Pits and Stationary Treatment Facilities:Application Information
Sean AvittEnvironmental Permits & Support Unit
Main Line: 512.463.3840
![Page 2: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/2.jpg)
Disclaimer / Class Overview
2
• This is the highlights… This presentation is not intended to be, nor is it, a complete guide. There is no substitution for reading the rules, or having professional consultation.
• Environmental Permits Background Info• Pits – Application Info• STF – Application Info
![Page 3: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/3.jpg)
BACKGROUND INFORMATION
Environmental Permitting
3
![Page 4: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/4.jpg)
4
• Covers the management of oil and gas waste at or near the surface
• Includes all disposal methods other than injection wells
• Permitting and Management of:• Pits• Landfarming and Landtreatment• Recycling• Reclamation Plants• Separation Facilities• Discharges• Waste Haulers• Others
Environmental Permits & Support
![Page 5: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/5.jpg)
Environmental Permits & Support
5
• Covers the management of oil and gas waste at or near the surface
• Includes all disposal methods other than injection wells
• Permitting and Management of:• Pits• Landfarming and Landtreatment• Recycling• Reclamation Plants• Separation Facilities• Discharges• Waste Haulers• Others
![Page 6: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/6.jpg)
Associated Rules and Publications
• Rule 8 – Water Protection• Rule 57 – Reclamation Plants• Rule 78 – Financial Security• Rule 98 – Hazardous Waste Management• Chapter 4, Subchapter B – Commercial
Recycling
6
![Page 7: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/7.jpg)
Associated Rules and Publications
• Rule 8 – Water Protection• Rule 57 – Reclamation Plants• Rule 78 – Financial Security• Rule 98 – Hazardous Waste Management• Chapter 4, Subchapter B – Commercial
Recycling• Surface Waste Management Manual
7
http://www.rrc.state.tx.us/oil-gas/applications-and-permits/environmental-permit-types-information/
![Page 8: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/8.jpg)
Rule 8 Background
• Environmental Permitting’s Authority
• Subsections• (b) No Pollution• (d) Pollution Control
• Prohibited / Authorized Disposal• Prohibited / Authorized Pits• Authorized Pit Backfilling requirements• Prohibited / Authorized Recycling
8
![Page 9: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/9.jpg)
Rule 8 - Permitted Pits
• If a pit is not authorized by Rule 8, a Form H-11 must be filed with Environmental Permits and a permit issued before use of the pit can begin.
• Examples of types of pits that require a permit:• Commercial Fluid Recycling Pit• Disposal Pit• Collecting Pit• Emergency Saltwater Storage Pit• Brine Pit• Washout Pit• Skimming Pit• Gas Plant Evaporation/Retention Pit
9
![Page 10: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/10.jpg)
Rule 8 - Permitted Pits
• Examples of types of pits that require a permit:• Commercial Fluid Recycling Pit• Disposal Pit• Collecting Pit• Emergency Saltwater Storage Pit• Brine Pit• Washout Pit• Skimming Pit• Gas Plant Evaporation/Retention Pit• ANY PIT NOT SPECIFICALLY AUTHORIZED BY RULE 8
10
![Page 11: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/11.jpg)
Rule 8 - Permitted Pits
• Examples of types of pits that require a permit:• Commercial Fluid Recycling Pit
• We’ll talk about this in the next presentation
• Disposal Pit• Collecting Pit• Emergency Saltwater Storage Pit• Brine Pit• Washout Pit• Skimming Pit• Gas Plant Evaporation/Retention Pit
11
![Page 12: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/12.jpg)
Rule 8 - Permitted Pits
• Examples of types of pits that require a permit:• Commercial Fluid Recycling Pit• Disposal Pit
