Muhammad Sadiq Aftab     Karachi, Pakistan. Cell No.:+923333535697    Email: [email protected] CAREER OBJECTIVE To attain professional excellence by applying my technical and management skills along with strong academic background in an organization or institution having challenging and competitive environment. A challenging assignment in project planning & control with a reputable company to utilize acquired skills & knowledge and deliver outstanding results PROFILE SYSNOPSIS  Versatile Civil Engineer with 6 years of rich hands on experience in project planning & control at major projects in the Pakistan in Building & Industrial Projects.  Proven competence in project planning including, preparation of Level III & IV schedules using Primavera P6 and MS Project, progress measurement system, monitoring progress and updating schedules and providing forecasts & lookahead schedules  Skilled in measuring project progress through earned value management, identifying risks and factors likely to impact schedules and proposing effective corrective measures.  Good working knowledge of contracts administration and assisted planning and project manager at different projects.  Experienced in reviewing and endorsing for approval engineering procurement, construction & commissioning schedules from EPC contractors.  Deft coordinating with representatives of clients & contractors on all matters related schedule revisions, subject & recovery plans, lookahead schedules, finalizing change orders and validating progress claims.  Proficient in working with multi teams with excellent communication, coordinating, problem solving, decision making, and planning & execution skills to deliver consistently superior performances.  ACADEMIC QUALIFICATION Masters in Engineering Management (Construction Management) with 3.66/4.0 CGPA in 2014 N.E.D University of Engineering & Technology Bachelor in Engineering (Civil Engineering) with 1st Division in 2010 N.E.D University of Engineering & Technology  CAREER HISTORY Claims & Planning Engineer Feb 2016 - Present Mott McDonald Pakistan (Pvt) Ltd. Project     : “Construction of New Islamabad International Airport Pakistan Salient Features           : “New Islamabad International Airport Pakistan will be the first greenfield airport in Pakistan and the first to support the landing of Airbus A380. Build on an area of 3,289 acres, the project consists of 90 checkin counters and a parking facility for 2,000 vehicles and will cater to upward of 10 million people every year in its first phase and up to 25 million in the second phase. The terminal includes 15 gates with ten remote gates, a fourstar hotel, dutyfree shops, two runways, six taxiways, food court and 42 immigration counters. It is being built on more than 3200 acres of land and consists of a passenger terminal building, 2 runways (28L/10R, 28R/10L), taxiways, apron and parking bays for wide body aircraft. There will also be a cargo terminal, air traffic control complex, fuel farm, as well as a fire, crash and rescue facility. It would be equipped to handle all types of aircraft including the new generation aircraft such as the Airbus A380, Boeing 7478 and Boeing 787 Dreamliner. The airport 

Transcript of Planning Engineer Resume.

Page 1: Planning Engineer Resume.

Muhammad Sadiq Aftab     Karachi, Pakistan. Cell No.:+92‐333‐3535697    Email: [email protected] 

CAREER OBJECTIVE To attain professional excellence by applying my technical and management skills along with strong 

academic background in an organization or institution having challenging and competitive environment. 

A challenging assignment in project planning & control with a reputable company to utilize acquired 

skills & knowledge and deliver outstanding results 

PROFILE SYSNOPSIS  Versatile Civil  Engineer with 6  years of  rich hands on  experience  in project planning &  control  at major projects in the Pakistan in Building & Industrial Projects. 

Proven  competence  in  project  planning  including,  preparation  of  Level  III  &  IV  schedules  using Primavera  P‐6  and MS  Project,  progress measurement  system, monitoring  progress  and  updating schedules and providing forecasts & look‐ahead schedules 

Skilled in measuring project progress through earned value management, identifying risks and factors likely to impact schedules and proposing effective corrective measures. 

Good working knowledge of contracts administration and assisted planning and project manager at different projects. 

Experienced  in  reviewing  and  endorsing  for  approval  engineering  procurement,  construction  & commissioning schedules from EPC contractors. 

Deft  coordinating  with  representatives  of  clients  &  contractors  on  all  matters  related  schedule revisions,  subject &  recovery  plans,  look‐ahead  schedules,  finalizing  change  orders  and  validating progress claims. 

Proficient in working with multi teams with excellent communication, coordinating, problem solving, decision making, and planning & execution skills to deliver consistently superior performances. 

