Plans 13IL0121

download Plans 13IL0121

of 5

description

AAA

Transcript of Plans 13IL0121

  • SET NO. SHEET NO.

    Republic of the PhilippinesDepartment of Public Works and Highways

    OFFICE OF THE DISTRICT ENGINEERSouthern Leyte District Engineering Office

    Maasin City 1 1

    SHEET CONTENTS :APPROVED :RECOMMENDED :

    MA. MARGARITA C. JUNIA, DMDISTRICT ENGINEER

    REVIEWED / SUBMITTED :

    VINCENT T. SY, IIIENGINEER III

    CHIEF, PLANNING & DESIGN SECTION

    CHECKED :

    ELMO P. MULIGENGINEER II

    DESIGNED :

    ASSISTANT DISTRICT ENGINEER

    Republic of the PhilippinesDepartment of Public Works and HighwaysOFFICE OF THE DISTRICT ENGINEERSouthern Leyte District Engineering Office

    Maasin City

    REGION VIII

    PROPOSED REHAB./ RECONSTRUCTIONUPGRADING OF DAMAGED PAVED

    NATIONAL R0ADAlong JCT. Himay-angan ---Silago --- Abuyog Road

    ( K1102 + 000 --- K1102 + 920 (S00210LT) )Canipaan, Hinunangan, Southern Leyte

    5ARIEL M. TIDALGO ENGINEER II

    DENNIS E. ORAISENGINEER II

    PROJECT TITLE

    PROJECT TITLE & LOCATION :

    PROPOSED REHAB./ RECONSTRUCTIONUPGRADING OF DAMAGED PAVED

    NATIONAL ROADAlong Jct. Himay-angan --- Silago --- Abuyog Rd.

    ( K1102 + 000 --- K1102 + 920 ) Canipaan, Hinunangan, Southern LeyteRegion VIII

  • SOUTHERNLEYTE

    S o g o d B a y

    MAASIN CITY

    SAN RICARDO

    SOUTHERN LEYTE MAP

    LIMASAWA

    PINTUYAN

    PADRE BURGOS

    MACROHON

    BONTOC

    SOGOD

    LILO-AN

    SILAGO

    ST. BERNARD

    HINUNANGAN

    HINUNDAYAN

    LIBAGON

    1. SPECIFICATION :

    1.1 Design Specifications

    1.1.1 DPWH Standard Specification for Highways, Bridges & Airport Volume II 2004

    1.2 Construction Quanlification

    1.2.1 All works shall be made in conformity with the DPWH Standard Specification for Highways, Bridges &Airport Volume II 2004 special provisions and supplemental specifications pertaining to this project.

    2. DRAWINGS :

    2.1 Dimensions, Elevations and Stationings

    a. All dimensions are expressed in meters unless otherwise shown in the plans.

    b. All elevations are in meters.

    c. All stationings are in kilometers and meters.

    SPECIFICATIONS:

    DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES &AIRPORTS, REVISED EDITION 2004

    SPECIFICATIONS:

    DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES &

    VICINITY MAP

    THIS SITE

    SET NO. SHEET NO.

    Republic of the PhilippinesDepartment of Public Works and Highways

    OFFICE OF THE DISTRICT ENGINEERSouthern Leyte District Engineering Office

    Maasin City 2 2

    SHEET CONTENTS :APPROVED :RECOMMENDED :REVIEWED / SUBMITTED :CHECKED :DESIGNED :

    GENERAL NOTES INDEX OF SHEETS LOCATION MAP VICINITY MAP

    INDEX OF SHEETSSHEET NO. 1 ----------- TITLE PAGE

    SHEET NO. 2 ----------- GENERAL NOTES, INDEX OF SHEETS, LOCATION MAP, VICINITY MAP

    SHEET NO. 3 ----------- SUMMARY OF QUANTITIES, TYPICAL SECTION

    SHEET NO. 4 ----------- TYPICAL PLAN OF A TWO LANE PAVEMENT, JOINTS DETAIL, GENERAL NOTES

    SHEET NO. 5 ----------- STRAIGHT LINE DIAGRAM

    N

    MA. MARGARITA C. JUNIA, DMDISTRICT ENGINEER

    VINCENT T. SY, IIIENGINEER III

    CHIEF, PLANNING & DESIGN SECTION

    ELMO P. MULIGENGINEER II ASSISTANT DISTRICT ENGINEER

    ARIEL B. TIDALGO ENGINEER II

    DENNIS E. ORAIS ENGINEER II

    5

    PROJECT TITLE & LOCATION :

    PROPOSED REHAB./ RECONSTRUCTIONUPGRADING OF DAMAGED PAVED

    NATIONAL ROADAlong Jct. Himay-angan --- Silago --- Abuyog Rd.

