PLAN - SSE Renewables
Transcript of PLAN - SSE Renewables
4300
3300
3000WIDE GATE
LiDAR
PALISADE FENCE(2.5m HIGH)
GALVANISED STEEL
CONCRETESLAB
3700
4700
4000
2500
PALIS
ADE
FENC
E
LiDAR
Scale: 1:50
ELEVATION1-
3000WIDE GATE
4300
1
PLANScale: 1:50
UNITERRUPTEDPOWER SUPPLY PANEL(1m x 1m x 1m)
INTERFACE PANEL(1m x 0.3m x 1m)
3000
750 MINIMUM CLEARANCE
TO FENCE/GATE
UNITERRUPTEDPOWER SUPPLY PANEL(1m x 1m x 1m)
INTERFACE PANEL(1m x 0.3m x 1m)
Notes
1. All dimensions are in millimetres (mm)unless stated otherwise.
Figure 2.11Permanent LiDAR
Strathy South Wind FarmEIAR 2020
0 1 2Km ±
Underground Cable RouteFigure 2.12
Strathy South Wind FarmEIAR 2020
KeySite BoundaryPreferred Indicative Cable Routethrough Strathy NorthAlternative Indicative Cable Routethrough Strathy NorthCommon Indicative Cable RouteSubstationSubstation Temporary Laydown Area
© Crown copyright and database rights 2020 Ordnance Survey 0100031673
1:44,000Scale @ A3
CABLE PROTECTION COVERSTO BS 2484
3 x 105mm POWER CABLE
48mmØ EARTHINGCONDUCTOR
CEMENTBOUND SAND
TO ENATS 97-1
195
48
75210
578
75
48
SECTION E - E1 x 132kV CABLE CIRCUIT TRENCH
WELL COMPACTED THERMALLYSUITABLE SELECTEDINDIGENOUS BACKFILL
CABLE MARKER TAPE
CABLE PROTECTION COVERSTO BS 2484
3 x 105mm POWER CABLE
CEMENT BOUND SAND TOENATS 97-1
48mmØEARTHING
CONDUCTOR
75
48 50
210 195
578
7548
7515
098
0
SECTION D - D1 x 132kV CABLE CIRCUIT TRENCH
50
271
7515
098
027
1
7515
0
WELL COMPACTEDTHERMALLY SUITABLESELECTED INDIGENOUSBACKFILL
CABLE MARKER TAPE
CABLE PROTECTIONCOVERS TO BS 2484
3 x 188/200mm ID/ODPLAIN HDPE BLACKCOLOUR DUCTS TOENATS 12-24
CEMENT BOUNDSAND TO ENATS 97-1
2 x 100 / 110mm ID / ODUPVC RIGID GREENCOLOUR DUCTSUBDUCTED EN 50086-24
100 / 110mm ID / ODDUCT
46mmØ EARTHINGCONDUCTOR
244 (TYP)
7511
044
882
7
75 110 50 200 200 75
750
SECTION K - K1 x 132kV CABLE CIRCUIT TRENCH
244 (TYP)
GROUND LEVEL
GROUND LEVEL
2 x 100 / 110mm ID / OD UPVCRIGID GREEN COLOUR DUCTSUBDUCTED EN 50086-24
WELL COMPACTED THERMALLYSUITABLE SELECTEDINDIGENOUS BACKFILL
244 (TYP)
2 x 100 / 110mm ID / OD UPVCRIGID GREEN COLOUR DUCTSUBDUCTED EN 50086-24
CABLE MARKER TAPE
Notes
1. All dimensions are in millimetres.
Figure 2.13Typical Cable Trench
Section
Strathy South Wind FarmEIAR 2020
Scale 1:10 @ A3
0 100 200 300mm
SECTION B-B'SCALE: 1:2000
PERIPHERAL BUND
INDICATIVE RESTORATION PROFILE
PROPOSED MAXIMUMEXCAVATION PROFILE
EXISTINGTOPOGRAPHY
SECTION A-A'SCALE: 1:2000
PERIPHERAL BUND
INDICATIVE RESTORATION PROFILE
1:100 FALL
PROPOSED MAXIMUMEXCAVATION PROFILE
EXISTINGTOPOGRAPHY
AA'
B
B'
280800E
280900E
281000E951700N
951800N
951900N
952000N
952100N
281100E
1:100 FALL
1. OVERBURDEN ASSUMED TO BE CIRCA 0.78mIN THICKNESS COMPRISING PEATY SOIL ANDPEAT.
2. INITIAL STRIPPED OVERBURDEN TO BEPLACED IN PERIPHERAL BUND, WITHSUBSEQUENT OVERBURDEN AND WASTEMATERIALS TO BE STOCKPILED WITHIN FLATBASAL AREA OF BORROW PIT PRIOR TO BEINGUSED IN RESTORATION.
