” Folsom Dam Auxiliary Spillway Control Structure Project budget Project type $250,000,000 Heavy Civil Rework cost avoided Saved per week per person SAVINGS WITH PLANGRID PlanGrid is an essential tool for our superintendents and engineers. — Larry Camilleri, Project Engineer $3.25M 6 hrs Fo�som, Calif� �nia www.plangrid.com 03
-
Upload
plangrid -
Category
Technology
-
view
71 -
download
0
Transcript of PlanGrid Project Success Story: Granite, Folsom Dam
”
Folsom Dam Auxiliary Spillway Control Structure
Project budget
Project type
$250,000,000
Heavy Civil
Rework cost avoided
Saved per week per person
SAVINGS WITH PLANGRID
PlanGrid is an essential tool for our superintendents and engineers.
— Larry Camilleri, Project Engineer
$3.25M 6 hrs