REVIEWEXAMPLE 1
PLAN
Brian SalvoNJDEP Division of Water Quality
SWMDR Training Day 2October 31, 2019
![Page 2: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/2.jpg)
Presentation Goals
• Review site plans and stormwater management report
• Identify any errors with the design
Goals
2
![Page 3: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/3.jpg)
Determining Applicable Design & Performance Standards
• Trigger the municipality’s SCO?
• Disturb one acre or more?
• Increase impervious coverage by ¼ acre or more?
Does the Development
3
![Page 4: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/4.jpg)
Determining Applicable Design & Performance Standards
• Major Development:
Any development that provides for ultimately disturbing one or more acres of land or more than 10,000 square feet of new impervious surface.
Municipal Stormwater Control Ordinance:
4
![Page 5: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/5.jpg)
Familiarize Yourself with the Site
• Important in determining the requirements
• Existing land cover
• Has the existing land cover existed for the past 5 years?
Where are the pre-construction conditions?
5
![Page 6: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/6.jpg)
Pre-Development Site
6
![Page 7: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/7.jpg)
Stormwater Management Report
Existing CoverageCoverage Type Area
Woods 19.71 acresOpen space 0.95 acres
Proposed CoverageCoverage Type Area
Road, Roof, Driveway 5.50 acres
Open space 8.25 acresWoods 6.91 acres
7
![Page 8: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/8.jpg)
Post-Development Site
8
![Page 9: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/9.jpg)
Determining Applicable Design & Performance Standards
• Total Disturbance:o 13.5 acres
• Increase in impervious area:o 5.5 acres
• Is the site a major development?o Yes
Disturbance & Increase in Impervious Area
9
![Page 10: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/10.jpg)
Determining Applicable Design & Performance Standards
• Water Quantityo Required
• Water Qualityo Increase in impervious coverage >0.25 acreo Required
• Groundwater Rechargeo Planning Area 1 – Not “previously developed”o Required
• Nonstructuralo Required for all major developments
Which standards are required?
10
![Page 11: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/11.jpg)
Nonstructural Strategies Used
• Minimize impervious surface or disconnect the flow of runoff over impervious surfaces (#2)
• Maximize the protection of natural drainage features and vegetation (#3)
• Minimize land disturbance including clearing and grading (#5)
• Minimize soil compaction (#6)• Provide low maintenance landscaping that
encourages retention and planting of native vegetation that minimizes the use of lawns, fertilizers, and pesticides (#7)
What nonstructural measures were provided?
11
![Page 12: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/12.jpg)
NSS
12
![Page 13: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/13.jpg)
Proposed Structural BMPs
• Lower area of BMP is infiltration areao 6,000 square feet
• Upper area of BMP to remain as woods
Infiltration Basin
13
![Page 14: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/14.jpg)
Soil Testing
• 6,000 square foot infiltration areao Required – 2 soil profile pits in infiltration areao Provided – 1 soil profile pit in infiltration area
4 soil profile pits nearbyo Also need determination of permeability
• Used undisturbed tube permeameter tests - Acceptable
Infiltration basin
14
![Page 15: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/15.jpg)
Basin Detail
15
![Page 16: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/16.jpg)
Test Pit #1
16
![Page 17: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/17.jpg)
Test Pit #2
17
![Page 18: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/18.jpg)
Test Pit #3
18
![Page 19: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/19.jpg)
Test Pit #4
19
![Page 20: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/20.jpg)
Test Pit #5
20
![Page 21: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/21.jpg)
Test Pit Summary