 

ACADEMIC QUALIFICATION Masters  in  Engineering  Management  (Construction  Management)  with  3.66/4.0  CGPA  in  2014 N.E.D University of Engineering & Technology 

Bachelor in Engineering (Civil Engineering) with 1st Division in 2010 

N.E.D University of Engineering & Technology 

 

CAREER HISTORY Claims & Planning Engineer Feb 2016 - Present Mott McDonald Pakistan (Pvt) Ltd. Project       : “Construction of New Islamabad International Airport Pakistan” Salient Features           : “New Islamabad International Airport Pakistan will be the first greenfield airport in Pakistan and the first to support the landing of Airbus A380. Build on an area of 3,289 acres, the project consists of 90 check‐in counters and a parking facility for 2,000 vehicles and will cater to upward of 10 million people every year in its first phase and up to 25 million in the second phase. The terminal includes 15 gates with ten remote gates, a four‐star hotel, duty‐free shops, two runways, six taxiways, food court and 42 immigration counters. It is being built on more than 3200 acres of land and consists of a passenger terminal building, 2 runways (28L/10R, 28R/10L), taxiways, apron and parking bays for wide body aircraft. There will also be a cargo terminal, air traffic control complex, fuel farm, as well as a fire, crash and rescue facility. It would be equipped to handle all types of aircraft including the new generation aircraft such as the Airbus A380, Boeing 747‐8 and Boeing 787 Dreamliner. The airport 

Page 2: Planning Engineer Resume.

Muhammad Sadiq Aftab     Karachi, Pakistan. Cell No.:+92‐333‐3535697    Email: [email protected] 

will have a 180,000m² modular terminal building which will initially be able to handle 9 million passengers and 80,000 metric tons cargo per annum. The numbers are expected to reach 15 million passengers by 2019 and increase to 25 million passengers by 2024. Being a new airport, a significant portion of the land has been earmarked for commercial purposes such as duty‐free shops, hotel and convention center, air malls, business center, food courts, leisure and recreational facilities. 

As Claims & Planning Engineer, my duties are 

Prepare and update project schedule based on the contract. 

Set work program and target milestones for each phase based on the project plan. 

Monitor critical activities based on the project schedule and advise project management. 

Prepares and submit updated work program and cash flow curve showing actual progress and identify areas of weakness and establishes means and methods for recovery, if any, as well as new critical activities. 

Maintain and record update of site work progress obtained from Project Manager. 

Prepares monthly report reflecting work progress summary. 

Report to the Project Manager about the current work progress and make comparison between plan and actual progress and study impact of alternative approaches to work. 

Participate in project meetings and discussions with the Client as required. 

Prepare extension of time (EOT) and delay analysis.  

Review Contractor delay claims for substantiation.  

Liaise with Commercial Team and Planning Team and exchange information.  

Prepare frag net schedules as required.  

Assess potential time impacts of variations.  

Make recommendations to overcome project issues and re‐sequencing as required.  

Interface with other Claims Planning & Commercial Team staff.  

Develop logic for various facilities and trades.  

Meet with client and contractors as needed to review schedule and issues.  

Identify potential issues and ways to overcome them.  

Review and analyze contractor’s schedule and submission logs/reports.   

Planning & Project Control Engineer June 2015 – Feb-2016 TUV Austria (Pakistan Chapter)& Proctor & Gamble Pakistan. Project        : “Project Shaheen‐Hair Care, Proctor & Gamble Pakistan Port Qasim‐Karachi” Salient Features           : “Project Shaheen Hair Care (Proctor & Gamble Pakistan, Port Qasim‐Karachi) is a new Plant to build localizes Hair Care products manufacturing. This project includes construction of Hair products making systems, packing systems, Utilities systems, Warehouses, Laboratories, and Facilities. Construction of Hair Care plant for production of P&G hair care products like Head& Shoulder , Pantene shampoo e.t.c It has approx. 0.1 Million Sq. feet area”  

As Planning & project Control Engineer my duties are 

Review schedule sheets from respective disciplines ‐ HSE, Facilities, Making, Packing, Utilities, Start‐up etc and identify  all opportunities 

 Make an integrated END to END L3 schedule including all disciplines with proper linkages working with construction contractors. 

Page 3: Planning Engineer Resume.

Muhammad Sadiq Aftab     Karachi, Pakistan. Cell No.:+92‐333‐3535697    Email: [email protected] 

 Develop weekly tracking report to be shared in weekly CPS review meeting and issue report after the meeting. 

 Lead the weekly Shaheen CPS review meeting and clearly communicate opportunities and action plan status. 