3. DESIGN PARAMETERS ARE INDICATIVE ANDSHOULD BE REFINED BASED UPON FINDINGSOF GROUND INVESTIGATIONS AND OR INITIALEXCAVATIONS, TAKING INTO ACCOUNTGROUND CONDITIONS AND HYDROLOGICALISSUES.
4. ASSUMES INSITU CONVERSION FACTOR OF 2TONNES PER m³.
BENCH/BASE OF EXCAVATION
EXCAVATION BATTER
PERIPHERAL BUND
GENERAL WORKING DIRECTION
INDICATIVE SURFACE WATERDRAIN (DIVERTING SURFACEWATER TO PREVENT INGRESSINTO BORROW PIT)
CONTOURS
PLAN: Borrow Pit ASCALE 1:2500
Figure 2.14aBorrow Pit Design
Strathy South Wind FarmEIAR 2020
Scale 1:2000 @ A3
0 40 8020 60m
Scale 1:2500 @ A3
0 50 100m
SECTION B-B'SCALE: 1:1250
PERIPHERAL BUND PROPOSED MAXIMUMEXCAVATION PROFILE
EXISTINGTOPOGRAPHY
INDICATIVE RESTORATION PROFILE
PERIPHERAL BUND
INDICATIVE RESTORATION PROFILE
1:100 FALL
PROPOSED MAXIMUM EXCAVATIONPROFILE EXISTING
TOPOGRAPHY
SECTION A-A'SCALE: 1:1250
280600E
280700E
280800E
950200N
950300N
950400N
950500N
AA'
B
B'
1:100 FALL
1. OVERBURDEN ASSUMED TO BE CIRCA 0.29mIN THICKNESS COMPRISING PEATY SOIL ANDPEAT.
2. INITIAL STRIPPED OVERBURDEN TO BEPLACED IN PERIPHERAL BUND, WITHSUBSEQUENT OVERBURDEN AND WASTEMATERIALS TO BE STOCKPILED WITHIN FLATBASAL AREA OF BORROW PIT PRIOR TO BEINGUSED IN RESTORATION.
3. DESIGN PARAMETERS ARE INDICATIVE ANDSHOULD BE REFINED BASED UPON FINDINGSOF GROUND INVESTIGATIONS AND OR INITIALEXCAVATIONS, TAKING INTO ACCOUNTGROUND CONDITIONS AND HYDROLOGICALISSUES.
4. ASSUMES INSITU CONVERSION FACTOR OF 2TONNES PER m³.
PLAN: Borrow Pit BSCALE 1:2000
BENCH/BASE OF EXCAVATION
EXCAVATION BATTER
PERIPHERAL BUND
GENERAL WORKING DIRECTION
INDICATIVE SURFACE WATERDRAIN (DIVERTING SURFACEWATER TO PREVENT INGRESSINTO BORROW PIT)
CONTOURS
Figure 2.14bBorrow Pit Design
Strathy South Wind FarmEIAR 2020
Scale 1:2000 @ A3
0 40 8020 60m
Scale 1:1250 @ A3
0 25 50m
SECTION B-B'SCALE: 1:1250
PERIPHERAL BUND
INDICATIVE RESTORATION PROFILE
PROPOSED MAXIMUM EXCAVATIONPROFILE
EXISTINGTOPOGRAPHY
SECTION A-A'SCALE: 1:1250
PERIPHERAL BUND
INDICATIVE RESTORATION PROFILE
1:100 FALL
PROPOSED MAXIMUM EXCAVATIONPROFILE
EXISTINGTOPOGRAPHY
A A'
B
B'
278700E
278800E
278900E
950900N
951000N
951100N
951200N
1:100 FALL
1. OVERBURDEN ASSUMED TO BE CIRCA 0.38mIN THICKNESS COMPRISING PEATY SOIL ANDPEAT.
2. INITIAL STRIPPED OVERBURDEN TO BEPLACED IN PERIPHERAL BUND, WITHSUBSEQUENT OVERBURDEN AND WASTEMATERIALS TO BE STOCKPILED WITHIN FLATBASAL AREA OF BORROW PIT PRIOR TO BEINGUSED IN RESTORATION.
3. DESIGN PARAMETERS ARE INDICATIVE ANDSHOULD BE REFINED BASED UPON FINDINGSOF GROUND INVESTIGATIONS AND OR INITIALEXCAVATIONS, TAKING INTO ACCOUNTGROUND CONDITIONS AND HYDROLOGICALISSUES.
