Planning, Station and Environs and Future Development

description

Inchicore on Track's presentation at the ABP Oral Hearing in March 2011, in relation to the Dart Underground coming Above ground in Inchicore. Chapter 3: Planning, Station and Environs and Proposed Future Development

Transcript of Planning station environs_proposed_future_slides

Page 1: Planning station environs_proposed_future_slides

Planning, Station and Environs and Future Development

Page 2: Planning station environs_proposed_future_slides

A Community Under Threat

• Quiet and Green

• Integrated with the Railway Works

• A Cul-de-sac threatened by greater permeability and proposed future development of the Railway Works

Page 3: Planning station environs_proposed_future_slides

A Community Under Threat

• Future Development: the Railway Works Site is Twice the Size of Temple Bar, similar to the Docklands

Page 4: Planning station environs_proposed_future_slides

A Community Under Threat

• The community needs to be a participating stakeholder in any future development

Page 5: Planning station environs_proposed_future_slides

CIE’s History of Neglect and Failure to Plan

• Section 43(1) , Transport (Railway Infrastructure) Act 2001 as amended by the Planning and Development, (Strategic Infrastructure) Act 2006, sets out matters Bord Pleanála is required to consider before deciding whether to grant the order

• These include: ‘the likely consequence for proper planning and sustainable development in the area in which it is proposed to carry out the Railway Works and for the environment of such works.’(s. 43(1)(g)).

Page 6: Planning station environs_proposed_future_slides

CIE’s History of Neglect and Failure to Plan

• Experience of the Third Track Works and Reinstatement

Page 7: Planning station environs_proposed_future_slides

Poor Reinstatement

Page 8: Planning station environs_proposed_future_slides

Permanent Way Compound and Fenced-off Areas

Page 9: Planning station environs_proposed_future_slides

Then

Page 10: Planning station environs_proposed_future_slides

Now

Page 11: Planning station environs_proposed_future_slides

Proposed Station: Access

Page 12: Planning station environs_proposed_future_slides

Proposed Station: Access

Page 13: Planning station environs_proposed_future_slides

Proposed Station: Access

Page 14: Planning station environs_proposed_future_slides

A Terminus Station

Image of station with dotted lines for provision of tie in to Kildare Route Project

Page 15: Planning station environs_proposed_future_slides

Implications for the Railway Estate: Anti-Social Behaviour

Image of station with dotted lines for provision of tie in to Kildare Route Project

Page 16: Planning station environs_proposed_future_slides

Economic and Social Impact

Image of Davitt Road Rubble

Page 17: Planning station environs_proposed_future_slides

Economic and Social Impact

Image of empty shopfronts in Inchicore

Page 18: Planning station environs_proposed_future_slides

Economic and Social Impact

Image of empty shopfronts in Inchicore

Page 19: Planning station environs_proposed_future_slides

Economic and Social Impact: Proposed Future Development

Image of empty shopfronts in Inchicore

Page 20: Planning station environs_proposed_future_slides

A Vision