 Review schedule submitted by contractors in their bids and make input to evaluation as part of contractor selection/evaluation process. 

Planning & Project Control Engineer Jan 2013 - June 2015 Habib Rafiq (Pvt) Ltd. Project        : “Bahria Icon Tower,Karachi. Pakistan” Salient Features           : “This is high rise building of Pakistan. It has three towers i.e Office Tower (07 Nos. Basement +Ground +Mezzanine+64 Stories), Hotel Tower (07 Nos. Basement +Ground +Mezzanine+42 Stories) & Commercial podium. It has approx. 3.4 Million Sq. feet area”  

As Sr. Planning Engineer my duties are 

Preparation of a baseline schedule in coordination with the project’s staff including timeframes, resources, equipment, submittals, cost loading and budgeting. 

Conducting site visits on regular basis and collecting necessary data as required to study projected progress and work schedule completion 

Performing weekly updates to follow up the progress and implement preventive / corrective actions when needed. 

Continuous project monitoring and cost control / comparing budget cost against actual cost and reconciliation with accounting department. 

Earned Value Analysis 

Providing feedback to Project Managers in case of projected over‐ or under‐run in disbursements in comparison to project budgets and plans 

Providing continuous on‐site support to the project staff and clarifying details pertaining to the work plan 

Developing Key Performance Indicators (KPIs) as required by clients and finding ways to achieve them with high efficiency and effectiveness. 

Planning & Contract Engineer Jan 2012 – Jan 2013 Haris& Co.(A company of TH Group) Project    : “Beacon House School System” Salient Features         : “Construction of 05 No. Blocks of Beacon House School System 15,000 Sq. Yard area for 2500 O and A level students with recreational activities.”  

As Planning & Contract Engineer my duties are 

Analyze rates for new upcoming tender with contract manager. 

Participate in tenders with Contracts manager. 

Preparation, Submission and checking of Running & final Bills to client/ Consultant. 

Prepare variation in projects. 

Preparation, submission and updating of the project master program 

Recording progress of the project by comparing with the target project.  

Page 4: Planning Engineer Resume.

Muhammad Sadiq Aftab     Karachi, Pakistan. Cell No.:+92‐333‐3535697    Email: [email protected]  Submit weekly and monthly progress reports.  

Preparation of Delay Impact and Extension of Time (EOT) Claims Programs (Variation Claims). 

Recording and reporting the actual progress of the work versus the planned work.   

Preparation of Weekly/Monthly Progress Reports. 

Follow up of Submittals, Procurement Schedule, etc. 

Preparation of In‐house program for the construction team to expedite the work. 

Preparing Daily Site Reports for the consultant and Issuing Daily/Weekly Construction Schedules for the Construction Team. 

Jr. Planning & Site Co-ordination Engineer Dec 2010 – Jan 2012 Zia Ud Din& Co (Pvt) Ltd. Project               : “IBA (Institute of Business Administration) city campus” Salient Features          : “Extension & Renovation of IBA City Campus existing Admin Block building about 23000 Square feet”  

As Jr. Planning & Project Co‐ordination Engineer my duties are: 

Site Supervision & Monitoring of daily activities. 

Supervise all Structural works as per consultant specification and standards while keeping all safety measurements. 

Preparation and arrangement of Manpower, Equipment’s and Materials for fore coming activities to run project in smooth way. 

Maintain progress by fixing targets.  

Can prepare shop drawings and as built drawing on site. 

Can prepare bar bending schedule and can control all field documents. 

Involvement in Planning & Execution of project on daily Basis. 

Estimates quantities of materials, manpower and equipment.  

Responsible to give appropriate and effective solution for all site related structural issue.  

Communication with Client as well as with Consultant & Architect in the execution of Project. 

Fully assure that work is proceeding as per drawing and specification as well as per satisfaction of Client and Consultant. 

Participate in all quality control and progress meeting. 

PROFESSIONAL MEMBERSHIP  Pakistan Engineering Council (Civil/30679)  

Member of IEP (Institute of Engineer of Pakistan) 

American Concrete Institute (ACI), Student member 

SEMINAR & COURSES  Attending  one  day  seminar  on  Civil  Works  Quantity  &Cost  Estimation  organized  by  PAQS 

(Pakistan Association of Quantity Surveyor). 

Attending workshops on following subjects. Cost control Engineering, Occupational Health & Safety, Total Quality Management and Construction Productivity Management.