PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client...
Transcript of PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client...
![Page 1: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/1.jpg)
PLANNING CONSIDERATIONS
FOR
DAM REMOVALSDAM REMOVALS
August 2011
1
![Page 2: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/2.jpg)
DAM REMOVALS
ELVIDIO V. DINIZ, P.E., D. WRE
Senior Client Service Manager,
Hydrology and Drainage Specialist
WESTON Solutions, Inc.
JEMEZ DAM, SANTA
ANA PUEBLO, NM
SAPILLO CREEK BELOW LAKE ROBERTS
DAM, GILA, NM
PONDEROSA DAM,
PONDEROSA, NM
![Page 3: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/3.jpg)
OUTLINE
� Introduction
� Dam Construction Impacts
� River Corridor Response
� Reservoir Sediment Accumulation
� Reservoir Water Quality� Reservoir Water Quality
� Existing Geomorphology
� Existing Habitats
� Expected Geomorphology
� Expected Habitats
� Stream Water Quality
� Developing The Plan
3
KINNEY DAM, ALBUQUERQUE, NM
![Page 4: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/4.jpg)
Introduction
� Only option to restore natural stream conditions
� Careful and detailed planning is required
Three approaches to removal:
4
� Three approaches to removal:
� Complete
� Partial
� Staged
� Operating rules and management
"Water is the most critical resource issue
of our lifetime and our children's
lifetime. The health of our waters is the
principal measure of how we live on
the land. "
-Luna Leopold
![Page 5: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/5.jpg)
Dam Construction Impacts
� Large Dams
� Control all but extreme
floods
Stratification of reservoir
5
� Stratification of reservoir
� Cold water release
� Sediment sorting &
organics deposition
� Hungry water releases
Katse Dam
![Page 6: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/6.jpg)
Dam Construction Impacts� Small Dams
� Capture only minor
floods
� Large sediment
deposition only
6
� Well mixed storage by
bigger flows
� Sediment movement
around and out of
reservoir
� Minor floodplain effects
Beaver Dam
![Page 7: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/7.jpg)
Dam Construction Impacts
� Stream Equilibrium
� Pre-removal
� Post-removal
7
� Post-removal
Lake Delhi Dam break
� Size of dam –vs- stream
flow
� Purpose of dam –vs- flow
regime
� Different ecological effects
between large & small dams
![Page 8: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/8.jpg)
River Corridor Response
� Physical
� Depth and Width
� Coarse material moves by
8
dispersal. No sediment pulse.
� Fine material movement – pulse wavelength increases and amplitude decreases downstream
� Debris transport and accumulation across cross-section
� Cut bank and terrace formation
Isleta Dam on Rio Grande,
Albuquerque, NM
![Page 9: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/9.jpg)
River Corridor Response
� Hydrologic
� Timing of removal vs. high flow
periods
� Natural river flow regime
� Environmental
� Deferential rates of deposition and
scour over space and time
� Sediment transport variability with flows
Heterogeneous water quality
9
� 2 or 3-D velocity and sediment
distribution across channel modeling
� Temporal flow variations – flow
duration, peak frequency, flow mass
curves
� In-stream flow requirements – pre-
and post dam removal
� Heterogeneous water quality
� Bio-diversity & population density
increase
� Debris island habitat formation
� Relationship between wash,
suspended, and bed loads
� Flow volume + ground water recharge
+ floodplain soil wetting determine
species diversity
![Page 10: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/10.jpg)
� Delta formation
Main stream and tributaries
Reservoir Sediment Accumulation
�
10
Main stream and tributaries
New channel evolution
Sediment sorting
Coarse vs. fine
�
�
Sources of post-dam removal sediment
�
Hondo Arroyo Dam built in 1900’s is
silted to the top, Santa Fe, NM
![Page 11: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/11.jpg)
Reservoir Water Quality
� Nutrient processing
� Related to fine sediment
disposition
11
disposition
� DO availability
� Sediment re-suspension
� Temperature variations
� Reservoir velocity current circulation
� Stratification
� Bank vegetation
Farmington Lake, NM - water storage and
quality
![Page 12: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/12.jpg)
Existing Geomorphology
� Reservoir
� Water Storage cycles
� Velocity currents
� Bank erosion
� Island formation
12
� Island formation
� Delta stabilization
� Stream
� Water release cycles
� Bar formation
� Pools and riffles
� Meanders Galisteo Creek, New Mexico
![Page 13: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/13.jpg)
Existing Habitats
� Soils
� Vegetation
13
� Ecozones
� Biota
"Riparian areas are those plant communities
adjacent to and affected by surface or ground water
of perennial or ephemeral water bodies such as
rivers, streams, lakes, ponds, playas, or drainage
ways. These areas have distinctly different
vegetation than adjacent areas or have species
similar to surrounding areas that exhibit a more
vigorous or robust growth form."
![Page 14: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/14.jpg)
Expected Geomorphology
� Sediment characterization
� Toxic or poor quality sediment,
depth and extent
14
� Sediment disturbance/initiating
movement
� Sediment transport
� Dispersal and deposition
� Stream response
� Long term monitoring
� River aggradation
� Flood plain impactsGrand Canyon, AZ
![Page 15: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/15.jpg)
Expected Habitats
� Soils and nutrients
� Suspended sediment
concentrations and turbidity
15
� Vegetation transforms
� Ecozones/terraces
� Biota, opportunistic and
succession
� Water quality protection
� Short term control of dust and
erosion
Quality habitats support an entire
biological community
![Page 16: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/16.jpg)
Stream Water Quality
� Expected Changes
� temperature
16
� nutrients
� dissolved oxygen
� other contaminants
Many benefits of good water quality; FISH!
![Page 17: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/17.jpg)
Developing The Plan
� Baseline inventory
� Stakeholder involvement
� Restoration designs
17
� Restoration designs
� Permitting and licensing issues
� Plan formulation
� Evolution of outcomes
� Benefits vs. risks
� Plan development
� Implementation
![Page 18: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/18.jpg)
� DAM REMOVAL DESIGN
Do something that the
Thank you!
18
� STORMWATER
MANAGEMENT
� RIVER RESTORATION
� HYDROLOGY AND
HYDRAULICS
Do something that the
world would care about
for decades after you
have passed on.Lorrin L. Lee
![Page 19: PLANNING CONSIDERATIONS FOR DAM REMOVALS...DAM REMOVALS ELVIDIO V. DINIZ, P.E., D. WRE Senior Client Service Manager, Hydrology and Drainage Specialist WESTON Solutions, Inc. JEMEZ](https://reader033.fdocuments.us/reader033/viewer/2022061002/60b0fe0370dec8147e784f7a/html5/thumbnails/19.jpg)
WESTON Services
19