4. ASSUMES INSITU CONVERSION FACTOR OF 2TONNES PER m³.
PLAN: Borrow Pit CSCALE 1:2500
BENCH/BASE OF EXCAVATION
EXCAVATION BATTER
PERIPHERAL BUND
GENERAL WORKING DIRECTION
INDICATIVE SURFACE WATERDRAIN (DIVERTING SURFACEWATER TO PREVENT INGRESSINTO BORROW PIT)
CONTOURS
Figure 2.14cBorrow Pit Design
Strathy South Wind FarmEIAR 2020
Scale 1:1250 @ A3
0 25 50m
Scale 1:2500 @ A3
0 50 100m
PERIPHERAL BUND
SECTION B-B'SCALE: 1:1250
INDICATIVE RESTORATION PROFILE
PROPOSED MAXIMUM EXCAVATIONPROFILE
EXISTINGTOPOGRAPHY
SECTION A-A'SCALE: 1:1250
PERIPHERAL BUND
INDICATIVE RESTORATION PROFILE
PROPOSED MAXIMUM EXCAVATIONPROFILE
1:100 FALL
EXISTINGTOPOGRAPHY
A
A'
B
B'
278700E
278800E
278900E
953100N
953200N
953300N
953400N
1:100 FALL
1. OVERBURDEN ASSUMED TO BE CIRCA 0.34mIN THICKNESS COMPRISING PEATY SOIL ANDPEAT.
2. INITIAL STRIPPED OVERBURDEN TO BEPLACED IN PERIPHERAL BUND, WITHSUBSEQUENT OVERBURDEN AND WASTEMATERIALS TO BE STOCKPILED WITHIN FLATBASAL AREA OF BORROW PIT PRIOR TO BEINGUSED IN RESTORATION.
3. DESIGN PARAMETERS ARE INDICATIVE ANDSHOULD BE REFINED BASED UPON FINDINGSOF GROUND INVESTIGATIONS AND OR INITIALEXCAVATIONS, TAKING INTO ACCOUNTGROUND CONDITIONS AND HYDROLOGICALISSUES.
4. ASSUMES INSITU CONVERSION FACTOR OF 2TONNES PER m³.
PLAN: Borrow Pit DSCALE 1:2000
BENCH/BASE OF EXCAVATION
EXCAVATION BATTER
PERIPHERAL BUND
GENERAL WORKING DIRECTION
INDICATIVE SURFACE WATERDRAIN (DIVERTING SURFACEWATER TO PREVENT INGRESSINTO BORROW PIT)
CONTOURS
Figure 2.14dBorrow Pit Design
Strathy South Wind FarmEIAR 2020
Scale 1:2000 @ A3
0 40 8020 60m
Scale 1:1250 @ A3
0 25 50m
SECTION B-B'SCALE: 1:2000
PERIPHERAL BUND
INDICATIVE RESTORATION PROFILE PROPOSED MAXIMUM
EXCAVATION PROFILE EXISTINGTOPOGRAPHY
SECTION A-A'SCALE: 1:2000
PERIPHERAL BUND
INDICATIVE RESTORATION PROFILE
1:100 FALL
PROPOSED MAXIMUMEXCAVATION PROFILE
EXISTINGTOPOGRAPHY
A A'
B
B'
279000E
279100E
279200E
952400N
952500N
952600N
952700N
1:100 FALL
1. OVERBURDEN ASSUMED TO BE CIRCA 1.24mIN THICKNESS COMPRISING PEATY SOIL ANDPEAT.
2. INITIAL STRIPPED OVERBURDEN TO BEPLACED IN PERIPHERAL BUND, WITHSUBSEQUENT OVERBURDEN AND WASTEMATERIALS TO BE STOCKPILED WITHIN FLATBASAL AREA OF BORROW PIT PRIOR TO BEINGUSED IN RESTORATION.
3. DESIGN PARAMETERS ARE INDICATIVE ANDSHOULD BE REFINED BASED UPON FINDINGSOF GROUND INVESTIGATIONS AND OR INITIALEXCAVATIONS, TAKING INTO ACCOUNTGROUND CONDITIONS AND HYDROLOGICALISSUES.
4. ASSUMES INSITU CONVERSION FACTOR OF 2TONNES PER m³.
PLAN: Borrow Pit ESCALE 1:2000
BENCH/BASE OF EXCAVATION
EXCAVATION BATTER
PERIPHERAL BUND
GENERAL WORKING DIRECTION
INDICATIVE SURFACE WATERDRAIN (DIVERTING SURFACEWATER TO PREVENT INGRESSINTO BORROW PIT)
CONTOURS
Figure 2.14eBorrow Pit Design
Strathy South Wind FarmEIAR 2020
Scale 1:2000 @ A3
0 40 8020 60m
SECTION B-B'SCALE: 1:1250
PERIPHERAL BUND
INDICATIVE RESTORATION PROFILE
PROPOSED MAXIMUM EXCAVATIONPROFILE
EXISTINGTOPOGRAPHY
SECTION A-A'SCALE: 1:1250
PERIPHERAL BUND
INDICATIVE RESTORATION PROFILE PROPOSED MAXIMUM EXCAVATION
PROFILE
EXISTINGTOPOGRAPHY1:100 FALL
278900E
279000E
279100E
952100N
952200N
952300N
A
A'
B
B'
1:100 FALL
1. OVERBURDEN ASSUMED TO BE CIRCA 0.44mIN THICKNESS COMPRISING PEATY SOIL ANDPEAT.
2. INITIAL STRIPPED OVERBURDEN TO BEPLACED IN PERIPHERAL BUND, WITHSUBSEQUENT OVERBURDEN AND WASTEMATERIALS TO BE STOCKPILED WITHIN FLATBASAL AREA OF BORROW PIT PRIOR TO BEINGUSED IN RESTORATION.
