Hobart & Heron successfully won the design & build project forStena’s new ferry terminal in Belfast at Victoria Terminal 4(VT4) in 2006. By the time the VT4 building was completedand opened in June 2008, we had been appointed directly byStena to design and procure the new Loch Ryan Port buildingson a windswept exposed site just north of Cairnryan inScotland. This £50m development project incorporateddredging, site reclaimation and harbour development works, tocreate the land onto which the new passenger terminal, and 5other support buildings would be built. This passenger terminalwas designed to enhance passenger comfort, and completethe second leg of the journey that started with the VT4 BelfastTerminal. Two new luxury fast ferries, which would reducejourney time and greatly enhance the travel experience forpassengers, were also introduced on the route at the openinglast year.
The terminal building design has a low profile of 2 storeys,with a curved overhanging roof to provide both shelter fromthe elements when the rain is not coming horizontally, andsoften the buildings appearance against the steep slopes ofthe Galloway hills which rise some 200m above the A77 roadnorth on the sites eastern boundary. A high performanceglazed curtain wall façade provides the main external wallelement, and the visual link from inside the building to therugged natural landscape of hillside and sea on this exposedsite. A neutral grey external colour pallet for the building waschosen to enhance the corporate signage colours of Stena onthe roof and canopies. Inside, the colours are a neutral ‘offwhite’, with occasional walls of red and blue, Stena’s corporatecolours. Furniture was selected by Hobart & Heron to reflectmodern vibrant departure lounges, café and offices, andarranged to provide views outside in all directions on bothground and first floor offices.
The terminal building ground floor is designed to allow for thesmooth flow of foot passengers and staff through the building.Beyond the ‘meeters and greeters’ waiting area is security,which is similar to Airport security as this is a main entry portinto the UK. Foot passengers then proceed to the waitinglounge, which has catering and toilet facilities.
Car and freight passengers must drive through a securitybuilding and then through a Ticketing building before parkingin designated waiting rows before being allowed to drive ontothe ferry. Car passengers can also enter the terminal buildingfrom the secure side for refreshments and toilet use.
The first floor level of the Terminal building has Stena andsecurity personnel offices, as well as conference rooms,meeting rooms, canteens, and stores. On the second floor are the boiler room and air handling units, with an open plant well.
CASE STUDY ARCHITECT’S ACCOUNT
THE TEAM
PERSPECTIVE70
PLAIN SAILING
Client / Stena Line Ports- Loch Ryan
Architect / Hobart & HeronMark Porter, William Dawson, Eamon Farrelly
Quantity Surveyor / Sammon
Structural / Doran Consulting
Mech & Elec / Caldwell Consulting
Main Contractor / McLaughlin Harvey
Photography / Chris Hill s
PAGE 70-74 STENA AACCOUNT 2_Orchard 21/08/2015 09:52 Page 1
CASE STUDY ARCHITECT’S ACCOUNT
PERSPECTIVE 73PERSPECTIVE72
CASE STUDY
Condiments
BAGGAGE
RECLAIM
BAGGAGE
CHECK-IN
SECURITAS OFFICE
& MESS
LADIES
W.C.
GENTS
W.C.
DIS. W.C.
LADIES W.C.
GENTS
W.C.
TRAVEL OFFICE
TICKETS
GRAB & GO
Dockers WC
Dockers
Lockers
Drying
Room
Dockers
Mess
PSO Team
Leader
DEPARTURES TO
BOAT
MAIN TERMINAL
ENTRANCE
INTERVIEW
ROOM 1
PREP
ROOM
DEPARTURE
LOUNGE
GROUND FLOOR PLAN
LADIES HGV
TOILETS
GENTS
HGV
TOILETS
Switch
Room
1
12
20
CAR PASSENGERS &
HGV DRIVERS
1
1213
feet
0 5 10
STAIRCASE 1
STAIRCASE 2
COMMS
ROOM
BIN
CAR HIRE
STORE
CAR HIRE
INNOVATION
DIRECTOR
INNOVATION
ADMIN
ASSISTANT BUSINESS
CONTROL
OPS
SECRETARIES
SHIP & PORT
MANAGER
BUSINESS
CONTROLER
MEETING
ROOM
MEETING
ROOM
MEETING
ROOM
INNOVATION
MEETING
ROOM
HR
STAFF
STAFF
MESS
OPS
MANAGER
TRAINING
OFFICE
INNOVATION
ADMIN
IT STORE
STENA IT OFFICE
FOREMOST
LEISURE
CAMERA
SWITCH
ROOM
03 04
02 06
11
01
1009
FIRST FLOOR PLAN
DIS. W.C.
