Plan Control Calitate PCCVI

download Plan Control Calitate PCCVI

of 24

Transcript of Plan Control Calitate PCCVI

  • 7/28/2019 Plan Control Calitate PCCVI

    1/24

    Crt.

    No.

    Work type,

    controls and

    checks

    specified in the

    technical

    specifications

    Checks or characteristics

    to be determined

    Admitted

    tolerances

    Technical

    documentation/

    standards

    Test

    frequency

    Registering,

    documents

    issued

    Responsible

    for control/

    check

    Notes

    0 1 2 3 4 5 6 7 8

    A. EARTHWORKS - BEFORE STARTING WORKS1. Checking the

    drawing of the

    axis and the land

    territory of the

    road

    -staking road axis between the

    important points of the territory

    -angle peaks marked with

    concrete miles stones, tied to the

    road marks, outside the landterritory

    -marking with stakes and

    templates

    a. land territory of the road

    b. tilt of the embankment

    c. height of the fillings (backfill)and depth (cutting) in the axis

    -identifying the undergroundand aerial installations in the

    land territory

    Max. + 0.05m

    According to situation plan

    Visual findings and

    measurements

    + 0.5m

    + 0.1m under width 3m

    + 0.05m

    Findings concerningrespecting the norms when

    taking-over the location

    STAS 9824/84

    PT+CS

    C56/86

    PT

    PT cross sections +

    CS

    The taking-overdocuments for the

    location

    -min. 3 points

    at 100m

    -max. 30m

    alignment

    -max. 20mcurves

    -before

    starting works

    -during the

    execution

    period

    Official report

    of drawings

    Approval for

    asphalt cutting

    for cases

    Official reportof taking-over

    the location

    Consultant, CQ,

    land surveyor

    Consultant,

    constructor

    Consultant,RTEL, CQ

    2 The control of

    the preparativeworks

    -grubbing

    -cleaning the territory-dismantling the top soil

    -draining the road territory

    -demolishing existing buildings

    Visual findings concerning

    respecting thedocumentation

    PT + CS Before starting

    earthworks

    Final official

    report oftaking-over

    Consultant,

    constructor

    3. Checking thefoundation soil

    -compacting degree

    -distortion at the foundation soil

    level

    Min. 100% on 30 cm depthfor h2m cutting as in tab. 5 CS

    < admitted distortion in

    max. 10% of the measuredpoints

    STAS 2984/84C182

    STAS 7107/1;3

    STAS 2914/84CS

    CD 31-94

    3 samples at250 ml

    every 25m

    Analyzebulletin (AB)

    compacting

    degreeFinal official

    report of

    taking-over

    AB - bearing

    capacity

    Laboratory

    Consultant,

    constructor

    Laboratory, CQ

    1

  • 7/28/2019 Plan Control Calitate PCCVI

    2/24

    4. The quality of

    the soil from the

    borrowed pits

    -classifying and identifying the

    soils

    -density in dry state-granulosity

    -plasticity limits

    -evenless coefficient

    -compacting characteristics-free swelling

    -freezing/unfreezing sensibility-humidity

    According to tab. 1a and 2b

    STAS 2914-84 and CS

    STAS 1243-88

    STAS 2914-84STAS 1913/5-85

    STAS 1913/4-86

    STAS 1913/13-83STAS 1913/12-83

    STAS 1706/3-90STAS 1913/1-82

    Before

    carrying out

    the earthworks

    AB the nature

    of the soil

    Approval for

    the borrowed

    pit

    AB

    compactingdegree

    Laboratory, CQ

    Consultant

    Laboratory, CQ

    DURING WORKS1. Checking the

    quality of the

    works during theexecution

    -respecting technical procedureof execution and technological

    processes-checking when working with

    uncohesive materials:

    a. humidity

    b. compacting degree

    -when working with cohesivematerials

    a. humidityb. compacting degree

    -checking the quality of the soil

    from the borrowed pits

    Following PTE

    Assuring Wopt min.98%

    from d max in 95% of

    measured points

    Assuring Wopt min.98%from d max in 95% of

    measured points

    PACSTAS 12253-84

    STAS 1913/1-82

    STAS 12288-85

    CS

    STAS 1913/1-82STAS 1913/3-76

    CS

    Daily or 1 test

    at 250 m

    platform

    3 test at 250ml

    platform

    Daily andwhen

    necessary; 1test at 250 ml

    1 test at

    5000m3

    AB

    compacting

    degree

    Final officialreport of

    taking-overAB

    compacting

    degree

    AB the nature

    of the soil

    Laboratory, CQ

    Consultant,constructor,

    laboratory, CQ

    Laboratory, CQ

    2. Compacting

    parameters

    -checking the technical

    characteristics of the compacting

    equipments (weight, vibrating

    frequency, speed)

