Planning for Renewable Energy
Glen SkarbakkaGreat River Energy
Workshop on Renewable Energy for MinnesotaOctober 12, 2006
2
Great River Energy Overview
A Generation & Transmission Cooperative28 Member Distribution Cooperatives600,000 Distribution CustomersLong term growth rate ~3%Summer peaking (~2600 MW)
2005 Energy Growth
0-2%8%+
6-8%
4-6%
2-4%
3
0150300450600750900
1050120013501500165018001950210022502400
1/1/
2001
1/13
/200
11/
25/2
001
2/6/
2001
2/18
/200
13/
2/20
01
3/14
/200
13/
26/2
001
4/7/
2001
4/19
/200
1
5/1/
2001
5/13
/200
15/
25/2
001
6/6/
2001
6/18
/200
16/
30/2
001
7/12
/200
17/
24/2
001
8/5/
2001
8/17
/200
1
8/29
/200
19/
10/2
001
9/22
/200
110
/4/2
001
10/1
6/20
0110
/28/
2001
11/9
/200
111
/21/
2001
12/3
/200
112
/15/
2001
12/2
7/20
01
0150300450600750900
1050120013501500165018001950210022502400
1/1/
2001
1/13
/200
11/
25/2
001
2/6/
2001
2/18
/200
13/
2/20
01
3/14
/200
13/
26/2
001
4/7/
2001
4/19
/200
1
5/1/
2001
5/13
/200
15/
25/2
001
6/6/
2001
6/18
/200
16/
30/2
001
7/12
/200
17/
24/2
001
8/5/
2001
8/17
/200
1
8/29
/200
19/
10/2
001
9/22
/200
110
/4/2
001
10/1
6/20
0110
/28/
2001
11/9
/200
111
/21/
2001
12/3
/200
112
/15/
2001
12/2
7/20
01
1200 MW
1200 MWJune - July
GRE is very summer peaking
4
GRE’s Supply Portfolio
CapacityEnergy
CoalGasOilWindHydroRDFPurch
*nameplate rating
*
5
GRE Generating Facilities
6
Wind Power Purchases
<2005: 3 x 6 MW projects = 18 MW2005: Trimont = 100 MW2007: High Prairie = 100 MW
High Prairie
Trimont
7
0%
2%
4%
6%
8%
10%
12%
14%
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
% o
f Ene
rgy
PlannedExist & CommittedREO
GRE is meeting MN's Renewable Energy Objective
8
Coping with growth
100 MW / yr
9
Environment
Reliability Cost
Planning Objectives
10
Environmental Targets
By 2020:Supply 20% of energy with renewablesReduce CO2 emissions to 2000 levels
11
The olden days: a physical world
GRE Member Loads
GRE Generators
GRE Gen=
GRE Load
12
Midwest ISO
Operates transmission and energy markets.
13
Today: a financial world
MISO
GRE Member Loads
MISO MidwestIndependent System Operator
GRE Generators GRE Gen≠
GRE Load
14
Market Prices: temporal volatility
($50)
$0
$50
$100
$150
$200
$250
$300
$350
7/31/06 8/1/06 8/2/06 8/3/06
LMP
$/M
Wh
GRE.GREReal-time LMP
Monday WednesdayTuesday
15
Market Prices: spatial volatility
16
Wind Site Value: Cost v. Revenue
Wind Resource→ Cost of Wind
Market Price (LMP)→ Revenue from Wind
17
Queued Generating Projects
3443 MW
10,978 MW
12,572 MW
MISO Generator Interconnection Queue 9/26/06
18
Wind Development Issues
SitingEnergy ValueGeographic diversityTransmission availability
TimingTransmission interconnection arrangementsFederal Production Tax Credit deadlines
CostEquipment & installation
TechnicalEquipment reliability (long term)Wind integration / ancillary services
Project SizeEconomies of scale v. small developer preference
19
Other renewables
BiomassWaste streams
Municipal wasteWaste woodAg wasteLandfill gas
Energy cropsSwitchgrass, trees, etc.
Co-firing
HydroSolar
20Saline-Filled
Basalt Formations
Saline-Filled Sedimentary Formations
MajorBit and SubbitCoal Basins
Depleting Oil Fields
Depleting Gas
Basins
Existing Coal PlantsAnnounced Coal Plants
Other ways to reduce CO2
CO2 capture & sequestration
21
Other ways to reduce CO2
CO2 capture & sequestrationImproved power plant efficiencies"Energy Factories"
Combined heat and powerpower production <--> industrial process
Coal to liquids or syngas
Distributed Gasification Combined CycleNuclearPoint of use generationConservation!