Planning of T2.4 “Energy Monitoring tools design”

15
1 ARTISAN 1st ARTISAN 1st Plenary Plenary Meeting Meeting May 8th – 9th 2012 Planning of T2.4 “Energy Monitoring tools design” Konstantina Papachristopoulou Athens Technology Center S.A.

description

Planning of T2.4 “Energy Monitoring tools design”. Konstantina Papachristopoulou Athens Technology Center S.A. Overview. Task Leader: ATC Participants: AUEB, INTRA Timeline Phase A: April 2012 – October 2012 Phase B: June 2013 – July 2013 - PowerPoint PPT Presentation

Transcript of Planning of T2.4 “Energy Monitoring tools design”

Page 1: Planning of T2.4  “Energy Monitoring tools design”

1ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

Planning of T2.4 “Energy Monitoring tools design”

Konstantina PapachristopoulouAthens Technology Center S.A.

Page 2: Planning of T2.4  “Energy Monitoring tools design”

2ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

• Task Leader: ATC

• Participants: AUEB, INTRA

• Timeline

– Phase A: April 2012 – October 2012

– Phase B: June 2013 – July 2013

• Goal of Task: to further elicit the requirements, design & develop the energy monitoring tools to report the energy-consumption indicators (per process & product)

Overview

Page 3: Planning of T2.4  “Energy Monitoring tools design”

3ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

Brief Description of Work

• Finalisation of the requirements design & development of the IT tools aiming at delivering the energy-use profile for the Textile/Clothing SC (WP1 framework) • The tools will address the needs of: – energy monitoring for the complete process flows– focus on each individual processes involved– interoperability with higher level enterprise

applications

3

Page 4: Planning of T2.4  “Energy Monitoring tools design”

4ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

• D2.2 Energy Consumption Reduction & Energy Monitoring Tools & Testing report - initial Version (M12 – October 2012)

• D2.4 Energy Consumption Reduction & Energy Monitoring Tools (M21 – July 2013)

Results of Task

Page 5: Planning of T2.4  “Energy Monitoring tools design”

5ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

• Identification of the project case studies (WP1)

• Setting of the overall infrastructure (T2.1)• Submission of the Method & data

management structure (T2.2)• Initial version of the energy consumption

reduction tool (T2.3)

Occurrences needed before task initiation

Page 6: Planning of T2.4  “Energy Monitoring tools design”

6ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

• Input expected for this task from partners AUEB, DITF & ENEA

• Dependencies: T2.5 & WP3

Dependencies

Page 7: Planning of T2.4  “Energy Monitoring tools design”

7ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

• Acquisition and Installation of metering devices at Piacenza

• Decision on the way the energy data of MC will be transmitted to the Technology partners

• Drafting and submitting D2.1 (AUEB /DITF, with contributions from ENEA) – Due on May 31st 2012

Critical issues

Page 8: Planning of T2.4  “Energy Monitoring tools design”

8ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

• In the framework of T2.1 AUEB performed a market search to identify the needed hardware

• Technical characteristics:– Measurement of energy consumption– Ability to connect to a computer network and

transmit data to a server

Metering devices

Page 9: Planning of T2.4  “Energy Monitoring tools design”

9ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

• Companies: Barco-vision (closed solution – comes with SW), Schneider-Electric, & Abb.

• Schneider-Electric seems to provide a better solution, therefore we propose to use equipment from this company.

RFQs

Page 10: Planning of T2.4  “Energy Monitoring tools design”

10ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

Schneider-Electric

Meter Volt input Ampere Input Power SupplyCommunication Cost (Euros)

PM1200 up to 480 0,5 – 6A (CT)44 - 277 V AC at 50 Hz/60 Hz

ModBus RS485 262,50

44 - 277 V DC

IEM3155 83-477 1-63(No CT)ModBus RS485

will be in market after June 2012

1-5(CT)Integrated Web Server

Max number of connected meters

Communication with meters Output Format Power Supply Cost (Euros)

EGX300 64 (up to 100) ModBus RS485 CSV to FTP 24V DC 1286,80CSV to HTTPPDF to emailManual download

Page 11: Planning of T2.4  “Energy Monitoring tools design”

11ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

AbbMeter Volt input Ampere Input Power Supply Communication Cost (Euros)

DMTME-I-485-96 10-500V 0,05 – 5A (CT) 115-230AC ModBus RS485 260,00RS485/RS232

ConverterMax number of connected

meters Cost (Euros)CUS ? 560

PLCMax number of connected

meters Power Supply CostAC500 32 24V DC 734,00

Page 12: Planning of T2.4  “Energy Monitoring tools design”

12ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

• Indicative offer for 100 machines (as found in GR market)

Schneider-Electric Offer 1

Page 13: Planning of T2.4  “Energy Monitoring tools design”

13ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

• Indicative offer for 30 machines (as found in GR market)

Schneider-Electric Offer 2

Page 14: Planning of T2.4  “Energy Monitoring tools design”

14ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

• Piacenza pilot:– Decision on acquiring & installing the needed

equipment

• MC pilot:– Decision on the way the energy monitoring data

will be sent to the technology partners (direct access to the repository, access to a copy server, connection with web services,…)

Decisions & Next steps

Page 15: Planning of T2.4  “Energy Monitoring tools design”

15ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012

• Continue and successfully conclude Phase A (April 2012 to October 2012):– Energy monitoring tools definition based on the

outcomes of WP1 and D2.1 – Drafting of the use case scenarios – Requirements diagrams and Database design– Monitor development of D2.2 (1st prototype of the

tools)

6 months planning