• Large pit created for disposal of mud & cuttings
• Collecting Pit• Emergency Saltwater Storage Pit• Brine Pit• Washout Pit• Skimming Pit• Gas Plant Evaporation/Retention Pit
12
![Page 13: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/13.jpg)
Rule 8 - Permitted Pits
• Examples of types of pits that require a permit:• Commercial Fluid Recycling Pit• Disposal Pit• Collecting Pit
• Storage prior to disposal, typically, by injection
• Emergency Saltwater Storage Pit• Brine Pit• Washout Pit• Skimming Pit• Gas Plant Evaporation/Retention Pit
13
![Page 14: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/14.jpg)
Rule 8 - Permitted Pits
• Examples of types of pits that require a permit:• Commercial Fluid Recycling Pit• Disposal Pit• Collecting Pit• Emergency Saltwater Storage Pit
• Used temporarily during upset or repair
• Brine Pit• Washout Pit• Skimming Pit• Gas Plant Evaporation/Retention Pit
14
![Page 15: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/15.jpg)
Rule 8 - Permitted Pits
• Examples of types of pits that require a permit:• Commercial Fluid Recycling Pit• Disposal Pit• Collecting Pit• Emergency Saltwater Storage Pit• Brine Pit
• Storage of brine at underground storage caverns
• Washout Pit• Skimming Pit• Gas Plant Evaporation/Retention Pit
15
![Page 16: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/16.jpg)
Rule 8 - Permitted Pits
• Examples of types of pits that require a permit:• Commercial Fluid Recycling Pit• Disposal Pit• Collecting Pit• Emergency Saltwater Storage Pit• Brine Pit• Washout Pit
• Washout of “empty” trucks– wash water and incidental pollutants
• Skimming Pit• Gas Plant Evaporation/Retention Pit
16
![Page 17: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/17.jpg)
Rule 8 - Permitted Pits
• Examples of types of pits that require a permit:• Commercial Fluid Recycling Pit• Disposal Pit• Collecting Pit• Emergency Saltwater Storage Pit• Brine Pit• Washout Pit• Skimming Pit
• Prior to discharge to remove oil & grease to acceptable level
• Gas Plant Evaporation/Retention Pit
17
![Page 18: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/18.jpg)
Rule 8 - Permitted Pits
• Examples of types of pits that require a permit:• Commercial Fluid Recycling Pit• Disposal Pit• Collecting Pit• Emergency Saltwater Storage Pit• Brine Pit• Washout Pit• Skimming Pit• Gas Plant Evaporation/Retention Pit
• Pit used to collect rainwater and waste water – sometimes a buried tank or sump
18
![Page 19: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/19.jpg)
APPLICATION INFORMATION
Pits
19
![Page 20: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/20.jpg)
… You might be a Pit.
• If it’s in contact with the ground, but not an above-ground storage tank
• If it’s below grade (even if it’s just a little bit)
• If it’s a “sump” larger than 500 gallons
• If it’s a concrete structure that cannot be moved easily and quickly to be checked for leaks
• If it’s a steel containment ring with a liner
20
![Page 21: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/21.jpg)
Permitting Pits
• Submit an Application for Permit to Maintain and Use a Pit (Form H-11) to Austin and District Office
• And the supplemental information required by the back of the Form H-11
http://www.rrc.state.tx.us/oil-gas/forms/oil-gas-forms-library/oil-gas-forms-in-alphabetical-order
/
21
![Page 22: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/22.jpg)
Front of the H-11
22
![Page 23: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/23.jpg)
Front of the H-11
23
![Page 24: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/24.jpg)
Front of the H-11
24
![Page 25: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/25.jpg)
Front of the H-11
No box left empty!