    -establishing compactinghumidity

    -checking if the execution

    technology is followed

    Following the compacting

    parameters

    Following the optimalcompacting humidity

    According to the execution

    technology

    C 182-87, PT

    PT+CSC182-87

    STAS 1913/1-82

    CS-C 182-87

    Permanently

    Min. 3 tests at500cm or

    2000sqm oflayer or 1 to

    250m

    Permanently

    Official reportof control

    Approval from

    the

    compacting

    workshop

    Constructor

    RTEL, CQ,laboratory

    Consultant

    Ventila-

    tion,

    water

    2

  • 7/28/2019 Plan Control Calitate PCCVI

    3/24

    -establishing the thickness of the

    compacting layer

    < max. thickness of the

    elementary layer (optimal

    compacting thickness) max.+ 1-2cm from the project

    PT+CS

    experimental

    section

    Permanently

    3 tests every

    250m

    Site

    documents

    Consultant, CQ,

    constructor

    Constatat

    ion note

    (CN)- thelayer is

    leveled

    3. Checking the

    compacting

    degree

    Checking the compacting degree

    by establishing d max

    4% accepted in max. 10% of

    the number of measured

    points

    STAS 2914-84

    STAS 1913/13-83

    CS+PT

    1 test at every

    30m platform

    AB

    compacting

    degreeFinal officialreport of

    taking-over

    AB bearing

    capacity

    Laboratory

    Consultant,constructor

    Laboratory

    CN the

    compacti

    ng iscontinued4. Checking the

    bearing capacity

    Checking the distortion at the

    level of the road platform

    Ensuring the necessary

    bearing capacity: > admitted

    distortion in max. 10% of

    measured points

    C 182-87

    PT + CS

    STAS 2914-84

    CD 31-94

    In transversal

    profiles at 25m

    WHEN FINISHING WORKS1. Leveling

    measurements

    -checking the leveling at the

    platform by survey

    -roughness check transversallyand longitudinally

    Respecting admitted

    tolerances + 0.05m

    Max. + 3cm under the widthof 3m

    C 182-87

    PT

    STAS 2914-84PT+CS

    Transversal

    profiles at

    every 20m

    1 at every200m

    AB

    measurements

    (annex to

    PVFD)PVFD

    Consultant,

    RTEL, surveyor,

    CQ

    I+B+P+C

    CN

    platform

    leveling

    2. Checking the

    bearing capacity

    Checking the distortion at the

    level of the road platform

    Ensuring the necessary

    bearing capacity: > admitteddistortion in max. 10% of

    measured points

    C 182-87

    PT + CSSTAS 2914-84

    CD 31-94

    3 for every

    250m ofplatform on

    layer, or 1 for

    25m

    AB bearing

    capacity

    Laboratory

    B. CARRIAGE WAY FROM NATURAL AGGREGATES (BALLAST FOUNDATION) BEFORE STARTING WORKS1. Materials control

    (ballast andoptimal ballast)

    before making

    the ballast layer

    -fraction content:

    under 0.02mm

  • 7/28/2019 Plan Control Calitate PCCVI

    4/24

    -humidity Real humidity accepted STAS 4606-80 1 test/shift and

    when

    necessary

    DURING WORKS1. Quality control

    for ballastcompacting

    -the Proctor test, modified

    -establishing the compacting

    humidity and the correction

    -establishing the thickness of the

    compacted layer

    -checking the compactingintensity

    -compacting degree

    measurements by measuring d

    -establishing the bearing

    capacity at the superior level ofthe foundation level

    d max in dry state

    max + 2% from W opt

  • 7/28/2019 Plan Control Calitate PCCVI

    5/24

    surface profiles redone

    5

  • 7/28/2019 Plan Control Calitate PCCVI

    6/24

  • 7/28/2019 Plan Control Calitate PCCVI

    7/24

    -mechanical resistance at

    minimum compression at 28

    days (N/mm2)-preserving status: if the storage

    time has passed or if alteration

    factors were

    -additives

    -water

    -bitumen emulsion

    R28 = 32.5 N/mm2 for (a)R28 = 52.5 N/mm2 for (b,c)

    R28=42.5-62.5 N/mm2 for (d,e)