3. DESIGN PARAMETERS ARE INDICATIVE ANDSHOULD BE REFINED BASED UPON FINDINGSOF GROUND INVESTIGATIONS AND OR INITIALEXCAVATIONS, TAKING INTO ACCOUNTGROUND CONDITIONS AND HYDROLOGICALISSUES.
4. ASSUMES INSITU CONVERSION FACTOR OF 2TONNES PER m³.
PLAN: Borrow Pit FSCALE 1:2000
BENCH/BASE OF EXCAVATION
EXCAVATION BATTER
PERIPHERAL BUND
GENERAL WORKING DIRECTION
INDICATIVE SURFACE WATERDRAIN (DIVERTING SURFACEWATER TO PREVENT INGRESSINTO BORROW PIT)
CONTOURS
Figure 2.14fBorrow Pit Design
Strathy South Wind FarmEIAR 2020
Scale 1:2000 @ A3
0 40 8020 60m
Scale 1:1250 @ A3
0 25 50m
180185190195
180185190195
0+000 0+050 0+100 0+150 0+190
SCALE: 1:1250SECTION B-B'
PERIPHERAL BUND
INDICATIVE RESTORATION PROFILE
EXISTING TOPO
PROPOSED MAXIMUMEXCAVATION PROFILE
180185190195
180185190195
0+000 0+050 0+100 0+120
SCALE: 1:1250SECTION A-A'
PERIPHERAL BUND
INDICATIVE RESTORATION PROFILE
EXISTING TOPO
PROPOSED MAXIMUMEXCAVATION PROFILE
185.00
186.0
0
187.
00
188.
00
170.
00
175.
00
180.
00
185.0
0
167.
00
168.
00
169.
00171.
00
172.
00
173.
00
174.
00176.
00
177.00
178.00
179.00
181.00
182.00
182.00
182.
00
183.00
184.0
0
186.00
187.
0018
8.00
170.
00
180.
00
171.
00
172.
00
173.
0017
4.00
176.
00
177.
00
178.
00
179.
00
181.
00
182.
00183.00
184.00
1:100 FALL
952500N
952600N
952700N
278700E
278800E
278900E
A
A'
B
B'
1. OVERBURDEN ASSUMED TO BE CIRCA 0.5m INTHICKNESS COMPRISING PEATY SOIL.
2. INITIAL STRIPPED OVERBURDEN TO BEPLACED IN PERIPHERAL BUND, WITHSUBSEQUENT OVERBURDEN AND WASTEMATERIALS TO BE STOCKPILED WITHIN FLATBASAL AREA OF BORROW PIT PRIOR TO BEINGUSED IN RESTORATION.
3. DESIGN PARAMETERS ARE INDICATIVE ANDSHOULD BE REFINED BASED UPON FINDINGSOF GROUND INVESTIGATIONS AND OR INITIALEXCAVATIONS, TAKING INTO ACCOUNTGROUND CONDITIONS AND HYDROLOGICALISSUES.
4. ASSUMES INSITU CONVERSION FACTOR OF 2TONNES PER m³.
PLAN: Borrow Pit GSCALE 1:2000
BENCH/BASE OF EXCAVATION
EXCAVATION BATTER
PERIPHERAL BUND
GENERAL WORKING DIRECTION
INDICATIVE SURFACE WATERDRAIN (DIVERTING SURFACEWATER TO PREVENT INGRESSINTO BORROW PIT)
CONTOURS
Figure 2.14gBorrow Pit Design
Strathy South Wind FarmEIAR 2020
Scale 1:2000 @ A3
0 40 8020 60m
Scale 1:1250 @ A3
0 25 50m
BOREHOLELOCATION
50m 50m 50m
5m45
m
4x4 PARKIN
G
PARKING
STORAGEAREA
SITE ACCESSTO OPERATIONS BUILDING
PLANTAREA
TEMPORARY OFFICE /WELFARE AREA
Notes
1. All dimensions are in metres (m) unlessstated otherwise.
2. Layout is indicative only.
Scale 1:500 @ A3
0 10 205 15m
Figure 2.15Typical Construction Compound
Strathy South Wind FarmEIAR 2020