    ( K1102 + 000 --- K1102 + 920 ) Canipaan, Hinunangan, Southern LeyteRegion VIII

    SILAGO

    HINUNANGAN

    HINUNDAYAN

    THIS SITE

    ANAHAWAN

    N

    GENERAL NOTES :

  • ITEM

    SUMMARY OF QUANTITIES

    D E S C R I P T I O N UNIT REMARKS

    102(2)a ROADWAY EXCAVATION ( SURPLUS COMMON )

    105 SUB-GRADE PREPARATION

    101(4)a REMOVAL OF EXISTING PAVEMENT

    AGGREGATE SUB-BASE COURSE200

    QUANTITY

    504.00

    118.00

    76.40

    PCCP ( 0.28 m. THK. )311(1)a

    CU. M.

    SQ. M.

    PROJECT BILLBOARD UNIT 2.00SPL # 4

    CU. M.

    SQ. M.

    SQ. M.

    1 : 40 MTS.SCALE

    TYPICAL ROADWAY SECTION

    SET NO. SHEET NO.

    Republic of the PhilippinesDepartment of Public Works and Highways

    OFFICE OF THE DISTRICT ENGINEERSouthern Leyte District Engineering Office

    Maasin City 3 3

    SHEET CONTENTS :APPROVED :RECOMMENDED :

    MA. MARGARITA C. JUNIA, DMDISTRICT ENGINEER

    REVIEWED / SUBMITTED :

    VINCENT T. SY, IIIENGINEER III

    CHIEF, PLANNING & DESIGN SECTION

    CHECKED :

    ELMO P. MULIGENGINEER II

    DESIGNED :

    ASSISTANT DISTRICT ENGINEER

    0.15 m. THK. AGGREGATE SUB-BASE COURSE0.23 m. THK. PCCP (RECONSTRUCTION)

    ????????????????????????????????????

    3.05 m. 3.05 m.

    TYPICAL SECTION SHOWINGBOTH LANE REBLOCKING

    0.15 m. THK. AGGREGATE SUB-BASE COURSE0.23 m. THK. PCCP (RECONSTRUCTION)

    DOWEL

    C L C L

    TYPICAL SECTION SHOWINGHALF LANE REBLOCKING

    EXISTING PAVEMENT

    ARIEL B. TIDALGO ENGINEER II

    DENNIS E. ORAIS

    SUMMARY OF QUANTITIES

    TYPICAL ROADWAY SECTION ENGINEER II

    5

    PROJECT TITLE & LOCATION :

    PROPOSED REHAB./ RECONSTRUCTIONUPGRADING OF DAMAGED PAVED

    NATIONAL ROADAlong Jct. Himay-angan --- Silago --- Abuyog Rd.

    ( K1102 + 000 --- K1102 + 920 ) Canipaan, Hinunangan, Southern LeyteRegion VIII

    504.00

    504.00

    3.05 m.

  • 1. MATERIALS AND WORKMANSHIP SHALL BE CORFORM WITH THE DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS 2004 AND SPECIALS PROVISIONS.

    2. CONSTRUCTION (CONTACT) JOINTS ARE FORMED WHEN CONCRETE ON ONE SIDE OF THE JOINT IS POURED AHEAD AND ALLOWED TO SET BEFORE POURING ON THE OTHER SIDE.

    3. AT CONSTRUCTION JOINTS (LONGITUDINAL OR TRANSVERSE) CARE SHOULD BE TAKEN THAT NO CONCRETE FROM THE LAST SLAB PLACED OVERHANGS ANY PORTION OF THE FIRST SLAB.

    4. THE BARS SHOULD BE DEFORMED STEEL BARS. ALL THE DOWEL BARS BE SMOOTH ROUND STEEL BARS FREE FROM THE RUST AND OTHER THE DEFECTS WHICH MIGHT RESTRICT THIER MOVEMENT.

    5. TYPED OF WEAKEND PLAN JOINT TO BE USED SHALL BE AS SPECIFIED IN THE PLANS AND ONLY ONE TYPE SHALL BE UESD FOR THE WHOLE PROJECT.

    6. MATERIAL FOR THE METAL SIDE FROM SHALL BE BRAND NEW SHEET METAL GAUGE No. 18 OF BLOCK IRON FREE FROM THE RUST AND KINKS.

    7. AT LEAST SIX (6) SUCCESSIVE DOWELLED BUTT JOINTS AT NORMAL JOINT SPACING SHALL BE PROVIDED BEFORE ON AFTER IN EXPANSION JOINT.