6. Lease/Project/Facility name different than Operator10.b. Artificial liner – concrete or buried tank = lined10.c. LDS must be isolated… not monitor wells13. Other – Description of Pit Type15.b. Type of waste or fluid15.c. Chloride concentration16. If existing, don’t forget the construction date
25
X Original Signature
![Page 26: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/26.jpg)
Front of the H-11
26
X Original Signature
![Page 27: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/27.jpg)
Back of H-11 – Instructions to Pit Application
B. Notify Surface OwnerC. PlatD. County Highway MapG. Cross sectionsH. Liner infoI. Soil / subsoil infoJ. Leak Detection System (LDS)K. Routine Inspection if no LDSL. ESWS size justification
27
![Page 28: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/28.jpg)
Back of H-11 – Instructions to Pit Application
B. Notify Surface Owner w/ front & back of H-11C. PlatD. County Highway MapG. Cross sectionsH. Liner infoI. Soil / subsoil infoJ. Leak Detection System (LDS)K. Routine Inspection if no LDSL. ESWS size justification
28
![Page 29: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/29.jpg)
Back of H-11 – Instructions to Pit Application
B. Notify Surface Owner w/ front & back of H-11C. Plat
• Perpendicular distance to lease & survey lines clearly noted in feet
D. County Highway MapG. Cross sectionsH. Liner infoI. Soil / subsoil infoJ. Leak Detection System (LDS)K. Routine Inspection if no LDSL. ESWS size justification
29
![Page 30: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/30.jpg)
30
A-125
Survey Plat
S. AVITTA-047
V. Lang A-126
T & N.O.R.R.C.OSurvey
N
Pit
Sage Brush Ranch (01234) Lease
400 ft
820 ft
931 ft
931 ft
28.3215°, -97.5689°
Scale
![Page 31: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/31.jpg)
Back of H-11 – Instructions to Pit Application
B. Notify Surface Owner w/ front & back of H-11C. PlatD. County Highway Map
• 1 inch = 4 miles
G. Cross sectionsH. Liner infoI. Soil / subsoil infoJ. Leak Detection System (LDS)K. Routine Inspection if no LDSL. ESWS size justification
31
![Page 32: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/32.jpg)
Back of H-11 – Instructions to Pit Application
B. Notify Surface Owner w/ front & back of H-11C. PlatD. County Highway MapG. Cross sectionsH. Liner infoI. Soil / subsoil infoJ. Leak Detection System (LDS)K. Routine Inspection if no LDSL. ESWS size justification
32
![Page 33: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/33.jpg)
Cross section example
33
NaturalGrade
Top of Berms
This is only one cross section— Two are required.And don’t forget the plan view (bird’s eye)!
Fluid Level
![Page 34: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/34.jpg)
Cross section example
34
3
12 feet
Top of Berms
freeboard
1:3 slope
Fluid Level
This is only one cross section— Two are required.And don’t forget the plan view (bird’s eye)!
NaturalGrade
![Page 35: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/35.jpg)
Cross section example
35
3
12 feet
Top of Berms
freeboard
1:3 slope
Dimensions
Fluid Level
This is only one cross section— Two are required.And don’t forget the plan view (bird’s eye)!
Scale NaturalGrade
![Page 36: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/36.jpg)
36
2 feet freeboard
NaturalGrade
Top of Berms
Fluid Level
Texas P.E. seal and signature REQUIRED
Fluid Stored Above Grade
![Page 37: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/37.jpg)
Back of H-11 – Instructions to Pit Application
B. Notify Surface Owner w/ front & back of H-11C. PlatD. County Highway MapG. Cross sectionsH. Liner info
• Thickness, material, and manufacturer’s info incl. hydraulic conductivity (< 1 x 10-7 cm/s)
I. Soil / subsoil infoJ. Leak Detection System (LDS)K. Routine Inspection if no LDSL. ESWS size justification
37
![Page 38: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/38.jpg)
Back of H-11 – Instructions to Pit Application
B. Notify Surface Owner w/ front & back of H-11C. PlatD. County Highway MapG. Cross sectionsH. Liner infoI. Soil / subsoil infoJ. Leak Detection System (LDS)K. Routine Inspection if no LDSL. ESWS size justification
38
![Page 39: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/39.jpg)
39
http://websoilsurvey.nrcs.usda.gov
Soil Information
Underlying subsoil (Geology)www.twdb.state.tx.us/groundwater/aquifer/GAT
![Page 40: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/40.jpg)
Back of H-11 – Instructions to Pit Application
B. Notify Surface Owner w/ front & back of H-11C. PlatD. County Highway MapG. Cross sectionsH. Liner infoI. Soil / subsoil infoJ. Leak Detection System (LDS)
• Design & liner failure determination
K. Routine Inspection if no LDS• Annual emptying of pit & inspection of liner
L. ESWS size justification40
![Page 41: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/41.jpg)
Back of H-11 – Instructions to Pit Application
