PFKSB PIT STOP 2012
MECHANICAL WORK LIST
SUMMARY OF MECHANICAL STATIC WORK
FOR AMMONIA PLANT
NO. TAG NO. EQPT. NAME
1 H-13-01 Primary Reformer
2 R-13-01 Secondary Reformer
3 E-14-02 C & D BFW Preheater No.1
4 E-15-03 Process Gas/DFW Exchanger
5 E-15-01 LP Boiler
6 E-15-01 LP Boiler
7 C-15-02 & C-15-01
8 E-17-01A & B HP Methanator Exchanger
9 H-18-01 Start Up Heater
10 E-18-02 A BFW Preheater A
11 E-18-02 B & C BFW Preheater B & C
CO2 Regenerator & CO2Absorber
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 2/36
IST
CURRENT PROBLEMS/JUSTIFICATIONS
1) Channel head is leaking - Sparger is on. Suggest to replace gasket. Only can be done during shutdown.
1) Rectify defect at gasket seat. Defect from last TA.
1) Channel head is leaking - Sparger is on. Suggest to replace gasket. Repair bottom nozzle.
1) Thick, hard deposit at internal shell based on history. Suggest to clean it.
1) To take opportunity inspect tray condition and repair any defect found.
1) Bottom manhole is leaking - Sparger is on. Suggest to replace gasket.
1) Replacement.
1) Replacement of E-18-02A leak. Bad actor registered by RIM.
1) Suggest to perform intrusive inspection by Inspection Section.
1) Hotspot at various location, temperature exceed limit at certain locations. Only can be rectified duringshutdown.
1) Check valve process air - frequent hissing sound. To replace bolt and nut. Only can be rectified duringshutdown.
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 3/36
TAG NO. EQPT. NAME MANPOWER COST
H-13-01 Primary Reformer
R-13-01 Secondary Reformer
E-14-02 C & D BFW Preheater No.1E-15-03 Process Gas/DFW Exchanger
E-15-01 LP Boiler
E-15-01 LP Boiler
C-15-02 & C-15-01 CO2 Regenerator & CO2 Absorber
E-17-01A & B HP Methanator Exchanger
H-18-01 Start Up Heater
E-18-02 A BFW Preheater A
E-18-02 B & C BFW Preheater B & C
E-20-03 Stripper Feed Exchanger
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 4/36
MATERIAL COST EQPT. COST
1OOOOOO.00
LUMP SUMPCOST
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 5/36
TAG.NO NoActivity Description
E-15-03
E-15-03 1 Erect external scaffolding @ both channel heads
E-15-03 2 Remove insulation @ both channel heads (For UTFD)
E-15-03 3 Prepare and install temporary lifting device
E-15-03 3
E-15-03 5 Pre Inspection and deposit sampling (BY PFK)
E-15-03 6 Preparation for machining defected nozzle
E-15-03 7 Machining defected nozzle
E-15-03 8 Preparation for machining defected nozzle
E-15-03 9 Machining defected tube sheet flange
E-15-03 10 Inspection (NDT)
E-15-03 11 Blow dry tube internal and clean/wipe cloth tubesheet
E-15-03 12
E-15-03 13
E-15-03 14
E-15-03 15 Post Inspection as per SOE (BY PFK)
E-15-03 16 DOSH Inspection (BY PFK)
E-15-03 17 Final inspection prior to box up ( by PFK)
E-15-03 18 Reinstall channel head and JIT ( witness BY PFK )
E-15-03 19 Hydraulic Torque@ channel head bolting
E-15-03 20 Refit Insulation
E-15-03 21 Remove external scaffolding
E-15-03 22 Housekeeping
C-15-01 Int. insp. Open MHs(7) & tray manways, erect int.scaffold @ bottom, vacuum demister,
C-15-01 1 Erect external scaffolding @ bottom column drain nozzle- B5
C-15-01 2 Remove insulation @ manhole M1 to M7
C-15-01 3
C-15-01 4 Open all m/holes - M1~M7
C-15-01 5
C-15-01 6 Prepare for entry - cooling down (BY PFK)
C-15-01 7
C-15-01 8 Pre inspection and deposit sampling (By PFK)
C-15-01 9 Erect int. scaffold for cleaning and insp @ M6 and M7C-15-01 10 Remove m/way of ballast tray # 1,2 and 3 @ M1
C-15-01 11
C-15-01 12
C-15-01 13 Demister measurement By PFK ENG
C-15-01 14
C-15-01 15 Internal Cleaning; wire brush/wipe cloth internal
n . nsp. c ean ng, emove n ea , open s e nozz e- , a r ow
emove o c anne ea s an open nozz e orvideosco e
Channel head internal cleaning; power brush @ all internalweldment areas and clear any nozzle blockage
Clean gasket seating surface @channel head, flanges- powerbrush & scrapper
Wire brush all bolts (full length) apply antiseize compound -replace defective bolts
Fit isolation as per EIS for C-15-01, remove pump suctionstrainers @P-15-02A/B
Fit ventilator c/w plywood cover @ manhole M1, M3, M5 andM7
Provide int. lighting @ m/holes and expandable ladder @ M2,M4, M6 and M7
Chimney tray leak test @ M4 and M5 - drop level rate =0.5cm/min (witness By PFK)
Identify/Marking, and remove internal demister and put to theground level
Demister cleaning; water jet/air blow and tie up any loosedemister with SS tie wire.