    Max 10% residuum of the

    1.25 sieves

    Checking data from qualitycertificates; density of

    prepared solution CD22-92

    Chemical composition

    As in the quality certificate

    STAS 3011-96

    SREN 196/1-95

    STAS 227/1-86

    SREN 196/6-94

    STAS 790-84

    STAS 8877-72

    silo

    -1 test/ 100t or

    one from eachsilo

    -1 test/each

    provided silo

    or silo

    -1 test at thebeginning

    -For each

    provided lot

    Approval for

    the bitumen

    emulsion

    Consultant

    2 Quality controlfor the mixture

    -granulometric composition ofthe mixture

    -mixtures humidity

    -checking the compacting

    characteristicsa.compacting humidity

    b.layer densityc.Q/S

    -making specimens for

    resistance determination at 7 and

    28 days

    -checking the transport

    documents

    As in the preliminary study

    Assuring W opt

    As at the experimental

    section

    As in tab 9

    Transport time max

    45minutes

    STAS 10473/1-87STAS 4606/80

    STAS 1913/1-82

    STAS 10473/2

    STAS 1913/1

    STAS 1913/13-83STAS 12288-85

    STAS 10473/2-86

    CS

    1 test/ shift ormin. 1/500m2

    At least 1test /shift or as

    necessary

    2 test/ 1500m2

    2 test/ 1500m2

    Daily

    2 series of 3

    cylindrical

    specimens for

    a 1500sqm

    surface

    Every

    transport

    AB stabilized

    ballast

    Approval for

    the receipt

    Laboratory

    Consultant

    DURING WORKS1 The control of

    the naturalaggregates

    stabilized with

    cement

    Rc determinations on cylindrical

    specimens:7 days

    28 days

    -density of the carriage way for

    establishing the compacting

    degree

    1.2-1.8 N/sqmm

    1.8-3.0 N/sqmm

    As tab 11 CS

    STAS 10473/2-86

    STAS 10473/2-86

    2 series of 3

    cylindricalspecimens for

    a 1500sqm

    surface

    Min. 2 points /

    1500sqm

    AB

    compressionresistance

    AB

    compacting

    degree

    Laboratory

    Laboratory

    2 Checking the -maximum density in dry state Min. 100% in 95% of the STAS 12288/85 Min. 2 test at Equipments Consultant

    7

  • 7/28/2019 Plan Control Calitate PCCVI

    8/24

  • 7/28/2019 Plan Control Calitate PCCVI

    9/24

    preparation, the

    transport and the

    pouring throughsamples taken

    from the mixer or

    from pouring

    -the exterior temperature relatedto the meteorological conditions

    -preparation and transport

    a.determining the bitumen

    content

    b.determining the mineralaggregates granulosity

    -pouring, compacting, priming,

    treating the surface of the baselayer

    >10C bitumen D60/80, norain

    as in SR 174-97

    table I STAS 7970-2000

    fig. 1,2,3 STAS 7970

    as in the general execution

    requirements according toSTAS 7970-2000

    STAS 1338

    PT +CS +PTE

    the beginning

    of the works

    Permanently

    Two samples

    of 10kg taken

    from the mixer

    or pouring, for400-600t

    Permanently

    Register fortemperatures

    AB for coated

    macadam

    AB for the

    compactingdegree

    Laboratory, SPL

    Laboratory

    Laboratory, CQ

    4. Checking the

    coated macadam

    of base layerpreviously made

    -determining the bitumen

    content

    -determining the granulosity ofthe mineral aggregate

    -determining the physical-

    mechanical characteristics

    -checking the geometrical

    elementsa)total width

    b)thickness

    c)transversal slope

    d)max. allowed bumps in

    longitudinal profilee)the other geometrical

    elements acc. to SR 174-97

    f)the existence of the site

    registering(measurements book,

    laboratory register,consumptions register)

    + 0.4% to the receipt

    table 10, 11, 12 from CS,

    section 4, part 6

    + 50mm

    max -10% of the designed

    thickness

    + 0.4% allowed deviance to

    the project

    5mm under 3m reglet

    STAS 1338

    STAS 7970

    STAS 6400

    CS 56-85

    CS tab 16

    STAS 6400

    2 core samples

    40/40cm taken

    at 7000sqm 20days after

    pouringon core

    samples

    max 50m

    distance acc.to the transv.

    profiles

    5 measurement

    1axis, 2 at 1m

    and at 2m

    from the edge

    4 measurement

    2 at 10cmfrom the axis,

    2 at 1m from

    the edge

    AB coated

    macadam

    Measurement

    bulletins

    PVRF

    Laboratory

    Land surveying,

    RTEL, CQ, SPL

    Consultant

    Constructor

    5. Determinant

    phase

    The whole surface must be checked before priming SR 174-97 For a sector of

    maximum 5km

    PVFD I +B +P +C

    9

  • 7/28/2019 Plan Control Calitate PCCVI

    10/24

  • 7/28/2019 Plan Control Calitate PCCVI

    11/24

    6 Checking the

    shuttering

    -shuttering +/- 1cm at leveling

    max 5 cm at dimension

    max 2 mm at jointsmax 3 mm admitted bumps

    NE 012-99

    PT and CS

    Before

    concreting

    each element

    Official report

    of control

    CQ, SPL

    7 Checking the

    reinforcing

    -steel concrete Correct assembling,

    positioning, number of

    pieces, diameter, types

    NE 012-99

    STAS 438/1-80

    Before

    concreting

    each element

    Final official

    report of

    taking-over

    Consultant,

    constructor

    8 Checking theworks -concrete works and rubblestone masonry

    -arranging the ditches, gutters

    and slope drains

    -shoulder ditches with emptying

    through slope drains arranged onslopes

    -watch ditches

    -drains and devices for draining

    and for the removal of thewaters from the road

    -draining layer

    -longitudinal drains under the

    shoulder or the gutters

    Controlling the dimensionsand the admitted tolerances

    Longitudinal slope finishing

    degree:

    min 0.25% natural soil

    min 0.1% paved ditchMaximum slope of the

    ditches and the unprotected

    gutters

    Maximum slope of the

    ditches and the protected

    gutters

    -embankments h=3-5m

    -converted and heightenedcurves

    -embankments h>5m

    at min. 5m of the edge of

    the slope

    at min 1.5-2m of the slopes

    footThe possibility of draining

    the water in the ditch min15cm above the bottom of

    the ditch or the foot of the

    ditch;