    8. THE GROOVE OR CRACK ABOVE JOINTS (LONGITUDINAL OR TRANVERSE) SHALL BE SEALED WITH 30 - 50 PENETRATION ASPHALT SEAL OR COLD APPLIED LIQUID RUBBER COMPOUND AFTER THE CONCRETE HAD BEEN CURED AND BEFORE OPENING THE PAVEMENT TO TRAFFIC. ASPHALT SEAL SHOULD BE POURED IN SUCH MANNER THAT SPILLING SHALL BE PRESENTED/ELIMINATED.THIS PROVIDE A SMOOTH RIDING SURFACE.

    9. ALL TRANVERSE JOINTS. EXCEPT CONTRUCTION JOINT. BE CONTIMUOUS FROM THE EDGE TO EDGE

    10. ALL LONGITUDINAL JOINTS SHALL MEET AT INTERSECTIONS WITH NO GAPS OR OFFSETS

    11. ALL DIMENSIONS ARE IN MIIMETERS. UNLESS OTHERWISE SPECIFIED.

    12. AVOID STOPPAGE OF FORMWORKS ALONG CURVES.

    GENERAL NOTES:

    SET NO. SHEET NO.

    Republic of the PhilippinesDepartment of Public Works and Highways

    OFFICE OF THE DISTRICT ENGINEERSouthern Leyte District Engineering Office

    Maasin City 4 4

    SHEET CONTENTS :APPROVED :RECOMMENDED :REVIEWED / SUBMITTED :CHECKED :DESIGNED :

    EXISTING PAVEMENT

    TYPICAL PLAN OF A TWO LANE PAVEMENTSCALE : 1 : 100 M.

    NEW PAVEMENT

    EXISTING PAVEMENT NEW PAVEMENT

    D

    TRANSVERSE CONSTRUCTION (CONTACT) JOINT SHALL BEPROVIDED AT THE OF ANY RUN WHERE LAYING OFCONCRETE HAS BEEN STOPPED FOR THIRTY (30) MINUTESLONGER,

    TRANVERSE CONSTRUCTION JOINTS WHICH OCCUR AT LOCATIONOF WEAKENED PLANE, BUT JOINTS WITH DOWELS SHOULD BEUSED, IF JOINTS OCCURS IN THE MIDDLE THIRD OF THEWEAKENED PLANE (1500 - 3000 mm.), KAYED JOINT WITHTHE BARS SHOULD BE USED,

    DRILLING OF HOLES ON EXISTING PCCP AND OTHERSTRUCTURES SHALL BE PERFORMED USING POWER TOOLS THEHOLES SHALL BE PROPERLY CLEANED BEFORE GROUT/EPOXYINJECTION AND INSTALLATION OF DOWELS/THE BARS.

    NOTE:

    PCC PAVEMENT DESIGN PARAMETERS

    TRAFFIC ( ESAL ) . W

    RELIABILITY , R

    STANDARD NORMAL DEVIATE , Z

    1.55E+06

    85 %

    - 1.037

    OVERALL STANDARD DEVIATION , S

    SERVICEABILITY PSI = P - P

    0.39

    2.0

    RESILIENT MODULUS OF SUBGRADE REACTION ( CBR = 8% )

    SUBBASE ELASTIC MODULUS ( PSI ), ESB ( CBR = 25% )

    EFFECTIVE MODULUS OF SUBGRADE REACTION ( pci ), k

    12,000

    14,000

    180

    654

    3.60E+06

    8.0 %

    1

    3.8

    A. DESIGN VARIABLES VALUE :18

    R

    O

    B. PERFORMANCE CRITERIA :O 1

    C. MATERIALS PROPERTIES :

    PCC MODULUS OF RAPTURE ( PSI ), S'

    PCC MODULUS OF ELASTICITY ( PSI ), E

    DESIGN CBR

    DRAINAGE COEFFICIENT , C

    LOAD TRANSFER COEFFICIENT , J

    LOSS OF SUPPORT , L

    C

    C

    D. PAVEMENT STRUCTURAL CHARACTERISTICSd

    S

    E. PAVEMENT STRUCTURE THICKNESSPORTLAND CEMENT CONCRETE PAVEMENT ( PCCP ), mm

    AGGREGATE SUBBASE COURSE ( ASC), mm

    1.0

    230

    200

    ????????????????????????????????????

    ??????????????????????????????????????

    ( CONTRACTION JOINT )

    .175

    m.

    ???????????????????????????????

    ( CONSTRUCTION JOINT )4.50 m.

    1.50 m.

    4.50 m.

    3.35

    m.

    ( NO

    RM

    AL

    WID

    TH )

    3.35

    m.

