Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way...
Transcript of Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way...
![Page 1: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/1.jpg)
December 23, 2019
1
Pittsburgh Parking Authority
9th and Penn Avenue
Replacement Garage
Planning Commission
Design Review Process
New Construction
December 23, 2019
![Page 2: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/2.jpg)
December 23, 2019LOCATION MAP
2
![Page 3: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/3.jpg)
December 23, 2019INTRODUCTION
• Location
• 136 9th Street, Pittsburgh, PA
• Zoning District: GT-C (Golden Triangle – C)
• Size
• Demolition of existing 586 space parking structure
• Build a 692 space facility
• Operations
• Functional and efficient for ease of operations
• Durable cast in place p/t structure with extended life
• Community
• Revitalization and building block for future development
• Architecturally sensitive, and aesthetically enhanced
• Safe pedestrian connections to destinations
• Creation of urban open space (10%)
• Public art requirement (1%)
• Feasibility of re-purposing- ground tier
![Page 4: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/4.jpg)
December 23, 2019SITE PLAN – EXISTING PPAP OWNERSHIP
4
![Page 5: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/5.jpg)
December 23, 2019EXISTING PPAP OWNERSHIP AND DEMOLITION
5
![Page 6: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/6.jpg)
December 23, 2019CONDITIONS PRIOR TO DEMOLITION
![Page 7: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/7.jpg)
December 23, 2019EXISTING PPAP OWNERSHIP AND DEMOLITION
7
![Page 8: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/8.jpg)
December 23, 2019KEY DESIGN AND SITE CONSIDERATIONS
• User groups
• Daily Commuters
• Theatre District Patrons
• North Shore Stadium Events
• Architecture
• Open per code, and natural ventilated structure
• Horizontal lines and screening applications
• Recognition of proposed adjacent uses (hotel, condo)
• Traffic
• Traffic Study
• Primary entry/exits on 9th Street, overflow off of 8th Street
• Close coordination with the Cultural Trust
• Buildings owned by the Cultural Trust
• Maintaining the 3 buildings at corner of 9th and Penn Ave.
• Maintain the Goodyear building to the northwest of garage
• Coordination with demolition of the Duff’s building
• Property line consideration
• Sustainable
• ParkSmart Gold certified / Sustainable strategies
• Green Roof / City Park
![Page 9: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/9.jpg)
December 23, 2019SURROUNDING CONTEXT
9
Intersection of 9th Street and Penn Avenue Benedum Center / Umbrella Sky Exhibit
![Page 10: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/10.jpg)
December 23, 2019SURROUNDING CONTEXT
10
![Page 11: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/11.jpg)
December 23, 2019PERSPECTIVE RENDERINGS / PPAP Existing Parking Structures
11
![Page 12: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/12.jpg)
December 23, 2019RELATIONSHIP TO MASTER PLAN
12
PITTSBURGH CULTURAL TRUST MASTER PLAN
![Page 13: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/13.jpg)
December 23, 2019RELATIONSHIP TO MASTER PLAN
13
![Page 14: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/14.jpg)
December 23, 2019PERSPECTIVE RENDERINGS: 9th Street from Penn Avenue
14
Glass guardrail
pedestrian barrier
Cast-In-Place
Concrete
Perforated metal
panel; panels
project at varying
depth; multi-color
Curtainwall
Decorative /
Architectural
Fencing
![Page 15: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/15.jpg)
December 23, 2019PERSPECTIVE RENDERINGS: 8th Street from Penn Avenue
15