LADIES
W.C.
GENTS
W.C.
SPARE
OFFICE
DIS.
W.C.
Cleaners
store
STORE24
1
12
STORESTORE
Printer
zone
STORE ROOM
25
35
24
40
H/
L
H/
L
H/
L
H/
L
H/
L
05 08 12
13
14
OFFICE
STAIRCASE 2
STAIRCASE 1
RWP & outlet RWP & outlet
HR
MANAGER
INTERVIEW
ROOM 3
INTERVIEW
ROOM 2
POLICE
OFFICE
DRYING
ROOM
& outlet
OPS
& outlet outlet & outlet & outlet & outlet & outlet
ARIESSECRETA
OPS
MANAGER
& outletWPWPWPWPWPWPRRRRRR
ARIES
T & PORSHIP
MANAGER
HR
MANAGER
& outlet
MEETING
& outlet & outlet & outlet & outlet & outlet & outlet & outlet
ROOM
HR
AFFSTA
& outletWPWPWPWPWPWPRRRRRR
BUSINESSANTASSISTA
CONTROLMEETING
ROOM
TIONAINNOVVA
ORDIRECT
.C.22
44424
1
22CCCCC
srs
DIS. W W
Cleaners
24
1
12
AIRCASE 2STA
LADIES
.C.W.
OREST
ORE ROOMST
MEETING
ROOMORESTOREST MEETING
ROOM
AFFSTA
MESS
W
Printer
TIONATINNOVVA
ADMIN
BUSINESS
CONTROLER
DIS.
.C.W.
Printer
zone
H/H/
03
HH
L
H/HH
L
H H
02
01
ARESPA
OFFICE
store
H/
LL
H/
L
H/
L
HH/H/
L
H/
LLL
H/H/H/
L
04
06
GENTS
.C.W
05 08
OFFICE
2
ITSTENAA IT
CAMERA
SWITCH
ROOM
12
13
14
TIONAATIONNNOVVA
MEETING
ROOM
TIONAATIONNNOVVA
ADMIN
ORE STIT
OFFICE
FOREMOST
LEISURE
OFFICE
TRAINING
24
25
OFFICE
FOREMOST
25
24
40
OFFICE
AIRCASE 1ST
FLOOR PLANFIRST
09
FLOOR PLAN
1110
35
4040
ASSENGERS &CAR P A
HGV DRIVERS
FLOOR PLANFIRST
OTTURES ARDEP
TBOAAT
FLOOR PLAN
YINGDR
ROOM
POLICE
YING
ROOM PSO Team
Leader
.C.
V VD
2
S
1
222
20
DIS. W .
LADIES W
LADIES HGV
OILETST1
12
20
HGV DRIVERS
AIRCASE 2STA
COMMS
ROOM
.C.
SSSSST
ADIES W .
GENTS
HGV
OILETST
BAGGAGE
SSS
CHECK-IN
SECURIT
LADIES
INTER
ROOM 1
VIEWINTER
ROOM 2
BAGGAGE
WW
M 1
WEW NNTER
RECLAIM
ASURITA OFFICE
& MESS
LADIES GENTS
VIEWINTER
OM 1
VIEWINTER
ROOM 3
VIEW
ROOM 2
OFFICE
Dockers WC
Dockers
Lockers
Dockers
Mess
CondimentsC n
B GRAB & GO
PREP
ROOM
GENTS
.C.W
TUREARDEP
LOUNGE
LADIES
S
.W.