    >2% is done inclined(60)

    15cm thickness, is done upto the slope-emplacement

    -apron level, mounting thetube

    -making the inverse filter

    -placing the manholes and

    making them usable

    As in CS

    STAS 10796/2-79

    STAS 10796/1-77

    According to CS

    According to CS

    STAS 10796/2-79

    CS

    STAS 10796/2-79

    CS

    STAS 6400-84

    STAS 10796/1-77STAS 10796/3-88

    CS

    Each work

    Permanently

    Each work

    Each work

    Final officialreport of

    taking-over

    Final official

    report of

    taking-over

    Consultant,constructor

    Consultant

    Constructor

    11

  • 7/28/2019 Plan Control Calitate PCCVI

    12/24

    -making the channels, the box

    culverts and the manholes

    -emplacement

    -apron level

    -correct filling-placing and correctly

    executing the box culverts

    and the manholes

    -connections between the

    box culverts and the sewage

    usage control

    STAS 816-80

    CS

    9 Checking the

    kerbs and the

    precasted gutters

    -diggings

    -support finish of sand or mortar

    -joints

    -levels

    Element width +20cm

    Min. thickness 10cm

    Max thickness 2cm

    5cm to the levels from the

    transversal profile

    STAS 1139-87

    In transversal

    profiles

    Final official

    report of

    taking-over

    Consultant

    Constructor

    WHEN FINISHING WORKS1 Tests, controls,

    and taking-over

    on executionstages

    -informative preliminary tests

    -quality control tests

    -taking-over control tests-taking-over the works that

    become partially or totally

    covered, on stages:a.drains

    b.sewage

    c.concrete work and masonry

    d.transversal drains for theshoulder

    As the quality certificates

    PT and CS

    Following PT and CS

    -drawing and placing the

    manhole

    -digging level

    -making the apron; tube

    position-drain filling

    -drawing the channel, the

    box culverts and the

    manholes

    -digging level

    -placing the tubes and

    joining

    -making the apron-filling for each 1m and

    final level

    -drawings

    -digging level

    -making the shuttering

    -assembling the shuttering

    As CS

    technical execution

    proceduresC 56-85

    C 56-85

    On each

    technological

    stage

    On each

    technological

    stage

    Final official

    report of

    taking-over

    Final official

    report of

    taking-over

    Final off.reportof taking-over

    Consultant

    Constructor

    Consultant

    Constructor

    ConsultantConstructor

    12

  • 7/28/2019 Plan Control Calitate PCCVI

    13/24

    F. BRIDGES MATERIALS FOR CEMENT CONCRETE1. Material

    denomination

    -cement

    -examining data from qualitycertificate

    -preservation status (if the

    storage term has been passed or

    if alteration happened)

    Similarity with the writtendata

    R%

  • 7/28/2019 Plan Control Calitate PCCVI

    14/24

    c.Sort granulosity It should reach the limits

    from tab.6.7

    STAS 1667-80

    STAS 4606-80

    1test at max.

    500m3 sort

    AB checking

    granulosity

    Laboratory

    d.Density in stock in dry and

    loosen status

    Min. 1800kg/cm= ap

    Min. 1200kg/cm density in

    dry and loosen stock

    STAS 1606-80

    STAS 1667-76

    1test at 200m3 AB Laboratory

    e.Humidity For correcting the receipt

    concerning water content

    STAS 1667-76 1test at 200m3

    concrete and

    when necesary

    AB Laboratory

    3. Additions Finesse, stability, stability factor

    at 24 hours

    Reaching the limits of the

    product standard

    SREN 196/6-99 1test at each

    provided lot

    Approval from

    supplier

    Consultant

    4. Admixture Examining the data of the

    quality certificate

    Observing the quality

    warranty

    NE 012-99 at each

    provided lot

    Approval from

    supplier

    Consultant

    5. Water a.aspect, taste, smellb.chemical composition

    Clear, no suspensionas point 2.1 STAS

    STAS 790-84 For each water source

    6. Reinforcement

    steel

    -examining data from the quality

    certificate of the supplier

    Observing the quality

    warranty by the producer

    NE 012-99 at each

    provided lot

    CQ, SPL

    -checking the aspect (surfacequality), dimensions and profiles

    As in tab. 2 and 3;breakings, breaches are not

    allowed

    STAS 438/1-89 At 2% of thenumber of bar

    skeins and

    links

    CQ, SPL

    -testing at bending on the screwtap

    Bending angle min. 180 STAS 438/1-80 2 specimens AB Laboratory

    -checking the mechanical

    characteristics (breaking

    resistance, leaking limit,elongation when breaking)

