pl11 10 yokota【投影】.ppt [互換モード]equipment between oil refineries ・Implementing...

9
1 1 Area: 144 km 2 Population: 1.45 mil (9 th in the nation) (as of Jan 1, 2014) No. households: 680,000 (as of Jan 1, 2014) Geographical advantage of being located in a metropolitan area Highlyconvenient transportation network of roads, railroads, and airports To Haneda Airport: 15 min. To Tokyo Station: 18 min. To Yokohama Station: 10 min. 川崎市 Overview of Kawasaki City City GNP: ~JPY 5.2 trillion Major industries: Production (iron & steel, precision machinery, petrochemicals) Growth industries: Telecommunications, environment welfare, life sciences 2 Many factories are concentrated in the city’s seaboard area Population density: 10,033 ppl/ km 2 (2 nd out of designated cities) (as of Oct 1, 2013)

Transcript of pl11 10 yokota【投影】.ppt [互換モード]equipment between oil refineries ・Implementing...

Page 1: pl11 10 yokota【投影】.ppt [互換モード]equipment between oil refineries ・Implementing bodies: Tonen General Sekiyu K.K., Showa Shell Sekiyu K.K., Toa Oil Co., Ltd. (RING

1

1

●Area: 144 km2

●Population: 1.45 mil (9th in the nation)(as of Jan 1, 2014)

●No. households: 680,000(as of Jan 1, 2014)

Geographical advantage of being located in a metropolitan area

Highly‐convenient transportation network of roads, railroads, and airports

・To Haneda Airport: 15 min.・To Tokyo Station: 18 min.・To Yokohama Station: 10 min.

川崎市

Overview of Kawasaki City●City GNP: ~JPY 5.2 trillion

●Major industries: Production (iron & steel,precision machinery, petrochemicals)

●Growth industries: Telecommunications, environmentwelfare, life sciences

2

Many factories are concentrated in the city’s seaboard area

●Population density: 10,033 ppl/ km2

(2nd out of designated cities)(as of Oct 1, 2013)

Page 2: pl11 10 yokota【投影】.ppt [互換モード]equipment between oil refineries ・Implementing bodies: Tonen General Sekiyu K.K., Showa Shell Sekiyu K.K., Toa Oil Co., Ltd. (RING

2

3

Transformation of Kawasaki’s Reclaimed Land along the Seaboard

【1940s】 【1960s】

【2008】

Current State of Air Pollution(Changes in sulfur oxide emission levels)

4

■Continuous, real‐time monitoring of air pollution

■Conclusion of pollution  agreements between the city and businesses

■Continuous, real‐time monitoring of pollution sources

■Improved regulationsIntroduction of Japan’s first regulations on total emissions; enactment of Pollution Control Ordinances in Kawasaki.

Changes in sulfur oxide emission levels at factories and businessesTons

Year

Page 3: pl11 10 yokota【投影】.ppt [互換モード]equipment between oil refineries ・Implementing bodies: Tonen General Sekiyu K.K., Showa Shell Sekiyu K.K., Toa Oil Co., Ltd. (RING

3

Current State of Air Pollution(Changes in sulfur dioxide emission levels)

二酸化硫黄濃度

5

SO2 emission levels

Year

【Aerial view of the seaboard district in 2010】

【Aerial view of the seaboard district in 1966】

Mount Fuji

Achievements of Kawasaki’s Environmental Measures (Aerial views of the seaboard district)

6

Page 4: pl11 10 yokota【投影】.ppt [互換モード]equipment between oil refineries ・Implementing bodies: Tonen General Sekiyu K.K., Showa Shell Sekiyu K.K., Toa Oil Co., Ltd. (RING

4

0

10

20

30

40

50

60

70

80

90

100

0

5

10

15

20

25

30

1987 1990 1993 1996 1999 2002 2005 2008

下水

道普

及率

年度

下水道普及率

五反田川・追分橋

平瀬川・平瀬橋(人道橋)

矢上川・日吉橋

(mg/l)

市内

河川

の生

物学

的酸

素要

求量

(%)