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 6/36
C-15-01 16
C-15-01 17
C-15-01 18
C-15-01 19
C-15-01 20
C-15-01 21
C-15-01 22 Post Inspection as per SOE (By PFK)
C-15-01 23 DOSH Inspection (By PFK)
C-15-01 24
C-15-01 25 Refit column internals and tighten all boltings
C-15-01 26 Lift up and refit demister - Tighten all demister boltings
C-15-01 27
C-15-01 28 Remove internal scaffold
C-15-01 29 Remove int. ventilator, lighting and expandable ladder
C-15-01 30 Final Inspection prior to Box-up (By PFK)
C-15-01 31 Close all m/holes & JIT (Witness By PFK)
C-15-01 32 Remove isolation/reinstatement & JIT
C-15-01 33 Clean and re-instate suction strainer @ P-15-02A/B
C-15-01 34 Refit insulation
C-15-01 35 Remove external scaffolding
C-15-01 36 Housekeeping
TOTAL
C-15-02 Int. inspection: Open MHs(6) & tray manways, erect internal scaffold, vacuum demister,
C-15-02 1 Remove insulation @ m/hole M1 to M6
C-15-02 2 Fit isolation as per EIS for C-15-02
C-15-02 3
C-15-02 4 Remove all manholes. M1~M6
C-15-02 5 Fit ventilator c/w plywood cover @ m/hole M1,M3 and M5
C-15-02 6 Prepare for entry - cooling down (By PFK)
C-15-02 7 Provide int. lighting @ m/hole M2,M4 AND M6
C-15-02 8 Pre Inspection and deposit sampling (By PFK)
C-15-02 9 Remove m/way of ballast tray # 1,2 AND 3 @ M1
C-15-02 10 Erect int. scaffold @ btm part of column, M6
C-15-02 11
C-15-02 12 Demister measurement By PFK ENG
C-15-02 13
C-15-02 14 Internal Cleaning; wire brush/wipe cloth internal
C-15-02 15
C-15-02 16
C-15-02 17
Internal Cleaning; power brush circ. weld., long weld seams,nozzle to shell weldment where feasible as per SOE. Powerbrush weldment at reinforcement pad of last defect @bottom-internal.
Dismantle column internals@ bed limiter, distributor, internalpiping at locations as instructed by PFK OPS
Clean gasket seating surface @ m/holes, flanges - powerbrush, & scrapper
Wire brush all stud bolt (full length) and apply antiseizecompound - replace defective stud bolt
Contigency: Repair Work @ redistributor pipe, chimneytrays@M4, trays. Replace chimney tray gasket after chimneytray leak test.
Packing Inspection By PFK OPS - Top up new SS packings(asinstructed by OPR )
Refit ballast tray m/way #1,2 and 3 and retigthen tray clampswhere accessable, replace missing bolt & nuts for alltrays(bolts tightening inspection BY PFK;ENG,OPR)
Remove suction strainer of pump P-15-01A/B and full opensuction line drain valve
Identify/Marking, and remove internal demister and put to theground level
Demister cleaning- water jet/air blow and tie up any loosedemister with SS tie wire.
Contigency:Repair and replace tray distributor collector @nozzle A2, A3
Clean gasket seating surface @ m/holes, flanges - powerbrush, scrapper
Wire brush all stud bolt (full length) and apply antiseizecompound - replace defective stud bolt
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 7/36
C-15-02 18 Post inspection as per SOE (BY PFK)
C-15-02 19 Dosh inspection (BY PFK)
C-15-02 20 Lift up and refit demister - Tighten all demister boltings
C-15-02 21
C-15-02 22 Remove int. scaffold
C-15-02 23 Remove int. ventilator, lighting AND expandable ladder
C-15-02 24 Final inspection prior to Box-up (By PFK)
C-15-02 25 Close all m/holes & JIT (Witness By PFK)
C-15-02 26 Remove isolation/reinstatement & JIT
C-15-02 27 Clean and re-instate suction strainer @ P-15-01A/B
C-15-02 28 Refit insulation
C-15-02 29 Housekeeping
TOTAL
E-14-03 Remove OLS clamps,open manhole,machinig gasket surface
E-14-03 1 Erect scaffolding @ manhole
E-14-03 2 Fit isolation as per EIS E-14-03
E-14-03 3 Remove OLS clamp
E-14-03 4 Remove manhole cover
E-14-03 5
E-14-03 6 Pre inspection
E-14-03 7 Preparation for machining
E-14-03 8 Machining on gasket surface area
E-14-03 9 NDT
E-14-03 10 Final inspection prior to box-up
E-14-03 11 Install new stud bolt
E-14-03 12 install new gasket
E-14-03 13 Install manhole cover
E-14-03 14 HBT & JIT
E-14-03 15 Remove isolation as per EIS E-14-03
E-14-03 16 Remove scaffolding
E-14-03 17 Housekeeping
E-14-03 30
E-14-03 31
E-17-01A Open top & bottom cover,machining , inspection
E-17-01A 1 Erect scaffolding
E-17-01A 2 Remove insulation @ Nozzles
E-17-01A 3 Fit isolation as per EIS E-17-01A
E-17-01A 4 Open bottom and top cover(HTW)
E-17-01A 5 Drop bottom and top cover
E-17-01A 6 remove stud bolt at bottom & top cover
E-17-01A 7 Clean all stud bolt
E-17-01A 8 Pre inspection
E-17-01A 9 Preparation for machining
E-17-01A 10 machining both cover