Test Pit SHWT ElevationTP #1 9.5 ftTP #2 9.0 ftTP #3 9.5 ftTP #4 9.4 ftTP #5 9.5 ft
21
![Page 22: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/22.jpg)
Basin Detail
22
![Page 23: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/23.jpg)
Permeability Test
23
![Page 24: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/24.jpg)
Infiltration Rate Summary
Test Pit Permeability Results (in/hr)TP #1 2.67 (A) | 3.84 (B)TP #2 0.28 (A) | 0.31 (B)TP #3 6.54 (A) | 2.21 (B)TP #4 2.45 (A) | 3.52 (B)TP #5 12.73 (A) |11.91 (B)
24
![Page 25: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/25.jpg)
Test Pit #2
25
![Page 26: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/26.jpg)
Soil Replacement
26
![Page 27: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/27.jpg)
Drain Time
• 6 inch orifice @ 13.2 ft• Bottom of basin @ 12.0 ft• Ponding depth 1.2 ft• Infiltration rate = 1in/hr• Drain Time = 14.4 hr
27
![Page 28: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/28.jpg)
Groundwater Mounding Analysis
28
For example purposes only; use published default values
from the guidance document
![Page 29: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/29.jpg)
Groundwater Mounding Analysis
29
![Page 30: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/30.jpg)
Groundwater Mounding Analysis
30
For example purposes only; use published default values from the guidance document
Duration of infiltration period, t (hours)
=𝑣𝑣𝑣𝑣𝑣𝑣𝑣𝑣𝑣𝑣𝑣𝑣 𝑣𝑣𝑜𝑜 𝑟𝑟𝑣𝑣𝑟𝑟𝑣𝑣𝑜𝑜𝑜𝑜 𝑡𝑡𝑣𝑣 𝑏𝑏𝑣𝑣 𝑖𝑖𝑟𝑟𝑜𝑜𝑖𝑖𝑣𝑣𝑡𝑡𝑟𝑟𝑖𝑖𝑡𝑡𝑣𝑣𝑖𝑖 𝑐𝑐𝑜𝑜 𝑥𝑥 12 𝑖𝑖𝑟𝑟/𝑜𝑜𝑡𝑡𝐼𝐼𝑟𝑟𝑜𝑜𝑖𝑖𝑣𝑣𝑡𝑡𝑟𝑟𝑖𝑖𝑡𝑡𝑖𝑖𝑣𝑣𝑟𝑟 𝑖𝑖𝑟𝑟𝑣𝑣𝑖𝑖 𝑠𝑠𝑜𝑜 𝑥𝑥 𝑅𝑅𝑣𝑣𝑐𝑐𝑅𝑖𝑖𝑟𝑟𝑅𝑅𝑣𝑣 𝑟𝑟𝑖𝑖𝑡𝑡𝑣𝑣 𝑖𝑖𝑟𝑟/𝑅𝑟𝑟
![Page 31: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/31.jpg)
Infiltration Basin Requirements
• Distance from SHWT >2 fto Distance = 2 ft
• Infiltration rate > 1 in/hro Soil Replacement
• Max. standing water depth < 2 fto 6 in orifice @ 13.2 ft, basin bottom 12.0 ft
• Infiltrate water quality storm o WQDS elevation = 12.5 fto Recharge design storm elevation= 13.2 ft
• Drain Time (with mounding analysis) < 72 hrBMP granted 80% TSS removal rate
31
![Page 32: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/32.jpg)
Water Quantity
Design Storm
Pre-developed Onsite Peak Runoff (cfs)
Pre-developed Offsite Peak Runoff (cfs)
Allowable Onsite Peak Runoff (cfs)
Allowable Total Peak
Runoff (cfs)
Proposed Total Peak Runoff (cfs)
2-year 2.3 1.5 1.15 2.65 2.5
10-year 12.9 3.7 9.675 13.375 5.1
100-year 48.5 9.6 38.8 48.4 34.7
32
![Page 33: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/33.jpg)
Water Quantity
• Do the numbers in the table match calculation results?
• Were pervious and impervious calculated separately?
• Is the rainfall depth/distribution correct?• Are the Times of Concentration correct?• Do the land covers/HSGs match the field?• Was the appropriate unit hydrograph used?• Does the basin model match the plans (volume,
outlets, etc.)?• Was infiltration included in routings?
What to check? (NRCS Method Used)
33
![Page 34: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/34.jpg)
Water Quantity
Do the numbers in the table match results?
34
![Page 35: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/35.jpg)
Water Quantity
Design Storm
Pre-developed Onsite Peak Runoff (cfs)
Pre-developed Offsite Peak Runoff (cfs)
Allowable Onsite Peak Runoff (cfs)
Allowable Total Peak
Runoff (cfs)
Proposed Total Peak Runoff (cfs)
2-year 2.3 1.5 1.15 2.65 2.5
10-year 12.9 3.7 9.675 13.375 5.1
100-year 48.5 9.6 38.8 48.4 34.7
35
![Page 36: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/36.jpg)
Water Quantity
• Easiest way to see this is usually the subcatchment diagram (ask for this if they haven’t provided it)
• Note that some programs may allow pervious and impervious on the same subcatchment but still calculate separately
Were pervious and impervious surfaces calculated separately?
36
![Page 37: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/37.jpg)
Water Quantity
37
![Page 38: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/38.jpg)
Water Quantity
Calculations used:Type III
2-year = 3.3 in10-year = 5.2 in
100-year = 8.9 in
Were the correct rainfall depths/distribution used?