1993年 川崎市河川水質管理計画策定

BOD levels in city rivers and sewage diffusion rate

1972  Enactment of Kawasaki pollution control regulations

2000  Enactment of regulations for protection of the living environment,  such as pollution control in Kawasaki

State of Water Environment (Water quality in city rivers)

1993  Development of water quality improvement plan for rivers in Kawasaki city

7

Percentage of sewered population

BOD levels in

 city rivers

Sewage diffusion rate

Gotanda River, Oiwake Bridge

Hirase River, Hirase Pedestrian BridgeYagami River, Hiyoshi Bridge

Year

Tama River in 1975

Tama River in 1975

Tama River in 2010 (Ayu (sweetfish) swimming upstream)

State of Water Environment (Water quality in city rivers)

8

Page 5: pl11 10 yokota【投影】.ppt [互換モード]equipment between oil refineries ・Implementing bodies: Tonen General Sekiyu K.K., Showa Shell Sekiyu K.K., Toa Oil Co., Ltd. (RING

5

9

Kawasaki Basic Environmental Plan formulated in 1994

◆Specified the direction of measures to counter global warming by showcasing Kawasaki as a global environmentally-friendly, sustainable resource recycling city.

Kawasaki Basic Environmental Plan revised in Oct 2002

Aimed at 6% reduction of emissions in the city, such as CO2, in 2010 compared to 2000 levels

Kawasaki Challenge to Prevent Global Warming formulated in 1998

Formulated in cooperation between the city’s residents, businesses,schools, and local administration

Kawasaki Global Warming Countermeasure Area Promotion Planformulated in Mar 2004

Aimed to achieve a reduction of GHG emissions in the city area in 2010 to -6% for the base year

Actions and Current State of theDevelopment of a Low-Carbon Society (1)

10

Promotion Plan for Global Warming Countermeasures in Kawasaki: Basic plan formulated in October 2010, implementation plan formulated in Mar 2011 (Phase 1), implementation plan formulated in Mar 2014 (Phase 2)

Aims at a reduction that would be equivalent to 25% or more of GHG emissions in the city area in FY 1990 by FY 2020.

Regulations on the Promotion of Global Warming Measures in Kawasaki formulated in Apr 2010

Formulated as rules to promote global warming measures throughout the city

Announcement of activities in Feb 2008 based onCarbon Challenge Kawasaki Eco-Strategy (CC Kawasaki)

Activities featuring the entire city carried out to promote the virtuous circleof an integrated environment and economy and create a sustainable societyon a global scale.

Actions and Current State of theDevelopment of a Low-Carbon Society (2)

Page 6: pl11 10 yokota【投影】.ppt [互換モード]equipment between oil refineries ・Implementing bodies: Tonen General Sekiyu K.K., Showa Shell Sekiyu K.K., Toa Oil Co., Ltd. (RING

6

29,223

25,755 25,924

24,878

26,757

25,226

24,302

23,725

23,883

20,000

21,000

22,000

23,000

24,000

25,000

26,000

27,000

28,000

29,000

30,000

1990年度 2000年度 2005年度 2006年度 2007年度 2008年度 2009年度

改定値

2010年度

改定値

2011年度

暫定値

Thousand t-CO2

▲18.3% compared to FY 1990

Changes in GHG Emissions in Kawasaki

11

FY 1990 FY 2000 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009Revised figures

FY 2010Revised figures

FY 2011Provisional figures

40%

60%

80%

100%

120%

140%

160%

180%

200%

1990年

2000年

2001年

2002年

2003年

2004年

2005年

2006年

2007年

2008年

2009年

改定値

2010年

改定値

2011年

暫定値

Private (households)

Private (businesses)

Transport

Waste

Industries

Industrial processes Conversion

Conversion 1.6%

Industrial sector72.5%

Private sector (household‐

related) 8.3%

Private sector (business‐

related) 8.0%

Transport 4.9%

Waste1.4%

Industrial process 3.4%

Comparison and Changes by Sector for CO2

Emissions in the City

FY 2011(Provisional figures)

12

Page 7: pl11 10 yokota【投影】.ppt [互換モード]equipment between oil refineries ・Implementing bodies: Tonen General Sekiyu K.K., Showa Shell Sekiyu K.K., Toa Oil Co., Ltd. (RING

7

• Eco-Town plan recognized by the Ministry of International Trade and Industry (now the Ministry of Economy, Trade and Industry) in 1997.