TICKETS
LADIES
BBBI
.C. .C.W.
BIN
Drying
1
C
Room
Switch
Room
1
AIRCASE 1STA
CAR HIRE
GROUND FLOOR PLANGROUND FLOOR PLAN
OFFICEVELTRAAVEL
TERMINALMAIN
ENTRANCE
1
0 55 1
1333
0 500
23
223
1213
CAR HIRE
feet
0 555 110
ORE ST
EAST ELEVATION Fronting Car Park & hillside beyond
W
A A A A A
Finished Ground Floor Level + 0.000m
Window Cill Level + 0.950m
Window Head Level + 2.125m
Ceiling Level + 3.000m
Finished First Floor Level + 4.080m
Window Cill Level + 5.030
Window Head Level + 6.355m
Ceiling Level + 6.880m
RWP Behind Column
RWP Behind Column
RWP Behind Column
RWP Behind Column
R
RWP Behind Column
RWP Behind Column
RWP Behind Column
RWP Behind Column
L O C H R Y A N P O R T
Stena Line SS
O C H R Y A N P O R T
S
A B C D E F G H
F1
7.2m 7.2m 7.2m 7.2m 7.2m 7.2m 7.2m
3.6m 3.6m
S I G N S I G NS I G N S I G N
S I G N
0
SVP SVP SVP SVP SVPFlueFlue
0.82m
0.82m
A
SVP
7.2m
B
7.2m
SVP SVP
C
7.2m
SVP
7.2m
D
7.2m
E
7.2m
F
7.2m
Flue
0.82m
F1
7.2m
m
3.6mFlue
0.82m
G
3.6m SVP
7.2m
H
Window Head Level + 6.355mWindow Head Level + 6.355m
Ceiling Level + 6.880m
SSSSSSSSSSL O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T
ttSSSSL O C H R Y A N P O R T
eSSSSS neeeSSSSSSS eeettttttttteeeeeennnnnn O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T
La Lnnnaaann LLnn LLn LLaaaaaaaa LLLLLL O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T
nnenneiiiiiiiiiiinneennnnnneeeeee
Window Head Level + 2.125m
Finished First Floor Level + 4.080m
Window Cill Level + 5.030
Window Head Level + 2.125m
Ceiling Level + 3.000m
Finished First Floor Level + 4.080m
Window Cill Level + 5.030
S I G NS I G NS I G N S I G N G
RWP m mBehind Column
I G NS I G N I G NS I G NS I G N G N S
RWP m mBehind Column
RWP m mBehind Column
S I G N S I G NS I G NS I G N S I G NS S N N
m mRWP Behind Column
Finished Ground Floor Level + 0.000m
Window Cill Level + 0.950m
Finished Ground Floor Level + 0.000m
Window Cill Level + 0.950m
RWP m mBehind Column mn
RWP m mBehind Column
RWP m m m mBehind Column
RWP m mBehind Column
EAST ELEVATION Fronting Car Park & hillside beyond
EAST ELEVATION Fronting Car Park & hillside beyond
WEST ELEVATION Facing Docks & Loch Ryan beyond
Finished Ground Floor Level + 0.000m
Window Cill Level + 0.950m
Window Head Level + 2.100m
Ceiling Level + 3.000m
Finished First Floor Level + 4.080m
Window Cill Level + 5.030
Window Head Level + 6.355m
Ceiling Level + 6.880m
F
RWP RWP RWP
R
RWP
RWP RWP RWP RWP
Scr
een
Scr
een
Scr
een
O C H R Y A N P O R T
S
L O C H R Y A N P O R T
Stena Line SS
ABCDEFGH
7.2m 7.2m 7.2m 7.2m 7.2m 7.2m 7.2m
7
S I G N
0
SVPSVPSVPSVPSVP Flue Flue
0
0.82m
0.82m
PPC Aluminium downpipe support clips mechanically fixed to masonry wall. No. of Brackets: 3 (1 Top, 1 Bottom, 1 Intermediate)