    Conforming the standard

    characteristics

    STAS 438/1-89 Min. 6 tests/lot Suppliers

    approval

    Consultant

    7. Welded mesh Examining the data of the

    quality certificate

    Observing the quality

    warranty

    STAS 438/3-89 at each

    provided lot

    CQ, SPL

    Checking the aspect and thedimensions

    -max. 3% unwelded knots-local defects if they dont

    lead to a diameter under

    admitted

    -a thin layer of oxide if

    when removed doesnt lead

    to a smaller diameter thanadmitted

    STAS 438/3-89 At 3% of thelot but not less

    than 3 random

    welded meshes

    CQ, SPL

    Checking the mechanical

    characteristics and the quality of

    knots welding

    Conforming the standard

    characteristics

    STAS 438/1-89 At 3% of the

    lot, but not less

    than 3 meshes

    Suppliers

    approval

    Consultant

    8. Strand of slick

    wire

    -dimensions, shape

    -aspect

    Visually, no rust admitted STAS 438/2-91 2% of the lot,

    but no less

    Suppliers

    approval

    Consultant

    14

  • 7/28/2019 Plan Control Calitate PCCVI

    15/24

    than 3 skeins

    CHECKING CONCRETE QUALITY1. Fresh concrete Consistency As in performance levels

    tab. 711-714 of NE 012-99

    STAS 1759-88

    STAS 3622-86

    2/shift and

    concrete type

    AB for

    consistency

    check by

    subsidence

    Laboratory

    Temperature Within 5-30C NE 012-99 4 ests/shift and

    concrete typeApparent density concrete + 40kg STAS 2414-91 2 tests/

    concrete type

    AB Laboratory

    Sand content 0/3 mm f min.%= -2

    f max. %=+2

    STAS 1759-88 When

    necessary

    AB Sand

    content 0/3

    Laboratory

    Concrete preparing -internal regulation

    -aggregate storage on sorts

    -silos for min. 2 types of

    cement

    -material dosing equipment

    -preparing equipment-authorized personnel

    -authorized laboratory

    -internal authorization-receipt approved by the

    consultant

    NE 012-99 Permanently Official report

    calibration,

    concrete plant

    check

    Plant chief, AQ,

    RTEL, CQ

    Concrete storing In bunker max. 20 min. NE 012-99 Permanently

    Concrete transport As in tab. 12.1; when

    carried with weighing

    machine duration is 15

    shorter

    NE 012-99 Permanently Plant chief, SPL

    2. Hardened

    concrete

    a1.determining compression

    resistance on cylindrical

    specimens, cubes for resistance

    checks on stages

    As the terms (days) for

    shuttering removal from tab.

    14.3 of NE 012-99

    STAS 1275-88 1 test/shift or

    as in project or

    PTE

    Sample taking

    bulletin

    Laboratory

    a2.determining compression

    resistance for checking the

    concrete class

    Compression resistance as

    in STAS 3622-86 for 28

    days; 5% of the results can

    be under statistical values

    STAS 1275-88

    STAS 3622-86

    STAS 1799-88

    NE 012-99

    For each

    concrete type

    from the

    structure, but at

    least 1test at:

    300m3, C16/20

    AB

    Rc test

    Laboratory

    b.determinating sealing degree As in tab. 7.2.2. NE 012-99 STAS 3518-86 1test at 300 m3 AB sealing Laboratory

    15

  • 7/28/2019 Plan Control Calitate PCCVI

    16/24

    STAS 3662-86 but min. 2 tests/object

    degree det.

    c.determinating the frostsusceptibility degree

    Tab. 7.2.3. NE 012-99 STAS 3518-86STAS 3662-86

    1test at 1000m3 AB Laboratory

    DIRECT FOUNDATIONS1. Checks at direct

    foundations in

    enclosure

    -location

    -dimensions, positions

    -foundation level

    -the nature of the foundation soil

    -compacting degree-bearing capacity

    -as in PT (technical project)

    -as in CS

    -as in PT

    -as in CS

    -as in CS-as in CS

    PT

    PT+CS

    PT

    CS

    CSCS

    at each elem.

    at each elem.

    at each elem.

    at each elem.at each elem.

    Off.rep. of

    taking-over loc.

    Direct

    measurements

    PVRF

    AB

    AB

    AB

    Land survey,SPL

    CQ, SPL

    B+C

    Laboratory

    LaboratoryLaboratory

    SHUTTERING1. Preliminary

    check-preparative works andshuttering and propping

    elements or parts

    -dimensioning the shuttering and

    the fixing pieces

    -written specifications for

    shuttering in the project forspecial constructions

    -following the requirementsof chapt. II NE 012 and

    chapt. 7 CS

    -respecting the norms for

    stability, rigidity and sealing

    -as the technological project

    or PTE

    NE 012-99

    Guide for shuttering

    design and usage

    PT + Cs

    Before startingworks

    Permanently

    Before

    beginningexecution

    Autocontrol SPL

    2. Control during

    execution

    -drawing the shuttering position

    -assembling and temporary

    propping up of the plates

    -checking and correcting the

    plates position-closing, tiding and final

    propping

    As annex III.I from NE 012-

    99 and table III.I.I fron

    chapt. 7 CS

    NE 012-99 Permanently Official report

    of drawing

    Official report

    of control

    Land surveyor,

    SPL

    CQ, SPL

    3. Final control,

    taking-over the

    shuttering

    Controlling before pourring the

    concrete:

    -shuttering geometry

    -shuttering stability-shuttering tightness

    -treatment with oil for shuttering

    removal(decofrol)

    -finishing

    -cleaning the shuttering

    Length + 4mm

    Width + 3mmChapter 17 NE 012-99

    Chapter 8 CS

    NE 012-99

    CS

    Before

    pourring the

    concrete

    Final official

    report of

    taking-over

    Consultant

    Constructor

    REINFORCING THE OVERCONCRETING SLAB1. Checking the -quality certificate data At each lot Final official CQ, SPL

    16

  • 7/28/2019 Plan Control Calitate PCCVI

    17/24

    reinforcement of

    overconcreting

    slabs

    -assembling the reinforcement -distance between bar axis +5mm

    -ensuring the covering layer of

    concrete + 2mm

    NE 012-99 At each

    element

    report of

    taking-over

    Consultant

    Constructor

    WATERPROOFING1. Controlling the

    material quality

    for waterproofing

    before execution

    -checking data from quality

    certificates

    -taking-over the aproved

    material

    As product standard table STAS 5088-75

    SR 137-95

    Each supplied

    lot

    Final official

    report of

    taking-over

    (PVRF)

    Laboratory

    Taking-over

    commission

    2. Checkings duringexecution

    -of the support surface:a.evenness

    b.connecting to the edges and

    gorges

    c.executing the slopes from the

    project

    d.assembling the box culvertse.removing the impurities

    -of the prime cote:a.penetration

    b.covering degree

    -of the base, the supplementaryand the gluing layer

    a.adherence between

    waterproofing foils and support

    surface

    b.empty spaces, bubbles, non-

    gluing at joints

    -of the protection layers:

    a.planeityb.lack of bumps

    -of the joining finishing at the

    edge of the construction

    element, at the box culverts and

    at the breaches-of the way of realizing the

    joints covering devices

    -admitted bumps < 2mm

    -the surface must be smooth

    -one bump admitted + 5mm

    with 3m straightedge in anydirection

    -temp > 5 C

    -total priming of the surface

    as product standard

    -as product standard for

    physico-mechanical

    characteristics(breaking

    force, traction resistance,

    flexibility)

    -Solutions accepted:

    concrete finishing, lutebitumen or protection

    membranes-as execution details,

    through visual observation

    -following technical

    characteristics from CS

    STAS 5088-75

    PT + CS

    PT + CS

    SR 137-95

    STAS 6642-73

    PT + CS

    PT + CS

    PT + DDE

    Before strarting

    waterproofing

    Permanently

    Permanently

    Permanently

    Permanently

    Permanently

    PVRF

    PVRF

    PVRF

    PVRF

    PVRF

    PVRF

    PVRF

    PVRF

    Consultant

    Constructor

    Consultant

    Constructor

    Consultant

    Constructor

    Consultant

    Constructor

    SPL, CQ

    Consultant

    Constructor

    Consultant

    Constructor

    Consultant

    Constructor

    3. Checking at the - the aspect

    17

  • 7/28/2019 Plan Control Calitate PCCVI

    18/24

    end of

    waterproofing

    -the tightness, if there are

    unconvenient notes in the

    Official report of covered works

    -proper response to water

    drowning test for hmax =5cm

    STAS 5080-75

    PT + CS

    When

    finishing

    works

    PVFD I+B+P+C Determin

    ant stage

    STRUCTURES OF PRECASTED ELEMENTS1. Checking the

    quality ofprecasted

    elements

    -quality certificate

    -verifying the aspect, the form

    and the main dimensions-checking the numbering of

    precasted elements

    -as in the recorded data

    -according with the

    admitted tolerances-as the position from the

    mounting plan

    NE 012-99

    STAS 6657/1-76

    STAS 7009/79STAS 8600/79

    Mounting plan

    -at each

    supplied lot

    -before

    assembling the

    precasted

    elements

    PVRC

    Quality control

    documents

    Taking-over

    comission, CQ

    CQ

    2. Verifying the

    assembling of the

    precasted

    elements

    a.verifying the preparative

    works for assembling

    b.verifying the assembling of

    precasted elements

    -during assembling

    -at the end of assembling

    -visual verifying and

    measurements

    -following the mounting

    plan+ 0.5cm from the project

    level in the long. and transv.

    profile

    NE 012-99

    Work instructions

    Before

    beginning

    assembling

    During

    assemblingAt the end

    PVRF

    Assembling

    registerPVRF

    Consultant

    Constructor

    CQ

    Consultant

    Constructor

    3. Verifying the

    monolithing of

    the precastedelements

    a.verifying the cast-in-place

    shuttering of the precasted elem.

    b.verifying the cast-in-placereinforcement of the precasted

    elements

    c.verifying the cast-in-place

    concreting of the precasted

    elements

    d.verifying the monolithing of

    the precasted elements after theremoval of the shuttering

    -reaching the tolerances for

    shuttering

    -reaching the tolerances forassembling the

    reinforcemnet

    -using the same class of

    concrete at monolithing and

    at precasted elements; it

    must be well compacted- reaching the tolerances for

    concreting; the concretemust not be segregated

    NE 012-99

    Permanently

    Permanently

    Permanently

    After

    shutteringremoval

    Official report

    for shutt.