Refit ballast tray m/way #1,2 and 3 and retighten tray clampswhere accessible(bolt tightening inspection By PFK;ENG,OPR)
Remove Stud bolt for manhole. contigency : tocut and drill stud bolt
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 8/36
E-17-01A 11 Post inspection (NDT)
E-17-01A 12 Install stud bolt for bottom and top cover
E-17-01A 13 Final Inspection prior to Box up (By PFK)
E-17-01A 14 Install bottom and top cover
E-17-01A 15 HTW & JIT
E-17-01A 16 Remove isolation as per EIS E-17-01A
E-17-01A 17 Fit insulation
E-17-01A 18 Remove scaffolding
E-17-01A 19 Housekeeping
E-17-01B Open top & bottom cover,machining , inspection
E-17-01B 1 Erect scaffolding
E-17-01B 2 Remove insulation @ Nozzles
E-17-01B 3 Fit isolation as per EIS E-17-01A
E-17-01B 4 Open bottom and top cover(HTW)
E-17-01B 5 Drop bottom and top cover
E-17-01B 6 remove stud bolt at bottom & top cover
E-17-01B 7 Clean all stud bolt
E-17-01B 8 Pre inspection
E-17-01B 9 Preparation for machining
E-17-01B 10 machining both cover
E-17-01B 11 Post inspection (NDT)
E-17-01B 12 Install stud bolt for bottom and top cover
E-17-01B 13 Final inspection
E-17-01B 14 Install bottom and top cover
E-17-01B 15 HTW & JIT
E-17-01B 16 Remove isolation as per EIS E-17-01A
E-17-01B 17 Fit insulation
E-17-01B 18 Remove scaffolding
E-17-01B 19 Housekeeping
E-17-01B 20
E-17-01B 21
E-15-01
E-15-01 1 Erect scaffold @ channel head & m/hole M
E-15-01 2 Remove Insulation @ Channel Head & Nozzle A1 pipe spool
E-15-01 3 Fit isolation as per EIS E-15-01
E-15-01 4
E-15-01 5
E-15-01 6 Open m/hole M
E-15-01 7
E-15-01 8 Fit ventilator c/w plywood @ manhole M
E-15-01 9 Prepare for entry (BY PFK)
E-15-01 10 Provide internal lighting & expandable ladder
E-15-01 11 Pre-inspection & deposit sampling (BY PFK)
Int. insp./cleaning thru manhole,remove channel head, air blow int. tubes, open shell ma @ nozzle B3. 4) Remove and service gate valve.
Support tube sheet with wooden block,jack and level block toprevent tube sheet movement and preparation for removechannel head.
Remove channel head/ pipe spool
Reinstall boltings (tubesheet to shell) to prevent tubesheetmovement
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 9/36
E-15-01 12 Blow dry tube internal and clean/wipe cloth tubesheet
E-15-01 13
E-15-01 14
E-15-01
E-15-01 15
E-15-01 16
E-15-01 17 Post Inspection as per SOE (By PFK)
E-15-01 18 DOSH Inspection (By PFK)
E-15-01 19 Remove internal lighting & expandable ladder
E-15-01 20 Final inspection prior to box-up ( By PFK)
E-15-01 21 Close Manhole M and JIT (witness By PFK)
E-15-01 22
E-15-01 23 Hydraulic Bolt Tensioning @ channel head boltings
E-15-01 24 Remove isolation/reinstatemant & JIT
E-15-01 25 Refit Insulation
E-15-01 26 Remove external scaffolding
E-15-01 27 Remove lifting part and Housekeeping
R-13-01
R-13-01 1
R-13-01 2 Remove insulation @inlet pipe spool and check valve
R-13-01 3
R-13-01 4 Fit isolation as per EIS for H-13-01 (Refer to H-13-01 EIS)
R-13-01 5
R-13-01 6 Unbolt top cover boltings and open manhole M
R-13-01 7
R-13-01 8 Erect scaffolding @mixer for inspection
R-13-01 9
R-13-01 10 Fit ventilator c/w plywood @ M
R-13-01 11 Prepare for entry (By PFK)
R-13-01 12 Prepare internal lighting and exandable/rope laddder
R-13-01 13 Pre inspection and deposit sampling (By PFK)
R-13-01 14 Catalyst unloading By PFK Vendor
R-13-01 15 Internal cleaning; industrial vacuum clean
R-13-01
R-13-01
R-13-01 16 Cover all blasting area with canvas
R-13-01 17
R-13-01 18
R-13-01 19 Replace check valve
R-13-01 20 Post inspection as per SOE (By PFK)
Shell internal cleaning; remove sludge/hard deposit whereaccessible ( may required jack hammer)
Channel head internal cleaning; power brush @ all internalweldment areas and clear any nozzle blockage
Defect: 1)To service 15 LG 04 2) To service 16" gate valve@NB3
Clean gasket seating surface @channel head, flanges- powerbrush & scrapper
Wire brush all bolts (full length) apply antiseize compound -replace defective bolts
Reinstall channel head (new set of boltings) and pipespool,remove level block,jack & wooden block ( Witness ByPFK)
. ., . , . ,paint, HBT@ top cover, repair any damage internal refractory, catalyst change out (by P
Erect external scaffolding @ top cover,manhole M, inlet checkvalve and reactor surrounding for painting work
Mobilized top cover support structure to the site (crane & lowloader required), position it opposite the reactor (next to theroad)