PPC Aluminium downpipe support clips mechanically fixed to masonry wall. No. of Brackets: 3 (1 Top, 1 Bottom, 1 Intermediate)
ABCDEFG F1
H
7.2m
G
G
GGG
7.2m
SVP
G F1FF1 F
F
F
7.2m
FF
Flue
0.82m
F
7.2m
Flue
0.82m
E
E
EEEE
7.2m
D
D
DDD
7.2m
D C
C
C
7.2m
CCC
7.2m
SVPSVP
B
B
B
SVPSVP
B
7.2m
SVP
A
A
AA
SVP
AA
0.82m
SSSSSSSSSS
0.82m
L O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T
ttSSS eeSL O C H R Y A N P O R T
eSSSSS neeeSSSSSSS eeettttttttteeeeeennnnnn O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T
La Lnnnaaann LLLnn LLn LLaaaaaaaa LLLLLL O C H R Y A N P O R T O C H R Y A N P O R T O C H R Y A N P O R T
nneneiiiiiiiiiiinneennnnnneeeeee
Finished First Floor Level + 4.080m
Window Cill Level + 5.030
Window Head Level + 6.355m
Ceiling Level + 3.000m
Finished First Floor Level + 4.080m
Window Cill Level + 5.030
Window Head Level + 6.355m
Ceiling Level + 6.880m
RWP
S I G NS I G NS I G N
RWP RWP
Finished Ground Floor Level + 0.000m
Window Cill Level + 0.950m
Window Head Level + 2.100m
Finished Ground Floor Level + 0.000m
Window Cill Level + 0.950m
Window Head Level + 2.100m
Ceiling Level + 3.000m
RWP RWP
PPC Aluminium downpipe support
wall. p
wall. No. of Brackets: 3 (1 Top, 1 Bottom, 1 Intermediate) m, 1 Intermediate)
: 3
y
ntermediate) at
port y
te)
R
c
e
of Brackets: 3
eee
e e wall. wall.
kets: 3 k e e f Brackets: 3 t
e
f Brackets: 3 f Brackets: 3
e
Brackets: 3 1 Bottom, 1 Intermediate) 1 Bottom, 1 Intermediate)
ee
wall.
eeeeen Top, 1 Bottom, 1 Intermediate) 1 (1 Top, 1 Bottom, 1 Intermediate)
ee
f Brackets: 3
S
wall. wall. wall. wall. of Brackets: 3
wall.
u i
wall. of Brackets: 3 No. of Brackets: 3
p op p p p p, 1 Bottom, 1 Intermediate) p o o (1 Top, 1 Bottom, 1 Intermediate)
WP
e
PPC Aluminium downpipe support clips mechanically fixed to masonry
(
Scr
eScr
een
p downpipe support y fixed to masonry
RWPSc
Sccr
een
WEST ELEVATION Facing Docks & Loch Ryan beyond
WEST ELEVATION Facing Docks & Loch Ryan beyond
SLOW
SLOWSLOWSLOWSLOWSLOW
12
3
4
5
6
7
8
9
12
34
56
78
910
11
12
13
14
15
16
17
18
19
20
21
22
12
34
56
78
910
11
12
13
14
15
16
17
18
19
20
21
22
12
34
56
78
910
11
12
13
14
15
16
17
18
19
20
21
22
Totem Signage
TRAILER PARK
LINKSPAN
CARPARK
350 SPACESSHIP STORE
& WORKSHOP
TERMINAL BUILDING
TICKET BOOTHS & WEIGHBRIDGES
ENTRANCE SECURITY BUILDING
COACH PARK
AYR 44.8 miles
STRANRAER 5.0 miles
VEHICLE STANDAGE CARS & HGV's
FERRY BERTH
GANRTY SIGN
PUMP HOUSE
STENA LINE FERRY TERMINAL LOCH RYAN, SCOTLAND
FINAL PHASE COMPLETION
n
STRANRAER
RA
RANRA
STR
RA
RAE
NRAER
R 5.0 miles
R
R
miles
5 0 m
R
R
R 5 0 mR
AYR 44.8 mil es
SHIP STORE WORKSHOPH H H HIP STORE
& WORKSHOP WORKSHOP E P STORE RE
OP ORKSHOP OCARPARK CAR
3 C C A R
P A A C C350 SPACE5 5 0 S S