B. Notify Surface Owner w/ front & back of H-11C. PlatD. County Highway MapG. Cross sectionsH. Liner infoI. Soil / subsoil infoJ. Leak Detection System (LDS)K. Routine Inspection if no LDSL. ESWS size justification
• Calculation that demonstrates need during repair/upset
41
![Page 42: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/42.jpg)
APPLICATION INFORMATION
Stationary Treatment Facilities (STFs)
42
![Page 43: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/43.jpg)
Common Facilities at STFs
• Landfarm• Landtreatment• Waste Separation• Reclamation• Recycling • Disposal Pits• Collecting Pits
43
![Page 44: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/44.jpg)
General Requirements
• Site Information• Facility Design and Construction• Facility Monitoring• Closure
44
![Page 45: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/45.jpg)
General Requirements
• Site Information• Facility Design and Construction• Facility Monitoring• Closure• No Discharge, No pollution
45
![Page 46: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/46.jpg)
Site Information
• Environmental • Soil, Geology, Surface Water, Groundwater, Wetlands,
Floodplains
• Real Property• Survey/Lease, Adjacent Owners, Receptors
46
![Page 47: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/47.jpg)
47
Wetlands Map
USGS Topographic Maphttp://nationalmap.gov/ustopo/index.html
Environmental Information
http://www.fws.gov/wetlands/
![Page 48: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/48.jpg)
48
Groundwater
Flood Mapshttp://msc.fema.gov
Environmental Information
http://wiid.twdb.state.tx.us
![Page 49: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/49.jpg)
49
Facility
A-125
Survey & Lease Plat / Copy of Lease
S. AVITTA-047
V. Lang A-126
T & N.O.R.R.C.O
1 inch = 500 feet
N
1.2 acres
![Page 50: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/50.jpg)
50
FacilityMr. & Mrs. Brown
123 Sesame StreetVictoria, TX
A B C D E
Count Chocula
456 Sugar DriveTransylvania, TX
F
Billy Madison911 Porsche CourtAustin, TX
Offset Landowners
![Page 51: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/51.jpg)
Notification
• Surface owner permission• Adjacent owner notification with copy of
application• Public notice in accordance with H.B. 480 of
the 79th Legislature– Notice of application in a newspaper of general
circulation in the county with affidavit– Once a week for two consecutive weeks
51
![Page 52: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/52.jpg)
Receptors within 500 feet
52
200 feet500 feet
300 feet
![Page 54: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/54.jpg)
Facility Design and Construction
• Facility Diagram• Storage
• Liner info, cross sections, capacities• Processing / Treatment
• Equipment• Flow Diagram of process• Chemicals & aggregates
• Stormwater Management• Contact / Non-contact areas• 24-hour, 25-year rainfall event
54
![Page 55: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/55.jpg)
55
500 500500
Storage Pit
Processing Pad
Equipment
Tanks
Facility Diagram
Dimensions
Office
6 in. thickconcrete
![Page 56: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/56.jpg)
Process Flow Diagram
56
Incoming waste tested and accepted
Storage Tank
Processing Equipment
Final testing prior to disposal
or reuse
Chemicals/Materials?
![Page 57: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/57.jpg)
Facility Monitoring
• Waste Acceptance Plan• RCRA-exempt only, no NORM, etc.• Sampling Procedures
• Product/Disposal Assurance• Disposal criteria – Paint filter / 5% TPH• Roadbase sampling – TxDOT• Fluids sampling – Determined by Reuse
• Inspection• Facility deterioration• Monitor Wells• Leak Detection Systems
57
![Page 58: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/58.jpg)
Facility Monitoring
• Waste Acceptance Plan• RCRA-exempt only, no NORM, etc.• Sampling
• Product/Disposal Assurance• Roadbase sampling – TxDOT• Fluids sampling – Determined by Reuse• Disposal criteria – Paint filter / 5% TPH
• Inspection• Facility deterioration• Monitor Wells• Leak Detection Systems
• Records58
![Page 59: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/59.jpg)
Closure
• Financial Security• Closure Cost Estimate (CCE) – Demo, Transport,
Disposal, Reclaim• Restrictive Covenant
• Removal of all equipment• Empty, Backfill, Compact any pits• Final Sampling
• Soil & GW• Recontour & reseed
59
![Page 60: Pits and Stationary Treatment Facilities: Application Information](https://reader035.fdocuments.us/reader035/viewer/2022062423/56814d90550346895dbaea00/html5/thumbnails/60.jpg)
STF Permitting Tips
• Closure Cost Estimates (CCE) should clearly explain every assumption
• Engineering and geological work products must be signed by their respective Texas-registered professionals
• All oil and gas waste and products should be stored in lined permitted or authorized pits, or above-ground storage tanks until reuse or disposal