Cast-In-Place
Concrete
Glass guardrail
pedestrian barrier
Perforated metal
panel; panels
project at same
depth; one color
Curtainwall
![Page 16: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/16.jpg)
December 23, 2019PERSPECTIVE RENDERINGS: 9th Street from Fort Duquesne
16
Glass guardrail
pedestrian barrier
Cast-In-Place
Concrete
Perforated metal
panel; panels
project at varying
depth; multi-color
Curtainwall
Decorative /
Architectural
Fencing
![Page 17: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/17.jpg)
December 23, 2019PERSPECTIVE RENDERINGS: 9th Street from Penn Avenue (night)
17
Glass guardrail
pedestrian barrier
Cast-In-Place
Concrete
Perforated metal
panel; panels
project at varying
depth; multi-color
Curtainwall
Decorative /
Architectural
Fencing
![Page 18: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/18.jpg)
December 23, 2019AERIAL RENDERINGS: 9th Street from Fort Duquesne
18
Paver area;
temporary movie
area
Tall grasses
Children’s
playground; sport
turf
Artwork / sculpture
Dog park
Glass guardrail
pedestrian barrier
![Page 19: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/19.jpg)
December 23, 2019WALL PANEL DETAIL
19
Perforated metal
panels in 6 shades
of grey, projecting
from the face of the
garage at varying
distance
![Page 20: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/20.jpg)
December 23, 2019SITE PLAN
20
![Page 21: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/21.jpg)
December 23, 2019SITE PLAN
21
![Page 22: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/22.jpg)
December 23, 2019GROUND TIER PLAN
22
![Page 23: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/23.jpg)
December 23, 2019GROUND TIER PLAN
23
![Page 24: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/24.jpg)
December 23, 2019SECOND TIER PLAN
24
![Page 25: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/25.jpg)
December 23, 2019TYPICAL TIER PLAN
25
![Page 26: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/26.jpg)
December 23, 2019ROOF LEVEL PLAN – GREEN ROOF
26
![Page 27: Pittsburgh Parking Authority 9 and Penn Avenue Replacement ......Jan 09, 2020 · Gate for two way traffic Tower Crane Reach zone - Approx 150ft radius Limited Delivery Zone Will](https://reader034.fdocuments.us/reader034/viewer/2022050412/5f894f9596f3136e2e59a582/html5/thumbnails/27.jpg)
PEN
N A
VEN
UE
→)
UB
UP
SPEED RAMPUP
PL PL PL PL
PL PL
P L
PL PL PL PL PL
PL
PROPOSED PARKINGGARAGE
URBAN OPEN SPACE ANDPEDESTRIAN ACCESS
EASEMENT #2
ACCESS DRIVEEASEMENT #1
SIT
E D
EV
ELO
PM
EN
T P
LAN
LD-5
NOTES:
1. SOIL CLASSIFICATION;
URBAN LAND (UB) - 0 TO 3 PERCENT SLOPES, PAVEMENT, BUILDINGS AND OTHER ARTIFICIALLY COVERED AREAS.
NOTE: FOR LEGEND OF EXISTING FEATURES SEE SHEET LD-2; NOTES, LEGEND AND ABBREVIATIONS
PIT
TS
BU
RG
H P
AR
KIN
G A
UT
HO
RIT
Y9T
H A
ND
PE
NN
PA
RK
ING
GA
RA
GE
CIT
Y O
F P
ITT
SB
UR
GH
ALL
EG
HE
NY
CO
UN
TY
P
A
N WC
ON
SU
LT
ING
EN
GIN
EE
RS
, IN
C.
151
REN
O A
VEN
UE
NEW
CU
MBE
RLAN
D, P
A 17
070
(717
) 441
-221
6
FA
X (7
17) 6
95-7
449
ww
w.n
avar
row
right
.com
NA
VA
RR
O &W
RIG
HT
DRAFTGoodyear Service Center
- No Access
Cultural Trust TempParking - Access neededfor easement construction
9th & Penn Garage FootprintOccupied Buildings- No Access
Sidewalk Closure forduration of project
9th Street
8th Street
Penn A
venue
Ft D
uquesne Blvd.
TemporaryConstructionFence
Site accessGate for twoway traffic
Tower CraneReach zone -Approx 150ft radius
Limited Delivery Zone Will need coordinated for lane closure
Site accessGate for twoway traffic
ConstructionTrailers
ConstructionAccess Zone
Temporary EasementDumpsterLocation
Main Delivery Zone Crane Hoisting Area
DRAFT - Site Logistics Plan
Developed by Massaro12/02/2019