K
ES E S ES
Totem SignageS gS
P
SignageSignage
P O O O O UMP
Signage
P
S
E
S
OUSE O E
Signage
PUMP PUMP PUMP UMP EPUMP HO E
Totem eeaga egenage
TRAILER PARKRAILER PARKR T T RAILER PARKAILER PARKA LER PARKR R ILER PARKER PARKER PARKA A ER PARK PARK A A PARK PARK PARK R R ARK RK K K RK
WORKSHOP& WORKSHOP OP
12
TERMINAL
ORKSHOP O
BUILDING
12 & HGV's
10
STANDAGE 10
STANDAGE 10
STANDAGE 10
STANDAGE 10
STANDAGE
COACH PARK
350 SPACE
1
16
1515
14
13
HGV's
1
RS & HGV's RS & HGV'sRS & HGV'sS & HGV'sS & HGV'sS & HGV's & HGV's & HGV's & HGV's & HGV's & HGV's & HGV'sC C C C C C C CARS & HGV'sS & HGV'sCARS & HGV'sS & HGV'sARS & HGV'sS & HGV'sS & HGV'sCARS & HGV'sA RS & HGV'sA A C
11
STANDAGE STANDAGE STANDAGE T STANDAGE STANDAGE C C C C C C
C C
C CLE STANDAGE L L L CLE STANDAGE CLE STANDAGE CLE STANDAGE L C C C L L L E STANDAGE E STANDAGE E STANDAGE E STANDAGE E STANDAGE E STANDAGE E STANDAGE E STANDAGE E STANDAGE E STANDAGE E STANDAGE E STANDAGE E STANDAGE E STANDAGE STANDAGE T T 10
STANDAGE 1 STANDAGE STANDAGE STANDAGE 10
STANDAGE STANDAGE STANDAGE T T T T T T T V V V V V V V V VEHICLE STANDAGE E E H H VEHICLE STANDAGE VEHICLE STANDAGE EHICLE STANDAGE E E E E VEHICLE STANDAGE VEHICLE STANDAGE H H H HICLE STANDAGE I I HICLE STANDAGE H HICLE STANDAGE HICLE STANDAGE I H H H H H H C C CLE STANDAGE L L CLE STANDAGE C CLE STANDAGE CLE STANDAGE C C C C C L L
99999
V V V V V V V V V V VEHICLE STANDAGE V VEHICLE STANDAGE VEHICLE STANDAGE E VEHICLE STANDAGE V V V V
888877
666665555555
444443
22222
3
350 SPA3 5 5 0 S S P A A C C
VEHICLE STANDAGE VEHICLE STANDAGE ICLE STANDAGE HICLE STANDAGE STANDAGE STANDAGE RS & HGV'sARS & HGV's HGV's & HGV's
21
3
21
3
4
5
6
7
8
9
23
45
67
89
10
11
12
13
14
12
3
STANDAGE STANDAGE STANDAGE STANDAGE STANDAGE STANDAGE STANDAGE & HGV's
VEHICLE STANDAGE & HGV'sC CARS & HGV'sCARS & HGV'sCARS & HGV's
ES
18
17
16
s V s s s s s HGV's V GV's V HGV's GV's GV's HGV's G V's E E E E V s s s V E E E E HGV's HGV's G G HGV's HGV's E E E E ANDAGE N N ANDAGE ANDAGE N N ANDAGE A NDAGE NDAGE NDAGE D D D N A A
1010101010101010
99998
GESSEESESESSSEEE S & S & H H H
E S
SSES HS &
EEEE &
SES &
ANDAGE ANDAGE D G NDAGE GE GE V s V s
211
23
45
67
89
111
12
13
14
15
16
17
18
19
20
21
22
TICKET BOOTHS & BOOTHS & B H WEIGHBRIDGESBRIDGESB GES
ANDAGE V s V's HGV's HGV's HGV's
WSL
ANCE SECURITY E SECURITY E SECURITY
SLOW
GN
N SECURITY LDING
N C E SECURITY NCE SECURITY
WWS
WS
WS
W
W
G GA AN
W
SIG
SLOW
SLOW
SLOWS
WSSLOW
WSLOW GANRTY SIGN
UUN UUILDINGN N N N N N N N N N N ANCE SECURITY N N N N UUUUUUUN N C C ANCE SECURITY N N N N N ANCE SECURITY N
IC C III
N IUUU
ANCE SECURITY N N N
G N G N IG GN
ENTRANCE SECURITY A BUILDINGIILDINGUILDINGBUILDINGBUILDING
GN
