PlanGrid Project Success Story: Granite, Folsom Dam

1
Folsom Dam Auxiliary Spillway Control Structure Project budget Project type $250,000,000 Heavy Civil Rework cost avoided Saved per week per person SAVINGS WITH PLANGRID PlanGrid is an essential tool for our superintendents and engineers. — Larry Camilleri, Project Engineer $3.25M 6 hrs Fo�som, Calif� �nia www.plangrid.com 03

Transcript of PlanGrid Project Success Story: Granite, Folsom Dam

Folsom Dam Auxiliary Spillway Control Structure

Project budget

Project type

$250,000,000

Heavy Civil

Rework cost avoided

Saved per week per person

SAVINGS WITH PLANGRID

PlanGrid is an essential tool for our superintendents and engineers.

— Larry Camilleri, Project Engineer

$3.25M 6 hrs

Granite

Fo�som,Calif� �nia

www.plangrid.com 03