    PVRF

    CQ

    Consultant

    Constructor

    G. RETAINING WALLS1 Checking the

    embankments(di

    ggings)

    -drawing the reference elementsof the retaining walls

    -foundation level

    -geometrical elements of the

    foundation excavation

    -the nature of the foundation soil

    Max + 0.05m

    Max + 5cm

    As in PT

    CS

    C 182-87

    C 56-85

    Technical project

    -Beforebeginning the

    works at every

    6m

    Official reportof drawing

    PVRF

    Land surveyor

    18

  • 7/28/2019 Plan Control Calitate PCCVI

    19/24

  • 7/28/2019 Plan Control Calitate PCCVI

    20/24

    2.

    3.

    4.

    5.

    Sand from

    crushing sort 0-3

    Natural sand

    sort 0-3, 3-7, 0-7

    Sorted gravel

    sort 7-16, 16-31

    Filler

    -frost susceptibility coefficient

    -sensibility

    -water absorption-granulosity

    - content of impurities

    -activity coefficient

    a)sand from crushing with max

    8% fractions of 0-0.09 mmb)sand from crushing with max.

    8% fractions of 0-0.09 mm

    -cellulose fiber

    -granulosity

    -sand equivalent-impurities content:

    other materialshumus(the color of the sodium

    hydroxide solution)

    -granules shape b/a; c/a

    -content of flat and acicular

    granules-content of fractions dmaxmax. 10%

  • 7/28/2019 Plan Control Calitate PCCVI

    21/24

    6.

    7.

    8.

    Bitumentype D60/80

    Bituminous

    emulsion

    Taking-over the

    supplied

    materials

    -apparent density

    -empty spaces coefficient

    According to the annexed table

    Viscosity, bituminous residuum,

    stability when storing

    Examining the quality

    certificates from the suppliers,

    comparing the data from thequality certificate with the

    laboratory tests and analyzes,

    taking-over document

    0.5-0.8 g/cm3

    0.-0.5

    Anexis 1 PCCVI

    According to the technical

    specifications table 1

    According to the product

    standards

    PT and CS

    NAR norm 537SR 174-1/97

    STAS 7970-76

    STAS 8877

    C 56-85

    checked

    For each

    provided lot

    Taking-over

    on stages

    AB bitumen,bituminous

    emulsion

    Material and

    source

    approval

    PVRC

    Laboratoy, CQ

    Consultancy

    Taking-over

    commission, CQ

    PRODUCTION CONTROL1.

    2.

    3.

    4.

    Material keeping

    and storing

    Applying the

    production

    receiptChecking theplant for coated

    macadam, the

    equipments, the

    laboratory equip.

    and conditions

    Checking the

    preparation of

    the coated

    Visual examining

    Existence of the receipts

    according to HG 766-97

    Initial dosage equipments:-calibrating

    -the existence and the state of

    the grates

    -functioning of the volumetrical

    dosage equipment

    -functioning of the vibrators-functioning of the sieves

    Mixer-functioning of the rotative sieve

    -bunkers for sorts

    -functioning of the bitumen

    doser-functioning of the filer supply

    installation-functioning of the aggregate

    balance

    -reaching the granulosity area

    for the designed type of mixture

    -the cleanness

    On concreted platforms

    On sorts

    Reaching the limits for the

    mixture type

    In accordance with thefunctioning authorization,

    the internal authorizationand the technical agreement

    tolerance limit from Table 4

    Impurities content

    SR 174-97

    SR 174-97STAS 7970-86

    SR 174/2-97

    Permanently

    At production

    beginning

    When

    changing the

    aggregates

    Daily andrandom

    When

    beginning the

    production and

    Receipt

    approval

    Official report

    for calibrating

    and for

    checking the

    plant(anexis to

    the metrologybulletin)

    AB coated

    macadam

    Site chief

    Consultancy

    Plant chief, AQ,

    RTEL, CQ

    Laboratory, CQ

    21

  • 7/28/2019 Plan Control Calitate PCCVI

    22/24

    5.

    6.

