 Plant Location Group 2

    13/14

    Country Sold Into: Freetradia Isolated States Freetradia Freetradia

    Plant Location Freetradia Isolated States Freetradia Freetradia

    Raw Materials from Freetradia Isolated States Developia Developia

    Plant construction Costs $10,000,000 $8,000,000 $10,000,000 $10,000,000

    Number of Units made

    before revolution1000000.00 1000000.00 200000.00

    Number of Units made

    after revolution800000.00

    A Cost $ 2.00 $ 2.00 $ 2.00 $ 2.00

    B Cost $ 6.00 $ 6.00 $ 4.00 $ 4.00

    C Cost $ 10.00 $ 10.00 $ 7.00 $ 7.00

    Total Material Cost $ 18.00 $ 18.00 $ 13.00 $ 13.00

    Labor $ 12.00 $ 12.00 $ 12.00 $ 12.00

    OH Applied $ 10.00 $ 8.00 $ 10.00 $ 10.00

    Transportation cost

    Tariff

    Total Cost of Charger $ 40.00 $ 38.00 $ 35.00 $ 35.00

    Total cost of production $ 40,000,000.00 $ 38,000,000.00 $ 7,000,000.00 $ 28,000,000.00

    Cost of Production

    Average cost of

    Production$ 40.00 $ 38.00

    Total cost of project (production + plant) 50,000,000.00$ 46,000,000.00$

    S

    $ 35.00

    Raw Materia

    $ 35,000,000.00

    1. The average cost of production should be charged to breakeven

    2. "I told you so" peple will say that they had already predicted that the cost of production in Deve

    3. Overnight global shipments are costly and time bound. As the consignment has to travel by air t

    the consignment.

    45,000,000.00$

  • 8/3/2019 Plant Location Group 2

    14/14

    Isolated States Isolated States Freetradia Freetradia Isolated States Isolated States

    Isolated States Isolated States Developia Developia Developia Developia

    Developia Developia Developia Developia Developia Developia

    8,000,000.00$ 8,000,000.00$ $4,000,000 $4,000,000 4,000,000.00$ 4,000,000.00$

    200000.00 200000.00 200000.00

    800000.00 800000.00 800000.00

    3.00$ 3.00$ $ 1.00 $ 1.00 1.00$ 1.00$

    7.00$ 7.00$ $ 3.00 $ 3.00 3.00$ 3.00$

    12.00$ 12.00$ $ 5.00 $ 5.00 5.00$ 5.00$

    $ 22.00 $ 22.00 $ 9.00 $ 9.00 $ 9.00 $ 9.00

    12.00$ 12.00$ $ 4.00 $ 4.00 4.00$ 4.00$

    8.00$ 8.00$ $ 4.00 $ 20.00 4.00$ 20.00$

    $ 25.00 $ 4.00 25.00$ 4.00$

    13.00$ 13.00$

    $ 42.00 $ 42.00 $ 42.00 $ 37.00 $ 55.00 $ 50.00

    $ 8,400,000.00 $ 33,600,000.00 $ 8,400,000.00 $ 29,600,000.00 $11,000,000.00 $ 40,000,000.00

    cenario 5

    $ 42.00 $ 38.00 $ 51.00

    ls

    $ 42,000,000.00 $ 38,000,000.00 $ 51,000,000.00

    lopia will be more and the sources are not reliable.

    hey have a fixed time when the consignment should be delivered after which they will not be able to take

    50,000,000.00$ 42,000,000.00$ 55,000,000.00$