Remove top pipe spool and send check valve to w/shop forservice
Remove top cover c/w mixer & spool (crane & chain blockrequired) and properly place it on the support structure
Erect scaffolding shade with canvas above reactor opening andplatform
Contigency: Erect internal scaffolding for refractory repair
Contigency: Repair damaged internal refractory and manholeplug M
Surface preparation/inspection on shell external for painting:sweep blast
Painting thermosensitive paint @ reactor shell external(Material By PFK)
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 10/36
R-13-01 21 Dosh inspection (By PFK)
R-13-01 22 Catalyst loading By PFK Vendor
R-13-01 23 Remove shade above reactor opening
R-13-01 24 Remove internal ventilator, lighting and ladder
R-13-01 25 Final inspection prior to box-up (By PFK;ENG,OPR)
R-13-01 26
R-13-01 27 Hydrolic torque @ top cover boltings
R-13-01 28 Reinstall top spool and check valve
R-13-01 29 Hydrolic torque @ at nozzle A2
R-13-01 30 Closed manhole M and JIT
R-13-01 31
R-13-01 32 Remove scaffolding
R-13-01 33
R-13-01 34 Housekeeping
E-18-02A Install new exchanger
1 Erect scaffolding
2 Remove insulation
3 Installation of lifting lug at SG pipe spool
4 Preparation of welding jigs for fit up, backing gas, etc
5 Mobilize new equipment to site
6 Removal of control valve 18-TV-24 for isolation purpose
7
8 Install jack at temporary pipe support (18-SG-18007)
9 Crane setup and secure SG pipe to the crane
10
11 Installation of cold cutting machine (SG line)
12 Cold cutting works (SG line) - Cut and bevel
13 Installation of cold cutting machine (BFW line)(8-BFW-18001)
14 Cold cutting works (BFW line) - Cut and bevel
15 Jack the SG pipe (18-SG-18007) to give space for lifting
16 Remove the SG pipe spool from site
17 Remove the BFW pipe from site
18
19 NDT at 18-SG-18007 pipe bevel to find crack at bevel surface
20
21
22 Cooling down SG pipe
23 NDT at pipe and nozzle bevel after hydrogen relieving
24 Secure the new E-18-02A equipment to the crane boom
25
26
27
Reinstall top cover [including mixer] - crane and chain blockrequired
Remove isolation (Info only; refer to H-13-01 JMS AND EIS fordetails)
Transport top cover support structure back to Mechanicalworkshop
Venting out remaining process gas at 18-TV-24 and makewater trap at bottom E-18-02C SG line
Mark location to be cut (top and bottom of equipment, SG and
BFW line)
Cut the new E-18-02A to the same length of the removed pipe,and prepare the welding jigs for fit up
Preparation for hydrogen relieving at existing pipe 18-SG-18007 and Top E-18-02B nozzle channel head
Hydrogen relieving works at both 18-SG-18007 and top E-18-02B nozzle
Heavy lifting work. Lifting the equipment to the requiredlocationInitial fit up activities, jacking works, aligning works, weldingroot gap, instalation of shim plate etc
Tack weld the equipment to the pipes (SG and BFW) andnozzles (SG).
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 11/36
28 Root welding at the 18-SG-18007 and nozzles
29 NDT at root welding
30 Full welding and complete weld capping
31 Preparation for PWHT at SG line and nozzle
32 PWHT works
33 Cooling down SG pipe
34 NDT at SG piping weldment and nozzle weldment
35 Root weld at BFW line (3 joints)
36 Full weld at BFW line (3 joints)
37 NDT at BFW line weldments
38 Install the bolting at equipment support/saddle
39
40 Housekeeping
41
42
43
44
E-18-02B Intrusive inspection
1 Manhole cover opening
2 Grinding diaphragm gasket
3 Pre inspection
4 Partition plate removal
5 Install balloon
6 Internal inspection
7 Partition plate reinstall
8 Weld diaphragm gasket
9 Manhole cover closing
10
E-18-02C Intrusive inspection
E-18-02C 1 Manhole cover opening
E-18-02C 2 Grinding diaphragm gasket
E-18-02C 3 Pre inspection
E-18-02C 4 Partition plate removal
E-18-02C 5 Install balloon
E-18-02C 6 Internal inspection
E-18-02C 7 Partition plate reinstall
E-18-02C 8 Weld diaphragm gasket
E-18-02C 9 Manhole cover closing
E-18-02C 10
E-20-03
E-20-03 1 CW system LT by opr.(By PFK)
E-20-03 2 Fit isolation as per EIS E-20-03 (for press. test)
E-20-03 3 Remove channel head
Reinstallation of control valve 18-TV-24, Removal of water trapat E-18-02C
Int. insp./cleaning: remove Chn Head, pull bundle, hydrojet tubes, VI, Videoscope (5%),insulation at nozzle for UTFD.
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 12/36
E-20-03 4 Pre inspection & deposit sampling (By PFK)
E-20-03 5
E-20-03 6