• Target area is the entire seaboard area of Kawasaki (2,800ha) located in the metropolitan area.

• Development and expansion of resource-recycling production activities of existing businesses and promotion of construction of new resource recycling facilities.

• Development of Kawasaki Zero-Emissions Industrial Complex, a resource-recycling and energy-saving area that uses waste as materials and resources for production.

Kawasaki Zero-Emissions Industrial Complex

Eco-town area

Overview of Kawasaki Eco-Town

132014/7/22

14

エコタウン対象エリア

Main Facilities in Kawasaki Eco-Town

1

①Biomass power station・Output (planned): ~33,000 kW・ Site area: ~3.2ha・ Start of operations: Feb 2011・ Implementing body: Kawasaki Biomass, other; selected for NEDO subsidy・ Treatment facility that supplies fuel for use at power plants (joint establishment with Japan Bio-Energy)

②Cement plant・ CO2 reductions by effective use of waste and byproducts for raw fuel for cement・ CO2 reductions through production of blast furnace scrap cement.・ Implementing body: TC Corporation

③Construction of a dry distillation gasification incinerator・Gasification and combustion of waste・Density of toxic substances: 90% reduction・Exhaust gas: 60% reduction・ Start of operations: July 2007・Implementing body: Zeon Corporation

④Development of advanced technologies for integrated treatment of heavy-crude oil ・Efficient manufacturing of high value-added petroleum products, such as volatile oil, is possible with the combination and integrated application of different heavy-oil cracking equipment between oil refineries・ Implementing bodies: Tonen General Sekiyu K.K., Showa Shell Sekiyu K.K., Toa Oil Co., Ltd. (RING Project)

⑤Soil remediation plant・ Implementing body: Shimizu Corporation【Ougi-cho】・Treated volume: 40 t/h・ Start of operations: Sep 2002【Shiraishi】 Specifically for dioxins・Treated volume: 5 t/h・Start of operations: May 2009

⑥Facility for manufacturing of ammonia from waste plastic・Treated volume: 64,000 t/year (waste plastic)・Produced volume: 58,000 t/year (ammonia)・ Start of operations: 2003・Implementing body: Showa Denko K.K.

⑦ PET to PET recycling plant・Treated volume: 27,500 t/year (waste PET bottles)・Produced volume: 23,000 t/year (resin for PET bottles)・ Start of operations: 2004・Implementing body: PET Refine Technology Co., Ltd.

⑧ Recycling plant for difficult-to-process paper・Treated volume: 81,000 t/year (paper)・Produced volume: 54,000 t/year (toilet paper)・ Start of operations: 2002・Implementing body: Sanei Regulator Co., Ltd.

⑨ Manufacturing plant for processing waste plastics as reducing agent for blast furnace・Treated volume: 25,000 t/year (waste plastic)・ Start of operations: 2000・Implementing body: JFE Kankyo Corporation⑩ Household appliance recycling plant・Treated volume: 40,000-50,000 pieces/year (used household appliances)・ Start of operations: 2001・Implementing body: JFE Urban Recycle Corporation⑪ PET bottle recycling plant・Treated volume: 15,000 t/year (waste PET bottles)・ Start of operations: 2002・Implementing body: JFE Kankyo Corporation⑫ Production of panels for concrete molds manufactured from waste plastic・Treated volume: 25,000 t/year (waste plastic)・ Start of operations: 2002・Implementing body: JFE Kankyo Corporation

Page 8: pl11 10 yokota【投影】.ppt [互換モード]equipment between oil refineries ・Implementing bodies: Tonen General Sekiyu K.K., Showa Shell Sekiyu K.K., Toa Oil Co., Ltd. (RING

8

川崎市の特徴Promotion of smart measures with features of Kawasaki, which are connected to safety and security during disasters and improvements in convenience and quality of lifestyles, including low‐carbon development through the optimal usage of energy towards the creation of a sustainable society.