    ( NO

    RM

    AL

    WID

    TH )

    TYPICAL PLAN OFA TWO LANE PAVEMENT

    JOINTS DETAILGENERAL NOTES

    50

    6

    SAWED GROOVE W/POURED JOINT FILLER

    DEFORMED TIE BAR 16mm ?X 600mm. @ 600mm O.C.

    12

    25

    T/3

    T/3

    T/3

    FORMED GROOVE W/ KEYWAYS& POURED JOINT FILLER

    50

    6

    SAWED GROOVE W/ POURED JOINT FILLER(@ 4.5m INTERVAL OR AS DIRECTED BY THE ENGINEER

    25

    EXISTING PCCP/FIRST CASTING

    CONSTRUCTION JOINT DETAIL SCALE 1 : 20 M.

    CENTER LINE DETAIL SCALE 1 : 20 M.

    SAWED GROOVE DETAIL SCALE 1 : 20 M.

    KEYED TRANSVERSE CONSTRUCTION OR CONTRUCT JOINT(TO BE PLACED ONLY IN MIDDLE THIRD OF NORMAL JOINT INTERVAL)

    0.30 m. 0.30 m.

    0.30

    m.

    0.28

    m.

    0.28

    m.

    DEFORMED TIE BAR 16mm ?X 600mm. @ 600mm O.C.

    0.30 m. 0.30 m.

    0.28

    m.

    50

    6

    SAWED GROOVE W/POURED JOINT FILLER

    ROUND TIE BAR 25mm ?X 600mm. @ 600mm O.C.

    CONTRACTION JOINT DETAIL SCALE 1 : 20 M.

    0.30 m. 0.30 m.

    0.30

    m.

    0.28

    m.

    JOINTS DETAIL SCALE 1 : 20 MTS.

    MA. MARGARITA C. JUNIA, DMDISTRICT ENGINEER

    VINCENT T. SY, IIIENGINEER III

    CHIEF, PLANNING & DESIGN SECTION

    ELMO P. MULIGENGINEER II ASSISTANT DISTRICT ENGINEER

    ARIEL B. TIDALGO ENGINEER II

    DENNIS E. ORAIS ENGINEER II

    5

    PROJECT TITLE & LOCATION :

    PROPOSED REHAB./ RECONSTRUCTIONUPGRADING OF DAMAGED PAVED

    NATIONAL ROADAlong Jct. Himay-angan --- Silago --- Abuyog Rd.

    ( K1102 + 000 --- K1102 + 920 ) Canipaan, Hinunangan, Southern LeyteRegion VIII

  • 1 : 500 MTS.SCALE

    STRAIGHT LINE DIAGRAM

    SET NO. SHEET NO.

    Republic of the PhilippinesDepartment of Public Works and Highways

    OFFICE OF THE DISTRICT ENGINEERSouthern Leyte District Engineering Office

    Maasin City 5 5

    SHEET CONTENTS :APPROVED :RECOMMENDED :REVIEWED / SUBMITTED :CHECKED :DESIGNED :

    TO SOGOD

    STRAIGHT LINE DIAGRAM

    MA. MARGARITA C. JUNIA, DMDISTRICT ENGINEER

    VINCENT T. SY, IIIENGINEER III

    CHIEF, PLANNING & DESIGN SECTION

    ELMO P. MULIGENGINEER II ASSISTANT DISTRICT ENGINEER

    ARIEL B. TIDALGO ENGINEER II

    DENNIS E. ORAIS ENGINEER II

    1102 + 100 1102 + 200 1102 + 300

    TO SILAGO

    5

    PROJECT TITLE & LOCATION :

    PROPOSED REHAB./ RECONSTRUCTIONUPGRADING OF DAMAGED PAVED

    NATIONAL ROADAlong Jct. Himay-angan --- Silago --- Abuyog Rd.

    ( K1102 + 000 --- K1102 + 920 ) Canipaan, Hinunangan, Southern LeyteRegion VIII

    K1102

    1102 + 300 1102 + 400 1102 + 500 1102 + 600

    1102 + 700 1102 + 800 1102 + 9001102 + 600 1102 + 920

    PROPOSED REBLOCKING ( L/S )K1102 + 000.00 --- K1102 + 013.30

    PROPOSED REBLOCKING ( B/S )K1102 + 075.40 --- K1102 + 085.40

    PROPOSED REBLOCKING ( L/S )K1102 + 085.40 --- K1102 + 234.00

    PROPOSED REBLOCKING ( R/S )K1102 + 075.40 --- K1102 + 105.20

    PROPOSED REBLOCKING ( B/S )K1102 + 234.00 --- K1102 + 300.00