SECURITY SECURITY SECURITY SECURITY RITY ITY SECURITY INGINGG
TH
FERRY BERTH
AN
LINKSPANAN
15
16
17
18
19
20
21
22
19
20
21
22
n
FERRY BERTH
E
E
E
E
E
E
E
E
E
E
E
B
E
E
E
E
E
E
B
E
FERRY BERTH
nFINAL PHASE COMPLETIONFINAL PHASE COMPLETION
STENA LINE FERRY TERMINAL LOCH RYAN, SCOTLAND
STENA LINE FERRY TERMINAL LOCH RYAN, SCOTLAND
STENA LINE FERRY TERMINAL LOCH RYAN, SCOTLAND
As Architects and Lead Consultant of the buildings designteam, we coordinated design information from the otherconsultants for the delivery of all the buildings on the project.We liaised with the Civil Engineering project manager to reportand monitor progress of the building works. We assisted in theprocurement and selection of a main contractor, subcontractors, and building envelope contractors. We also had amain role in the management of both the centralized designinformation documentation system, and NEC3 contractmanagement. Stena also had specialist Swedish contractors,whom we assisted in getting their design informationapproved under Scottish Building Warrants.
The project was designated as one of the Scottish Parliamentstop ten infrastructure projects and as such was being fasttracked through the approval process. It also had to be seen
s
s
PAGE 70-74 STENA AACCOUNT 2_Orchard 21/08/2015 09:52 Page 3
CASE STUDY ARCHITECT’S ACCOUNT
to achieve a higher level of sustainability beyond thoseindicated in Scottish Building Regulations. To achieve this thebuilding is heated and cooled by a highly efficient Air SourcedHeat Pump VRV Air Conditioning System. The system recoversheat from the areas in the building that require cooling andallows it to be used in areas that need heating, for examplethe system cooling the comms rooms provides heat to the overdoor air curtains at the main passenger entrances. The main AirHandling Unit that serves the passenger areas also utilizes aheat recovery wheel to reduce the energy used by the systemthat operate on a 24/7 basis.
The lighting scheme within the terminal building wasdeveloped in line with the Stena Corporate ID based on theirmain terminal in Gothenburg, Sweden. The operational area ofthe site is lit to port standards and required substantialmodelling and production of photo montages during theplanning process.
The project consisted of significant infrastructure works due toits location. This included a new dedicated transformerinstallation, a 1 mile stretch of new street lighting on the A77,a 1 mile water main installation and new sewage treatmentworks to serve the site and the local village of Cairnryan. Thebuildings were all completed in 15 months and have been wellreceived by Stena management, their staff and passengers.
Brian GordonDirector, Hobart & Heron Architects