E-20-03 7 Install test-ring and all boltings for pressure test
E-20-03 8 Hydrojet and blow dry tube internal
E-20-03 9 Power brush tube sheet
E-20-03 11 Leak test (air at 4.0 barg) (Witness By PFK;Insp)
E-20-03 12 Contigency repair
E-20-03 13
E-20-03 14
E-20-03 15
E-20-03 16
E-20-03 17
E-20-03 18
E-20-03 19 Mobilize Channel Head from blasting yard
E-20-03 20 Post Inspection as per SOE (By PFK)
E-20-03 21 DOSH Inspection - By PFK
E-20-03 22 Final Inspection prior to Box-up (witness by PFK)
E-20-03 23 Reinstall tube bundle (Witness by PFK)
E-20-03 24 Reinstall channel head (Witness by PFK)
E-20-03 25 Remove isolation and JIT
E-20-03 26 Housekeeping
Transport channel head to designated blasting yard forblasting / painting work
Channel head internal blasting, coating with Tar free modifiedepoxy. Inspection by PFK
Hydrotest (1.25 x MAWP) subject to repair work (Witness ByPFK;Insp)
Pull tube bundle (Support bundle with wooden block if on theground)
Pre inspection & deposit sampling @ tube bundle and shellinternal (By PFK)
Hydrojet and blow dry @ tube bundle and shell internal (wedgeopen nozzle SO)
Clean all gasket seating surface@ channel head, flanges-power brush and scrapper
Wire brush all stud bolts (full length) and apply antiseizecompound - replace defective stud bolt
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 13/36
TradePipe Fitter Semi skill Hlpr Rigg Welder
Scaffolder
Insulator
Rigger 2 1 1
Mech Fitter 1 2 1 1
Inspection 1
helper 1
helper 1
helper 2
helper 1
Inspection
1 1
2 1
1
Mech Fitter 2
Mech Fitter 1 1
Semi Skill 1 1Inspection 1
DOSH 1Mech Fitter 1 1Mech Fitter 2 2 1
HTW 2Insulator
5 0 10 19 3 1 0
I and UTTM, inspect weld repair at reinforcement pad of last defect. Repair and replace tray distributor collector @ nozzle A2, A3
Scaffolder
Insulator
Mech Filter 2 2
Mech Fitter 2 2
Semi skill 1 1
OPR
Semi Skill 1 1
Inspection 1 1
Scaffolder 1Mech Fitter 1 1 1
Mech Fitter 1 1 1
Mech Fitter 1 1 2
ENG 1 1
Mech Fitter 1 2
Mech Fitter 2 4
MechFitter
Hydro Jetter
u e n , , eoscope, an , c ean ng n erna n ea ,
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 14/36
Mech Fitter 1 1
Mech Fitter 1 1 2
Hlpr 2 2
Helper 2
Inspection 1 1
DOSH 1
Semi skill 1 2 1
Mech Fitter 1 1 2
Mech Fitter 2 1 1 1
Mech Fitter 1 1
Scaffolder
Helper 1 1
ENG/OPR 1 2
Mech Fitter 2 2
Mech Fitter 1 1
Mech Fitter 1 1
Insulator
Scaffolder
Helper 2
22 0 24 33 2 0 0
I and UTTM, insp. Vortex breaker
Insulator
Mech Fitter 4 4
Mech Fitter 2 2
Mech Fitter 4 4
Semi Skill 1 1
Operation
Semi skill 1 1
Inspection 1 1
Mech Fitter 1 1 1
Scaffolder
Mech Fitter 1 1 2 1
ENG 1 1
Mech Fitter 1 2
Mech Fitter 2 4
Mech Fitter 2 2
Helper 2
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 15/36
Inspection 1 1
DOSH 1
Mech Fitter 2 1 1 1
Mech Fitter 1 1 1
Scaffolder
Semi Skill 2 2
OPR/ENG 1 2
Mech Fitter 4 4
Mech Fitter 4 4
Mech Fitter 2 2
Insulator
Helper 2
30 0 33 26 2 0 0
Scaffolder
Mech Fitter 2 2
Mech Fitter 2 2
Mech Fitter 2 1
Mech Fitter 2 1
Inspection
machinist 1
machinist 1
Inspection
Opr/Mech
Mech Fitter 2 1
Mech Fitter 2 1
Mech Fitter 2 1
HBT 1
Mech Fitter 2 2
Scaffolder
Helper 2
16 0 13 3 0 0 0
Scaffolder
Insulator
Mech Fitter 2 2
Mech Fitter 2 2
Mech Fitter 2 2 1
Mech Fitter 2 2
Helper 2
Inspection
Machinist 2
Machinist
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 16/36
Inspection
Mech Fitter 2 2
Inspection
Mech Fitter 2 2 1
HTW 2
Mech Fitter 2 2
Insulator
Scaffolder
Helper 2
14 0 18 4 2 0 0
Scaffolder
Insulator
Mech Fitter 2 2
Mech Fitter 2 2
Mech Fitter 2 2 1
Mech Fitter 2 2
Helper 2
Inspection
Machinist 2
Machinist
Inspection
Mech Fitter 2 2
Inspection
Mech Fitter 2 2 1
HTW 2
Mech Fitter 2 2
Insulator
Scaffolder
Helper 2
14 0 18 4 2 0 0
Scaffolder
Insulator
Mech Fitter 1 1
Mech Fitter 1 1 1
Mech Fitter 1 2 1 1
Mech Fitter 2 2
Mech Fitter 1 1 2
Semi Skill 1 1
Opr 1
Semi Skill 1 1
Inspection 1
nhole,remove hard deposite, VI, Videoscope and UTTM. DEFECT: 1) To service 15 LG 04. 2) To repair piping header. 3) To servic
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 17/36
Semi Skill
Mech Fitter 1 2
Semi Skill 1 1
Mech Fitter 1 1
Semi Skill 1 1
Inspection 1
DOSH 1
Semi Skill 1 1
ENG/OPR 1 1
Mech Fitter 2 2
Mech Fitter 2 2 1
HBT 2
Mech Fitter 1 1
Insulator
Scaffolder
Helper 2
12 0 20 19 3 0 0
Scaffolder
Insulator
Rigger 1 2 1
Mech fitter 2 2 1
Mech fitter 2 2 2
Rigger 2 2 1 1
Scaffolder
Scaffolder
PFK Vendor 1 1
OPR
PFK Vendor 1 1
Inspector 1
PFK Vendor
PFK Vendor
Semi skill 2 2
Mech fitter 1 1