    macadam

    Checking thepouring of the

    coated macadam

    Checking andcontrolling the

    compaction of

    -the temperature of the binder atthe entrance in the mixer

    -the temperature of the

    aggregates dried and heated at

    the exit from the drier

    -the granulosity of the

    aggregates at the exit from the

    drier

    -the temperature of the coatedmacadam when preparing, at the

    exit from the mixer

    -reaching the established

    bitumen dosage

    -the composition of the coated

    macadama)SOXHLET extraction

    b)centrifugal device extractionc)granulometrical composition

    -taking-over the support layer-exterior temperature

    -verifying the pouring

    equipments

    a)technically and functionallyb)installation for beam vibration

    c)installation for beam heatingd)side limiter, touching

    equipment

    -priming the surface of the

    support layer and the working

    joint

    -the temperature of the coated

    macadam when pouring min. C-thickness of the aired layer of

    mixture

    -gaps at the transversal and

    longitudinal joints

    -checking the compactingequipment

    a) technically and functionally

    Table 1

    Table 1

    According to the receipt

    Table 1

    Allowed deviance 0-0.3%

    Table 4 SR 174/2 and

    receipt

    According to PT and CSMinimum 10C

    Bitumen quantity after

    priming 0.3-0.5 kg/m2

    According to table 2

    20% bigger than the project

    Minimum 10 cm

    SR 174/2-97

    SR 174/2-97

    STAS 1338-87

    STAS 1338/2 -87

    SR 174/2-97SR 174-97

    SR 174/2-97

    SR 174/2-97

    PTE

    when changing

    materials

    Permanently

    Permanently

    Daily or at one

    inappropriate

    mixture

    At everyworking hour

    Daily

    20 kg daily for

    400t of coatedmacadam

    Daily at thebeginning of

    the works on

    the sector

    Permanently

    Permanently

    At least twice

    a dayPermanently

    Daily

    Register for

    the

    temperatures

    Register forthe production

    AB for dosage

    of bitumen,

    aggregates,

    filler

    Official reportof control

    Official report

    of control

    Site register

    Plant chief

    Laboratory

    Plant chief

    Laboratory

    CQ, RTEL, SPL

    CQ, RTEL, SPL

    Land surveying,

    SPL

    22

  • 7/28/2019 Plan Control Calitate PCCVI

    23/24

    the coated

    macadam

    b)moisturizing-cleaning

    installation

    c)equipment weighing-mixture temperatures before

    compaction

    -checking no. of passes

    -mixture temperatures at the end

    of min. compacting C

    -method of compacting

    -compaction degree-ulterior treatment of the

    wearing course surface

    According to table 2

    Min. table 3 and the trial

    sector

    According to table 2

    According to PTE

    Min. table 92-3 kg/m2 bituminize sand

    2-3%

    SR 174/2-97

    SR 174/2-97

    SR 174/2-97

    SR 174/2-97

    SR 174/2-97PT and CS

    At least twice

    a day

    Permanently

    At least twice

    a day

    Daily

    PermanentlyPermanently

    Equipments

    and

    compacting

    workshop

    approval

    Temperatures

    register

    AB coatedmacadam

    compaction

    Consultancy

    SPL

    Laboratory, CQ

    CHECKING THE COMPOSITION AND THE PHYSICAL-MECHANICAL CHARACTERISTICS OF THE COATED MACADAM AND THE PAVEMENTS1.

    2.

    3.

    4.

    Methods of

    sample-taking

    Checking thecomposition of

    the coatedmacadam

    Checking the

    physical-

    mechanical

    characteristics of

    the coatedmacadam

    Checking the

    compacting

    degree of the

    pavement done

    Determining the density, the

    absorption, the thickness and the

    compacting degree

    -Granulosity of the mineralaggregates

    -Bitumen dosage table 6 SR174/2-97

    Characteristics on Marshall

    cylinder:

    -stability (S) at 60C

    -flowing index (I)

    -rapport S/IkN/mm-apparent density kg/m3

    -water absorption %

    Characteristics on cubes

    -compression resistance at 22C

    min. N/m2

    - compression resistance at 50C

    min. N/m2

    -apparent density min.-water absorption % vol.

    -Apparent density of the mixture

    from the layer

    -Apparent density of the mixture

    determined on Marshall

    cylinders

    At approx. 1m from the

    edge of the pavement to the

    mixer; pouring with the

    beneficiary present

    Tab. 4 SR 174/2-97

    0-0.3% allowed deviancesto the dosage

    According to SR 174/1-97

    table 7, 8, 9

    The apparent density of the

    mixture must reach 100% in

    95% of the samples, and in

    the other 5% of the samples

    it must be > ap

    SR 174/2 -97

    STAS 1338/2

    SR 174/2-97

    STAS 1338/1

    STAS 1338/2

    STAS 1338/3

    Norm 539/2000

    SR 174/2-97

    PT and CS

    1 sample 20 kg

    at 400t min. 1

    plate 40x40 at

    7000m2 made

    Idem 1

    Samples taken

    from the

    mixer, poring,

    before

    compacting or

    existing

    pavement

    During the

    execution

    AB coated

    macadam

    ABaggregates,

    bitumendosage

    AB physical-

    mechanical

    characteristics

    of the coated

    macadam

    AB

    compacting

    degree of the

    coated

    macadam

    Laboratory

    Laboratory

    Laboratory

    Laboratory and

    CQ

    23

  • 7/28/2019 Plan Control Calitate PCCVI

    24/24

    5.

    6.

    Checking the

    geometrical

    elementsincludes

    fulfilling the

    quality

    conditions for

    support layer as

    in STAS 6400

    Checking the

    works for thetaking-over

    -thickness of existing pavement

    -width of lane layer

    -transversal slope

    -longitudinal slope

    -surface evenness

    a.maximum allowed bumps in

    long profiles