2 Promotion of model project based on regional features

1 Basic idea for the creation of a Smart City

Development andexpansion of outcomes of

model projects

・Examination of new business models that apply HEMS

・Demo project on energy management by 

local constituents ・Introduction of smart EV buses

・Development of hydrogen network

・Find solutions for local issues

by using smart devices, other

Promotion of Smart City Strategy

15

EnergySmart use of energy 

(technologies/techniques)

LifestylesSmart lifestyles(soft aspects)

TransportationSmart movement and transport

City DevelopmentSmart buildings anddevelopment (hard)

Environment & IndustrySmart industries & 

businesses

Improve value with smart 

development

Smart developmentof Kawasaki 

seaboard district

<Area measures>

Creation of visible local energy environment Use of ICT & data

Viewpoint of smart development

Everyone benefits

● Low‐carbon development through optimal use of energy● Improvement of convenience of lifestyles● Security and safety                    

Other

Area around Kosugi Stn.

Area around Kawasaki Stn.

Seaboard districtArea around Fujimi

Development and expansion of individual projects by various stakeholders in other areas

16

Smart Community Project around Kawasaki Station

16

The Smart Community project in the area around Kawasaki Station aims to create a smart community in already-developed areas through low-carbon development by the maximum efficient utilization of broad-based energy has been developed by commercial and business facilities, improvements to the convenience and comfort of lifestyles, and security and safety.

Introduction of smart solutions

■Lazona Kawasaki Plaza・BEMS・Co-generation power plant (total 2,500 kW)・Power plant for emergencies (1,250 kW)・Inverter pump for cool/hot water・LED lighting, rooftop gardens, etc.

■Toshiba Smart Community Center (opened Oct 2013)・Linkage and optimal control of all facilities through advanced BEMS・Advanced eco-performance facilities (LED lighting for all facilities/high-efficiency cooling system, etc.)・Solar power・In-house power generation for emergencies (total 2,400kW)・CASBEE Kawasaki “S-Rank”, etc.

A-2 area, Omiya-machi: Attracting development

■Canon Kawasaki Office(Scheduled for completion and open for common use in 2015)・Application of BEMS・In-house power generation for emergencies, etc.

■Free passage at the Kita exit (2017)・LED lighting, rooftop lighting・Transmission of smart city concept

■Kawasaki Saiwai Hospital・BEMS・In-house power generation for emergencies (1,000kW)・Rooftop and wall gardens

■La Cittadella・BEMS・Co-generation power plant (total 646 kW)・Solar power (5 kW)・LED lighting/rooftop vegetable garden

Area 2 of the urban redevelopment plan

Urban redevelopment emergency improvement area

■Kawasaki Azelea・Heating/cooling system using Neo White cooling medium・BEMS・LED lighting・・In-house power generation for emergencies (1,200kW)

■Development of Kawasaki Stn/Higashiguchi Stn. plaza・Solar power (32kW)・Lithium storage batteries (~30kWh)・LED lighting / photocatalyst / greenery (wall, etc.)

■Kawasaki Frontier Bldg. (completed 2012)・CASBEE Kawasaki “S-rank”・BEMS・In-house power generation for emergencies (1,000kW)

East area, Keikyu Kawasaki Stn.(Projects under adjustment)

■Aerial photo of area surrounding the station

■Smart Community Project Committee for Area around Kawasaki Station

Chair: Prof. Norihiro Nakai, University of Tokyo; Co-chair: Prof. Kimiya Murakami, Shibaura Inst. of Tech.

Members: NREG Toshiba Building, NTT East-Kanagawa, Kajima Corp., Kawasaki Azelea, Kawasaki Tsurumi Rinko Bus, Canon, Keikyu Corporation, Sekishinkai Kawasaki Saiwai Hospital, Tokyo Gas, TEPCO, Toshiba, JR East, Mitsui Fudosan, Urban Renaissance Agency, Kawasaki Chamber of Commerce and Industry, Kawasaki Global Warming Measures Promotion Council, Kawasaki Center for Climate Change Actions, Kawasaki City

Page 9: pl11 10 yokota【投影】.ppt [互換モード]equipment between oil refineries ・Implementing bodies: Tonen General Sekiyu K.K., Showa Shell Sekiyu K.K., Toa Oil Co., Ltd. (RING

9

Thank you for your kind attention.

17