Painter
Semi skill 1 1 1 1
Inspector
, , .K vendor), Refractory repair work (by PFK vendor),
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 18/36
DOSH
PFK Vendor
Scaffolder
Semi skill 1 1
ENG,OPR 1 2
Mech fitter 2 2 1 1
HTW 2
Mech fitter 1 1 1
HTW 2
Mech fitter 2 2
Scaffolder
Rigger 1 2 1
Helper 4
14 0 19 26 7 0 0
Scaffolder
Insulator
1 1 1
1 1
1 1
2 2
Operation
2 1
2 2 1
Inspection
2
1
1
1
2
1 1
1 1
RAWNA
Inspection
1
1
2 2 1
2 2 1
2 2 2 1
1 1 1
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 19/36
1 2
2 4
1
1
1 2
1 2
2 2
2 2
4
2
20 2 10 33 6 0 12
Mech Fitter 2 2
Pipe Fitter 1 1
Inspection 1
Mech Fitter 2 2
Mech Fitter 2 1
Inspection 1
Mech Fitter 2 2
Welder 1 1
Mech Fitter 2 2
2
10 2 11 3 0 0 1
Mech Fitter 2 2
Pipe Fitter 1 1
Inspection 1
Mech Fitter 2 2
Mech Fitter 2 1
Inspection 1
Mech Fitter 2 2
Welder 1 1
Mech Fitter 2 2
10 2 11 1 0 0 1
Opr
Mech Fitter 1 1
Mech Fitter 1 1 1
TFD and UTTM, leak test, Chn Head internal painting, open
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 20/36
Inspection 1
Semi Skill 1 1
Blaster/ painter
Mech Fitter 1 1 1
Hydrojetter 1 1
Mech Fitter 1 1
Mech Fitter 1 2
Mech Fitter 2 1 1
Inspection 1
Hydrojetter 1 1
Mech Fitter 1 1
Semi Skill 1 1
Semi Skill 1 1
Inspection 1
DOSH 1
OPN/ENG 1 1
Mech Fitter 2 1 1
Mech Fitter 1 1 1
Mech Fitter 1 1
Helper 2
12 0 17 12 3 2 0
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 21/36
Painter Total Qty Hour Mhr(P) Pipe Fitter Semi skill Hlpr
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
4 2 8 0.00 0.00 0.00 0.00
5 7.5 37.5 7.50 0.00 0.00 7.50
1 1 1 0.00 0.00 0.00 0.00
1 1 1 0.00 0.00 0.00 0.00
1 2 2 0.00 0.00 0.00 0.00
2 2 4 0.00 0.00 0.00 0.00
1 4 4 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
2 6 12 0.00 0.00 0.00 0.00
3 4 12 0.00 0.00 0.00 0.00
1 2 2 0.00 0.00 0.00 0.00
2 4 8 0.00 0.00 0.00 0.00
2 1.7 3.4 0.00 0.00 0.00 0.00
2 2 4 0.00 0.00 0.00 0.001 1.3 1.3 0.00 0.00 0.00 0.001 1 1 1.00 0.00 0.00 0.002 1.5 3 1.50 0.00 0.00 1.50
5 7.8 39 15.60 0.00 0.00 31.202 3 6 0.00 0.00 0.00 0.000 0 0.00 0.00 0.00 0.00
0 38 53.8 149.2 0 25.6 0 0 40.2
0 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00
4 2.50 10.00 5.00 0.00 5.00 0.00
4 7.60 30.40 15.20 0.00 15.20 0.00
2 1.50 3.00 0.00 0.00 1.50 1.50
0 0.00 0.00 0.00 0.00 0.00
2 2.00 4.00 0.00 0.00 2.00 2.00
2 1.00 2.00 1.00 0.00 0.00 1.00
1 0.00 0.00 0.00 0.00 0.00
3 1.20 3.60 1.20 0.00 1.20 1.20
3 6.00 18.00 6.00 0.00 6.00 6.00
4 2.00 8.00 2.00 0.00 2.00 4.00
2 0.50 1.00 0.50 0.00 0.00 0.50
3 6.00 18.00 0.00 0.00 6.00 12.00
6 61.90 371.40 0.00 0.00 123.80 247.60
MechFitter
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 22/36
2 1.00 2.00 1.00 0.00 0.00 1.00
4 3.00 12.00 3.00 0.00 3.00 6.00
4 3.50 14.00 0.00 0.00 7.00 7.00
2 2.50 5.00 0.00 0.00 0.00 5.00
0 0.00 0.00 0.00 0.00 0.00
2 1.70 3.40 1.70 0.00 0.00 1.70
1 1.00 1.00 1.00 0.00 0.00 0.00
4 6.00 24.00 0.00 0.00 6.00 12.00
4 3.00 12.00 3.00 0.00 3.00 6.00
5 4.00 20.00 8.00 0.00 4.00 4.00
2 1.50 3.00 1.50 0.00 1.50 0.00
0 0.00 0.00 0.00 0.00 0.00
2 2.00 4.00 0.00 0.00 2.00 2.00
3 2.00 6.00 2.00 0.00 0.00 4.00
4 9.30 37.20 18.60 0.00 18.60 0.00
2 2.60 5.20 2.60 0.00 2.60 0.00
2 1.10 2.20 1.10 0.00 1.10 0.00
0 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00
2 1.00 2.00 0.00 0.00 0.00 2.00
0 81 137.40 622.40 74.40 0.00 211.50 326.50
0 0.00 0.00 0.00 0.00 0.00
8 2.15 17.20 8.60 0.00 8.60 0.00
4 3.00 12.00 6.00 0.00 6.00 0.00
8 4.50 36.00 18.00 0.00 18.00 0.00
2 1.50 3.00 0.00 0.00 1.50 1.50
0 0.00 0.00 0.00 0.00 0.00
2 1.50 3.00 0.00 0.00 1.50 1.50
2 1.00 2.00 1.00 0.00 0.00 1.00
3 1.20 3.60 1.20 0.00 1.20 1.20
0 0.00 0.00 0.00 0.00 0.00
5 4.00 20.00 4.00 0.00 4.00 8.00
2 1.00 2.00 1.00 0.00 0.00 1.00
3 6.00 18.00 0.00 0.00 6.00 12.00
6 39.50 237.00 0.00 0.00 79.00 158.00
0.00 0.00 0.00 0.00 0.00
4 3.00 12.00 0.00 0.00 6.00 6.00
2 2.50 5.00 0.00 0.00 0.00 5.00
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 23/36
2 1.70 3.40 1.70 0.00 0.00 1.70
1 1.00 1.00 1.00 0.00 0.00 0.00
5 4.00 20.00 8.00 0.00 4.00 4.00
3 1.50 4.50 1.50 0.00 1.50 1.50
0 0.00 0.00 0.00 0.00 0.00
4 1.50 6.00 0.00 0.00 3.00 3.00
3 1.70 5.10 1.70 0.00 0.00 3.40
8 5.00 40.00 20.00 0.00 20.00 0.00
8 2.50 20.00 10.00 0.00 10.00 0.00
4 3.30 13.20 6.60 0.00 6.60 0.00
0 0.00 0.00 0.00 0.00 0.00
2 1.00 2.00 0.00 0.00 0.00 2.00
0 91 94.05 486.00 90.30 0.00 176.90 210.80
0 0 0.00 0.00 0.00 0.00
4 4 16 8.00 0.00 8.00 0.00
4 4 16 8.00 0.00 8.00 0.00
3 2 6 4.00 0.00 2.00 0.00