38
![Page 39: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/39.jpg)
Water Quantity
39
![Page 40: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/40.jpg)
Water Quantity
• Existing – 23.5 minutes
• Proposed – 6 minutes for all impervious surfaces
Are the Tc calculations correct?
40
![Page 41: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/41.jpg)
Water Quantity
• What is the HSG?o They should have provided soil mapo If not, visit the web soil survey
• Remember if web soil survey shows no HSG or defines the material on-site as fill, testing is required in accordance with appendix E to determine HSG
Do the land covers/HSGs match the field?
41
![Page 42: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/42.jpg)
Water Quantity
Pink = HSG BGreen = HSG A/DGray = unknown HSG
42
![Page 43: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/43.jpg)
Water Quantity
Existing CoverageCoverage
TypeArea Curve
NumberWoods 19.71 acres 30/55
Open space 0.95 acres 39/61
Proposed CoverageCoverage
TypeArea Curve
NumberRoad, Roof,
Driveway5.5 acres 98/98
Open space 8.25 acres 39/61Woods 6.91 acres 30/55 43
![Page 44: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/44.jpg)
Water Quantity
• Application used Delmarva unit hydrographo Site is in coastal plaino Site is largely undisturbedo No steep slopes
• Can Delmarva be used in proposed conditions too?o Yes, just not when sizing MTDs
Was the appropriate unit hydrograph used?
44
![Page 45: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/45.jpg)
Water Quantity
• Outlet structureDoes the basin model match the plans?
45
![Page 46: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/46.jpg)
Water Quantity
• Outlet structure
46
![Page 47: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/47.jpg)
Water Quantity
• Volume
Does the basin model match the plans?
47
![Page 48: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/48.jpg)
Water Quantity
180
200
180 x 200 =36,000 sq ft
48
![Page 49: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/49.jpg)
Water Quantity
• Volume
Does the basin model match the plans?
49
![Page 50: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/50.jpg)
Water Quantity
200
480
200 x 480=96000 sq ft
50
![Page 51: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/51.jpg)
Water Quantity
• Volume
Does the basin model match the plans?
51
![Page 52: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/52.jpg)
Water Quantity
• Check outlet structure for infiltration, exfiltration, custom outlets, or discarded flow
Was infiltration used in the routings?
52
![Page 53: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/53.jpg)
Water Quantity
• Need to fix detail of outlet structure on plan
• Otherwise everything looks OK
The water quantity requirement is met
Summary
53
![Page 54: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/54.jpg)
Water Quality
• 5.5 acres of new impervious coverageo Only roadways, parking areas, etc. require
treatment
Simplest thing to do is look back at the plans and determine if the entire roadway/parking network is directed to the basin
54
![Page 55: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/55.jpg)
Post-Development Site
55
![Page 56: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/56.jpg)
Water Quality
• Since BMP is granted 80% TSS removal rateAND
• All of the new roadway/parking/driveways drain to the BMP
The water quality requirement is met
Summary
56
![Page 57: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/57.jpg)
Groundwater Recharge
• Existing 2-year runoff volume = 40,825 cf
• Proposed 2-year runoff volume = 100,218 cf
• Difference = 59,393 cf
• Volume below lowest outlet = 59,400 cf
Engineer has opted to infiltrate the difference in the 2-year storm
57
![Page 58: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/58.jpg)
Maintenance Plan
• Responsible party – Developer o Will probably need updating after construction
• Preventative maintenance tasks and schedules - OK• Cost estimates – OK• Blank maintenance logs - OK• Needs to be recorded on deed
58
![Page 59: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/59.jpg)
Stormwater Management Report
Total Summary• Nonstructural – OK, need to require restriction• BMP Design - OK• Water Quantity – OK, with change to outlet detail• Water Quality - OK• Groundwater Recharge - OK• Maintenance Manual - OK
Meets the stormwater control ordinance and can be approved
59
![Page 60: Plan Review Example 1 › dep › stormwater › pdf › SMDR_Plan... · 2019-10-23 · REVIEW EXAMPLE 1 PLAN. Brian Salvo. NJDEP Division of Water Quality. SWMDR Training Day 2.](https://reader030.fdocuments.us/reader030/viewer/2022040618/5f2732dfcaa42364c379fef9/html5/thumbnails/60.jpg)
Plan Review Example
60
Bureau of Nonpoint Pollution ControlDivision of Water Quality401 East State StreetPO Box 420, Mail Code 401-2BTrenton, NJ 08625-420Tel: 609-633-7021www.njstormwater.org
Brian [email protected]