3 8 24 16.00 0.00 8.00 0.00
0 0 0.00 0.00 0.00 0.00
1 2 2 0.00 0.00 2.00 0.00
1 4 4 0.00 0.00 4.00 0.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
2 0 4.00 0.00 2.00 0.00
3 1 3 2.00 0.00 1.00 0.00
3 2 6 4.00 0.00 2.00 0.00
1 2 2 0.00 0.00 0.00 2.00
4 4 16 8.00 0.00 8.00 0.00
0 0 0.00 0.00 0.00 0.00
2 2 4 0.00 0.00 0.00 4.00
0 0 0.00 0.00 0.00 0.00
0 1 0.00 0.00 0.00 0.00
0 29 37 100 54.00 0.00 45.00 6.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
4 4 16 8.00 0.00 8.00 0.00
4 8 32 16.00 0.00 16.00 0.00
5 6 30 12.00 0.00 12.00 0.00
4 8 32 16.00 0.00 16.00 0.00
2 2 4 0.00 0.00 0.00 4.00
0 0 0.00 0.00 0.00 0.00
2 6 12 0.00 0.00 0.00 12.00
0 0 0.00 0.00 0.00 0.00
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 24/36
0 0 0.00 0.00 0.00 0.00
4 8 32 16.00 0.00 16.00 0.00
0 0 0.00 0.00 0.00 0.00
5 6 30 12.00 0.00 12.00 0.00
2 8 16 0.00 0.00 16.00 0.00
4 4 16 8.00 0.00 8.00 0.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
2 1 2 0.00 0.00 2.00 0.00
0 38 61 222 88.00 0.00 106.00 16.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
4 4 16 8.00 0.00 8.00 0.00
4 8 32 16.00 0.00 16.00 0.00
5 6 30 12.00 0.00 12.00 0.00
4 8 32 16.00 0.00 16.00 0.00
2 2 4 0.00 0.00 0.00 4.00
0 0 0.00 0.00 0.00 0.00
2 6 12 0.00 0.00 0.00 12.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
4 8 32 16.00 0.00 16.00 0.00
0 0 0.00 0.00 0.00 0.00
5 6 30 12.00 0.00 12.00 0.00
2 8 16 0.00 0.00 16.00 0.00
4 4 16 8.00 0.00 8.00 0.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
2 1 2 0.00 0.00 2.00 0.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
0 38 61 222 88.00 0.00 106.00 16.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
2 0.8 1.6 0.80 0.00 0.80 0.00
3 3 9 0.00 0.00 3.00 3.00
5 8.3 41.5 8.30 0.00 16.60 8.30
4 1 4 2.00 0.00 2.00 0.00
4 3 12 3.00 0.00 3.00 6.00
2 1 2 0.00 0.00 1.00 1.00
1 1 1 0.00 0.00 1.00 0.00
2 1 2 0.00 0.00 1.00 1.00
1 1 1 0.00 0.00 1.00 0.00
e globe valve
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 25/36
0 0 0.00 0.00 0.00 0.00
3 18 54 0.00 0.00 18.00 36.00
2 2 4 0.00 0.00 2.00 2.00
0 0 0.00 0.00 0.00 0.00
2 1.7 3.4 0.00 0.00 1.70 1.70
2 1.5 3 0.00 0.00 1.50 1.50
1 2 2 0.00 0.00 2.00 0.00
1 1.2 1.2 1.20 0.00 0.00 0.00
2 1 2 0.00 0.00 1.00 1.00
2 1.7 3.4 1.70 0.00 0.00 1.70
4 1.25 5 2.50 0.00 2.50 0.00
5 8.6 43 17.20 0.00 0.00 17.20
2 4 8 0.00 0.00 0.00 8.00
2 1 2 1.00 0.00 1.00 0.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
2 1 2 0.00 0.00 0.00 2.00
0 54 65.05 207.1 37.70 0.00 59.10 90.40
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
4 1.5 6 0.00 0.00 1.50 3.00
0 0 0.00 0.00 0.00 0.00
5 1.8 9 3.60 0.00 3.60 0.00
6 8 48 16.00 0.00 16.00 16.00
6 5 30 10.00 0.00 10.00 5.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
2 0.5 1 0.00 0.00 0.50 0.50
0 0 0.00 0.00 0.00 0.00
2 1 2 0.00 0.00 1.00 1.00
1 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
4 8 32 0.00 0.00 16.00 16.00
2 2 4 2.00 0.00 0.00 2.00
0 0 0.00 0.00 0.00 0.00
4 4 16 4.00 0.00 4.00 4.00
0 1.3 0 0.00 0.00 0.00 0.00
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 26/36
0 1 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
2 1 2 0.00 0.00 1.00 1.00
3 1.2 3.6 1.20 0.00 0.00 2.40
6 6 36 12.00 0.00 12.00 6.00
2 5 10 0.00 0.00 0.00 10.00
3 2 6 2.00 0.00 2.00 0.00
2 1 2 0.00 0.00 0.00 2.00
4 1.25 5 2.50 0.00 2.50 0.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
4 1.5 6 0.00 0.00 1.50 3.00
4 3 12 0.00 0.00 0.00 12.00
0 66 56.05 230.6 53.3 0 71.6 83.9
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
3 2 6 0.00 2.00 0.00 2.00
2 2 4 0.00 2.00 0.00 2.00
2 2 4 2.00 0.00 0.00 2.00
4 4 16 8.00 0.00 8.00 0.00
0 0 0.00 0.00 0.00 0.00
3 2 6 4.00 0.00 0.00 2.00
5 2 10 4.00 0.00 0.00 4.00
0 0 0.00 0.00 0.00 0.00
2 2 4 0.00 0.00 0.00 4.00
1 12 12 0.00 0.00 0.00 12.00
1 1 1 0.00 0.00 0.00 1.00
1 4 4 0.00 0.00 0.00 4.00
2 2 4 4.00 0.00 0.00 0.00
2 2 4 0.00 0.00 2.00 0.00
2 1 2 0.00 0.00 1.00 0.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
1 2 2 0.00 0.00 0.00 2.00
1 12 12 0.00 0.00 0.00 12.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
5 3 15 6.00 0.00 0.00 6.00
5 4 20 8.00 0.00 0.00 8.00
7 6 42 12.00 0.00 12.00 12.00
3 2 6 2.00 0.00 0.00 2.00
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 27/36
3 3 9 0.00 0.00 0.00 3.00
0 0 0.00 0.00 0.00 0.00
6 24 144 0.00 0.00 0.00 48.00
1 2 2 0.00 0.00 0.00 2.00
1 12 12 0.00 0.00 0.00 12.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
3 1 3 0.00 0.00 0.00 1.00
3 4 12 0.00 0.00 0.00 4.00
0 0 0.00 0.00 0.00 0.00
4 4 16 8.00 0.00 8.00 0.00
4 4 16 8.00 0.00 8.00 0.00
4 4 16 0.00 0.00 0.00 16.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
2 0 0 0.00 0.00 0.00 0.00
0 83 125 404 66 4 39 161
4 3 12 6.00 0.00 6.00 0.00
2 3 6 0.00 3.00 0.00 3.00
1 1 1 0.00 0.00 1.00 0.00
4 4 16 8.00 0.00 8.00 0.00
3 2 6 4.00 0.00 2.00 0.00
1 4 4 0.00 0.00 4.00 0.00
4 4 16 8.00 0.00 8.00 0.00
2 3 6 0.00 3.00 0.00 0.00
4 3 12 6.00 0.00 6.00 0.00
2 0 0.00 0.00 0.00 0.00
0 27 27 79 32.00 6.00 35.00 3.00
4 3 12 6.00 0.00 6.00 0.00
2 3 6 0.00 3.00 0.00 3.00
1 1 1 0.00 0.00 1.00 0.00
4 4 16 8.00 0.00 8.00 0.00
3 2 6 4.00 0.00 2.00 0.00
1 4 4 0.00 0.00 4.00 0.00
4 4 16 8.00 0.00 8.00 0.00
2 3 6 0.00 3.00 0.00 0.00
4 3 12 6.00 0.00 6.00 0.00
0 0 0.00 0.00 0.00 0.00
0 25 27 79 32.00 6.00 35.00 3.00
0 0 0.00 0.00 0.00 0.00
2 1.25 2.5 1.25 0.00 1.25 0.00
3 0.8 2.4 0.80 0.00 0.80 0.80
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 28/36
1 0.5 0.5 0.00 0.00 0.50 0.00
2 0.8 1.6 0.00 0.00 0.80 0.80
0 0 0.00 0.00 0.00 0.00
3 1 3 1.00 0.00 1.00 1.00
2 2 4 0.00 0.00 0.00 2.00
2 0.75 1.5 0.00 0.00 0.75 0.75
3 4 12 4.00 0.00 8.00 0.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
4 1 4 2.00 0.00 1.00 0.00
1 0.5 0.5 0.00 0.00 0.50 0.00
2 2 4 0.00 0.00 0.00 2.00
2 0.8 1.6 0.00 0.00 0.80 0.80
2 1 2 0.00 0.00 1.00 1.00
2 0.8 1.6 0.00 0.00 0.80 0.80
1 0.8 0.8 0.00 0.00 0.80 0.00
1 0.5 0.5 0.50 0.00 0.00 0.00
2 0.8 1.6 0.80 0.00 0.00 0.80
4 1 4 2.00 0.00 1.00 0.00
3 1 3 1.00 0.00 1.00 0.00
2 1.5 3 1.50 0.00 1.50 0.00
2 0.5 1 0.00 0.00 0.00 1.00
0 46 23.3 55.1 14.85 0.00 21.50 11.75
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 29/36
Rigg Welder Painter
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.000.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.000.00 0.00 0.00 0.00
0 0 0 0
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.000.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
Hydro Jetter
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 30/36
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
6.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
4.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
10.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
4.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 31/36
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
4.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
8.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
6.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 32/36
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 33/36
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
8.60 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
19.90 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
1.50 0.00 0.00 0.00
0.00 0.00 0.00 0.00
1.80 0.00 0.00 0.00
0.00 0.00 0.00 0.00
5.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
4.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 34/36
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
6.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
2.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
1.50 0.00 0.00 0.00
0.00 0.00 0.00 0.00
21.8 0 0 0
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 2.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
2.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
2.00 0.00 0.00 0.00
1.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
3.00 0.00 0.00 0.00
4.00 0.00 0.00 0.00
6.00 0.00 0.00 0.00
0.00 0.00 2.00 0.00
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 35/36
0.00 0.00 6.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 96.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 2.00 0.00
0.00 0.00 8.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
18 0 116 0
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 3.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 3.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 3.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 3.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
8/6/2019 Pitstop Budget
http://slidepdf.com/reader/full/pitstop-budget 36/36
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 2.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
1.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 2.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
1.00 0.00 0.00 0.00
1.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
3.00 4.00 0.00 0.00